Loading...
2014-04 RESOLUTION 2014-04 Illinois Department Resolution for Improvement by I Municipality Under the Illinois of Transportation Highway Code BE IT RESOLVED, by the President and Board of Trustees of the Council or President and Board of Trustees Village of Buffalo Grove Illinois City,Town or Village that the following described street(s) be improved under the Illinois Highway Code: Name of Thoroughfare Route From To See attached list BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of curb and gutter, base course restoration and resurfacing, design engineering and construction engineering and shall be constructed 35' and 27' B-B wide and be designated as Section 14-00104-00-RS 2. That there is hereby appropriated the (additional ❑ Yes ® No) sum of One million Dollars ( $1,000,000.00 )for the improvement of said section from the municipality's allotment of Motor Fuel Tax funds. 3. That work shall be done by contract ; and, Specify Contract or Day Labor BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the district office of the Department of Transportation. Approved I, Janet M. Sirabian, Village Clerk Clerk in and for the Village of Buffalo Grove City,Town or Village County of Cook and Lake , hereby certify the Date foregoing to be a true, perfect and complete copy of a resolution adopted by the President and Board of Trustees Council or President and Board of Trustees Department of Transportation at a meeting on January 20, 2014 Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 20th day of January, 2014 Regional Engineer (SEAL) City,Town,or Village Clerk Printed 1/16/2014 BLR 09111 (Rev. 11/06) VILLAGE OF BUFFALO GROVE,ILLINOIS 2014 VILLAGE WIDE CONTRACTUAL STREET MAINTENANCE PROGRAM EXHIBIT B PROTECT DESCRIPTION The streets included in the 2014 Street Improvements (approx.4.0 miles)are shown below: Street From To Golfview Ter. Dundee Rd. Buffalo Grove Rd. Raupp Blvd. Golfview Ter. St.Mary's Pkwy. St.Mary's Pkwy. Lincoln Ter. Raupp Blvd. E.Dundee Parkway End End Chenault Ct Golfview Ter. End Bristol Ln. Freemont Way Freemont Way Port Clinton Rd misc.200'section Morningside Ln W Hidden Lake Dr End Morningside Ln E Hidden Lake Dr End Autumn Ct Hidden Lake Dr End Blue Ash Dr. Sandalwood Rd. End Kingston Dr. Dunstan Ln. Blue Ash Dr. Butternut Dr. Kingston Dr. Whispering Oaks Dr, Daulton Dr./Court Foxford Dr. Butternut Dr. Foxford Dr. Buffalo Grove Rd. Daulton Dr. Dunstan Ln. Blue Ash Dr. Buffalo Grove Rd. The project will be funded with MFT funds and Village funds. SCOPE OF SERVICES We offer the following scope of services to complete design of the 2014 Street Improvements: • Meetings: Attend up to two meetings with the Village and one meeting with IDOT. • Cross Section Design: Design roadway cross sections at 100-foot intervals and all cross streets, driveways and cross-road culverts along Raupp Blvd. and St. Mary's Parkway.Compute earthwork calculations.Stage construction earthwork calculations are not anticipated. - I - BAXTE OODMAN Consulting Engineers