2014-04 RESOLUTION 2014-04
Illinois Department Resolution for Improvement by
I Municipality Under the Illinois
of Transportation Highway Code
BE IT RESOLVED, by the President and Board of Trustees of the
Council or President and Board of Trustees
Village of Buffalo Grove Illinois
City,Town or Village
that the following described street(s) be improved under the Illinois Highway Code:
Name of Thoroughfare Route From To
See attached list
BE IT FURTHER RESOLVED,
1. That the proposed improvement shall consist of curb and gutter, base course restoration and resurfacing,
design engineering and construction engineering
and shall be constructed 35' and 27' B-B wide
and be designated as Section 14-00104-00-RS
2. That there is hereby appropriated the (additional ❑ Yes ® No) sum of One million
Dollars ( $1,000,000.00 )for the
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
3. That work shall be done by contract ; and,
Specify Contract or Day Labor
BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the
district office of the Department of Transportation.
Approved I, Janet M. Sirabian, Village Clerk Clerk in and for the
Village of Buffalo Grove
City,Town or Village
County of Cook and Lake , hereby certify the
Date
foregoing to be a true, perfect and complete copy of a resolution adopted
by the President and Board of Trustees
Council or President and Board of Trustees
Department of Transportation at a meeting on January 20, 2014
Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this
20th day of January, 2014
Regional Engineer
(SEAL)
City,Town,or Village Clerk
Printed 1/16/2014 BLR 09111 (Rev. 11/06)
VILLAGE OF BUFFALO GROVE,ILLINOIS
2014 VILLAGE WIDE CONTRACTUAL STREET MAINTENANCE PROGRAM
EXHIBIT B
PROTECT DESCRIPTION
The streets included in the 2014 Street Improvements (approx.4.0 miles)are shown below:
Street From To
Golfview Ter. Dundee Rd. Buffalo Grove Rd.
Raupp Blvd. Golfview Ter. St.Mary's Pkwy.
St.Mary's Pkwy. Lincoln Ter. Raupp Blvd.
E.Dundee Parkway End End
Chenault Ct Golfview Ter. End
Bristol Ln. Freemont Way Freemont Way
Port Clinton Rd misc.200'section
Morningside Ln W Hidden Lake Dr End
Morningside Ln E Hidden Lake Dr End
Autumn Ct Hidden Lake Dr End
Blue Ash Dr. Sandalwood Rd. End
Kingston Dr. Dunstan Ln. Blue Ash Dr.
Butternut Dr. Kingston Dr. Whispering Oaks Dr,
Daulton Dr./Court Foxford Dr. Butternut Dr.
Foxford Dr. Buffalo Grove Rd. Daulton Dr.
Dunstan Ln. Blue Ash Dr. Buffalo Grove Rd.
The project will be funded with MFT funds and Village funds.
SCOPE OF SERVICES
We offer the following scope of services to complete design of the 2014 Street
Improvements:
• Meetings: Attend up to two meetings with the Village and one meeting with
IDOT.
• Cross Section Design: Design roadway cross sections at 100-foot intervals and all
cross streets, driveways and cross-road culverts along Raupp Blvd. and St.
Mary's Parkway.Compute earthwork calculations.Stage construction earthwork
calculations are not anticipated.