Loading...
2017-19A RE SOLUTION APPROVING AN INTERGOVERNMENTAL AGREEMENT FOR A SANITARY SEWER FORCE MAIN INTERCONNECT AT THE PORT CLINTON SANITARY SEWER LIFT STATION WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois Constitution of 1970; and WHEREAS, Buffalo Grove owns and operates a sanitary sewer lift station on Port Clinton Road which is used for the collection and transportation of sanitary sewage within Buffalo Grove to a treatment facility operated by the County; and WHEREAS, The County operates a lift station at Teal Lane, and seeks to create a more efficient system for routing its sewage flow to the County's treatment facility by diverting the flow that runs through the Teal Lane lift station into Buffalo Grove's Port Clinton lift station,- and WHEREAS, Buffalo Grove's life station has additional capacity that can accommodate the flow the County seeks to divert; and WHEREAS,The County and the Village are authorized by the Illinois Intergovernmental Cooperation Act (SIC 220/1 et seg.) to enter into agreements such as this to perform jointly any governmental purpose or undertaking that either of the could do singularly. NOW THEREFORE BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS, that the Village President and Village Clerk are hereby authorized and directed to execute the AYES: 6 — Bennan,LlLrillin,, Stein, Otteiiheinier, Weidenfeld, Johnson NAYS: 0 - one ABSENT: 0 - one PASSED: May 15, 2017. APPROVED: May 15, 2017, APPROVED: Janet'V[. Sirabian, Village Clerk Lake County Illinois Text File File Number: 17-0402 Agenda Date: Version: 1 Status: Passed In Control: Public Works and Transportation Committee File Type: resolution 71ETTITM7131H.] Title Joint resolution authorizing an Intergovernmental Agreement for the Lake County's diversion of flow into Buffalo Grove's force main. Staff Summary • The Village of Buffalo Grove owns and operates its Port Clinton Lift Station and sanitary sewer force main on Port Clinton Road which discharges into the County's Des Plaines River Water Reclamation Facility. • The County owns and operates the Teal Lane Lift Station and sanitary sewer force main, which is located along Port Clinton Road, near the Village's lift station and force main. • The County sanitary sewer system, downstream from the Port Clinton and Illinois Route 83 area, has sewage capacity limitations that could be eliminated by diverting the Teal Lane Lift Station sewage flow into the Village's Port Clinton Lift Station and force main. • The Village's Port Clinton Lift Station and force main have excess capacity available accept the County's sewage flow. • The County will design and construct a new force main to divert the flow from the Te Lane Lift Station to the Port Clinton Lift Station. In addition, the County must reimbur the Village for recapture fees associated with the original construction of the Port Clinton Lift Station and pay users fees to the Village based upon the sewage flow int their lift station. • The proposed agreement is for 30 years. This sewage diversion will eliminate the ne for the County to perform extensive downstream improvements to its sewer systems. The cost to partner with Buffalo Grove is $780,000 as compared with an estimated $1,200,000 for the County to complete downstream improvements. • This sewage diversion will eliminate the need for the County to perform extensive downstream improvements to its sewer systems. I M WHEREAS, the County of Lake (County) owns and operates the Teal Lane Lift Station and associated sanitary sewer force main; and WHEREAS, the Village of Buffalo Grove (Village) owns and operates a sanitary sewer force main and lift station along Port Clinton Road which delivers sewage to the County's Des Plaines River Water Reclamation Facility within the Southeast Lake Facility Planning Area; and WHEREAS, the Village has available sewer capacity within its force main and lift Lake County Illinois Page 1 Printed on 511612017 station on Port Clinton Road and is willing to accept the sewage flow from th�-� County's Teal Lane Lift Station; and WHEREAS, in exchange for the use of the Village's force main and lift station, the County will connect to the Village's force main and pay recapture and user fees to ths- Village; and WHEREAS, execution of this Agreement must be authorized by resolution of this County Board. NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the Chair of the County Board and the Clerk of said County be and they are hereby authorized and directed to execute the attached Intergovernmental in the form substantially herein. 1—s—nTff -d—ay-0Y-A-p-r17X.'-*7 2017. Lake County Illinois Page 2 Printed on 5/16/2017 INTERGOVERNMENTAL AGREEMENT FOR THE COUNTY OF LAKE'S I DtVERSION OF FLOW tNTo BUFFALO GROVE'S PORT CLINTON LIFT LTATIO� This agreement is made under the Intergovernmental Cooperation Act, 5 ILCS 220/1 et seq., between the County of Lake, Illinois, an Illinois body politic and corporate ("County"), a I Buffalo Grove, Illinois, an Illinois municipal corporation ("Buffalo Grove"), and will become effective as provided in the terms below. a) The County has established a Department of Public Works under 55 IS 515-15001, et seq., for the purpose of performing the function of sewage disposal, among other purposes. b) Buffalo Grove owns and operates a sanitary sewer lift station on Port Clinton Road, as shown on Exhibit A, which is used for the collection and transportation of sanitary sewage within Buffalo Grove to a treatment facility operated by the County. c) The County operates a lift station at Teal Lane, and seeks to create a more efficient system for routing its sewage flow to the County's treatment facility by diverting the flow that runs throuali the Teal Lane lift station into Buffalo Grove's Port Clinton lift station. ,i) Buffalo Grove's life station has additional capacity that can accommodate the flow the County seeks to divert, as further specified in this agreement. No lift station modifications shall be provided by the Village to accommodate Lake County's discharge volume. e) The County and the Municipality are authorized by the Illinois Intergovernmental Cooperation Act (5 ILCS 220/1 et seq.) to enter into agreements such as this to perform jointly any governmental purpose or undertaking that either of them could do singularly. I) The role of Buffalo Grove herein is to act as a conduit so that the Lake County Department of Public Works can convey sewage to its treatment plant. The sewer service is being provided by the Lake County treatment plant and not by the Village of Buffalo Grove. In light of the foregoing, the parties now agree as follows: Agreement 2. Connection. The County shall divert its sewage flow into Buffalo's Grove's lift station by constructing a connection in the location as shown on Exhibit B and in accordance with the plans & specifications (Lake County Project #PW2017.21) dated 4/26/2017. The County agrees to construct the connection in a workmanlike manner according to plans the County will have designed and will set out for bid. All costs, whether for design or construction of the connection, shall be paid by the County. U 3. RecaptureUpon execution of this agreement, the County agrees to pay $153,477.16 (as calculated through June 1, 2017) to Buffalo Grove, which is a recapture fee that Buffalo Grove will remit to the parties with which it has a recapture agreement. The County will make payment within 30 days of the execution of this agreement. In the event that the County fails to pay the recapture fee within a reasonable time, the County will pay any such additional cost as may be accrued through the payment date. 4. Volume. The volume of material the County will deliver into the force main from the Teal Lane lift station will not exceed an annualized average flow of 80,000 gallons per day, and a peak flow of 225,000 gallons per day. The County anticipates this volume to remain relatively stable and will provide annual data to Buffalo Grove upon request. This agreement is limited to the area currently served by the Teal Lane Lift Station as shown on Exhibit C. Any ?vriew-c4 zY4 a)rjrT fim any expansion. 5. Sewer Fees. The County shall pay to the Village a sewer fee of $1.18/1,000 gallons (or such future amount as stated by the Village of Buffalo Grove Municipal Code) for the use the Village conveyance system. Such fees will be paid quarterly and based upon sewer flow data supplied by the County. 6. Maintenance. Lake County will be responsible for the maintenance, repair and replacement of all facilities up to and including the connection the Buffalo Grove lift station. If to Buffalo Grove: "'t-40y" 50 Raupp Blvd. Buffalo Grove, IL 60081 Attn: Village Manager If to the County: Lake County Department of Public Works 650 Winchester Road Libertyville, Illinois 60046 Attn: Director of Public 8. Governing law; venue. The laws of Illinois, without giving effect to principles conflict of laws, govern all matters arising under this agreement, including all tort claims, and lawsuits shall be brought only in the Nineteenth Judicial Circuit of Lake County, Illinois. I 9. Severability. If any provision of this agreement is unenforceable to any exte the remainder of this agreement (or application of that provision to any persons or eircumstanc other than those as to which it is held un;lQn and will be enforceable to the fullest extent permitted by law. 0 10. Modification; Entire Agreement. No amendment of this agreement will be effective unless it is in writing and signed by the parties. This agreement constitutes the entire agreement of the varties relating to the %ral or written agreements. II. Term; Effective Date; Renewal. The term of this agreement will be 30 years from its effective date. This agreement will become effective when all the parties have signed The date this agreement is signed by the last party to sign it (as indicated by the date associated with that party's signature) will be deemed the date of this agreement. If a party signs but fails to date a signature, the date that the other party receives the signing party's signature will be deemed to be the date that the signing party signed this agreement, and the other party may inscribe that date as the date associated with the signing party's signature. This agreement may be renewed upon written agreement by both parties. Such notice shall be communicated no less than three years preceding the termination date. 12. Termination. This agreement may be terminated upon the expiration of the initial term provided that the terminating party provides three years advanced notice of their intent to terminate. 13. Detrimental Impact. Should the existence of the connection as specified in this agreement have a materially detrimental impact on the Buffalo Grove lift station, provided that the Buffalo Grove lift station is functioning properly, Buffalo Grove shall work with the County to engineer a solution to the problem, at the County's expense. If, after 120 days it is determined that no engineering solution is practicable from an engineering or financial standpoint, then either party shall have the right to terminate this agreement. In the event of such tennination, Lake County, at its own expense, shall abandon in place its connection. For the purpose of this paragraph, a "materially detrimental impact" is something that undennines the operational integrity of the lift station to an extent that requires maintenance, repair or replacement beyond that which would be ordinary for such sewer facilities. 14. Counterparts. The parties may sign this agreement in several counterparts, each of which will be deemed an original but all of which together will constitute one instrument. [Signature Page Follows] 3 W��M By:_ ch i q-ntn LakC/nty Board Avest: Date By: Village President Attest: Villa g'�re-CJerk SP (,/I I Date 0 EXHIBIT A J. BUFFALO GROVE FORCE MAIN 0 Buffalo Grove Manhole LCPW Manhole 13 Buffalo Grove Lift Station A LCPW Lift Station TEALLANE ...... Buffalo Grove Gravity Main LCPW Gravity Main LIFT STATION Buffalo Grove Force Main (LAKE COLJNTY�.. Do LCPW Force Main Map ID: 2413 o PORT CLINTON LIFT STATION )f PEE RD RAINTREE C.), 00 G if Club CP CID ASH DR 16 ' / Location of Connection =go]"c"C" .1801 0 Buffalo Grove Manhole * LCPW Manhole Buffalo Grove Lift Station A LCPW Lift Station Buffalo Grove Gravity Main LCPW San Sewer Valve —p— Buffalo Grove Force Main LCPW Gravity Main LCPW Force Main Proposed 6" gate valve in vault. .) .) - ) --0 3 - Y ) -) -) F m 0 ;o Proposed 6" gate valve in vault. CLINTON RD 14" FOR - - BUFFALO GROVE PORT CLINTON LIFT STATION Proposed connection to existing Buffalo Grove Manhole 7; UJ W IX z >1 J, La ke o u n t Y Ueparlment of Pul,flic, VVIwks V� 0. CE I I AINTREE C1 P CAt S 0 < Aerial View of Area Served LAKE COUNTY PUBLIC WORKS DEPARTMENT. PROJECT NUMBER PW2017.021 PROPOSEDIMPROVEMENTS FOR THE LAKE COUNTY PUBLIC WORKS BUFFALO GROVE SANITARY SEWER STANDARD SYMBOLS INTERCONNECTION PROJECT EXISTING INDEX OF SHEETS PART OF SECTION 17, T 43 N, R 1 1 E (A =l`TNF :kNNOII (N.H.) OR -OUT (C.O.) VILLAGES OF BUFFALO GROVE 8c LONG GROVE ® 1 N 114 Evam oscn 1. nnE sHEEr LAKE COUNTY, ILLINOIS urcx BnsIN (c.B.) Jx 3. PROJECT SPEC1HCATONS — QNE.) G. UT., PLPN ON (F.E .) 6M E BOx VPLVE ® k Box (V.B.) VPLVE A VPLLi (V.V.) n R xT (N D.) NUL MBORE — o STREET F— JOLOY iT YPRD NOHT c q-b SiREEf DGHi .. o R O W NUiN' N PROPERTY RON "I .0. RCRE mSH Q Q BU�S�HEE Ex DITCH �wu Eev� BNeTNiY SEWER a •° "-"—�e'ru� FORCENNN �' •°." „ .��.° „ :ram saxN NUN BEWm CALL HAN e wnTm —a — JULIE — — 8 R 110NE CP&E 48 hour W �` "S,v 1 S, i ,..,, ElEC1RMu Cn81E BEFORE YOU DIG BENCHMARKS Es H EDisi mH me NORTl— C—ER 1+ x1a'Orvr. 771 'Nra O v z OF BRIDGE, CROSBNG INDWI CREEK ON THE 7BOCU Tol ROAD. E, SOUTH ElEVnnON = e)8.88 LOCATION MAP°BPS R Nx FOR IDOInON11 BENCH— SEE „ UTUTY PVN SHEET 16-1) i �f mo o+ Ex IIIEE IJ-Oo-» °'oGw" GREENGARD INC. NaNE LCPW-BUFFALO GROVE SANITARY INNTERCONNECTION �.eom lays s°to >>o 56003 a.a . ven vuroe or eunr,o o°wc wonmrno wnw ou W. Uo69 l q arm . x v ° 623 owwv 7" " _ TITLE SHEET � To-. a, :. o:e. v,a:... a°x. a oop 1 a 3 GENERAL NOTES UNDERGROUND UTILITIES UNDERGROUND UTILITIES vll Or- zx ® GixEEiv Gazxn INC. u. NONE LCPW—BUFFALO GROVE SANITARY INNTERCONNECTION woos 2 PROJECT SPECIFICATIONS 611 VALVE & VAULT -1 5" VALVE & VAULT -2 onxro�I L EX. SANITARY MANHOLE -3 w xx L A %4DIAN CREEK .......... - TREE PROTECTION DETAIL M1.1-111 V.TLlV%llW 711 M111441 a=1111— PAVEMENT PATCH DETAIL LEGEND 0 GROVE SANITARY INNTERCONNECTION UTILITY PLAN