Loading...
2020-03 - FOR CALENDAR YEAR 2020 VILLAGE-WIDE STREET MAINTENANCE MOTOR FUEL TAX (IDOT FORM) - 01/21/2020 Hinds Departnrient Resolution for MaintenanceVAC Of Transportation Under the Illinois Highway Code o Y Resolution Number Resolution Type Section Number 2020 - 03 Original 20-00000-00-GM BE IT RESOLVED, by the President and Board of Trustees of the Village of Governing Body Type Local Public Agency Type Buffalo Grove Illinois that there is hereby appropriated the sum of One Million Seven Name of Local Public Agency Hundred Forty Two Thousand Two Hundred Forty Nine Dollars Dollars ($1,742,249.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of Illinois Highway Code from 01/01/20 to 12/31/20 . Beginning Date Ending Date BE IT FURTHER RESOLVED,that only those operations as listed and described on the approved Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution,are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED,that Village of Buffalo Grove Local Public Agency Type Name of Local Public Agency shall submit within three months after the end of the maintenance period as stated above,to the Department of Transportation, on forms available from the Department,a certified statement showing expenditures and the balances remaining in the funds authorized for expenditure by the Department under this appropriation, and BE IT FURTHER RESOLVED,that the Clerk is hereby directed to transmit four(4) ceritified originals of this resolution to the district office of the Department of Transportation. I Janet Sirabian Village Clerk in and for said Village Name of Clerk Local Public Agency Type Local Public Agency Type of Buffalo Grove in the State of Illinois,and keeper of the records and files thereof, as Name of Local Public Agency provided by statute,do hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the President and Board of Trustees of Buffalo Grove at a meeting held on 01/21/20 . Governing Body Type Name of Local Public Agency Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 21st day of January, 2020 Day Month,Year (SEAL) Clerk Signature APPROVED Regional Engineer Department of Transportation Date Printed 01/22/20 BLR 14220(Rev.02/08/19) MI 0 Illinois Department Local Public Agency General Maintenance OM of Transportation Estimate of Maintenance Costs Submittal Type Original Maintenance Period Local Public Agency County Section Number Beginning Ending Village of Buffalo Grove Cook 20-00000-00-GM 01/01/20 12/31/20 Maintenance Items Material Categories/ Total Maint Point of Delivery or Maintenance Maintenance Eng Insp. Work Performed by Operation Operation Category Req. an Outside Contractor Unit Quantity Unit Cost Cost Cost 1. Street Patching IIA No Labor HR 600 $35.00 $21,000.00 $21,000.00 IIA No Equipment HR 600 $56.44 $33,864.00 $33,864.00 2. Pothole Patching HA No Labor HR 1,000 $35.00 $35,000.00 $35,000.00 IIA No Equipment HR 1,000 $56.44 $56,440.00 $56,440.00 3. Street Sweeping IIA No Labor HR 1,000 $35.00 $35,000.00 $35,000.00 IIA No Equipment HR 1,000 $65.96 $65,960.00 $65,960.00 4. Pavement IIA No Labor HR 100 $35.00 $3,500.00 $3,500.00 Marking IIA No Equipment HR 100 $2.97 $297.00 $297.00 5. Road Salt IIA No Labor HR 200 $35.00 $7,000.00 $7,000.00 Application IIA No Equipment HR 200 $5.21 $1,042.00 $1,042.00 6. Snow Plowing IIA No Labor HR 1,500 $50.00 $75,000.00 $75,000.00 IIA No Equipment HR 1,500 $23.75 $35,625.00 $35,625.00 7. ROW Mowing IIA No Labor HR 100 $35.00 $3,500.00 $3,500.00 IIA No Equipment HR 100 $10.21 $1,021.00 $1,021.00 8.Salt Purchasing I No Road Salt TON 2,400 $70.00 $168,000.00 $168,000.00 9.Street Light I No Energy(ComEd) LSUM 1 $100,000.00 $100,000.00 $100,000.00 Energy 10. Street Patching IIB Routine Maint. (Bid) LSUM 1 $400,000.00 $400,000.00 $400,000.00 11. Sidewalk IIB Routine Maint. (Bid) LSUM 1 $200,000.00 $200,000.00 $200,000.00 Repair 12. Street Light IIB No Routine Maint. (Bid) LSUM 1 $220,000.00 $220,000.00 $220,000.00 Maint. 13.Traffic Signal IIB No Routine Maint. (Bid) LSUM 1 $80,000.00 $80,000.00 $80,000.00 Maint. 14. Pavement IIB No Routine Maint. (Bid) LSUM 1 $75,000.00 $75,000.00 $75,000.00 Marking 15. ROW Mowing IIB No Routine Maint. (Bid) LSUM 1 $0.00 16. Cracksealing IIB No Routine Maint. (Bid) LSUM 1 $50,000.00 $50,000.00 $50,000.00 17.Storm Sewer IIB Routine Maint. (Bid) LSUM 1 $75,000.00 $75,000.00 $75,000.00 Repair Total Operation Cost $1,742,249.00 Printed 01/22/20 Page 1 of 2 BLR 14222(Rev. 12/31/19) Estimate of Maintenance Costs Submittal Type Original Maintenance Period Local Public Agency County Section Beginning Ending Village of Buffalo Grove Cook 20-00000-00-GM 01/01/20 12/31/20 Estimate of Maintenance Costs Summary Maintenance MFT Funds Other Funds Estimated Costs Local Public Agency Labor $180,000.00 $180,000.00 Local Public Agency Equipment $194,249.00 $194,249.00 Materials/Contracts(Non Bid Items) $468,000.00 $468,000.00 Materials/Deliver&Install/Request for Quotations (Bid Items) Formal Contract(Bid Items) $900,000.00 $900,000.00 Maintenance Total $1,742,249.00 $1,742,249.00 Estimated Maintenance Eng Costs Summary Maintenance Engineering MFT Funds Other Funds Total Est Costs Preliminary Engineering Engineering Inspection Material Testing Advertising Bridge Inspection Engineering Maintenance Engineering Total Total Estimated Maintenance $1 ,742,249.00 $1,742,249.00 Remarks SUBMITTED Local Public Age y Offi ial Date 2- /aoa-0 Title APPROVED Village President Regional Engineer County Engineer/Superintendent of Highways Date Department of Transportation Date Printed 01/22/20 Page 2 of 2 BLR 14222 (Rev. 12/31/19)