1997-32RESOLUTION NO. 97- 32
A RESOLUTION APPROVING A LETTER AGREEMENT FOR
ENGINEERING SERVICES RELATED TO PRELIMINARY IMPROVEMENT STUDIES
OF THE BUFFALO GROVE ROAD/PORT CLINTON ROAD/PRAIRIE ROAD AND
WEILAND ROAD/PRAIRIE ROAD CORRIDORS
WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois
Constitution of 1970; and,
WHEREAS, the Village desires to adopt an agreement for the provision of necessary
engineering services which are required to perform certain preliminary engineering studies related to the
Weiland Road/Prairie Road and Buffalo Grove Road/Port Clinton Road /Prairie Road corridors;
NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES
OF THE VILLAGE OF BUFFALO GROVE, LAKE AND COOK COUNTIES, ILLINOIS as follows:
Section 1: The attached June 26, 1997 Letter Agreement, RE: "Improvement Staging Plans and
Construction Cost Estimates; Buffalo Grove Road - IL Route 83 to North Village Limit;
Weiland/Prairie Road - Lake -Cook County Line to IL Route 22" is hereby approved.
Section 2: The Village Manager is hereby authorized and directed to execute the Letter Agreement.
A copy of said agreement is attached hereto and made a part hereof.
AYES: 5 - Marienthal, Reid, Rubin, Hendricks, Glover
NAYES: 0 - None
ABSENT: 0 - None
PASSED: October 6 , 1997
APPROVED: October 6
ATTEST:
rj adA
1*!- -
G:\PWDIRGRP\LHC\TRANSPRT\0922RES.WPD
1997
. • I i . .
•
.� CIVILTECH
ENGINEERING, INC.
500 PARK BOULEVARD • SUITE 250 • ITASCA, ILLINOIS 60143 -1297
(630) 773 -3900 • FAX (630) 773 -3975
June 26, 1997
Mr. Gregory P. Boysen, P.E.
Director of Public Works
Village of Buffalo Grove
51 Raupp Boulevard
Buffalo Grove, Illinois 60090
fl��K �� °az �tlw,iw
13.1
VILLACr OF BUFFALO GROVE I
I-- I
JLN3 0'l'
PUSysA 'A 0 �K
Reference: Improvement Staging Plans and Construction Cost Estimates
Buffalo Grove Road - IL Route 83 to North Village Limit
Weiland/Prairie Road - Lake -Cook County Line to IL Route 22
Dear Mr. Boysen:
In accordance with your request, we have prepared a scope of work and estimate of fee to prepare
improvement staging plans and construction cost estimates for improvements to Buffalo Grove Road
from Illinois Route 83 to the northern Village limit and for Weiland Road/Prairie Road from the
Lake -Cook County line to Illinois Route 22. The improvements would be those outlined in the
Jurisdictional Transfer Agreement for those routes dated June 13th, 1995 with Lake County.
Following is our proposed scope of work for each route.
A. SCOPE OF WORK
Buffalo Grove Road
Because the ultimate roadway geometrics and right -of -way requirements for Buffalo Grove Road
have been largely determined, the scope of work for this route will consist primarily of estimating
construction costs for completion of a 4 -lane improvement along the study limits. The anticipated
construction staging is as follows:
Stage I - Construct 3 -lane improvement at Port Clinton Road and Prairie Road to
provide a continuous roadway between the west leg of Port Clinton to the
north leg of Prairie including the realignment of the south and east legs of the
existing intersection to form a "T" intersection with Buffalo Grove Road as
well as an expanded railroad crossing with the Wisconsin Central Railroad.
Mr. Gregory P. Boysen, P.E.
Page 2 of 7
Stage IIA - Construct an additional travel lane in each direction on Buffalo Grove Road
between Illinois Route 83 and Aptakisic Road.
Stage IIB - Construct an additional travel lane in each direction on Buffalo Grove Road
between Aptakisic Road and Illinois Route 22.
Stage IIC - Construct an additional travel lane in each direction on Buffalo Grove Road
between Illinois Route 22 and the north Village limit.
The Stage II construction will include completion of an enclosed drainage system, continuous
sidewalk and bikeway systems and a highway lighting system along the length of Buffalo Grove Road.
The scope of services is as follows:
1. Drainage Concept Plan - Prior to estimating construction costs for each stage, a
preliminary study of the stormwater detention requirements specified in the Lake
County Watershed Development Ordinance will be performed in order to develop a
drainage concept plan for the route. If stormwater detention outside the existing
right -of -way is recommended, potential detention sites and approximate sizes will be
identified (NOTE: The work effort required for this task will depend upon how much
of the detention requirement the Village has already satisfied through off - right -of -way
storage facilities).
2. Utility Relocation Plan - The study will include an evaluation of existing utilities
within the right -of -way to identify potential utility relocations that would be required
prior to widening the roadway. This evaluation will be based upon existing public and
private utility atlas information and will not include field verification of actual
locations or depths of utilities.
3. Construction and Engineering Cost Estimate - The study will estimate the
construction costs for each construction stage based on 1997 unit prices. The study
will also include an estimate of Phase 2 and Phase 3 engineering costs associated with
each stage.
4. Cost Participation Table - The study will include preparation of a cost participation
table outlining estimated Village and County costs for major work items such as
roadway, drainage, sidewalks/bikeways, street lighting, traffic signals, landscaping,
etc.
5. Schematic Improvement Plan - The study will include preparation of a 1" = 100'
scale aerial plan exhibit that schematically depicts the various construction stages and
outlines the limits of proposed pavement widening.
Mr. Gregory P. Boysen, P.E.
Page 3 of 7
6. Summary Report - Finally, the scope of work will include preparation of a short
Summary Report which presents the basic design assumptions, drainage concept plan,
utility relocation plan, schematic improvement plan, construction cost estimates by
construction stage and the cost participation table.
Weiland/Prairie Road
The Jurisdictional Transfer Agreement does not specify the scope of the ultimate improvements to
Weiland or Prairie Roads, stating simply that improvements may be constructed in one or more stages
and that these improvements would consist of either: (1) reconstruction and /or rehabilitation and
widening of the existing pavement to provide a typical County 5 -lane improvement, or (2)
reconstructing and/or rehabilitating in whole or in part the existing 2 -lane pavement. The Agreement
also mentions the possibility of constructing the Weiland Road/Prairie Road Connection which would
directly connect Weiland Road to Prairie Road in an S -curve alignment north of Aptakisic Road.
According to the Agreement, the Village has the sole authority to determine the need for and the
alignment of the connection.
Based upon the above uncertainties, we believe the ultimate improvement concept for Weiland/Prairie
Road (i.e. number of lanes) must first be established. We propose to base this concept upon a traffic
study which quantifies existing traffic volumes, develops design hourly volumes from CATS 2020
traffic forecasts and identifies intersection channelization needs based on design year intersection
capacity analyses.
The anticipated construction staging for Weiland/Prairie Road improvements is as follows:
Stage I - Construct 3 -lane improvement, possibly with a temporary traffic signal
installation, at the Weiland Road/Pauline Avenue intersection primarily within
the existing right -of -way.
Stage IIA - Improve Weiland Road between Lake -Cook Road and Busch Road.
Stage IIB - Improve Weiland Road between Busch Road and Aptakisic Road.
Stage IIC - Improve Weiland Road/Prairie Road between Aptakisic Road and Illinois
Route 22 including the Weiland/Prairie Connector.
The Stage II construction will include completion of an enclosed drainage system, continuous
sidewalk and bikeway systems and a highway lighting system along the length of Weiland and Prairie
Roads.
Mr. Gregory P. Boysen, P.E.
Page 4 of 7
The scope of services is as follows:
1. Traffic Study - This work item will include conducting manual peak hour counts and
24 -hour machine counts at the following locations:
A.M. and P.M. Peak Hour Manual Counts -
Lake -Cook Road/Weiland Road
Busch Road/Weiland Road
Aptakisic Road/Weiland Road
Aptakisic Road/Prairie Road
Prairie Road /Illinois Route 22
24 -hour Machine Traffic Counts -
- Weiland Road between Lake -Cook and Busch
- Weiland Road between Busch and Aptakisic
- Aptakisic Road between Weiland and Prairie
- Prairie Road between Aptakisic and IL Route 22
This work item will also include obtaining CATS 2020 traffic forecasts for Weiland
and Prairie Road and developing design hourly volumes for all 5 intersections, as well
as performing intersection capacity analyses to define channelization and storage
requirements.
2. Drainage Concept Plan - Prior to estimating construction costs for each stage, a
preliminary study of the stormwater detention requirements specified in the Lake
County Watershed Development Ordinance will be performed in order to develop a
drainage concept plan for the route. If stormwater detention outside the existing
right -of -way is recommended, potential detention sites and approximate sizes will be
identified. (NOTE: The work effort required for this task will depend upon how
much of the detention requirement the Village has already satisfied through off -right-
of -way storage facilities).
3. Utility Relocation Plan - The study will include an evaluation of existing utilities
within the right -of -way to identify potential utility relocations that would be required
prior to widening the roadway. This evaluation will be based upon existing public and
private utility atlas information and will not include field verification of actual
locations or depths of utilities.
4. Construction and Engineering Cost Estimate - The study will estimate the
construction costs for each construction stage based on 1997 unit prices. The study
will also include an estimate of Phase 2 and Phase 3 engineering costs associated with
each stage.
Mr. Gregory P. Boysen, P.E.
Page 5 of 7
5. Cost Participation Table - The study will include preparation of a cost participation
table outlining estimated Village and County costs for major work items such as
roadway, drainage, sidewalks/bikeways, street lighting, traffic signals, landscaping,
etc.
6. Schematic Improvement Plan - The study will include preparation of a V = 100'
scale aerial plan exhibit that schematically depicts the ultimate improvements within
various construction segments and outlines the limits of proposed pavement widening.
7. Summary Report - Finally, the scope of work will include preparation of a short
Summary Report which presents the basic design assumptions, drainage concept plan,
utility relocation plan, schematic improvement plan, construction cost estimates by
construction stage and the cost participation table.
B. MANHOUR AND DIRECT COST ESTIMATE
Following is our manhour and direct cost estimate for scope of work for each route which was
detailed above.
• Buffalo Grove Road
Direct Costs
104 hrs.
$1,250
Work Item
Manhours
Direct Costs
1.
Drainage Concept Plan
148 hrs.*
-0-
2.
Utility Relocation Plan
85
-0-
3.
Construction Cost Estimate
140
-0-
4.
Cost Participation Table
16
-0-
5.
Schematic Improvement Plan
40
-0-
6.
Summary Report
24
-0-
TOTALS
453 hrs.
-0-
* 74 hrs. if substantial off - ri ght -of -way detention is already provided (deduction
of 74 hrs.).
• Weiland/Prairie
Road
Work Item
1. Traffic Study
2. Drainage Concept Plan
3. Utility Relocation Plan
Manhours
Direct Costs
104 hrs.
$1,250
172 **
-0-
85
-0-
** 129 hrs. if substantial off - right -of -way detention is already provided
(deduction of 43 hrs.).
0
Mr. Gregory P. Boysen, P.E.
Page 6 of 7
Work Item
4. Construction Cost Estimate
5. Cost Participation Table
6. Schematic Improvement Plan
7. Summary Report
TOTALS
C. ESTIMATE OF FEE
0
Manhours
164
18
80
24
647 hrs.
Direct Costs
-0-
-0-
-0-
-0-
$1,250
We propose to perform the work on the basis of cost plus a fixed fee with a not -to- exceed maximum.
The fee will include reimbursement of direct labor costs, overhead, fringe benefit and salary burden
costs, plus a net fee for profit. Direct expenses will be reimbursed at their actual cost. The upper
limit of compensation is $69,360 based upon the fee calculation shown below.
Fee Estimate:
1,100 hrs. X $24.00 (Avg. Hrly. Rate) x 2.58 = $68,110.
Direct Costs - Machine Traffic Counts = $ 1,250.
TOTAL =
$69,360.
Once existing off - right -of -way detention provisions are quantified, it is likely that reductions in the
maximum hours required for the Drainage Concept Plans for both Buffalo Grove Road and
Weiland/Prairie Roads can be made. We estimate these deductions to range up to $4,600 for Buffalo
Grove Road and up to $2,700 for Weiland/Prairie Roads for a total reduction in the upper limit of
compensation of $7,300. Once data collection is completed, we propose to adjust the upper limit of
compensation for the contract.
Mr. Gregory P. Boysen, P.E.
Page 7 of 7
D. SCHEDULE
We proposed to complete the Improvement Staging Plans and Construction Cost Estimates within
4 months from the date of authorization to proceed and the receipt of data. We thank you for the
opportunity to submit this proposal and look forward to the possibility of assisting the Village of
Buffalo Grove on this planning study. If this Proposal/Agreement is acceptable, please execute below
and return one copy to us.
Accepted By:
Title:
Date:
Very truly yours,
CIVILTECH ENGINEERING, INC.
Robert J. Andres, P.E.
RESOLUTION NO. 97- 32
A RESOLUTION APPROVING A LETTER AGREEMENT FOR
ENGINEERING SERVICES RELATED TO PRELIMINARY IMPROVEMENT STUDIES
OF THE BUFFALO GROVE ROAD/PORT CLINTON ROAD/PRAIRIE ROAD AND
WEILAND ROAD/PRAIRIE ROAD CORRIDORS
WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois
Constitution of 1970; and,
WHEREAS, the Village desires to adopt an agreement for the provision of necessary
engineering services which are required to perform certain preliminary engineering studies related to the
Weiland Road/Prairie Road and Buffalo Grove Road/Port Clinton Road/Prairie Road corridors;
NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES
OF THE VILLAGE OF BUFFALO GROVE, LAKE AND COOK COUNTIES, ILLINOIS as follows:
Section 1: The attached June 26, 1997 Letter Agreement, RE: "Improvement Staging Plans and
Construction Cost Estimates; Buffalo Grove Road - IL Route 83 to North Village Limit;
Weiland/Prairie Road - Lake -Cook County Line to IL Route 22" is hereby approved.
Section 2: The Village Manager is hereby authorized and directed to execute the Letter Agreement.
A copy of said agreement is attached hereto and made a part hereof.
AYES: 5 - Marienthal, Reid, Rubin, Hendricks, Glover
NAYES: 0 - None
ABSENT: 0 - None
PASSED: October 6 , 1997
APPROVED: October 6 , 1997
ATTEST:
04a W %-o"
ViW Clerk
G:\PWDIRGRP\LHC\TRANSPRT\0922RES.WPD
ITEM XII. (B)
XIII. (A)
TO: William R. Balling
Village Manager
FROM: Gregory P. Boysen
Director of Public Works
DATE: September 25, 1997
SUBJECT: . Buffalo Grove /Lake County Transportation Agreement
In follow -up to your September 23rd memo and our recent discussions, I am transmitting a copy
of the agreement entitled "Agreement Between the County of Lake and the Village of Buffalo
Grove for the Roadway Improvements, Maintenance Responsibilities and Jurisdictional
Transfers of Busch Road /Parkway and Deerfield Parkway; Buffalo Grove Road/Port Clinton
Road /Prairie Road; Weiland; and Prairie Road" dated June 13, 1995. This agreement was
adopted by Buffalo Grove Resolution No. 95 -44 which was approved on June 5, 1995.
I have also attached a copy of the agreement entitled "An Agreement Between the Village of
Buffalo Grove, the Village of Lincolnshire and the Village of Vernon Hills Concerning the
Buffalo Grove Road/Prairie Road (Port Clinton Road to U.S. Route 45) Street Alignment" dated
January 18, 1992 which was approved by Buffalo Grove Resolution No. 93 -2 which was
approved on January 18, 1993.
Mr. Delmer Powell, Director of Planning and Programming of the Lake County Division of
Transportation indicated this morning that a letter will be provided later this week in follow -up to
the Village Board's discussion as we had requested of the County's Director of Transportation
last week.
I believe that the attached material and the letter which should be available later this week
provides all information which the Village Board members requested as prerequisite for
proceeding with initiating right -of -way acquisition activities and performing engineering studies
of the Weiland /Prairie and Buffalo Grove /Port Clinton Road/Prairie Road corridors as previously
recommended in my memorandum dated September 2nd.
If you have any questions concerning this matter, please let me know.
G: \P WDIRGRP \LHC \LAKECTY\09257WRB. WPD
� o LakeCount
74f
Buffalo Grove Transportation Agreement
Buffalo Grove Road/Port Clinton Road/Prairie Road
Stage I InterseWon Improvement
Village Right -of Way Acquisition
October 1, 1997
The Honorable Sidney H. Mathias
President, Village of Buffalo Grove
50 Raupp Boulevard
Buffalo Grove, IL 60089
Dear President Mathias:
Division of Transportation
Martin G. Buehler, P.E.
Director of Trmsportation/County Engineer
600 West Winchester Road
Libertyville, Illinois 60048 -1391
Phone 947 382 3960
Fax 947 362 5290
Pursuant to that certain "ACRtEEM NT BETWEEN THE COUNTY OF LAKE AND THE
VMLAGE OF BUFFALO GROVE FOR THE ROADWAY DdFROVEvENT, MARVTENANCE
RBSPONSIBIl XrMS AND JURISDICTIONAL TRANSnIRS OF BUSCH ROAD/PARKWAY
AND E B1tFIIR:D PARKWAY; BUFFALO GROVE ROAD/PORT CUNTON ROAD/PRAmm
ROAD; WE LAND ROAD AND PRAMM ROAD" dated June 13,1995 (commonly ,known as the
`Buffalo Grove Transportadan Agreement"), the Division of Transportation has, in its 1997-2001
PROPOSED IHG WAY DdPROVEhfl NT PROGRAX made provisions for funding for the
OffinS -0f-`W8Y 80T"M and fiction of the Stage I Improvement of the intersection
ofBuffato Grove Road/Port Clinton Road/Praillie Road.
The Division of Transportation anticipates initiation of the selection process for a professional
consulting engineering firm during the upcoming winter months. I understand that the V&V is
contemplating action to begin the aoq=tion process of the pare of land in the northwest quadrant
ofthe itrtersection. This action is consistent with the provisions of Section IQ.C.2.a. of the Buffalo
Grove Tisnsportadon Ammment. Acquisition of this parcel by the Village is a key factor in moving
tlils project forward towards completion and I would encourage the Village to proceed at this time.
Should you have any questions, or require any additional information, please contact
Mr. Delmer Powell of my staff
Very tnily Yours,
l n G. Bu er P.E.
wr. f Tt'en$portation/
County Engineer
cc: William R Balling, Village Manager, Village of Buffalo Grove
Gregory P. Boysen, P.B., DircMr ofPuNc Works, Village of Buffalo Grove
TO: William R. Balling
Village Manager
FROM: Gregory P. Boysen
Director of Public Works
DATE: September 2, 1997
SUBJECT: Weiland Road/Prairie Road and
Buffalo Grove Road/Port Clinton Road/Prairie Road
Corridor Improvements
In follow -up to the Village Board's discussion at their July 21 st meeting, the following items are now
recommended for Village Board action at their next regular meeting scheduled for Monday, September
22, 1997:
Approval of the attached draft resolution entitled "A Resolution Approving a Letter Agreement
for Engineering Services Related to Preliminary Improvement Studies of the Buffalo Grove
Road/Port Clinton Road/Prairie Road and Weiland Road /Prairie Road Corridors" and waiver of
bids for the involved professional consulting service,
2. Authorize the initiation of land acquisition required for the improvement of the intersection of
Port Clinton Road and Prairie Road.
As discussed at the July 21st Village Board meeting, this recommendation is being made at this time
since the expense requirements for the Busch Parkway and Deerfield Parkway Intersection Improvement
are now better defined. The Busch and Deerfield contract is now proceeding to award to the low bidder,
Greco Contractors, Inc., in the amount of $1,596,389.46 which is $191,611.00 below the engineer's
estimate of $1,788,000.00. Also, Federal grant reimbursement paperwork for this project's recently
completed ROW acquisitions has now been completed and the involved $366,400 reimbursement is now
expected to occur soon within the current fiscal year. The funding originally designated for the
Busch/Deerfield project in the FY97 -98 budget is now projected to be sufficient to complete the two
above recommended items in addition to funding the Village's remaining expenses for the Busch and
Deerfield Intersection Improvement.
If you ha4 any questions concerning this matter, please let me know.
P.
attachment
cc: Richard K. Kuenkler, Village Engineer
G:\PWDIRGRP\LHC\TRANSPRT\0902WRB.WPD
®CIVILTECH
ENGINEERING, INC.
500 PARK BOULEVARD • SUITE 250 • ITASCA. ILLINOIS 60143 -1297
(630) 773 -3900 * FAX (630) 773 -3975
June 26, 1997
Mr. Gregory P. Boysen, P.E.
Director of Public Works
M lage of Buffalo Grove
51 Raupp Boulevard
Buffalo Grove, Illinois 60090
;VILLM' OF SIJFFALO GROVE
. N3009T
Reference: Improvement Staging Plans and Construction Cost Estimates
Buffalo Grove Road - Q. Route 83 to North Village Limit
Weiland/Prairie Road - Lake -Cook County Line to EL Route 22
Dear Mr. Boysen:
In accordance with your request, we have prepared a scope of work and estimate of fee to prepare
improvement staging plans and construction cost estimates for improvements to Buffalo Grove Road
from Illinois Route 83 to the northern Village limit and for Weiland Road/Prairie Road from the
Lake -Cook County line to Illinois Route 22. The improvements would be those outlined in the
Jurisdictional Transfer Agreement for those routes dated June 13th, 1995 with Lake County.
Following is our proposed scope of work for each route.
A. SCOPE OF WORK
Buffalo Grove Road
Because the ultimate roadway geometrics and right -of -way requirements for Buffalo Grove Road
have been largely determined, the scope of work for this route will consist primarily of estimating
construction costs for completion of a 4 -lane improvement along the study limits. The anticipated
construction staging is as follows:
Stage I - Construct 3 -lane improvement at Port Clinton Road and Prairie Road to
provide a continuous roadway between the west leg of Port Clinton to the
north leg of Prairie including the realignment of the south and east legs of the
existing intersection to form a "T" intersection with Buffalo Grove Road as
well as an expanded railroad crossing with the Wisconsin Central Railroad.
Mr. Gregory P. Boysen, P -E.
Page 2 of 7
Stage IIA - Construct an additional travel lane in each direction on Buffalo Grove Road
between Illinois Route 83 and Aptakisic Road.
Stage IIB - Construct an additional travel lane in each direction on Buffalo Grove Road
between Aptakisic Road and Illinois Route 22.
Stage IIC - Construct an additional travel lane in each direction on Buffalo Grove Road
between Illinois Route 22 and the north Village limit.
The Stage II construction will include completion of an enclosed drainage system, continuous
sidewalk and bikeway systems and a highway lighting system along the length of Buffalo Grove Road.
The scope of services is as follows:
1. Drainage Concept Plan - Prior to estimating construction costs for each stage, a
preliminary study of the stormwater detention requirements specified in the Lake
County Watershed Development Ordinance will be performed in order to develop a
drainage concept plan for the route. If stormwater detention outside the existing
right -of -way is recommended, potential detention sites and approximate sizes will be
identified (NOTE: The work effort required for this task will depend upon how much
of the detention requirement the Village has already satisfied through off - right -of -way
storage facilities).
2. Utility Relocation Plan - The study will include an evaluation of existing utilities
within the right -of -way to identify potential utility relocations that would be required
prior to widening the roadway. This evaluation will be based upon existing public and
private utility atlas information and will not include field verification of actual
locations or depths of utilities.
3. Construction and Engineering Cost Estimate - The study will estimate the
construction costs for each construction stage based on 1997 unit prices. The study
will also include an estimate of Phase 2 and Phase 3 engineering costs associated with
each stage.
4. Cost Particip ation Table - The study will include preparation of a cost participation
table outlining estimated Village and County costs for major work items such as
roadway, drainage, sidewalks/bikeways, street lighting, traffic signals, landscaping,
etc.
5. Schematic Improvement Plan - The study will include preparation of a 1" = 100'
scale aerial plan exhibit that schematically depicts the various construction stages and
outlines the limits of proposed pavement widening.
Mr. Gregory P. Boysen, P.E.
Page 3 of 7
6. Summary Report - Finally, the scope of work will include preparation of a short
Summary Report which presents the basic design assumptions, drainage concept plan,
utility relocation plan, schematic improvement plan, construction cost estimates by
construction stage and the cost participation table.
Weiland/Prairie Road
The Jurisdictional Transfer Agreement does not specify the scope of the ultimate improvements to
Weiland or Prairie Roads, stating simply that improvements may be constructed in one or more stages
and that these improvements would consist of either: (1) reconstruction and/or rehabilitation and
widening of the existing pavement to provide a typical County 5 -lane improvement, or (2)
reconstructing and/or rehabilitating in whole or in part the existing 2 -lane pavement. The Agreement
also mentions the possibility of constructing the Weiland Road/Prairie Road Connection which would
directly connect Weiland Road to Prairie Road in an S -curve alignment north of Aptakisic Road.
According to the Agreement, the Village has the sole authority to determine the need for and the
alignment of the connection.
Based upon the above uncertainties, we believe the ultimate improvement concept for Weiland/Prairie
Road (i.e. number of lanes) must first be established. We propose to base this concept upon a traffic
study which quantifies existing traffic volumes, develops design hourly volumes from CATS 2020
traffic forecasts and identifies intersection channelization needs based on design year intersection
capacity analyses.
The anticipated construction staging for Weiland/Prairie Road improvements is as follows:
Stage I - Construct 3 -lane improvement, possibly with a temporary traffic signal
installation, at the Weiland Road/Pauline Avenue intersection primarily within
the existing right -of -way.
Stage HA - Improve Weiland Road between Lake -Cook Road and Busch Road.
Stage IM - Improve Weiland Road between Busch Road and Aptakisic Road.
Stage IIC - Improve Weiland Road/Prairie Road between Aptakisic Road and Illinois
Route 22 including the Weiland/Prairie Connector.
The Stage II construction will include completion of an enclosed drainage system, continuous
sidewalk and bikeway systems and a highway lighting system along the length of Weiland and Prairie
Roads.
Mr. Gregory P. Boysen, P.E.
Page 4 of 7
The scope of services is as follows:
1. Traffic Study - This work item will include conducting manual peak hour counts and
24 -hour machine counts at the following locations:
A.M. and P.M. Peak Hour Manual Counts -
- Lake -Cook Road/Weiland Road
- Busch Road/Weiland Road
- Aptakisic Road/Weiland Road
- Aptakisic Road/Prairie Road
Prairie Roa(L Illinois Route 22
24 -hour Machine Traffic Counts -
- Weiland Road between Lake -Cook and Busch
- Weiland Road between Busch and Aptakisic
- Aptakisic Road between Weiland and Prairie
- Prairie Road between Aptakisic and IL Route 22
This work item will also include obtaining CATS 2020 traffic forecasts for Weiland
and Prairie Road and developing design hourly volumes for 0 5 intersections, as well
as performing intersection capacity analyses to define channelization and storage
requirements.
2. Drainage Concept Plan - Prior to estimating construction costs for each stage, a
preliminary study of the stormwater detention requirements specified in the Lake
County Watershed Development Ordinance will be performed in order to develop a
drainage concept plan for the route. If stormwater detention outside the existing
right -of -way is recommended, potential detention sites and approximate sizes will be
identified. (NOTE: The work effort required for this task will depend upon how
much of the detention requirement the Village has already satisfied through off -right-
of -way storage facilities).
3. Utility Relocation Plan - The study will include an evaluation of existing utilities
within the right -of -way to identify potential utility relocations that would be required
prior to widening the roadway. This evaluation will be based upon existing public and
private utility atlas information and will not include field verification of actual
locations or depths of utilities.
4. Construction and Engineering Cost Estimate - The study will estimate the
construction costs for each construction stage based on 1997 unit prices. The study
will also include an estimate of Phase 2 and Phase 3 engineering costs associated with
each stage.
Mr. Gregory P. Boysen, P -E.
Page S of 7
5. Cost Participation Table - The study will include preparation of a cost participation
table outlining estimated Village and County costs for major work items such as
roadway, drainage, sidewalks/bikeways, street lighting, traffic signals, landscaping,
etc.
6. Schematic Improvement Plan - The study will include preparation of a 1" = 100'
scale aerial plan exhibit that schematically depicts the ultimate improvements within
various construction segments and outlines the limits of proposed pavement widening.
7. Summary Report - Finally, the scope of work will include preparation of a short
Summary Report which presents the basic design assumptions, drainage concept plan,
utility relocation plan, schematic improvement plan, construction cost estimates by
construction stage and the cost participation table.
B. MANHOUR AND DIRECT COST ESTIMATE
Following is our manhour and direct cost estimate for scope of work for each route which was
detailed above.
• Buffalo Grove Road
* * 129 hrs. if substantial off - right -of -way detention is already provided
(deduction of 43 hrs.).
Work Item
Manhours
Direct Costs
1.
Drainage Concept Plan
148 hrs.*
-0-
2.
Utility Relocation Plan
85
-0-
3.
Construction Cost Estimate
140
-0-
4.
Cost Participation Table
16
-0-
5.
Schematic Improvement Plan
40
-0-
6.
Summary Report
24
-0-
TOTALS
453 hrs.
-0-
* 74 hrs. if substantial off- right -of -way detention is already provided (deduction
of 74 hrs.).
• Weiland/Prairie Road
Work Item
Manhours
Direct Costs
1.
Traffic Study
104 hrs.
$1,250
2.
Drainage Concept Plan
172 **
-0-
3.
Utility Relocation Plan
85
-0-
* * 129 hrs. if substantial off - right -of -way detention is already provided
(deduction of 43 hrs.).
! a
Mr. Gregory P. Boysen, P.E.
Page 6 of 7
Work Item Manhours Direct Costs
4.. Construction Cost Estimate 164 -0-
5. Cost Participation Table 18 -0-
6. Schematic Improvement Plan 80 -0-
7. Summary Report 24 -0-
TOTALS 647 hrs. $1,250
C. ESTLN1ATE OF FEE
We propose to perform the work on the basis of cost plus a fixed fee with a not -to- exceed maximum.
The fee will include reimbursement of direct labor costs, overhead, fringe benefit and salary burden
costs, plus a net fee for profit. Direct expenses will be reimbursed at their actual cost. The upper
limit of compensation is $69,360 based upon the fee calculation shown below.
Fee Estimate:
1,100 hrs. X $24.00 (Avg. Hrly. Rate) x 2.58 = $68,110.
Direct Costs - Machine Traffic Counts = $ 1,250.
TOTAL = $69,360.
Once existing off - right -of -way detention provisions are quantified, it is likely that reductions in the
maximum hours required for the Drainage Concept Plans for both Buffalo Grove Road and
Weiland/Prairie Roads can be made. We estimate these deductions to range up to $4,600 for Buffalo
Grove Road and up to $2,700 for Weiland/Prairie Roads for a total reduction in the upper limit of
compensation of $7,300. Once data collection is completed, we propose to adjust the upper limit of
compensation for the contract.
Mr. Gregory P. Boysen, P.E.
Page 7 of 7
D. SCHEDULE
We proposed to complete the Improvement Staging Plans and Construction Cost Estimates within
4 months from the date of authorization to proceed and the receipt of data. We thank you for the
opportunity to submit this proposal and look forward to the possibility of assisting the Village of
Buffalo Grove on this planning study. If this Proposal/Agreement is acceptable, please execute below
and return one copy to us.
Very truly yours,
CIVILTECH ENGINEERING, INC.
Y^
Robert J. Andres, P.E.
Accepted By:
Title:
Date:
EXHIBIT I
JURISDICTIONAL TRANSFER AGREEMENT
BLR 1602
BUSCH ROAD/PARKWAY/DEERFIELD PARKWAY
ILLINOIS ROUTE 83 TO U.S. ROUTE 45ALLINOIS ROUTE 21
C
0
I Illinois Department I ocal Agency No. 1 (Conveyor) -)cal Agency No. 2 (Recipient)
of Transportation municipality Buffalo Grove Municipality
LOCAL AGENCY Township/ Township/
AGREEMENT Road District Road District
FOR
JURISDICTIONAL TRANSFER County County Lake
In accordance with authority granted in Section 4 -409 of the Illinois Highway Code. this ageement is made and entered into be-
tween the above Local Agency No. 1, hereinafter referred to as "CONVEYOR', and the above Local Agency No. 2. hereinafter
referred to as "RECIPIENT", to transfer the jurisdiction of the designated location from the CONVEYOR to the RECIPIENT.
Busch Road /Parkway/ Location Description
Name Deerfield Parkway Route C.H. 11 Length 15175± L.F.Miles 2.87
Termini From Illinois Route 83 to U.S. Route 45 /Illinois Route 21
This transfer does /does not include Structure No.
Include for Municipalities Only
WHEREAS, the authority to make changes to the Municipal Street System is granted to the Municipality by Section 7-101 of the
Illinois Highway Code.
NOW THEREFORE IT IS AGREED that the corporate authority of said municipality will pass an ordinance providing for the transfer
of the above location and shall attach hereto and make a part hereof a copy of the ordinance, and
Include for Counties Only
WHEREAS, the authority to make changes to the County Highway System is granted to the County by Section 5 -105 of the Illinois
Highway Code.
NOW THEREFORE IT IS AGREED that the County Board of said County will pass a resolution providing for the transfer of the
above location and shall attach hereto and make a part hereof a copy of the resolution, and
Id1�1?iX�aNi�X�i?C��l�!(4��X
Biidd�tlbXa�i eXb�i F,II10! r ,�ru y1g ar Axsfizi�itXg �,:�� S,�ar :�
THE CONVEYOR AGREES to prepare a map of the above location and attach a copy of such location map hereto.
IT 1S MUTUALLY AGREED, that this jurisdictional transfer will become effective upon: Approval by the T1 1 i nni s
Department of Transportation
Supplements
Additional information and /or stipulations, if any, are hereby attached and identified below as being a part of this agreement.
Supplement see Buffalo Grove Transportation Agreement
(Insert supplement numbers or letters and page numbers, if applicable.)
IT IS FURTHER AGREED, that the provisions of this agreement shall be binding upon and inure to the benefit of the parties hereto.
their successors and assigns.
APPROVED BY CONVEYOR APPROVED BY RECIPIENT
Name Sidney H. Mathias Name Robert W. Depke
-1 V-
ar
LOCATION MAP
JURISDICTIONAL TRANSFER TO LAKE COUNTY.
FROM ILLINOIS ROUTE 83
TO U.S. ROUTE 45 /ILLINOIS ROUTE 21.
1111C
EXHIBIT II
JURISDICTIONAL TRANSFER AGREEMENT
BLR 1602
BUFFALO GROVE ROAD/PORT CLINTON
ROAD/PRAIRIE ROAD
ILLINOIS ROUTE 83 TO NORTH CORPORATE LIlVIIT ON PRAIItIE ROAD
C
C
UtW cal Agency No.1 (Conveyor) :al Agency No. 2 (Recipient)
Illinois Department
of Transportation Municipality Buf falo Grove Municipality
LOCAL AGENCY Township/ I Township/
AGREEMENT Road District Road District
FOR
JURISDICTIONAL TRANSFER County County Lake
In accordance with authority granted in Section 4 -409 of the Illinois Highway Code. this ageement is made and entered into be-
tween the above Local Agency No. 1, hereinafter referred to as 'CONVEYOR', and the above Local Agency No. 2. hereinafter
referred to as 'RECIPIENT', to transfer the jurisdiction of the designated location from the CONVEYOR to the RECIPIENT.
Location Description
Buffalo Grove Road/
Name Port Clinton Road /Prairie Road Route Prop C.H. 16 Length 18650tL. F. Miles 3.53
Termini From Illinois Route 83 to the North Corporate Limits of the Village of Buffalo
Grove on Prairie Road. This point is approximately 1620 L F south of U.S. Route 45
This transfer does /does not include Structure No.
Include for Municipalities Only
WHEREAS, the authority to make changes to the Municipal Street System is granted to the Municipality by Section 7 -101 of the
Illinois Highway Code.
NOW THEREFORE IT IS AGREED that the corporate authority of said municipality will pass an ordinance providing for the transfer
of the above location and shall attach hereto and make a part hereof a copy of the ordinance, and
Include for Counties Only
WHEREAS, the authority to make changes to the County Highway System is granted to the County by Section 5 -105 of the Illinois
Highway Code.
NOW THEREFORE IT IS AGREED that the County Board of said County will pass a resolution providing for the transfer of the
above location and shall attach hereto and make a part hereof a copy of the resolution, and
THE CONVEYOR AGREES to prepare a map of the above location and attach a copy of such location map hereto.
IT IS MUTUALLY AGREED, that this jurisdictional transfer will become effective upon: Approval by the Illinois
Department of Transportation
Supplements
Additional information and /or stipulations, if any, are hereby attached and identified below as being a part of this agreement.
Supplement see Buffalo Grove Transportation Agreement
(Insert supplement numbers or letters and page numbers, if applicable.)
IT IS FURTHER AGREED, that the provisions of this agreement shall be binding upon and inure to the benefit of the parties hereto,
their successors and assigns.
APPROVED BY CONVEYOR APPROVED BY RECIPIENT
Name Sidney H. Mathias Name Robert W. Depke
Title President lla e,,of Buffalo Grove*% Title Chairm Lal
Signature Signature
APPROVE C
STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION By: _
Director of Hi ways
?LA 160219 ,1891 ' _19-
r. -
i
Cn
LOCATION MAP
JURISDICTIONAL TRANSFER TO LAKE COUNTY.
FROM ILLINOIS ROUTE 83 TO THE NORTH
CORPORATE LIMITS OF THE VILLAGE OF
BUFFALO GROVE ON PRAIRIE ROAD.
1" S I It
1t
t
EXHIBIT III
JURISDICTIONAL TRANSFER AGREEMENT
BLR 1602
WEILAND ROAD
LAKE -COOK COUNTY LINE TO APTAKISIC ROAD
Illinois Department
of Transportation
gal Agency No. t (Conveyor)
al Agency No. 2 (Recipient)
Municipality
Municipality Buffalo Grove
Township/
Township/
LOCAL AGENCY
AGREEMENT
Road District
Road District
FOR
County Lake
County
JURISDICTIONAL TRANSFER
In accordance with authority granted in Section 4 -409 of the Illinois Highway Code. this ageement is made and entered into be-
tween the above Local Agency No. 1, hereinafter referred to as 'CONVEYOR ", and the above Local Agency No. 2. hereinafter
referred to as "RECIPIENT', to transfer the jurisdiction of the designated location from the CONVEYOR to the RECIPIENT.
Name
Weiland Road
Location Description
Route C.H. 73 Length 11088 L.F. Miles 2.10
Termini From Lake -Cook County line to Aptakisic Road
This transfer does /does not include Structure No.
Include for Municipalities Only
WHEREAS. the authority to make changes to the Municipal Street System is granted to the Municipality by Section 7-101 of the
Illinois Highway Code.
NOW THEREFORE IT IS AGREED that the corporate authority of said municipality will pass an ordinance providing for the transfer
of the above location and shall attach hereto and make a part hereof a copy of the ordinance, and
Include for Counties Only
WHEREAS, the authority to make changes to the County Highway System is granted to the County by Section 5 -105 of the Illinois
Highway Code.
NOW THEREFORE IT IS AGREED that the County Board of said County will pass a resolution providing for the transfer of the
above location and shall attach hereto and make a part hereof a copy of the resolution, and
Xii�ijf?bYIil�3fi3� €f>�I�3RXifi`[1K
THE CONVEYOR AGREES to prepare a map of the above location and attach a copy of such location map hereto.
IT IS MUTUALLY AGREED, that this jurisdictional transfer will become effective upon: completion of future
roadway improvement projects to Weiland Road at which time the County will notify the
Illinois Department of Transportation of the Jurisdictional Tkansfer date:-
Supplements
Additional information and /or stipulations, if any, are hereby attached and identified below as being a part of this agreement.
Supplement see Buffalo Grove Transportation Agreement
(insert supplement numbers or letters and page numbers, if applicable.)
IT IS FURTHER AGREED, that the provisions of this agreement shall be binding upon and inure to the benefit of the parties hereto.
their successors and assigns.
APPROVED BY CONVEYOR APPROVED BY RECIPIENT
Name Robert W. Depke Name Sidney H. Mathias
Title Chairmarvi Lake Countv Board Title Pre i nt _V'
XX'
Sighature Signature
APPROVED .w
STATE OF ILLINOIS C� y 1
DEPARTMENT OF TRANSPORTATIO By: V
Director of High ays ate
'Lg 1602(9/891 -19-
LOCATION MAP
JURISDICTIONAL TRANSFER TO THE VILLAGE OF BUFFALO GROVE.
FROM LAKE -COOK COUNTY LINE TO APTAKISIC ROAD.
mIlt
EXHIBIT IV
JURISDICTIONAL TRANSFER AGREEMENT
BLR 1602
lutAlly '�
APTAKISIC ROAD TO ILLINOIS ROUTE 22
j Illinois Department
of Transportation
LOCAL AGENCY
AGREEMENT
FOR
JURISDICTIONAL TRANSFER
:al Agency No. l (Conveyor) I :al Agency No. 2 (Recipient)
Municipality
Township/
Road District
County Lake
Municipality Buf f'alo Grove
Township/
Road District
County
In accordance with authority granted in Section 4 -409 of the Illinois Highway Code, this ageement is made and entered into be-
tween the above Local Agency No. 1, hereinafter referred to as 'CONVEYOR', and the above Local Agency No. 2, hereinafter
referred to as 'RECIPIENT', to transfer the jurisdiction of the designated location from the CONVEYOR to the RECIPIENT.
Location Description
Name Prairie Road Route C.H. 59 Length 4752 L.F. Miles 0.90
Termini From Antakisic Road to Illinois Route 22
This transfer does /does not include Structure No.
Include for Municipalities Only
WHEREAS, the authority to make changes to the Municipal Street System is granted to the Municipality by Section 7 -101 of the
Illinois Highway Code.
NOW THEREFORE IT IS AGREED that the corporate authority of said municipality will pass an ordinance providing for the transfer
of the above location and shall attach hereto and make a part hereof a copy of the ordinance, and
Include for Counties Only
WHEREAS, the authority to make changes to the County Highway System is granted to the County by Section 5 -105 of the Illinois
Highway Code.
NOW THEREFORE IT IS AGREED that the County Board of said County will pass a resolution providing for the transfer of the
above location and shall attach hereto and make a part hereof a copy of the resolution, and
�R f h i Y>Ys ioXr }f}e :lrsXr t Xt'e`€ t f &V&XAMK
THE CONVEYOR AGREES to prepare a map of the above location and attach a copy of such location map hereto.
IT IS MUTUALLY AGREED, that this jurisdictional transfer will become effective upon: completion of future roadway_
improvement projects to Prairie Road at which time the County will notify the Illinois
Department of Transportation of the Jurisdictional Transfer date.
Supplements
Additional information and /or stipulations, if any, are hereby attached and identified below as being a part of this agreement.
Supplement _see Buffalo Grove Transportation Agreement
(Insert supplement numbers or letters and page numbers, if applicable.)
IT IS FURTHER AGREED, that the provisions of this agreement shall be binding upon and inure to the benefit of the parties hereto.
their successors and assigns.
APPROVED BY CONVEYOR APPROVED BY RECIPIENT
Name Robert W. Depke Name Sidney H. Mathias
Title - Chairman, kp-.CQuntv Board Title Presiden , Village—of Buffalo Grove
CSighature Signal re
APPROVED.
STATE OF ILLINOIS �-
DEPARTMENT OF TRANSPORTATION y:
Director of Highways I Cifite
eLQ 1602 (9/891 -19-
LOCATION MAP
JURISDICTIONAL TRANSFER TO THE VILLAGE OF BUFFALO GROVE.
FROM APTAKISIC ROAD TO ILLINOIS ROUTE 22.
nIit
STATE OF ILLINOIS )
COUNTIES OF LAKE AND COOK )
I, JANET M. SIRABIAN, hereby certify that I am the duly
elected, qualified and acting Village Clerk of the Village
of Buffalo Grove, Counties of Cook and Lake, Illinois, and
the keeper of its seal and records.
I hereby further certify that the attached is an
true copy of Resolution 95 -44 adopted on the 5th day
of June , 1995 by the Village Board of the
Village of Buffalo Grove shown by the records in my
custody.
IN WITNESS WHEREOF, I have hereunto set my hand and
affixed the seal of the Village of Buffalo Grove aforesaid,
at the Village, in the County and State aforesaid, this
10th day of _July 49'95 .
Village Clerk
By 1
Deputy Village Clerk
n
RESOLUTION NO. 95- 44
A RESOLUTION APPROVING A MULTI- CORRIDOR AGREEMENT WITH LAKE COUNTY
WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant
to the Illinois Constitution of 1976; and,
WHEREAS, the quality of life is enhanced by a good quality
transportation system; and,
WHEREAS, the funding of construction and maintenance of a high
quality transportation system is most appropriately shared by several
agencies of Federal, State and Local Government; and,
WHEREAS, an agreement with the County of Lake is a required
prerequisite for the establishment of various commitments for highway
improvement construction and maintenance by the County of Lake;
NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF
TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS as
follows:
Section 1: The agreement entitled "Agreement Between the County of
Lake and the Village of Buffalo Grove for the Roadway
Improvement, Maintenance Responsibilities and Jurisdictional
Transfers of Busch Road /Parkway and Deerfield Parkway;
Buffalo Grove Road /Port Clinton Road /Prairie Road; Weiland
Road; and Prairie Road" is hereby approved.
Section 2: The Village President and Village Clerk are authorized and
directed to execute the agreement. A copy of said agreement
is attached hereto and made a part hereof.
AYES: 6 - Marienthal, Reid, Rubin, Braiman, Hendricks, Glover
NAYES: 0 - None
ABSENT: 0 - None
PASSED: June 5
APPROVED:
ATTEST:
, 1995
Village Clerk
G95A90
• w
STATE OF ILLINOIS )
COUNTY OF L A K E )
COUNTY BOARD, LAKE COUNTY, ILLINOIS
Co-.Lty Board
County Administrator
Director of Finance
Transportation (2) cert.
CERTIFIED TO BE A TRUE COPY OF
RECORDS OF THE LAKE COUNTY
BOARD MEETING OF
JUN 13 1995 APPROVED
ANNUAL JUNE SESSION, A.D. 1995 CERTIFICATION NOT VALID UNLESS SEAL
OF LAKE COUNTY, ILLINOIS IS AFFIXED
JUNE 13, A.D. 1995 ''a--' %f �( %��
""�— " 44,4��t._. County Clerk
MR. CHAIRMAN AND MEMBERS OF THE COUNTY BOARD:
Your Public Service Committee and Financial & Administrative Committee
present herewith a resolution providing for the execution of a Transportation
agreement between the Village of Buffalo Grove and the County of Lake providing
for the roadway improvement, maintenance responsibilities and jurisdictional
transfers of four separate roadways, said roadways being as follows: (1) Busch
Road /Parkway and Deerfield Parkway from Illinois Rte. 83 to U. S. Route
45 /Illinois Rte. 21; (2) Buffalo Grove Road /Port Clinton Road /Prairie Road from
Illinois Rte. 83 to the north corporate limits on Prairie Road; (3) Weiland Road
from the Lake -Cook County Line to Aptakisic Road; and (4) Prairie Road from
Aptakisic Road to Illinois Rte. 22.
We RECOMMEND adoption of this Resolution.
Respectfully submitted,
R E S O L U T I O N
WHEREAS, the free flow of traffic along: (1) Busch Road /Parkway /Deerfield
Parkway from Illinois Rte. 83 to U. S. Route 45 /Illinois Rte. 21; (2) Buffalo
Grove Road /Port Clinton Road /Prairie Road from Illinois Rte. 83 to the north
corporate limits of the Village of Buffalo Grove on Prairie Road; (3) Weiland
Road from the Lake -Cook County Line to Aptakisic Road; and (4) Prairie Road from
Aptakisic Road to Illinois Rte. 22 is beneficial to the safety and welfare of the
Village of Buffalo Grove and the County of Lake; and
WHEREAS, in order to facilitate the free flow of traffic and ensure the
safety of the motoring public the Village of Buffalo Grove and the County of Lake
propose make certain improvements, jurisdictional transfers and the transfer of
maintenance responsibilities to said roadways as follows: (1) Busch
Road /Parkway /Deerfield Parkway from Illinois Rte. 83 to U. S. Route 45 /Illinois
Rte. 21 to provide widening and reconstruction, to provide jurisdictional
transfer to the County of Lake to make said roadway a part of the County Highway
System, and to provide the transfer of maintenance responsibilities to the County
of Lake upon completion of the improvements; (2) Buffalo Grove Road /Port Clinton
Road /Prairie Road from Illinois Rte. 83 to the north corporate limits of the
Village of Buffalo Grove on Prairie Road to provide widening and reconstruction,
to provide the jurisdictional transfer to the County of Lake to make said roadway
a part of the County Highway System, to provide the transfer of maintenance
responsibilities to the County of Lake; (3) Weiland Road from the Lake -Cook
County Line to Aptakisic Road to provide widening and reconstruction, to provide
the eventual jurisdictional transfer of said roadway to the Village of Buffalo
Grove to delete said roadway from the County Highway System, and to provide the
transfer of maintenance responsibilities to the Village of Buffalo Grove and (4)
Prairie Road from Aptakisic Road to Illinois Rte. 22 to provide widening and
reconstruction, to provide the eventual jurisdictional transfer of said roadway
to the Village of Buffalo Grove to delete of said roadway from the County Highway
System and to provide the transfer of maintenance responsibilities to the Village
of Buffalo Grove; and
WHEREAS, the Village of Buffalo Grove and the County of Lake are desirous
of entering into a Transportation agreement for the above -said improvements,
jurisdictional transfers and transfer of maintenance responsibilities.
NOW, THEREFORE BE IT RESOLVED that the Chairman of the County Board, the
County Clerk and the County Engineer-of the County of Lake, State of Illinois be
authorized and they are hereby directed, to execute a Transportation agreement
pertaining to the said improvements, jurisdictional transfers and transfer of
maintenance responsibilities providing in the opinion of the Public Service
Committee, if necessary, said Transportation agreement 'in its final form
substantially conforms to the draft attached hereto. The County Engineer shall
transmit in writing the final Transportation agreement to be executed by the
Chairman of the County Board and the County Clerk.
BE IT FURTHER RESOLVED that the Chairman of the County Board, the County
Clerk and the County Engineer of the County of Lake, State of Illinois, be
authorized and they are hereby directed to execute any and all necessary
maintenance and jurisdictional transfer agreements as provided for within the
Transportation agreement between the Village of Buffalo Grove and the County of
Lake.
BE IT FURTHER RESOLVED that copies of said jurisdictional transfer
agreements when executed in their final form be submitted to the Illinois
Department of Transportation for their approval and final processing.
Dated at Waukegan, Illinois,
this 13th day of June 1995.
AN AGREEMENT BETWEEN- THE VILLAGE OF BUFFALO GROVE, THE VILLAGE OF
LINCOLNSHIRE AND THE VILLAGE OF VERNON HILLS CONCERNING THE BUFFALO GROVE
ROAD /PRAIRIE ROAD (PORT CLINTON ROAD TO U.S. ROUTE 45) STREET ALIGNMENT
THIS AGREEMENT is made and entered into as of the 18th day of January ,
1992, by and between the Village of Buffalo Grove, the Village of
Lincolnshire and the Village of Vernon Hills.
WITNESSETH:
WHEREAS, the preservation and ancement of the quality of life in
a developing suburban area, such as southeastern Lake County, requires the
establishment of a high quality network of arterial streets; and,
WHEREAS, the improvement of the Buffalo Grove Road /Prairie Road
corridor, between Port Clinton Road and U.S. Route 45, is consistent with the
Comprehensive Plans of the Villages of Buffalo Grove, Lincolnshire and Vernon
Hills; and,
WHEREAS, the development of a four -lane arterial street corridor
along the Buffalo Grove Road /Prairie Road corridor in this area is in
accordance with the "Year 2005 Transportation Plan" and the "Comprehensive
Road Improvement Plan for Impact Fees" of Lake County, Illinois; and,
WHEREAS, the Village of Vernon Hills is committed to the extension
of the Buffalo Grove Road /Prairie Road corridor by the extension of Fairway
Drive south from its existing termini through the former Nike site to U.S
Route 45 at a point which can align with Prairie Road; and,
WHEREAS, the Villages of Buffalo Grove and Vernon Hills have
retained a qualified consulting engineering firm to perform a realignment
feasibility study for Buffalo Grove Road and Prairie Road, the draft results
of which were published in a report dated as revised March 27, 1992; and,
WHEREAS, it is recognized that the development of a high quality
suburban arterial street corridor requires the continued support and
cooperation of local municipalities in addition to Federal, State and County
agencies;
NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS:
1. As annexations and development authorizations are approved by each of
the municipalities of Buffalo Grove, Lincolnshire and Vernon Hills,
which include portions of the area within and adjacent to proposed
seelianed right- of -gays of Wfalo Grove load/Zrairie Road between fort
Clinton 1084 and u.8. testa 43 denoted in Exhibit 1-+A and ftUbit 2-A,
the right -of -gray desilaated in these Exhibits shsli, es a uftimms bt
reserved for use smd aaguisition as right-Of-WY for arterial street
luprovtueaes.
2. The right -of-wy denoted es being required In MAI It 1 -8 and ExUbit
2,B sbsll also be considered for reservation or acgaisitioo as
ri=he -of-Var for artarlal street Improve"Uts.
3. The m1pport, cooperation and fitgncial assistance of Federal, State and
County agencies in the Buffalo drove Rood/Prairie load Mort Clinton
Road to V.a. Route 45) Street Tmproveaeut is encouraged w4 supported.
IN VIMSS VHUWF, the Village of Buffalo Grove, the V111K96 of
Lincolnshire aid the V:Lllage of Vernon Hills have each caused this agreemat
to be amecuted as of the dgte first abava trritt+ot.
VILLAGE
. B7t
ATTES'!t
1:3
VILLAGE 0 SSIIiS ; :S
ay• � =
Village Prts , t,.
ATTEST!
G92B61
- 2 �
Village Lneirlc
39
r
'1 f e►'? . •i ..t• ,�-- -fir -r • — L( ~ t J ' 1 ` + r
:Y r• r .s 1.. f •T •LINE AA•Ml__ __�• . .i7
1✓ .� L�} •h• { E AIJERNATE N0.1 OR ! 5011TW • . •,. ' -
.✓ 1�` • �cl � tYnjiftC .. � ^_• •rte,_ �' . .: X'� - , ••.t�ii -,� .� '� /\
ej' as
��: �i•. .�;:e a,�•.Y�F :f .r.�' :! ^ � tr.�'.v'' rj�y; �'�;.• .i •�: `, s .• J;r!•"w. :�.
l a'• . •;a- L�����' �. : , "�.fr• 'Y�is-•�:� 1,:4. r • *'�' :Cy. -• �..Sti�..� c.• ; .. :: '� r':►,r.`y:° ;a`•c'
�+ •.. :` ... .h.,: :. Y 4e T►t s�t'4.'h•�:j:. ,Ali / 'Jnji•/ .. ♦$`C�l ,,` i y• wLl�� '.,::. �:.a•,,,�..
4.
ir iy • ' j� f.•! .. t
cl
-Fi
Nm
4.
-G .r. ►- / si � t!t' • 'T' -' •' ]t� � Jam'• = a •` +t � } SS
�:•�,+`�r2•��
Ali
461
'i .i'. f' ,� j. •�,..• ►s '�' ?s.� •j:a� � CY'w' '� -?'• :j;•
,tom ,S " =;� ...ti'•c' :�.S:�E
i • �. ' : ; •�'< +- - - - . �,L• Mfr ! L
..- r.: , ::5; =; ••it
r� «r7. r rif' � <� :?`�:''` • fj *. L .'si , �t,•: <} t i1�:s•!jr �!' 1�+ ''�•�Y:�,t t� :�.
• y ,► /. .�+ rrt • <. � ,a .':�.�:} use �. �L�t-1�,; i' ` `a.��•tt Y y •-
'�• j'2 :'�: �� 'k.. J. .;1•f „•'•a fir. tr-t�t7 ::• r° •yi �f.ri.;:.ry
�•� "r."•.r'- i•:Si -•• ;�'F; _ `.::.. �'• _'� ` •�.� 'r: "Kra ••.t��.''`i 5..•'.-•��;✓. ��. 3.• .�, .•.,t
V. r ;Ir) ,• i.,:. # t a.�s. _ . -< by �1..- j��j / :r
91ri!i, •�; A sit.. a .w'<i _ %I:i, '((3� •L �r '}` . �.�Si. a., Ii. �:
-•f �•. � .:y �5' •{rte •).�•„{ r I%� \•c. .{. �:• .> .jit!'•. {" .a Vii... ail ��/e•�l�•
�•ti�•' iJ• . •i� • a.F y� �,',�r'ttr_l ,i�t� ,_ '' tJ �rT •'. : -A'!,. •!T`•j• �• ti%: , ,•
a'. •• •� r. .r� 1v....�. i!ii° iKW:����� • •• r 4i� \ ; � • �` r
• ,• U•' a ,,•• .,,, "ZI -r,.• � ::. • v ' �t t b!• � �yt t _ : 'j rr=� Y,�i ,,r i!'
'yi i• °"'' �t ► •�> ` 2 y . .% '. V•. • r•5i.f ;j�•.,, "• ice'•' l•.•
�. . .fry • •. �� _ • { t �' - r :��:�) ', �
S.;
!. � q �. .•dpi .�!�,�
S�f� - • 0 2 _ - -
Vv
o
o
.ova �''�}i�.••y�S1F '.. • ►�t(•
9 - - b rs t. mot:• •t �7. �.
ol
• 1r ,• r .. �1t, li. ytj
A, y 4.,•.'fr'
if
�y� _ •'t � �,� :fir �!'� T !j +�
' ''� •;, .� _ Yom; NLINE C-$'• `l : = :r" •I' f. ^�. r j7sil�� .T .': •.;.Y' }•1• -d„• •�.�
.� :•a ' • �:t' ;. ��� : t sa il"t•f' ^:�• "t' ^7xc��j1`• X �:'� r' �:i'r g'•''J
:J'�M!�
Rf
�._�_�' _,.`� ``. 'L•'.1- .iy ~'.•y',• ��•I�wl�';Aa1�'?r G'�h.'R •..•�?K�.{rx���M'•' %•_:e.:f �, ^� ...i
i •• ,;, ., ,•",�i/�•'�r '1 • rY I' i � : L ��• ' i fJ'a' � � ?' V �•i � ?• . •t r -•• �: »•;'`, �'
'y.i►, 1. �'� I// -I.: .r•..JV.•• - -r ]r �C r rr 't.: i�..M' '•! a.�/,i�f� ;� %': • '.
•�4 - Jn(, =� ...j4...:� f� �. •.�`�• . n.. - �. /��'•.' fit' ',i K' M�
►r� - ":l. ._ •�- ij:.�.�:Y �~ Y.i' 14 'r 1 ir- fit.
�. ,..w9t7 w- .,f . ► :�M..TI�'�.!.,._.••� t w ? -, .r...�w.��y�we�,w •1 �! • t• � �'�T•����r +- .�..•,•
.�• • s • � ; "� ."��ifl•�' t .alt '} .� tom? •+X •�•j" ! •'J �aiR
y✓ �•! :yj•`t:�• 'tit..' "•". •v. .i'iw �' _.• •. •• .• r.., . -• f•, r.. ;,:i.',• �
?•}. !ti, \•. a.. �. V . ♦d:'yc� ,,1t•'t,_ s77�•}•`•. .,• �y�;'.TKL,A} ttr k•• �S:v'�i:,
:.♦'•�Q(J+f�. r�F•e /•+��f1 •'*�.�`• •�+[ ifs �:'�' "j•Ts�s.�_,`- 7� - •rt.- ..^i•'7
sett: _ �. -T ;" .,.•. . * ._"�ra'k,''� + ..;'!,•�.:s '• �:� • .
�{ .pit' i. ♦ r
.� h aye +� "'s �.eM sit .. - ;s i t' e� ' �k� i r• 1'j{ if r t�
...•�"�• �•�ayj�'� L����•+•, i- ����r:i +,�.f�f: 'a 11..''••''•'i'f,y��• �. fit•• 4J:,�.:.d�` }+7�..}iia �',�:,
.1[' - •IJ.a•"�Y �•ii1 7T t '7. j";.�. ♦�i' . '.Y!j ( -aw "' j ` i•
j�, ^�,�Fw �`e: s���' ;y�r". N• s..+•.., .i•�'r .i��:.'1:': �':A�:�'� ar r f}�:Lt�� S� '•�:i :.�yi.� -'• a7!•'*.:7,�ii'�l
y` i "z :�' rid.' ;' •>Yc 4Y: •• •f1!`C' ritn�.
Al
t_., , a'r��tA- ,-�.,�% f._. 1 1 may' ;. ♦ 1.• ;,• . v E.w I'.I}_. i4• � ; � �• •�� ?`.. ;'t '�`�'�;._'•
`' a ;-`,4� 7•':�s. +• r ♦ ..�• r it``. • '! r ;-
• t` - �;s•:•, rr�.,��.''�ja . «-.y,d , :: ��� .•' s,4-: r • '� to,,�•� -
't):�V�'• tri1� • . ' • .fit .i}r` ?F t avil far• •� - f d w.
c :yam. ♦.• �' ;j, i •�• � - ;• .�� } ,
• YY `iL
,.. �. .� .. ,�. �^ ♦ SSA
�'� Vim.• •, i , �R � •,� �j J: ��•
♦`..'1 �.� ` �+ A's�t .'r � c��c!`j�7 _xt:' r f���f�- �.,�I1��i� -•:{�
i - X -i,.f .t,t ,•
At V
`�. A .• .Ok.:Y<k, .off s.� . >1) .. t•. �
�� ,- i:• �, . . .• f . ~ _{ '• .'•: C TCNLINE D-D 4.
Ir
.E?�' �• ra: � ±'�,_ ._ ,!•% .�r� ;•• �• �e�tiSp �• �i • r! -�Y/�} • •} � •'�n•• r �t � •4'•
i mot' }• �'�t � •�¢ • �j/�,�;`�/jk r'��.,''��'- �• � ;',1�,.' _ .. . � � ���t•.• -`�"'► - Jy)t�.
' - rs��:r -ltje.i� %fir• _. �•'t t'. 1•::', ;y,�,;,
g''- : �• =. � t •,+ ,... r'�w. tea;., ,� -. r;;; .
r. C
i Ny
w
-o s-
1
v
r
,' '•• �'. .. �Yr �r •. L +' . �a'r.)e'�,'•;h�:; WaTt:Ml111E O-0 ..k
At
��,:'� F�g':� �: v '•
,•�s -•'cf :�+r. •��••i,),.. ,`a f'•> •j�� qtr• -••*�� �:(r,' � i ..�
• ; , .:, +� .', to , Jr'
..¢ ... •, � �y::• �.�•:y =fi'? ..�:. i`: 7, •;...,rya, -
�•J7t • f:,•:• �;.� 3�'tL •��TSr•�•�ttT► , - a .. t .
•.ti=iif:'Ei+
+� >. if•� }Z -� �t '1 •.��• I• `,,t. ., T if t .�'..•.:.a �y, �Y�...•'fat!�L".Y rK� ��jab�+�`;•'.1,�
�F`'+� %� •r . t • � r � v %1 ��::i:: -�•, `cy,« ;• ;lirrJ�.�s"t' K_;•,,,, t i�: j -' .;.
-. ...•. '.: - .f_�T -- ,•. :.n •� {�.Y- •-<'�_• ���.s t' .:.'• ' �• ��s•,�a "ryr�•Pt�••l -`•i t. ,[�' - i�::r.
VVV+ t. i:M .i � t• R;�� "�� tYjr.- f„7�•'�•:�i yj:f�.'• =3:!+ 1�:y
ia- :Y' a{; ~i1 Y� •`: 4oa.�:�ai ca.'*-iai:;3�1'
• •,.4t�3I fa �' §�-. •_ •:� " � ��tiw>r...:LLaa��z,'+: a•lc�:jy •2iE
s"`�y��yw�a�1P��'� Sr 1t, a .� ._ i' ` }�`'• '':',r. }.{��(�+ i`-• � e .S[7 as• .
i- �- X14;
yjtyyaa �,•" �� iC '¢E' Wit' .* '• ��; : '. l�`�� ,:f' • �.: -�w ti4 ' >,
•_ •�.�.. ;if'. ,pd1''�,�,S. '' . *ri.. •, : �'I••_ � � •i t{ • .4 .1�� �: s« y
•: 1y �i -+�'�, •��'^'Z�j'_iaS�Z•�.'Z t,: •s"i j� ,G :Ti•t •. •T, ��` ii. � ;� :' s +•`tr � "�,' � '••_ _
"-1`f .•••yy. �,•• V • yi..ilrL X 'T +. lt••i iR �r' ' 2 � � • J �r �fi�•• `� ` - .. .t ...•,t
�>f�s•.p �if .�' '•'aa�r' •••�N'SW�+:.n -i S'i• `':.i •i,.s z t �;��r r�•" ��4.' •''. 1 •.•. r�) +•�'Y•it"r`•.� ='_� �.
.: r• �� :yiA:!y� >s'. � '� �i:.frL-..`� x'1' »�>.�.:�7 i� - •a�r.'. •'�'�.. -�. ��„ .•K'�,e>r�.�••K:..
•S`���r •��a;``�: t:' �1ii.. :. �• •5; `•i�:�> ,)t- ._ *�:f.. • to .,,���y+ -:h.» L. a • ' •":i h'�
:� y a' � `a.•.. sir' � � :iL +f +/-. _ t:.g c. -�... ►.j� �. •'��: ,Y.- ,._�•�1�>:-��. � '� a, t�» 'i. � ::.
'.'Y' -' "�"1 a� .s-zy`���T} :•n,'.r. 1: ` • - 'air. "�a. I ♦ <�n. �C- '•�'�•�,�C'�•. =�r. _�►• ��. .
t:�.dlt ^,.may �; :: �c d : • � i , ' : � � t• : M-�!•iia� l'+ n•15, ,�i��•L}hL��
� f. �• .yl+.��. �. •tom' a. f• �I-r. w��. -..i .�• +....
r S, •r <i�A L)i3 `LL .}"•:. rG -•J• y lY.af�'�.i',��1: 4 •-+� +• �4,�a.,�� � � �,�,
,Y+ ��•�' }f.af -.� �1 t V Iv'4ny�T�. }.4 �•t :7�'� �y��b,�~^l�_• _�
:s...J+.�c aw•. �•i.,r ..�" ,Y.: '•• i'', i '1J 'Cf•c`r..: �� _ a. tR �•:.!' : -. ,.i rUp-- 22•' 'Xi
.. ar - .': t t;: •!'� a `'�' iii. .. • , .
i •. '•sue'+ :� (• �� -• it-t ?4�♦• •••r� ..s,,t.:_ � t. ,.'•�;r•�'S.:.;.;. �a�. .;
:,r�.�,. ..� c•v .'y :dry{ �• �.+ J•�_�f "� �.: � _ - t M1'`�.`'�r7� - .j �:i: M ;i�
r1'•�} �:'�� +1.�{•.Sf �' Si_ ��"�f�t' `'.�. l' .. .b1fr,- -,��Lr r.;• .,
-.-+ "�f i�c ��•� �: 'x `} :o. _il �.�.� ..- i�}•S+w��•.•.,�"�, +�' i'i`i.
rTr •. � �•t, • •, `., � t f f. rx �J� as -_ � 3. � f�[si ! lu •'•'4 :*.• ww"N' =i -
r '.�,; AJ11.�� `����..``��i-tL • ,, •r F �::i�'� ia. it , y .. ^i•ii.:S�:i �ii:'' aC +- •
• •I .l' b ♦,• -1. i_�' -.>. �• _ _'�ta~'•� Hwy i'•
-y,, :t,, � t�Sti ' S •rat :� t { <J r �.. t�., .;
f r � .��.rNi. Lr• �,1 * ! 111,,,222piii ,.t •
t � .;7 • . f 1•< w � a
Pill ~ t
' to • t -', ,.:. •
mu
:i ���= wH 1��ji�5 .,.:.•�•i•� c ?.:a: • -•:- t• ��� Jy, ;`4 •• :•.. .,,.N
1A. 'oa i 'r..��:i� �- �s.... .:� : �- '•v:•�;::...;;;- •'•s,�'.•'•,?f �'�:4 ":ate :.� r.:. :.� - � •y":.:» : t�. � :-
.'.:...... _ � ._Sacs^ �'' +. _� ii�:�'_.:...1_,..f....._,,..._ ...� <- .� = - -- �::.•<........_:.__.
•
� w.,! ._ � s•� \`'�SS :^'�''r vi 2e. irk' a �fI '!.. �J i. M,�, � {. :.Zy
^w± _ i ti� w �ii,ai.�?• . .:Ee�iy . �+ 't•1 rr C Z S� , ",?r • • • � �,,,S >� "«`'
QT
;r♦ �• 'Fi M' rar'�` �. � t y,, 03 1 • i( +�o;:.l `v : � . • Lk . J�7(N�rY
'�..J ;:r (o •'t •�� it �' `•+ y •$1�'t `t. ',7!,• '2 t.' � '" .L I ` �� ~ j'+(���:;•y�'aX_re���
•"~ .�� ,` ��n% a h. '4�.F•� `A' yN' +. a .x�k} k.I `.?t�Z�_.}'.,' ��' '�r.� _ . ;w-a� �Jt •r
l , 'i iii`.. /.•,f'Yi''e%' j' 1•lt�, CREEK eENp OR17, 9. +•w�1 • •y .a ...
4 L \ ��• , �° � � ,i,` mow.. ,� '�'•,':;,: � � � 4�.
• � S' "'•. • i••.� �• �. ��.�� »•. � ��` • ` - }.: mss' ;a ��F�Fa`````Y..a'•.• :M»
tQ
�. 41 s •� `��
Alf
IN\
r• ;;� tit: \�t,�, F. , t : -':'F r -v.
'.; 4 ''t-: •• �•i !R 4`' , - :`.�•.,�"'r:• •7 �� Ir. ; �; , L�i�' =' o � r` i :�'�}f�- ��F•'.•rt1 s•
Lo 4� �t. t ��; �rf �. r�� ))'``. .f I , i + �, � ;� ; .4 ' ��a'•r '� S. e $`+k•
.s�t,J. ;. •; L
..s •.1�4 �'` , �: '' +ter"'. -� F
{ •!r /ice. � Z � }� .i % •� ' `'I t .'r•.gvi.r :lf.' d .Y ,,.;'�'�� � .
r r3
:a xx � ..tr�.ir ?:�,, � _ •tr4 ' •!'• ' Y .�, i . , 1• -'1 .y �� [
` WE r ,� ''.:t�ai.l•':• .'%f . '�•; ±,r;+ :'�.YAl �'1 1 .f..i '} �li''i �•7�
y','4'1'i •�J i'`' ::•rt T's _ rt• • 1 .' • i is .I�� {• }I
.''fir• r'�'•' y ♦ar _•_ .>_�r�ts -.'' ni ��ai��i 'l w. J.�.
.7. ti F / .i .�• 1iV v.• • •w••�''� '
. t � �i .•r its 4
-
eooz 1�: �i�yjsa• . . a, �. i ^.� w.•
$
to t9 .:.,i°\s:. I' -�::. +`s lla _� ��',s �,� •rl,,.��- '�;i :'i!',
MM ` "..�3►`' SCR ' ..'. 1 r^' i+ .. Ls. ti` .. +t!-t
• '. H C7�s _:• +' 5r} "i �• \N 'a:.''.S' }.'y'
..f. {r, �,)::'`,SH IIi 1 .: ` J' +'/ ! a •ar ' • +w•'..'tti tj;.:.i� .•
' .• .:• 4` ., ' • '' it ,�..y, .: i - : •1, ' Jrw t•- ..y�TC1,LINE `t
�11;A'r • �y,l",N .`!., ' ♦a ..: 'L'.4'
•,y� �. .__�.. _..may %�-: _ ._ . _..... .._... ,..r.� ► . _� _....___ .. ...
e
r!. ! � rift �.i� f�, ;t �.� �•••�.;�i.�•�I.��!•,,j. ...i r",,`
r � - . - '� :ifs •. S� , ; � �;. i
• Yirt ewE 1- -� ��•�/wc,.' ' �Y ' ` �+ �- :� •' S. a.rp. ��?` �t�� �.�`•_ 'ti
�;�: I 'ter• •1 ,ris• t r.: 1. • • e.,?i•i .-tom;
dt�Y)rj••.i:' !ti ��R rS,�' '•'ice
1'�. t" w �1 - .. ••7�µ J... ai►rn �I;p f Y 4- iy lr,Y4•ti y� �`.'J
• � ., �. ,ti�• �_- �'�. t ^'I f `..• "�� -/. ]J. Yomk•. .� h►c. V.
�/.•
w �, ' ?. ! :SA'�.. r�f� . •�,� `:[. �.tj 13. ? . �1
, Kam_ ••.'.�'i.`'[
J •:y�%y�t,�i is ' • •
+• 's sA : t't • •::w�. '6- ''�i'�f . ':Jg•yr�"'C: t,'r°:.ji -1• �Y� • J +�� a.
• t ' ., �5:. �1 , `� t .a - ' �'.•a ty� • p � x�rsy _' �'c •o.�
i ^
ZIM
i 1= . °s.:t`_= �'Si'y*. " y�+•- j�a�.a t�'� t
'TM � 1; 1 y�-•iY Y •. 'fit'._ l' 7X'' �!-�w, � 't,_1 4 � • i s
�� A t tiq ,t'fat" •� : -��12' '{` _. Z¢�i.�.e• '4' °t • �e°. .. rY
�_p_�� (yi t �L T• .Z � .�Mlr'> ^: �'i::s'L+:'"'• -. .+. ^:��:�''3 %,��i'�`t�' rac'a ��• i. {�
• -T1 1 1 `t'ti iea� �r �_ �;S.S ••t3x .*[mil . t
�1. j��•' �� %'�� �z '?t;7'.:�s`%•.T.i.l h:. '; .:C,yi Lir'e..�y` i j.C^t•:- tt� ": -Y
r i .���f � '�a : i.,� . - '� 7�? w'�' YsJ••.r ~� ' ••�i: i4; �3� ::: ""'. � i `:�,•. -_
j •9 ••I. j4. {• �� t '-!. G�i'+C .... s%:::A. r^ .i �`N�%• .:�n�i'•' Y,i,�v • ..�•�.
t.. ~�..ii 'I az. :'`� r - �w~��. r_►_ :• ..• ""+5i„,.F: :_:K_1' .7"Mw `ajgij!. '??Y�iX ••..:�,�it
Vs
':.•••rte.... •- rL - -�.
wvt
�• jjj 4 7
• •�. YtM � y J {. i
!,s r
A
••tM•
R _Lrw t.tq rs'
M
• �.G7:��iw.. �...r••1 _ tip
r .r V41A
:;• ?'_
,a
• _ 4, r, i' •`
t
fbnti'�yei
{ {{ 'v t
r .r V41A
:;• ?'_
,a
• _ 4, r, i' •`
t
i �•r .. +'. i 7�r + ' 'tom.
.a Yr •.-` si�Te•+�` 1, rLl '�• .r_
_j �i. lfi, rc =' � ��: t *'i � G ��_ .'ft' � fS- -� �- �'. -•�•t ?s i''.�'.`"�7r `�a :-�^..�, ���` � '�C
•;. "��a','n'G2_�!S� y,,,�fi� dt: "a '�".�r s1'2'*�t.a„��f.
.m. t .•��:,�• n+...•.�m rehb...�tarcH►er.�.c:��;�;..ct �..:liMt.e•�t;r_v.t..ef,.e. a - K.aoae��. r-r. �_ _
' �u'�� ht'!•� � etA � l.l..TH iSS' T'iyaJ+•: 't t •e ,. •�'e:.�� _
_ "K`c5r 53i tFY f � i - l � r� �Y� l'. i• '.1.�. - i. �L L s : - � , ry y
�N�i:�t. � �a � v-.•u -i�.y� 'is �iy �-. ? i �l ,F, Gs�t r y � Imo, j: -.a 1
jC��"1+ /, -fM..N j }. 1 ��, - tK�' �,li -�+-' ��•ri �_ly��y�*�� 1 .r.�4��
tik
�t•_L L - ,mss 9i .ski` !.�1:, 1+- ''�, �Z'ti ►' !� ;,
i�
7I�'it J i t '� kh�J •Y+, �4t -� t' > 1 l�: r�' �.
rAi
�;"i: �:.t ��r + a 1- ' jr�^ �3et. }ikk�.:�+ ��' -. w, �tiaY`1\ tl r1 •sT'11 !
f• f. : 5
-1A
M
MATCH
LINE A,
(SEE ALTERN
AU 40.1 OR 2 SOUT14
A'
WY
10
A
IF,
74
4
�`. ar wi�a. -�}. -s J .J F "a.:ity• is. �!I �'••}E ,ti,.•y': •:i��.�.
t to.
. -Jv
-41
J6 IF --i i- - -
: j sej -4
RwWA
.4, "'M366
Ail
wg
— .74
.1k
Z 2'
'mr
— — — - - - - - - - -
A.
• V4
MAT
.44
• V •
6v.. •. -..4,1, . ,
:rf, I
i-A
v
j
jig
if -12 -A'
•. `j�d r ---f A •.'.:p
ko
Y14
i._ :. .ii •
J,
(A M
. I. - A'-'
l4p%
In - - i - . ; � -- . i ` . -. - ! 1 1 4
p
-3 to
it
SIT
M
0
4,
P.-
� t+[��,
:f.'.•�:•'�3 ,• a' �' � t,•3`: ••-{ '� • -' •',�.�.•••+ •• - i•L; yz' %• !a: i ; >=.L�•Ii• f.•: � �1 l�i "s.
..t T� °�~'� #�1 f:t °. _ •: �• � ., '1�;ji �: ''S `t "., ;... ,t r �s_�a.r `s�► .� 'S I'��
.X4 _f d �,t '! 3• �^�G•"'• �rK�... ., {� _a�yr: ,•y�,� ;�.1. r �,r •i •"%1Lz.�. �� -- �'•'I• •�r
40 ,•''r'
' � �'.�r �i� �; ;i.�.,�: ..• �.t•):?��,}t�::: •r ?ti-jftit mil+ :i_ = :-;�•}�•.�J.t•' .,. .,i-tyri��.j�-:�
�•i t "h,, L
-
/ ..6, a•,•�i. ` Yr �• ��. .s •' ;..` .aY�v`•'• .r� r• '��'�tA "4jii
mgN •, JT,r )'1.
-• `- "J,T •a}z rat' �f' �� J itir„ n �j' •r ?�•. ., t
• �, Y
�•l'rt fie•~ • `p �.� •'' � #�yti� �il� � •� - ��`,3: -•;) !•%`'3�� ct+�>�� ..✓1;�:
iAp
Lai: <' r'ri�`z,•'' �:x f �r�'� ' '� �. s� v •`ni' ;f ' v !l• �.i' .,�.Cr�i��•-.? r..� )� `C] J.[ I L' �y, �- r • x
ic.. :.1�.fi ��� `•s.y � -� !. .a`Yj�,._1 �� r:��:;?ii �, v,�.j•�-. "-: f1�� �. °4- .
�.. x Cv; '�. .� • ., • . "1..,' -cam °y 3;'
F � '� to � •'j+. i_ ���R'• •,Tif a•... t-�iV' ' r• : �. ri ;z1.. -,�. • ..:�TCIiUNE C - � •�� ,4 �.,• ILA
lk
WTI v y('n�''• ��".`i,4h ,L3f. /,� �. ' v�.� t' �' j'•�
AN ' ` �:. t� ±::'i±+�1+� :r; �� ►�•r t�iM 8� �j- , :l � :♦ _ ii
IL
is
:�� `i.. .f C, � *�• �• �Jy:��'r" .�1 v;,i � •� •w "�f+�!��e'��� t• _ i .` f •t ' •t {t�:
t'- x�y,�;��.s_• f'. �. �s,�,',.. `: 7i �i�, -,f;:t - ,i.,, f � ��o�n, ,J+ r�;�..y� j�r.: , 'I� _ .:1
•' jury^ ``!L.' •• .� -/�:�.:� • 4? t:Fc"I�'!'�'�'��� r nYl ,� S �
j�J +�Y� � fcr • � pp � t�y'rr'?"�-�� q�.f .!z MATCHUHE O-O ` •..
r ipr. �e a
z
•�'L'��z Mx .
ag = M
` wH
•+J f
W
W
C
'I,•�ai�f,�'�,tE� .f . .•�.. #•: -. ry. �Jt,). •',.. i+•. !, }a a: - i- ; t�+Y
�!�i•'', s ?a .t =} ..�i.' ...� -- 7•. J� ^• -�r. iii. �x...v...
MATCHLIW
JAI
ft
•JI �,•• ••» �+' . • ` • f::. rid " - �e .• 4. +.
- '�- •:�i.'i'o�ii •'ir,.r �y °•� �� :' {��; i*i�j_ -�4i � iD}ri�•= . .: *.e: •.�." .._ •r �:�:S.��w�.jS� =�}q�: i•y
.'J =��'� i• lw :. '� • •.aJ �' I' f•.' !, -'-l`' - �� t QQ�.: .ii•+.j�� •
..: ,� !_. �.,�il;:. a 3" ;�. � �7�� : }:v�,.: �;9 .'x �' �' Y• -(i�•:+•:�.CI:��=��i � t «:=1 ��.. r.,•�;� 't'
'i• .+ ._ � y + Yes: =�e.x���,. ' >'. •���' - • � "'�
.i{• %i ! + •' •.i::••f is .:.. �,�4��'. �� .:� =-��; `` •�. f� �'• r:.'`.w'?•�• +'
f } £ •'I?' X ��. t• Cis . •1'+ • <. • •! , . ..+ti • �= 1•.:.. �:� 'te
:t b►-i� +i� vrp -�i. • <s.i+}.= kw-
-4- �t; J,I• F� _ -. � :1�•_ `�•�.
..�• ?.• i ��'` � CfT► f�T �•'t�S�• ,,t� -�•.. 4f. ��y�'. :�`.`•�,Fy�•h� new••.»• -...• ,.- �..•v'` -t
its<f�: r.•: f iS +ltr.:i�.T.'..:' _• %` I• rrae�?`:''` •'
j1t•.t{�ti.,y, i . C ••:•til'�.'{•7 .. -. l••i..: r�-
..f�' Vii. •.J' :._�`�•L a`+�J �^�+Ji P- •+ !i "�- _.. ._.•
r•ti�)4 Y46tl y'a)M `)••'i� .;�, • i. _ �~N ;•• ••v+•'l,,'•
\tly_ at•�ry}
v, ? " F' � if;s • '' • '�i i `� s a tip. tn. * t. R-5. 41, i4.,�.•`•f 1,
•' ti .�i+ 1 .'• -.' "•'3. y ,.P, n
_, ��Y.^ ptj=t.cr�t::.t`�
_ �•.ti. ti ,}yTiw .3• S a� +�y,� '�i� s y, fy ►. ::t � ' -�� ! +ij7:K+:.•'.` .r%4'+. Jj
JE
r Z to r M.•.il: ?i: �t�•. y, t •�—• . 7S 3r .) -' : �.. ._. •.
• jPO MN �� .t Ti•
to
w� .:•�1, M 1 •+lie ♦ +.• f :t.. ..
!,V.' Af itc*.t'
Or
_i ... .. .. .J. .-J - -. ,t J. < :� -•� S_1• - .3i�.=.i`.(ilt.-- -- -- -- 1•- •R,� -t ,•�•":.,'y.:e a -L•r..
I
{: �: . ♦:, +kk�.J�•�Tf� t'n�' 4y k�eh¢• •i i ' w il 1� tq r�ti..i���4„ `
~•�+k •i}- .. r,�ty'{:.�Jr• ie 7�•}.J �4 ±��. •t• r ; .ti '.ti M~. et. �`T`M�1i..Y�'.!
.I.a'l ! . �•�.i �..;a�.. `a'�7'�.•�� ''• �.• • I ' r ; Y71E.:`!x ate t.
• � .�t ' l'; '\ •4;�,S..d... � ^�•. �•�r'�S=e •Cif'_`': -�� ''aC � 1 \'" •�;i :} %��� i l` ��r_3�x1>yail
\ �.y., t +��r, 1 , i\ • a Y. rI Vie.• ":! ; �'> .
r• \�. • `a `\ V `l;. +i��.tC?4 �' •i CREEK BEI+p ORII?e •""'•. • ... ••
:.+a -- - a,�`.�. `\ ...: �.r);f�:���V.2�1� ' -, ` � � ••!'fir` ''{•� ;^ T,.e...
- ••tiw 44.!<.� • , ,� 1 "« + �/ f.�•� .. •- '�•:.. t�y'a�'.4'�_7y:.:. w' •.
�:.t - •, ,�C _ .,, it s ='�.=
r � �� •.. id.� _ M -- \ "I�y' : ' %i ;• .. .' Sat •.•..� � ': C
,9 :N
f�h v �< , � -{{„y •., jf +- t • ;t \� \ } _ •e • : t ` � /lam' � ••„'Y'i �: �`;. �� .
fa . f • . f , 4, � te�•tri�)cw4�,, 1; :T � \ �•1. ` • t- •• � • - s • , - %� •a � :�.
•4y - *.' :r`4Y. t fjt•.'•s. �• �.• ..f'i +��_.�`••'\`,,\ ;;`11�' '.. 7 r�• _S. •.�! -I�r � .:<: -. '�� .�j.
:i ti •1' •a �.1�- \ \ \ \` `'.ta. :' �.il • F.• a ,r.�• . _ �t ..yt. r i•1 £ -.�'�..
M.
•r 1` �:� -i `•„ tom' \ t t� kjs .' -' a= ='
UN
re 'i i� O► +
-.' \4 •.•.r, i a t •. .+f+- •',tf'�% • -f .'''•'ice {:i
IX
• rte.- •� _ .� .` �i � _ . '. '� 1' � � •- .��',•. ♦.• : . .yam �. . +s ?� f27• � _ . � .
;`•� J} �i! •=i ••f:• r•,{y�? ;�•y �.� � ssl 1 21.a�:'.f. _ .. `.. J �.
• �.� .ie.:i : • ` � �l. '�` � r• >`��',�'e. 7i.` `ti+�� '� � J ^'G``\ � i j � ` `• � ir\ Ott •- +' ,' �. i• � 1 •�' `
«•' 16 .rF + .J `y:•..'' j.'- ?tip 1 t �. `;_' j�
J'" !� • ! t `-� 1, • ,��1 �'•lti. rC 1 ` :.: ' ..:L: � . •1".. . t s 1 3 : ' _''••' �r'•
\f��M1A� :.{�• t� f .• }Y • ` • It `a: • - 1 1 1 •�f , -t.-'• i '71 • ..
X1. a -
• -j',� '�1 it. lll����R�s.�y.�y�Z{,•i�•%•:s. 'b' -•'�. �_7. .�j tai: l �.:�.. �: •:
1A`v
,
V.
c� 't+ �.� r aY.�l. yam• : ::''rfif «M
to
J � w: a r4 •'"''Y! � ��z � :I� 1 �`S,tG{• �a�p'�,��.: p i�• .r*"ac'S! r
_ ..� P Hy ), . -f. � �.tal �' .' s .yam. ./ ���"�•, ry, .�f,.:�.
•Y*;,:: 77•.•1, 1� N �•!•y i ✓!f •/ ,r.�Y yt .• •�wats•�%:.aa.ir..: .•..
�i��r+• t: t.: �,� to fytJy •,i:' .•T;fr' A7CHUNE'A -�1►i
•yF.%« r 1 I�_y' .••••t�ti.; a l` •' a.. l._ y •�J ' t. to
_..../� ^^'i�•'b ... S.r .r++i .at��(t y�fiY- 1i1•. :l' '1� :• . ♦/
f i , •'+i�'' , s• a •t ,in.�; , i��� f.:i1 i��e i w �a,�` A tl�'�'r•�.: ,i
_,:t• vim• •�. a. } �Yti.' i` •�� r(. ,•� is !4 ;.� ; x,ys• �• ,�,
• MATALINE 'j -A :s ue. /^1.;���!.... -"•: .. _. ! = ��`�A•y7� 'w::��,,��♦(
i t!y +t ••jam "M. :•r ♦r.� a• �`•`�a: ` �t:.•,' ftr! �< •,'4/�s
.�(f�. � } ♦' ..r•a ''•. r -.! :�: 117�•.'.liS:�•r._•is�•i'�.� <, �f ��' t� •'�'
11 ( •y j r. �' +.' .. '*r,•''yRa °, t r `�l:..c.,72`♦ !y { it a' *.,
• .. `t• '! 11 ar ;i'•K 'v rC: r. i ` " -3 +� a• r r.
_ .�, ' y .,:) . a. ♦ t . lsir:.. ». ...u✓ 4 t,r• :l ". .,Y A /rty� ''� f' t _ Mri J�
"� r'�',,. 4^"•a, I� a, s`s�••PR•P- 'rv'�' j '_. ,1.� 4*'� ate;.( ���r �••'•f!.
R •�rYa�ta' a.}•.'• '� �• f i:Y Jf �i i•, ��a;KCr S }Cat{;e }n ;f� 9iti ixi
t AF`t. i 1. 7r. v+•Yf.. -.Tr +. <�+:� +.��.,,..` ��. t �r fi�i_ 'Ka'l't'�
3 � _t_ _::.�..1_..- ..•L�•..;,�N,. �'•• • at_ .�t(' ). t., .,:Sr•• ;fii,.(4`i. �` x (fit a�'7,� 2,�;'. _�i�q•__s
• % �''1 'T'•♦�JA.',j,' "'t.ri �; t31i_•�y�••� '+'r ,) ,t. 4:.�� � �.,x��, w�C; �`
bbii . ; ': ` •,�� y^ � Y' ��.. �...,�ji :: ;.) ;e- r « fit;'
1 •.y �.• .�. �. 11 e'y'•'�s 1'f� � � � � :T `.... '� "31`'t t,t./a. .i �(y�:�
as A
arti •.'i. 1Y��.:• •_ c� I�tI :�RT. `.p} �i �r \�'iC�_• •R_��!' s £' +�7•' -Y; 4'�rl�. O.e.. :f�,�r'♦
w � • � . � . ` `.%vim `'•• .M�� �� !� . /// �a, T �.,p' -� .! ♦� �'{),:I �7. � '���- •, - ::i; -t {
•�' r •f�:�, }t�.'�!�•.�•�w..• �.•.. .,,y� it r. 'Y•T� i'..�` ,.��. C� "lfrrt�� :���. i�'• y�` �`'1!
e � l a T�1)�. rtiF''y�(( �� ♦•�'SS . i♦ }t� l�� � '� F: <_`}r~ ak �� , R• � pa a - a'T ' • ��• s -..- : �,.. 'I i �L' a ^i �� �
•�' 7 Y '!i r1�'i X•DY` . �. •� w[. �� °� ~' � -r �� :. ��'��'- C•r L � \.F
l Y .. i• � t. a:'d -� ����.... � �� � y '• Ltry SJ���. �. , � a ;*s�Y.!S3
- ..a^ S•. .X' i�F Mt.. �_.' a ♦ •i-r 111 ).. -a'IC
_i .f: .. �. r'>1.7r �:l•'!''�j. �' :i :i7 _tii .. 'r.. � *,� y. .y.'••!} . �i
-1 __ •' .�� ;;'�'':•`- ... "' rs'. ?..::y;r�_•,' ° °:�.•::s'N �:•, -9 _ iy t �.r ";' fo'' .{' "a `!4 • .r+•f•` %•i
-i a` .. r . + _ ry '$,C�c.R.tit aF L'�r�$'�`i fi •fin:} .! ��. i• e. ,r s'%'� �t r�-' •� a<;+'t - }„ ;`�'I� s�� •`ar :�,+ ,,. �•:
♦ r 4 �•,}•= .�'a.� Y3L� ia�3Xj�� ♦1y j�' s "di' 3c4 s _:Ii. ;k!t �r� y .li::r'r :t
I ' i _z%: r >LC,; ,, � �k' '�' �„T" Y %i. i.i r 't ( •, t R
c 1 • ' "; ` • j�a 'ti^2' .s< •y'�••''`l'•. - ',a. -g X15: 3- •'
Qiir^ 3 . ?: '4 t4`:l�r�' "•s +_ 1'"vr4: . -A. t�tt i}i•)f?:Fj `fit± •4 1
TI � ; � �';Ry..3!r�`••�';�ys�',�v�� --� '•�=���^•,t^t.•%�a,.' s�tt���_+r ~�'.t � 4��� y, •��'�`�
1. .'3'- ••. ''t !°s:�.,^ "•+ - a G' i,. .:. 1•j'vA ='.:+ c` i�'••':rY�Y. F•'' �,• y a
N 1 1. = ti- yes . � � _ ,;, _ � '3•�_ • •
Z' -
i r: .•.c. � :1i:%i. ••LJrt .. --f. •Y 'zsi''t j• `j
•+1 1 .P Y�_' C" �s.�1=... -. +-: i.� .-�z• .'. a 1Y1`%. lD'.- �(� w Y �
,y �: �y„A G.. •. „r' -• t •4• �.3�f•77..��J. ar : a��•+c+.t _'�.
1 ( �t11 st '3. rs�•”' '.,c.} � • _ . _. • - .. .... • -, "'! Ya sz. yt�. � r. AK � - •�
�•1 1 1 � • �c ?, w� . � M_. - :r`..._ . -.. =.ter � y�•„ r � '• t ��' _ =T•J. �r�'
,i.{ '�1 � :x'71 "4�°.`!" <�'4 '1`� ? ?'i' S ''• �_
. 1 :{:.•';cam ;- -:,_� *-` ._:.... .
}� .r. •, w' :ck S; :j �:t:'.'M Aa:'�~~ _ ��TT-�iijj
a * •Sis. ;
.:s>........ .•r: ^�•f!.vl %ti!:��•'i�YR R R (IQ_ ••v -•�s •'•.h°V. 'a:. td-�`!�2_►. }Tf �K 't
y _ s� �;S.at� ..•.i.. _.(1fER OWNS4i.� . _ •.... `..r i O>
.. )'
. :� ��" •• •' 4s ♦ �' R � -S' 'n,r *.q ,L•Jl i.+j: r :. � A. t
,.i�MA+:� r -'9 +�3�f' � h?�i �' Ji•Z�.�f�}���%'c. '.� _' >,ir %. •�s�' .. < >�. :o i
at
�.-•: 4 • •i: .,d1 '`.. :Fsr7,ii{�.fY.+'fih .r' rf ys r_f• I `3i!
J� {g.� wti is �± .C"�- .t: "i1•
•� is w, n f 'i'R' '_`(',:
.y: t.` FJ' •:�!- «';-L'+• ?�. ��i ^' .�'•�a� • ,� �i•.:s •..s -�', '! t.►•Y .. 1 • .�' ; .'v .i�
Xft
Iz
•r� •+ � :� ��•� •-'. �,� .��� s � �'�z 5'•`;;r�t'-.� � r�• :t •y� �- Z 'i�r�'':S`' •
lis
!�- VEC7 ':x. Ali, i:•.r�F _ J. a.:i.yti.
x I
r .Q a il% , \Y:t. , Q li �fl!'tirf.):y•�
at y •e i 1 s .Y i•. •.7 �Z
♦• •'/-' � C, `SCi]! ..•�� �,•-�`''� {E
f- $214 HM ,�.;s �! ♦1 °`,v:t. • +�yi;�'� { '•y . �. w •Ti;••.�`ti-
J% s g r' ? v., ,^
{ A:
1 ,� • '•. • � :� ;•F�t �'^Y'•.'�, : l S : �•: O N `�::�:. ''^ �lC•� ��_ �=:�•; .': ".,!•J',•R.t:: • <,�, ": v: .•;
wys. `. ♦ r ??t f. x I(�•" � tc.' ♦i.r .�� ;Ir;' w ..�•� �• ai ro l s =,���4t2;. :' .,'�ti jar.' •� �"�' �^'Z �'•a! �.
��fa}J�,x'artt�i' w ao•'t: '� t'� ,}{.• ►`<' W � •i • •t •••�! �i � -i ::r' � _ �i _ y a y�j'
:�' •t: :�5� r. -a �i� aQ \. •� - ^= 7�..• ;.../1,• +l.'- "''( "'':;=! ' +r :"awi �. i� ' q`tyy'.. it- i
:Y. .��_ ;':.txi >3",:.$.1b?" a1� .�: +�a���n.- '��... �- a... �.•��X �,T'i•.'i' 'S_ ::. t. � � � �s•
w -T
-jL -t., : ,
4 T— -
TV
J41
IN i.1 %,
till
4-
LL,�Glc 01 u G
AF
........... .........
rA
•4
MARIF C&
'Fle
Mill,
7i: � \. �.1.yr, a� �y
-'s All
'M 0
t. Rile,
N 11,
-fus
S. rA;rl.
5T<. .,!• 5 :� I
Wk
*42,
JL
69ML'i- AAJ�!�
--tv
611
4j7
...... Or.
12N
i
R
S 002 n1
9
2. l z
ia S x
. L
If
RESOLUTION NO. 93- 2
A RESOLUTION APPROVING AN AGREEMENT BETWEEN THE VILLAGE OF BUFFALO GROVE, THE
VILLAGE OF LINCOLNSHIRE AND THE VILLAGE OF VERNON HILLS CONCERNING THE
BUFFALO GROVE ROAD /PRAIRIE ROAD (PORT CLINTON ROAD TO U.S.ROUTE 45) STREET
ALIGNMENT
WHEREAS, the Village of Buffalo Grove, the Village of Lincolnshire
and the Village of Vernon Hills have reviewed transportation plans and
studies which indicate that it is desirable to develop a north /south arterial
street corridor along the Buffalo Grove Road and Prairie Road alignments
between Port Clinton Road and U.S.Route 45 so as to connect with northerly
and southerly existing and proposed extensions of this north /south arterial
street corridor; and,
WHEREAS, discussions concerning potential funding of improvements
along this corridor have been initiated with the Lake County Division of
Transportation; and,
WHEREAS, it is desirable to establish documentation of identified
desirable alignments and general characteristics of corridor improvements and
right -of -way so as to accommodate high quality planning for private
development along the corridor;
NOW, THEREFORE, BE IT RESOLVED by the Village President and Board
of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois
as follows:
1. The attached agreement entitled, "An Agreement Between The Village of
Buffalo Grove, The Village of Lincolnshire And the Village of Vernon
Hills Concerning The Buffalo Grove Road /Prairie Road (Port Clinton Road
To U.S. Route 45) Street Alignment" is hereby approved subject to the
adoption of the agreement by the corporate authorities of the Village of
Lincolnshire and the Village of Vernon Hills.
-2-
2. Following the acceptance of the agreement by the Village of Lincolnshire
and the Village of Vernon Hills, the Village President and the Village
Clerk are authorized and directed to execute the agreement. A copy of
said agreement is attached hereto and made a part hereof.
AYES: 5 - Reid, Kahn, Rubin, Braiman, Hendricks
NAYES: 0 - None
ABSENT: 1 - Marienthal
PASSED: January 18 , 1993
APPROVED: January 18 , 1993
ATTEST:
1, 1r
1
Villeje Clerk
G92C111
0
f
AGREEMENT
BETWEEN THE COUNTY OF LAKE AND THE VILLAGE OF BUFFALO GROVE
FOR THE ROADWAY IMPROVEMENT, MAINTENANCE RESPONSIBILITIES
AND
JURISDICTIONAL TRANSFERS OF
BUSCH ROAD/PARKWAY AND DEERFIELD PARKWAY;
BUFFALO GROVE ROAD/PORT CLINTON ROAD/PRAIRIE ROAD;
WEILAND ROAD; AND PRAIRIE ROAD
THIS AGREEMENT entered into this /3 day of Tu N e , A D.,
199.5, by and between the COUNTY OF LAKE, Illinois, an Illinois body politic and corporate,
acting by and through its Chairman and County Board, hereinafter referred to as the COUNTY; and
the VILLAGE OF BUFFALO GROVE, Illinois, an Illinois Municipal Corporation, acting by and
through its Village President and Village Board, hereinafter referred to as the VILLAGE.
WITNESSETH:
WHEREAS, the COUNTY and the VILLAGE, due to increasing traffic volumes, roadway
congestion and the alignment of certain roadways, have undertaken certain discussions regarding
the need for roadway improvements and the transfer of jurisdictional and maintenance
responsibilities; and,
WHEREAS, as a result of said discussions and in order to facilitate the free flow of traffic,
mitigate congestion on the roadways and ensure safety to motoring public, the COUNTY and the
VILLAGE have reached certain agreements relating to the jurisdictional transfer, maintenance and
improvement of certain roadways under their respective jurisdictions; and,
WHEREAS, the COUNTY and the VILLAGE, having reached certain agreements, are
desirous of entering into an agreement relating to the jurisdicitonal transfer, maintenance and
improvement of certain roadways in the south central section of Lake County; and,
VaIEREAS, THIS AGREEMENT sets forth the duties and responsibilities of the COUNTY
and the VILLAGE as they relate to said jurisdictional transfers, maintenance responsibilities and
roadway improvements of said certain roadways, as hereinafter described. THIS AGREEMENT
shall be known as the BUFFALO GROVE TRANSPORTATION AGREEMENT; and,
WHEREAS, said certain roadways shall include: (1) Busch Road/Parkway/Deerfield
Parkway from Illinois Route 83 to U.S. Route 45/Minois Route 21; (2) Buffalo Grove Road/ Port
Clinton Road/Prairie Road from Illinois Route 83 to the north Corporate Limit on Prairie Road; (3)
Weiland Road from the Lake -Cook County Line to Aptakisic Road; and, (4) Prairie Road from
Aptakisic Road to Illinois Route 22; and,
WHEREAS, said jurisdictional transfers, maintenance responsibilities and roadway
improvements will be of immediate benefit to the COUNTY and the VILLAGE, their residents and
the motoring public;
NOW, THEREFORE, for and in consideration of the mutual covenants herein made and
pursuant to all applicable statutes and local ordinances, the COUNTY and the VILLAGE do hereby
enter into the following:
BUFFALO GROVE TRANSPORTATION AGREEMENT
Section I. Recitals
It is mutually agreed by and between the parties hereto that the foregoing recitals are hereby
incorporated herein as though fully set forth.
Section H. Busch Road/Parkway/Deerfield Parkway • Dlinois Route 83 to U.S. Route
45/Illinois Route 21
A. The Staged Construction of Improvements
It is mutually agreed by and between the parties hereto that the proposed improvement of
Busch Road/Parkway/Deerfield Parkway may be constructed in one or more stages. Said
stages of construction are generally described as follows:
Stage I- Busch Road/Parkway at Weiland Road (1) The widening and
reconstruction of the existing pavement to provide for 2 through lanes in each
direction and providing separate left turn lanes on all approaches of the intersection;
(2) installation of new traffic control signals; (3) widening and reconstruction of the
existing pavement on the east approach, easterly through the Wisconsin Central Ltd.
-2-
r t Y
railroad crossing then tapering down to the existing pavement width; (4) providing
a separate eastbound to southbound right turn lane at Commerce Court; (5)
installation of new traffic control signals at Commerce Court; (6) widening the
existing Wisconsin Central Ltd. railroad crossing to accommodate the 5 lane
roadway including the installation of new gates, flashers and rubber crossing surface;
(7) interconnection of said traffic control signals and the railroad crossing protection
devices; (8) installation of curb and gutter and stormsewer, (9) construction of center
barrier medians and traffic islands; (10) installation of pavement markings; and, (11)
performing all other work in conformance with the approved final engineering plans,
specifications and construction contract documents.
2. Stage II: Busch Road at Highland Grove Drive and at Buffalo Grove Road (1)
Widening and reconstructing the existing pavement to provide for 1 through lane in
each direction and separate left and right turn lanes at Highland Grove Drive and at
Buffalo Grove Road; (2) installing new traffic control signals at Highland Grove
Drive; (3) modernizing and upgrading the existing traffic control signals at Buffalo
Grove Road; (4) installation of pavement markings; and, (5) performing all other
work in conformance with the approved final engineering plans, specifications and
construction contract documents.
3. Stage III: Busch Road Reconstruction (Fillinu the Gans) Between Illinois Route 83
and Weiland Road (1) Widening and reconstructing the existing pavement to
provide for 1 through lane in each direction with a continuous center left turn lane
or painted median; (2) installing pavement markings; and, (3) performing all other
work in conformance with the approved final engineering plans, specifications and
construction contract documents.
4. Stage IV: Busch Parkway at Deerfield Parkway Intersection Realienment (1)
Widening the existing pavement to provide 2 through lanes in each direction on
Busch Parkway from the Wisconsin Central Ltd. railroad crossing to Deerfield
Parkway; (2) realigning the existing intersection of Busch Parkway and Deerfield
Parkway to provide for a continuous east -west through movement between Busch
Parkway and Deerfield Parkway; (3) widening the existing pavement on the north
(east) approach of Busch Parkway to provide for a separate right turn lane; (4)
installing new traffic control signals at the realigned intersection; and, (5) performing
all other work in conformance with the approved final engineering plans,
specifications and construction contract documents.
-3
r r
s +
B. COLTNTY Responsibilities. Busch Road/Parkway/Deerfield Parkway Illinois Route 83
to U.S. Route 451 Illinois Route 21
The COUNTY agrees to be responsible for the following:
1. Engineering Responsibilities
a. To solely determine the exact nature, scope and limits of the proposed
improvements to Busch Road/Parkway/Deerfield Parkway in consultation
with the VILLAGE.
b. To review and approve all preliminary and final engineering plans prior to
a construction contract letting. Said review and approval shall be at the sole
discretion of the COUNTY's County Engineer in consultation with the
VILLAGE. Said review and approval shall not be unreasonably withheld.
2. Improvement Cost Responsibilities
a. To pay 100% of the local match of the Federal STP -U funds as approved by
the Lake County CATS Council of Mayors for the roadway improvement
items only on Busch Road/Parkway/Deerfield Parkway, Weiland Road and
Buffalo Grove Road.
b. To pay 100% of all costs not covered by any Federal, state or private source
of funds for the widening of the Wisconsin Central Ltd. railroad crossing.
The COUNTY shall only be responsible for the costs of the railroad crossing
widening that are directly attributable to the roadway widening only.
C. To pay an amount up to, but not to exceed, $1,000,000.00 for the Stage I
improvement.
d. To pay an amount up to, but not to exceed, $935,000.00 per construction
stage for the Stage II, Stage III and Stage IV improvements.
3. Traffic Control Signal Responsibilities
a. To pay 100% of the local match for the modernization and upgrading of the
existing traffic control signals at (1) Busch Road/ Parkway and Weiland
Road; and, (2) Busch Road and Buffalo Grove Road.
-4-
s 1 a 1
r
b. To pay 50% of the local match for the installation of the new traffic control
signals at Busch Road and Highland Grove Drive.
C. To pay 2/3 of the local match for the installation of the new traffic control
signals at Busch Parkway and Deerfield Parkway.
d. The COUNTY's payment for the traffic control signals as herein set forth in
Section II.B.3.a., Section II.B.3.b. and Section II.B.3.c shall be considered
a part of and not in addition to, the upper limit of participation as heretofore
set forth in Section II.B.2.c. and Section II.B.2.d.
e. To assume sole ownership of the traffic control signals, inclusive of the
emergency vehicle pre- emption systems, for the traffic control signals on
Busch Road/Parkway at Buffalo Grove Road, Highland Grove Drive,
Weiland Road, Commerce Court and Deerfield Parkway.
f. To have the sole authority to regulate the sequence and all other aspects of
the timing of all the traffic control signals, inclusive of the emergency vehicle
pre - emption systems, at the locations as herein described in Section II.B.3.e.
g. To maintain, or cause to be maintained, all the traffic control signals,
inclusive of the emergency vehicle pre - emption systems, at the locations as
herein described in Section II.B.3.e.
h. To pay 100% of the maintenance costs for the traffic control signals at Busch
Road and Buffalo Grove Road.
I. To pay 50% of the maintenance costs for the traffic control signals at (1)
Busch Road and Highland Grove Drive; and, (2) Busch Road/Parkway and
Weiland Road.
j. To pay 2/3 of the maintenance costs for the traffic control signals at (1)
Busch Parkway and Commerce Court; and, (2) Busch Parkway and Deerfield
Parkway.
k. To pay 100% of all future costs for the repair, replacement, upgrading or
modernization of the traffic control signals at Busch Road and Buffalo Grove
Road.
-5-
r
To pay 50% of all future costs for the repair, replacement, upgrading or
modernization of the traffic control signals at (1) Busch Road and Highland
Grove Drive; and, (2) Busch Road/Parkway at Weiland Road.
M. To pay 2/3 of all future costs for the repair, replacement, upgrading or
modernization of the traffic control signals at (1) Busch Parkway and
Commerce Court; and, (2) Busch Parkway at Deerfield Parkway.
4. Roadway Maintenance Responsibilities
a. To assume the full and complete maintenance responsibilities of Busch
Road/Parkway/Deerfield Parkway upon the completion and acceptance by
the COUNTY's County Engineer of all the improvements as contemplated
in the Stage I, Stage II, Stage III and Stage IV improvements. Said
acceptance of said improvements and the assumption of maintenance shall
not be unreasonably withheld.
5. Jurisdictional Transfer Responsibilities
a. To prepare and duly execute the jurisdictional transfer agreement to make
Busch Road/Parkway/Deerfield Parkway/ from Illinois Route 83 to U.S.
Route 45/Illinois Route 21 a part of the County Highway System. Said
jurisdictional transfer agreement is attached hereto as EXHIBIT I and by
reference herein is hereby made a part of THIS AGREEMENT.
b. To assume full and complete jurisdictional authority including the sole
authority for the issuance of all permits in accordance with the applicable
COUNTY Ordinances, as amended from time to time, upon approval of the
jurisdictional transfer by the Illinois Department of Transportation.
C. To have the authority to erect County Highway route markers upon the
approval of the jurisdictional transfer by the Illinois Department of
Transportation.
6. Scheduling and Programming of Improvements
a. To have the sole authority and discretion to schedule and program the Stage
I, Stage II, Stage III and Stage IV improvements. Said scheduling and
programming shall be based on countywide priorities and needs, and the
availability of COUNTY funds.
1
b. To prepare and approve any and all stage improvement project specific joint
agreements. Said project specific joint agreements shall be in substantial
conformance with the provisions of THIS AGREEMENT and shall set forth
the specific duties and responsibilities of the COUNTY and the VILLAGE
as they relate to each stage improvement project.
C. VILLAGE Responsibilities Busch Road/Parkway/Deerfield Parkway: Illinois Route
83 to U.S. Route 45/I1linois Route 21
The VILLAGE agrees to be responsible for the following:
1. Engineering Responsibilities
a. To prepare, or cause to be prepared, and pay 100% costs for all required
preliminary engineering and all final engineering plans, specifications and
contract letting documents for Stage I, Stage II, Stage III and Stage IV
improvements.
b. To obtain, or cause to be obtained, and pay 100% of all costs for any and all
applicable permits and approvals that may be required from any Federal,
state, regional or local agency for the Stage I, Stage II, Stage III and Stage IV
improvements.
C. To provide, or cause to be provided, and pay 100% of all costs for all
construction engineering supervision for the Stage I, Stage II, Stage III and
Stage IV improvements. The VILLAGE further agrees that any Federal,
state or private funds that may be secured to pay all or a portion of the costs
of the Stage I, Stage II, Stage III and Stage IV improvements shall be first
applied against any roadway only construction costs. Any such Federal,
state or private funds that may remain after being attributed to the roadway
only improvements may then be applied to any eligible non - roadway only
and engineering costs.
2. Right of Wgy and Easement Acquisition Responsibilities
a. To acquire, or cause to be acquired, and to pay 100% of all costs for any
right -of -way or easements (temporary and permanent) that may be required
for the Stage I, Stage II, Stage III and Stage IV improvements. Said
acquisition shall include the preparation and recording of any and all
documents, plats and legal descriptions.
-7-
3. Improvement Cost Responsibilities
a. To obtain the approval for the use of Federal STP -U funds from the Lake
County CATS Council of Mayors for the Stage I, Stage II, Stage III and
Stage IV improvements.
b. To obtain an amount equal to $165,000.00 of Operation Green Light funds
to pay the costs of the installation of the new traffic control signals at Busch
Parkway and Commerce Court and a separate eastbound to southbound right
turn lane on Busch Parkway at Commerce Court.
C. To obtain the maximum amount of available funding from the Illinois
Commerce Commission, the Federal Highway Administration, the Illinois
Department of Transportation, the METRA Commuter Rail Board and the
Wisconsin Central Ltd. for the widening and installation of gates, flashers,
electronic circuitry, motion sensors and rubber crossing materials for the
widening of the Wisconsin Central Ltd. railroad crossing.
d. To pay 100% of any costs not covered by any Federal, state or private
funding source for that portion of the widening of the Wisconsin Central Ltd.
railroad crossing that is not directly attributable to the widening of the
roadway. By way of example, the VILLAGE shall be solely responsible for
said costs of any widening, gates, rubber crossing extension or other
materials or items that may be necessary to accommodate any sidewalks or
bikepaths.
e. To pay 100% of all costs for the Stage I, Stage II, Stage III and Stage IV
improvements which are not covered by other funding sources. Said other
funding sources shall include Federal, state, county and private sources.
f. To pay 100% of the local match for any roadway work that is performed on
any intersecting streets with Busch Road/Parkway/Deerfield Parkway that are
under the jurisdiction of the VILLAGE.
4. Traffic Control Signals Responsibilities
a. To pay 100% of the local match for the emergency vehicle pre - emption
systems on the traffic control signals at (1) Busch Road and Buffalo Grove
Road; (2) Busch Road and Highland Grove Drive; (3) Busch Road/Parkway
and Weiland Road; and, (4) Busch Parkway and Deerfield Parkway. It is
-8-
I
anticipated that the cost of the emergency vehicle pre - emption system on the
traffic control signals at Busch Parkway and Commerce Court will be paid
for with the funds from Operation Green Light.
b. To pay 1/3 of the local match for the new traffic control signals at Busch
Parkway and Deerfield Parkway.
C. To pay 50% of the local match of the new traffic control signals at Busch
Road and Highland Grove Drive.
d. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto, for the use and operation of the emergency vehicle pre-
emption systems.
e. To reimburse the COUNTY for 100% of all costs for the maintenance,
replacement, repairs, modernization, upgrades and removal of the emergency
vehicle pre - emption systems.
f. To pay 100% of all energy costs for the traffic control signals at (1) Busch
Road and Buffalo Grove Road; (2) Busch Road and Fighland Grove Drive;
(3) Busch Road/Parkway and Weiland Road; (4) Busch Parkway and
Commerce Court; and, (5) Busch Parkway and Deerfield Parkway.
g. To reimburse the COUNTY for 50% of the maintenance costs for the traffic
control signals at (1) Busch Road and Highland Grove Drive; and, (2) Busch
Road/Parkway and Weiland Road.
h. To reimburse the COUNTY for 1/3 of the maintenance costs for the traffic
control signals at (1) Busch Parkway and Commerce Court; and, (2) Busch
Parkway and Deerfield Parkway.
I. To pay 50% of all future costs for the repair, replacement, upgrading and
modernization of the traffic control signals at (1) Busch Road and Highland
Grove Drive; and, (2) Busch Road/Parkway and Weiland Road.
j. To pay 1/3 of all future costs for the repair, replacement, upgrading and
modernization of the traffic control signals at (1) Busch Parkway and
Commerce Court; and, (2) Busch Parkway and Deerfield Parkway.
WE
L f
5. Stormwater Detention/Retention and Related Facilities Responsibilities
a. To provide, or cause to be provided, and pay 100% of all costs for any land,
right -of -way, easements (temporary and permanent), stormsewer, ditching
and all appurtenances and the construction for any stormwater detention or
retention that may be required by the applicable provisions of the LAKE
COUNTY WATERSHED DEVELOPMENT ORDINANCE, as amended
from time to time, for the Stage I, Stage II, Stage III and Stage IV
improvements.
b. To maintain, or cause to be maintained, at no cost to the COUNTY, any and
all stormwater detention/retention basins, stormsewer, swales, ditching and
all appurtenant facilities thereto that are located outside of the existing right -
of -way limits of Busch Road/Parkway/Deerfield Parkway.
6. Roadway Maintenance Responsibilities
a. To perform full and complete maintenance on Busch
Road/Parkway/Deerfield Parkway, at no cost to the COUNTY, prior to the
completion and acceptance of all Stage I, Stage II, Stage III and Stage IV
improvements. Said maintenance shall include, but not be limited to (1)
major pavement repairs, resurfacing or reconstruction; (2) winter
maintenance operations; (3) minor pavement maintenance; (4) maintaining
all landscaping and turf areas; (5) maintaining all roadway drainage inclusive
of structures, structure replacement, ditches, swales and all appurtenances
thereto; (6) pavement striping; (7) curb and gutter repair and replacement; (8)
guardrail erection, maintenance and replacement; (9) shoulder maintenance;
and, (10) maintenance and placement of regulatory signage and traffic
control devices in accordance with the ILLINOIS MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, as
amended from time to time.
b. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for all maintenance operations performed or for the lack
of any maintenance performed.
7. Utility and Facility Responsibilities
a. To pay 100% of all costs for the necessary removal and relocation of all
VILLAGE owned stormsewer, water lines, sanitary sewer lines and
-10-
Y �
appurtenant facilities thereto (VILLAGE owned utilities) from underneath
the existing or widened pavement and curb and gutter. Said costs shall also
include any extraordinary costs that may be incurred due to the presence of
said VILLAGE owned utilities. Said removal and relocation shall be
performed prior to or as part of the Stage I, Stage II, Stage III and Stage IV
improvements.
b. To pay 100% of the local match for any new non - roadway facilities. Said
non-roadway facilities shall include but not be limited to any new sidewalks,
bikepaths, street lighting and tree landscaping (VILLAGE owned facilities)
in the parkway and the medians. Said costs shall also include any
extraordinary costs that may be incurred due to the new VILLAGE owned
facilities.
C. To pay 100% of the local match for the removal and relocation of any
existing VILLAGE owned facility that may be required due to the
construction of the Stage I, Stage II, Stage III and Stage IV improvements.
Said costs shall also include any extraordinary costs that may be incurred due
to the presence of any existing VILLAGE owned facility.
d. To maintain, at no cost to the COUNTY, all VILLAGE owned utilities and
facilities that are located within their existing right -of -way of Busch
Road/Parkway/Deerfield Parkway.
e. To pay 100% of all future costs for all VILLAGE owned utilities and
facilities within the existing right -of -way for their removal, modernization,
modification and upgrades.
f. To pay 100% of all energy costs for any street lighting within the existing
right -of -way.
g. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for the placement, construction, installation, existence,
maintenance (or lack thereof), use and operation of all VILLAGE owned
utilities and facilities within the existing right -of -way.
8. Jurisdictional Transfer Responsibilities
a. To approve and duly execute the jurisdictional transfer agreement to make
Busch Road/Parkway/Deerfield Parkway from Illinois Route 83 to U.S.
-11-
Route 45/Illinois Route 21 a part of the County Highway System prior to the
award of the construction contract for the Stage I improvement.
9. Scheduline _and Prosaamming of Improvements
a. To approve and duly execute any and all stage improvement project specific
joint agreements upon receipt of said project specific joint agreements from
the COUNTY's County Engineer. Said approval and due execution of said
project specific joint agreements shall not be unreasonably withheld.
Section IIL Buffalo Grove Road/Port Clinton Road/Prairie Road: Illinois Route 83 to North
VILLAGE Corporate Limit on Prairie Road
A. The Staged Construction of Improvements
It is mutually agreed by and between the parties hereto that the proposed improvement of
Buffalo Grove Road/Port Clinton Road/ Prairie Road may be constructed in one or more
stages. Said stages are generally described as follows:
1. Stage I• Port Clinton Road at Prairie Road (1) The realignment of the existing
intersection to provide for a continuous through movement from the west approach
of Port Clinton Road to the north approach of Prairie Road; (2) the reconfiguration
of the existing east approach and the south approach to provide a new single
approach; (3) widening and reconstructing the existing pavement to provide for 1
through lane in each direction with a continuous center left turn lane or painted
median; (4) widening and upgrading the existing Wisconsin Central railroad crossing
with flashing lights, gates and rubber crossing surface; (5) installing new traffic
control signals; (6) providing for a separate right and left turn lane on the new
through approaches; (7) providing a separate westbound to northbound right turn
lane on the new reconfigured approach; (8) acquisition of right -of -way; (9)
stormwater detention/retention; (10) installing pavement markings; and, (11)
performing all other work in conformance with the approved final engineering plans,
specifications and construction contract documents.
2. Subsequent Stages of Construction (1) Long range plans contemplate the existing
pavement be widened to provide for 2 through lanes in each direction; (2) installation
of curb and gutter and stormsewer; (3) modernizing and upgrading existing traffic
control signals; and, (4) performing all other work in conformance with the approved
final engineering plans, specifications and construction contract documents.
-12-
B. COUNTY Responsibilities: Buffalo Grove Road/Port Clinton Road/Prairie Road:
Illinois Route 83 to the North VILLAGE CoMorate Limit on Prairie Road
The COUNTY agrees to be responsible for the following:
1. Engineering Responsibilities
a. To solely determine the exact nature, scope and limits of all stages of
improvements to Buffalo Grove Road/Port Clinton Road/Prairie Road in
consultation with the VILLAGE.
b. To prepare, or cause to be prepared, and pay 2/3 of all costs for the final
engineering plans for the Stage I improvement.
C. To provide, or cause to be provided, and pay 100% of all costs for the
construction engineering supervision for the Stage I improvement.
d. To obtain, or cause to be obtained, and pay all costs for any and all
applicable approvals and permits that may be required by any Federal, state,
regional or local agency for all stages of construction.
e. To prepare, or cause to be prepared, and pay 100% of all costs for the
preliminary engineering and final engineering for the subsequent stages of
the improvement.
f. To provide, or cause to be provided, and pay 100% of all costs for the
construction engineering supervision for the subsequent stages of the
improvement.
2. Right -Of -Way and Easement Acquisition Responsibilities
a. To acquire, or cause to be acquired, and to pay 100% of all costs for any
rights -of -way or easements (temporary and permanent) that may be required
for all stages of improvements for the roadway improvements only except
that the COUNTY shall not be responsible, in any manner or form, for the
acquisition of the right -of -way in the northwest quadrant of the existing
intersection of Port Clinton Road and Prairie Road. Said acquisition shall
include the preparation and recording of any and all documents, plats and
legal descriptions.
-13-
3. Improvement Cost Responsibilities
a. To pay 100% of all costs for the roadway items only for all stages of
improvements on Buffalo Grove Road/Port Clinton Road/Prairie Road.
b. To pay 100% of all costs not covered by any Federal, state or private source
of funds for the widening of the Wisconsin Central Ltd. railroad crossing.
The COUNTY shall only be responsible for the costs of the railroad crossing
widening that are directly attributable to the roadway widening only.
4. Traffic Control Signal 1 Responsibilities
a. To pay 2/3 of the cost for the new traffic signals at Port Clinton Road and
Prairie Road.
b. To assume sole ownership of the traffic control signals, inclusive of the
emergency vehicle pre - emption system, at Port Clinton Road and Prairie
Road.
C. To have the sole authority to regulate the sequence and all other aspects of
the timing, inclusive of the emergency vehicle pre - emption system, at the
intersection of Port Clinton Road and Prairie Road.
d. To maintain, or cause to be maintained, the traffic control signals, inclusive
of the emergency vehicle pre - emption system, at Port Clinton Road and
Prairie Road.
e. To pay 2/3 of the maintenance costs for the traffic control signals at Port
Clinton Road and Prairie Road.
f. To pay 2/3 of all future costs for the repair, replacement, upgrading and
modernization of the traffic control signals at Port Clinton Road and Prairie
Road.
S. Stormwater Detention/Retention and Related Facilities Responsibilities
a. To provide, or cause to be provided, and pay 100% of all costs for any land,
right -of way, easements (temporary and permanent), stormsewer, ditching
and all appurtenances related thereto and the construction of any stormwater
detention or retention that may be required by the applicable provisions of
-14-
the LAKE COUNTY WATERSHED DEVELOPMENT ORDINANCE, as
amended from time to time, for the Stage I improvement.
6. Roadway Maintenance Responsibilities
a. To assume the full and complete maintenance responsibilities for Buffalo
Grove Road from Illinois Route 83 to Illinois Route 22 upon approval the
jurisdictional transfer agreement by the Illinois Department of
Transportation.
b. To assume full and complete maintenance responsibilities for Buffalo Grove
Road/Port Clinton Road/Prairie Road from Illinois Route 22 to the north
VILLAGE Corporate Limit on Prairie Road upon completion and acceptance
by the COUNTY's County Engineer of the Stage I improvement. Said
acceptance of said Stage I improvement shall not be unreasonably withheld.
7. Jurisdictional Transfer Responsibilities
a. To prepare and duly execute the jurisdictional transfer agreement to make
Buffalo Grove Road/Port Clinton Road/Prairie Road from Illinois Route 83
to the north VILLAGE Corporate Limit a part of the County Highway
System. Said jurisdictional transfer agreement is attached hereto as
EXHIBIT H and by reference herein is hereby made a part of THIS
AGREEMENT.
b. To assume full and complete jurisdictional authority including the sole
authority for the issuance of all permits on Buffalo Grove Road/Port Clinton
Road/Prairie Road in accordance with the applicable COUNTY Ordinances,
as amended from time to time, upon approval of the jurisdictional transfer by
the Illinois Department of Transportation.
C. To have the authority to erect County Highway route markers, on Buffalo
Grove Road/Port Clinton Road/Prairie Road, upon the approval of the
jurisdictional transfer by the Illinois Department of Transportation.
8. Scheduling and Programming mming of Improvements
a. To have the sole authority and discretion to schedule and program the Stage
I and subsequent stages of improvements. Said scheduling and programming
-15-
shall be based on countywide priorities and needs, and the availability of
COUNTY funds.
b. To prepare and approve any and all stage improvement project specific joint
agreements. Said project specific joint agreements shall be in substantial
conformance with the provisions of THIS AGREEMENT and shall set forth
the specific duties and responsibilities of the COUNTY and the VILLAGE
as they relate to each stage improvement project.
C. VILLAGE Responsibilities: Buffalo Grove Road/Port Clinton Road/Prairie Road:
Illinois Route 83 to the North Corporate Limit on Prairie Road
The VILLAGE agrees to be responsible for the following:
1. Engineering Responsibilities
a. To pay 1/3 of all costs for the final engineering plans for the Stage I
improvement.
b. To reimburse the COUNTY an amount equal to 15% of the construction
costs of those construction improvements attributable to the VILLAGE for
construction engineering supervision for the Stage I improvement.
C. To reimburse to the COUNTY an amount equal to 25% of the construction
costs of those construction improvements attributable to the VILLAGE for
preliminary engineering, final engineering plans and construction
engineering supervision for all subsequent stages of improvements.
2. Right of Way and Easement Acquisition Responsibilities
a. To acquire, or cause to be acquired, and pay 100% of all costs for the right -
of -way in the northwest quadrant of the existing intersection of Port Clinton
Road and Prairie Road. Said acquisition shall be in the name of the
COUNTY and shall include the preparation and recording of any and all
documents, plats and legal descriptions.
b. To pay 100% of all costs for any right -of -way and easements (temporary and
permanent) that may be required to accommodate any VILLAGE owned
utilities and facilities. Said costs shall include the preparation and recording
of any and all documents, plats and legal descriptions.
-16-
3. Improvement Cost Responsibilities
a. To pay 100% of all costs for any roadway work that is performed on any
intersecting streets with Buffalo Grove Road/Port Clinton Road/Prairie Road
that are under the jurisdiction of the VILLAGE for all stages of
improvements.
4. Traffic Control Signal 1 Responsibilities
a. To pay 1/3 of the costs for the new traffic control signals at Port Clinton
Road and Prairie Road.
b. To pay 100% of the costs for emergency vehicle pre - emption system on the
traffic control signals at Port Clinton Road and Prairie Road.
C. To reimburse the COUNTY for 100% of all costs for the maintenance,
replacement, repairs, modernization, upgrades and removal of the emergency
vehicle pre - emption system.
d. To pay 100% of all energy costs for the traffic control signals at Port Clinton
Road and Prairie Road.
e. To reimburse the COUNTY for 1/3 of the maintenance costs for the traffic
control signals at Port Clinton Road and Prairie Road.
f. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for the use and operation of the emergency vehicle pre-
emption systems.
g. To pay 1/3 of all future costs for the repair, replacement, upgrading and
modernization of the traffic control signals at Port Clinton Road and Prairie
Road.
5. Stormwater Detention/Retention and Related Facilities Responsibilities
a. To provide, or cause to be provided, and pay 100% of all costs for any land,
rights -of -way, easements (temporary and permanent), stormsewer, ditching
and all appurtenances thereto and the construction for any stormwater
detention or retention that may be required by the applicable provisions of
the LAKE COUNTY WATERSHED DEVELOPMENT ORDINANCE, as
-17-
amended from time to time, for any and all of the subsequent stages of
improvement on Buffalo Grove Road from Illinois Route 83 to the Wisconsin
Central Ltd. railroad crossing.
b. To maintain, or cause to be maintained, at no cost to the COUNTY, any and
all stormwater detention or retention basins, stormsewer, swales, ditching and
all appurtenant facilities thereto that are located outside the existing right -of-
way limits of Buffalo Grove Road/Port Clinton Road/ Prairie Road from
Illinois Route 83 to the north Corporate Limit on Prairie Road.
6. Roadway Maintenance Responsibilities
a. To perform full and complete maintenance on Buffalo Grove Road/Port
Clinton Road/Prairie Road from Illinois Route 22 to the north Corporate
Limit on Prairie Road, at no cost to the COUNTY, prior to the completion
and acceptance of the Stage I improvement. Said maintenance shall include,
but not be limited to (1) major pavement repairs; (2) winter maintenance
operations; (3) minor pavement maintenance; (4) maintaining all landscaping
and turf areas; (5) maintaining all roadway drainage inclusive of structures,
structure replacment, ditches, swales and all appurtenances thereto; (6)
pavement striping; (7) curb and gutter repair and replacement; (8) guardrail
erection, maintenance and replacement; (9) shoulder maintenance; and, (10)
maintenance and placment of regulatory signage and traffic control devices
in accordance with the ILLINOIS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES FOR STREETS AND HIGHWAYS, as amended
from time to time.
b. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for all maintenance operations performed or for the lack
of any maintenance performed.
7. Utility and Facility Responsibilities
a. To pay 100% of all costs for the necessary removal and relocation of all
VILLAGE owned stormsewer, water lines, sanitary sewer lines and
appurtenance facilities thereto (VILLAGE owned utilities) from underneath
the existing and widened pavement and curb and gutter. Said costs shall also
include any extraordinary costs that may be incurred due to the presence of
said VILLAGE owned utilities. Said removal and relocation shall be
performed prior to or as part of any stage of improvement. .
-18-
b. To pay 100% of all costs for any new non - roadway facilities. Said non-
roadway facilities shall include but not be limited to any new sidewalks,
bikepaths, street lighting and tree landscaping within the parkway and the
medians (VILLAGE owned facilities). Said costs shall also include any
extraordinary costs that may be incurred due to the new VILLAGE owned
facilities.
C. To pay 100% of all costs for the removal and relocation of any existing
VILLAGE owned facility that may be required due to the construction of any
stage of improvement. Said costs shall also include any extraordinary costs
that may be incurred due to the presence of any existing VILLAGE owned
facility.
d. To maintain, at no cost to the COUNTY, all VILLAGE owned utilities and
facilities that are located within the existing right -of -way of Buffalo Grove
Road/Port Clinton Road/Prairie Road.
e. To pay 100% of all future costs for all VILLAGE owned utilities and
facilities within the existing right -of -way for the removal, modernization,
modification and upgrades.
f. To pay 100% of all energy costs for any street lighting within the existing
right -of -way.
g. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for the placement, construction, installation, existence,
maintenance (or lack thereof), use and operation of all VILLAGE owned
utilities and facilities within the existing right -of -way.
8. Jurisdictional Transfer Responsibilities
a. To approve and duly execute the jurisdictional transfer agreement to make
Buffalo Grove Road/Port Clinton Road/Prairie Road from Illinois Route 83
to the north Corporate Limit on Prairie Road a part of the County Highway
System prior to the award of the construction contract letting for the Stage
I improvement to Busch Road/Parkway/Deerfield Parkway.
-19-
9. Scheduling and Programming of Improvements
a. To approve and duly execute any and all stage improvement project specific
joint agreements upon receipt of said project specific joint agreements from
the COUNTY's County Engineer. Said approval and due execution of said
project specific joint agreements shall not be unreasonably withheld.
10. Development Improvement Responsibilities
a. To continue to require and ensure the completion of the construction of any
and all development related improvements that the VILLAGE may have
required to be constructed on Buffalo Grove Road/Port Clinton Road/Prairie
Road prior to the VILLAGE entering into THIS AGREEMENT. The final
engineering plans, scope of work and any and all documents related to said
development related improvements shall be delivered to the COUNTY'S
County Engineer within 30 days of the VILLAGE's approval and due
execution of THIS AGREEMENT.
Section IV Weiland Road: Lake -Cook County Line to Aptakisic Road: Prairie Road:
Aptakisic Road to Illinois Route 22
A. The Construction of Future Improvements
It is mutually agreed by and between the parties hereto that the proposed future
improvements of Weiland Road and Prairie Road shall be in general conformance to the
descriptions as set forth hereinafter.
It is further mutually agreed by and between the parties hereto that the proposed
improvements as generally described hereinafter may be constructed in one or more stages.
Widening of Weiland Road and Prairie Road - Typical County 5 Lane Cross Section
(1) Reconstructing and/or rehabilitating and widening of the existing pavement to
provide for the typical County 5 lane cross section of 2 through lanes in each
direction with a continuous center painted median, separate left turn lanes or a bi-
directional left turn lane; (2) providing individual travel lane widths of 11 feet, or the
metric equivalent; (3) installing B-6.12 curb and gutter, or the metric equivalent,
with stormsewer; (4) providing a compacted aggregate and asphaltic base with an
asphaltic surface; (5) modernization of traffic control signals; (6) installing pavement
striping; and (7) performing all other work in conformance with the approved final
engineering plans, specifications and construction contract documents.
-20-
2. Reconstruction and/or Rehabilitation of Weiland Road and Prairie Road - Typical
County Reconstruction/Rehabilitation Improvement (1) reconstructing and/or
rehabilitating, in whole or in part, the existing pavement with a compacted aggregate
and asphaltic base with an asphaltic surface; (2) performing grading and earthwork
for the shoulder area and stormwater drainage conveyance; (3) providing curb and
gutter where applicable; (4) modernizing traffic control signals; (4) installing
pavement markings; and (5) performing all other work in conformance with the
approved final engineering plans, specifications and construction contract
documents.
B. COUNTY Responsibilities: Weiland Road: Lake -Cook County Line to Aotakisic Road:
Prairie Road: Al2takisic Road to Illinois Route 22
The COUNTY agrees to be responsible for the following:
1. Engineering Responsibilities
a. To determine jointly with the VILLAGE the exact nature, scope and limits
of the widening or reconstruction/rehabilitation (the improvements) of
Weiland Road and Prairie Road.
b. To prepare, or cause the be prepared, and pay 100% of all costs for the
preliminary engineering and final engineering plans for the improvements.
C. To provide, or cause to be provided, and pay 100% of all costs for the
construction engineering supervision for the improvements.
d. To obtain, or cause to be obtained, and pay all costs for any and all
applicable approvals and permits that may be required by any Federal, state,
regional or local agency for all the improvements.
2. Right -of -Way and Easement Acquisition Responsibilities
a. To acquire, or cause to be acquired, and to pay 100% of all costs for any
right -of -way or easements (temporary and permanent) that may be required
for the improvements for the roadways only. Said acquisition shall include
the preparation and recording of any and all documents, plats and legal
descriptions.
-21-
3. Improvement Cost Responsibilities
a. To pay 100% of all costs for the improvements for the roadways only on
Weiland Road and Prairie Road.
4. Traffic Control Signal Responsibilities
a. To maintain, or cause to be maintained, prior to the effective date of the
jurisdictional transfer, any new traffic control signals that may be installed
at any existing or future intersection with Weiland Road or Prairie Road,
inclusive of the emergency vehicle pre - emption systems.
b. To assume sole ownership of any new traffic control signals.
C. To maintain, or cause to be maintained, the existing traffic control signals at
(1) Aptakisic Road and Weiland Road; and, (2) Aptakisic Road and Prairie
Road inclusive of the emergency vehicle pre - emption systems.
d. To have the sole authority to regulate the sequence and all other aspects of
the timing, inclusive of the emergency vehicle pre - emption systems, of the
traffic control signals at (1) Aptakisic Road and Weiland Road; (2) Aptakisic
Road and Prairie Road; and, (3) any new traffic control signal installations.
e. To pay 2/3 of the maintenance costs for the traffic control signals at (1)
Aptakisic Road and Weiland Road; and, (2) Aptakisic Road and Prairie
Road. In the event that the Weiland Road/Prairie Road Connection is
constructed, the COUNTY's share of the maintenance costs for the traffic
control signals at Aptakisic Road and Weiland Road shall be reduced to 50 1/o.
f. To pay 2/3 of all future costs for the repair, replacement, upgrading and
modernization of the traffic control signals at (1) Aptakisic Road and
Weiland Road; and, (2) Aptakisic Road and Prairie Road. In the event that
the Weiland Road/Prairie Road Connection is constructed, the COUNTY's
share of any future costs for the traffic control signals at Aptakisic Road and
Weiland Road shall be reduced to 50 %.
5. Roadwgy MMaintenance Responsibilities
a. To perform only major maintenance roadway improvements. Said major
maintenance roadway improvements shall be limited to (1) major pavement
-22-
A
repairs; (2) reconstruction and/rehabilitation of the existing pavement area;
and, (3) maintenance resurfacing.
b. To pay 100% of all costs for all major maintenance roadway improvements.
Said costs shall include all costs for final engineering plans and construction
engineering supervision.
Jurisdictional Transfer Responsibilities
a. To prepare and duly execute the jurisdictional transfer agreement to remove
Weiland Road from the Lake -Cook County Line to Aptakisic Road from the
County Highway System. Said jurisdictional transfer agreement is attached
hereto as EXHIBIT III and by reference herein is hereby made a part of THIS
AGREEMENT.
b. To prepare and duly execute the jurisdictional transfer agreement to remove
Prairie Road from Aptakisic Road to Illinois Route 22 from the County
Highway System. Said jurisdictional transfer agreement is attached hereto
as EXMIT IV and by referenced herein is hereby made a part of THIS
AGREEMENT.
C. To continue to have jurisdictional authority over all, or parts of, Weiland
Road and Prairie Road until such time as the improvements to Weiland Road
or Prairie Road are completed and accepted by the VILLAGE.
d. To continue to retain sole authority to issue permits pursuant to the
applicable COUNTY Ordinances, as amended from time to time, until such
time as the jurisdiction of Weiland Road or Prairie Road, in whole or in part,
is transferred to the VILLAGE.
e. To agree that in the event the VILLAGE no longer desires the widening of
Weiland Road or Prairie Road or in the absence of existing current volumes
of traffic sufficient to warrant the widening of Weiland Road or Prairie Road,
the jurisdictional transfer to the VILLAGE shall become effective at 12:01
AM. June 1, 2010 or at such earlier or later time as the reconstruction and/or
rehabilitation of Weiland Road or Prairie Road has been completed and
accepted by the VILLAGE. Said acceptance by the VILLAGE shall not be
unreasonably withheld.
-23-
7. Scheduling and Programming mming of Improvements
a. To have the sole authority and discretion to schedule and program the major
maintenance roadway improvements and the improvements. Said scheduling
and programming shall be based on countywide priorities and needs, and the
availability of COUNTY funds.
b. To have the sole authority to construct in stages, the major maintenance
roadway improvements and the improvements. Said staged construction and
the limits of said stages shall be determined in consultation with the
VILLAGE.
C. To prepare and execute any and all stage improvement project specific joint
agreements. Said project specific joint agreements shall be in substantial
conformance with the provisions of THIS AGREEMENT and shall set forth
the specific duties and responsibilities of the COUNTY and the VILLAGE
as they relate to each stage improvement project.
The Weiland Road/Prairie Road Connection
a. To review and approve the preliminary engineering and the final engineering
plans for the Connection. Said review and approval shall be limited to any
proposed work to be performed on Weiland Road, Aptakisic Road and Prairie
Road inclusive of any proposed traffic control signal modifications and new
traffic control signal installations. Said review and approval shall not be
unreasonably withheld.
b. To prepare and execute the jurisdictional transfer agreement and related
documents to remove Prairie Road from Aptakisic Road to the Connection
from the County Highway System.
C. VILLAGE Responsibilities: Weiland Road: Lake -Cook County Line to Aptakisic
Road; Prairie Road: Aptakisic Road to Illinois Route 22
The VILLAGE agrees to be responsible for the following:
1. Engineering , `Responsibilities
a. To determine jointly with the COUNTY the exact nature, scope and limits of
the improvements of Weiland Road and Prairie Road.
-24-
b. To review and approve all preliminary engineering and final engineering
plans prior to a construction contract letting. Said review and approval shall
not be unreasonably withheld.
C. To reimburse to the COUNTY an amount equal to 25% of the construction
costs of those construction improvements attributable to the VILLAGE for
preliminary engineering, final engineering plans and construction
engineering supervision.
2. Right-of-Way and Easement Acquisition Responsibilities
a. To pay 100% of all costs for any right -of -way and easements (temporary and
permanent) that may be required to accommodate any VILLAGE owned
utilities and facilities. Said costs shall include the preparation and recording
of any and all documents, plats and legal descriptions.
3. Improvement Cost Responsibilities
a. To pay 100% of all costs for any roadway work that is performed on any
intersecting streets with Weiland Road and Prairie Road that are under the
jurisdiction of the VILLAGE.
b. To pay 100% of all costs for any widening or reconstruction and/or
rehabilitation that are different than or in excess of those improvements not
customarily a part of the COUNTY's typical 5 lane improvement or
reconstruction and/or rehabilitation improvement. Such improvements not
customarily typical of a COUNTY improvement include, but are not limited
to, (1) portland concrete cement roadway base and surface; (2) lane widths
of 12 feet; (3) center landscaped medians; and (4) portland concrete cement
curbs and gutters in excess of the B -6.12 standard curb and gutter.
4. Traffic Control Signal Responsibilities
a. To assume the following responsibilities for any new traffic control signals
that may be warranted and installed on Weiland Road or Prairie Road:
(I) To prepare, or cause to be prepared, and pay 100% of all costs for
preliminary engineering and final engineering plans.
-25-
(ii) To provide, or cause to be provided, and pay, or cause to be paid,
100% of all costs for construction engineering supervision.
(iii) To pay, or cause to be paid, 100% of all costs of the traffic control
signal installation, inclusive of all interconnect costs and costs for the
emergency vehicle pre - emption system.
(iv) To reimburse the COUNTY for 100% of all maintenance costs
inclusive of all interconnect maintenance costs and emergency
vehicle pre - emption costs.
(v) To indemnify, defend and hold harmless the COUNTY and pay
100% of all costs related thereto for the use and operation of the
emergency vehicle pre- emption system.
(vi) To pay 100% of all energy costs.
(vii) To pay 1001/6 of all future costs for the repair, replacement, upgrading
and modernization inclusive of future interconnect costs and
emergency vehicle pre - emption costs.
b. To pay 100% of all energy costs for the traffic control signals at (1) Aptakisic
Road and Prairie Road; and, (2) Aptakisic Road and Prairie Road.
C. To reimburse the COUNTY for 100% of all costs for the maintenance,
replacement, repairs, modernization, upgrades and removal of the emergency
vehicle pre - emption systems.
d. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for the use and operation of the emergency vehicle pre-
emption systems.
e. To reimburse the COUNTY for 1/3 of the maintenance costs for the traffic
control signals at (1) Aptakisic Road and Weiland Road; and, (2) Aptakisic
Road and Prairie Road. In the event that the Weiland Road/Prairie Road
Connection is constructed, the VELLAGE's share of the maintenance costs
for the traffic control signals at Aptakisic Road and Weiland Road shall be
increased to 50 %.
-26-
f. To pay 1/3 of all future costs for the repair, replacement, upgrading and
modernization of the traffic control signals at (1) Aptakisic Road and
Weiland Road; and, (2) Aptakisic Road and Prairie Road. In the event that
the Weiland Road /Prairie Road Connection is constructed, the VILLAGE's
share of the future costs for the traffic control signals at Aptakisic Road and
Weiland Road shall be increased to 50 %.
5. Stormwater Detention/Retention and Related Facilities Responsibilities
a. To provide, or cause to be provided, and pay 100% of all costs for any land,
rights -of -way (temporary and permanent), stormsewer, ditching and all
appurtenances thereto and the construction for any stormwater detention or
retention that may be required by the applicable provisions of the LAKE
COUNTY WATERSHED DEVELOPMENT ORDINANCE, as amended
from time to time, for the improvements.
b. To maintain, or caused to be maintained, at no cost to the COUNTY, any and
all stormwater detention or retention basins, stormsewer, swales, ditching and
all appurtenant facilities thereto that are located outside of the existing right -
of -way of Weiland Road and Prairie Road.
6. Roadway Maintenance Responsibilities
a. To perform full and complete maintenance on Weiland Road from the Lake -
Cook County Line to Aptakisic Road and on Prairie Road from Aptakisic
Road to Illinois Route 22 at no cost to the COUNTY. Said maintenance
responsibilities shall commence at such time as the jurisdictional transfer of
Buffalo Grove Road/Port Clinton Road/Prairie Road is approved by the
Illinois Department of Transportation. Said maintenance shall include, but
not be limited to (1) winter maintenance operations; (2) routine and daily
maintenance operations; (3) minor pavement maintenance; (4) maintaining
all landscaping and turf areas; (5) maintaining all roadway drainage,
inclusive of structures, structure replacement, ditches, swales and all
appurtenances thereto; (6) pavement striping; (7) curb and gutter repair and
replacement; (8) guardrail erection, maintenance and replacement; (9)
shoulder maintenance; and (10) maintenance and. placement of regulatory
signage and traffic control devices in accordance with the ILLINOIS
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR
STREETS AND HIGHWAYS, as amended from time to time.
-27-
b. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for all maintenance operations performed or for the lack
of any maintenance performed.
7. uility and Facility Responsibilities
a. To pay 100% of all costs for the necessary removal and relocation of all
VILLAGE owned stormsewer, water lines, sanitary sewer lines and
appurtenant facilities thereto (VILLAGE owned utilities) from underneath
the existing or widened pavement and curb and gutter. Said costs shall also
include any extraordinary costs that may be incurred due to the presence of
said VILLAGE owned utilities. Said removal and relocation shall be
performed prior to or as part of any stage of the improvements.
b. To pay 100% of all costs for any new non - roadway facilities. Said non-
roadway facilities shall include but not be limited to any new sidewalks,
bikepaths, street lighting and tree landscaping within the parkway and the
medians (VILLAGE owned facilities). Said costs shall also include any
extraordinary costs that may be incurred due to the new VILLAGE owned
facilities.
C. To pay 100% of all costs for the removal and relocation of any existing
VILLAGE owned facility that may be required due to the construction of any
stage of the improvements. - Said costs shall also include any extraordinary
costs that may be incurred due to the presence of any existing VILLAGE
owned facility.
d. To maintain, at no cost to the COUNTY, all VILLAGE owned utilities and
facilities that are located within the existing right -of -way of Weiland Road
and Prairie Road.
e. To pay 100% of all future costs for all VILLAGE owned utilities and
facilities within the existing right -of -way for the removal, modernization,
modification and upgrades.
f. To pay 100% of all energy costs for any street lighting within the existing
right -of -way.
g. To indemnify, defend and hold harmless the COUNTY and pay 100% of all
costs related thereto for the placement, construction, installation, existence,
-28-
maintenance (or lack thereof), use and operation of all VILLAGE owned
utilities and facilities within the existing right -of -way.
8. Jurisdictional Transfer Responsibilities
a. To approve and duly execute the jurisdictional transfer agreement to add
Weiland Road from the Lake -Cook County Line to Aptakisic Road to the
municipal street system prior to the construction contract letting for the Stage
I improvement of Busch Road/Parkway/Deerfield Parkway.
b. To approve and duly execute the jurisdictional transfer agreement to add
Prairie Road from Aptakisic Road to Illinois Route 22 to the municipal street
system prior to the construction contract letting for the Stage I improvement
of Busch Road/Parkway/Deerfield Parkway.
C. To accept full jurisdictional responsibility for completed stage constructed
widened or reconstructed and/or rehabilitated sections of Weiland Road or
Prairie Road.
d. To agree that in the event the VILLAGE no longer desires the widening of
Weiland Road or Prairie Road, or in the absence of existing current volumes
of traffic sufficient to warrant the widening of Weiland Road or Prairie Road,
the jurisdictional transfer to the VILLAGE shall become effective at 12:01
a.m., June 1, 2010 or at such earlier or later time as the reconstruction and/or
rehabilitation of Weiland Road or Prairie Road has been completed and
accepted by the VILLAGE. Said acceptance by the VILLAGE shall not be
unreasonably withheld.
9. Scheduling and Programming of Improvements
a. To approve and duly execute any and all stage improvement project specific
joint agreements upon receipt of said project specific joint agreements from
the COUNTY's County Engineer. Said approval and due execution of said
project specific joint agreements shall not be unreasonably withheld.
10. The Weiland Road/Prairie Road Connection
a. To have the sole authority and responsibility for determining the alignment
for the Connection.
-29-
11
b. To pay, or cause to be paid, 1000/6 of all costs for the preliminary
engineering, final engineering plans and construction engineering
supervision.
C. To pay or obtain, or cause to be paid or obtained, 100% of all costs for the
acquisition of all necessary right -of -way for the Connection.
d. To pay, or cause to be paid, 100% of all construction costs for the
Connection including all intersection modifications necessary on Weiland
Road, Aptakisic Road and Prairie Road. Said costs shall also include all
necessary traffic control signal modifications at Aptakisic Road and Prairie
Road, any new traffic control signal installations and the removal of the
traffic control signals at Prairie Road if warrants would no longer be met.
e. To assume full and complete maintenance and jurisdictional responsibilities
for the Connection upon completion.
f. To approve and duly execute the jurisdictional transfer agreement and
assume full and complete maintenance and jurisdictional responsibilities of
existing Prairie Road from Aptakisic Road to the Connection including all
major maintenance costs and future widening or reconstruction and/or
rehabilitation costs in the event the widening or reconstruction and/or
rehabilitation has not been completed. Said approval and due execution of
the jurisdictional transfer agreement shall occur prior to the approval of the
preliminary engineering and final engineering plans for the Connection by
the COUNTY's County Engineer.
New Development
a. To require any and all new development having frontage on Weiland Road
and Prairie Road to dedicate sufficient right -of -way for the future widening
of Weiland Road and Prairie Road. Said sufficient right -of -way shall be a
minimum of 50 feet half right -of -way width.
b. To obtain, or cause to be obtained, any land, rights -of -way and easements for
the conveyance of stormwater and any detention or retention basins that may
be needed for the widening of Weiland Road and Prairie Road.
-30-
Section IV, General Provisions
A. It is mutually agreed by and between the parties hereto that the following general
provisions shall be made a part of THIS AGREEMENT:
1. It is mutually agreed by and between the parties hereto that nothing in THIS
AGREEMENT shall preclude either party from obtaining any Federal, state or local
funds to pay all, or a portion, of the costs of any of the improvements as
contemplated in THIS AGREEMENT.
2. It is mutually agreed by and between the parties hereto that each parry shall fully
cooperate with the other in completing the improvements contemplated in THIS
AGREEMENT.
3. It is mutually agreed by and between the parties hereto that nothing contained in
THIS AGREEMENT is intended or shall be construed as, in any manner or form,
creating or establishing a relationship of co- partners between the parties hereto or as
constituting the VILLAGE (including its elected officials, officers, employees and
agents), the agent, representative or employee of the COUNTY for any purpose or
in any manner whatsoever. The VILLAGE is to be and shall remain independent of
the COUNTY with respect to all services performed under THIS AGREEMENT.
This Provision is reciprocal to the VILLAGE.
4. It is mutually agreed by and between the parties hereto that the provisions of THIS
AGREEMENT are severable. If any provision, paragraph, section, subdivision,
sentence, clause, phrase or word of THIS AGREEMENT is for any reason held to
be contrary to law, or contrary to any rule or regulation having the force and effect
of law, such decision shall not affect the remaining portions of THIS AGREEMENT.
5. It is mutually agree by and between the parties hereto that the agreement of the
parties is contained herein and that THIS AGREEMENT supersedes all oral
agreements and negotiations between the parties hereto relating to the subject matter
hereof.
6. It is mutually agreed by and between the parties hereto that any alterations,
amendments, deletions or, waivers of any provisions of THIS AGREEMENT shall
be valid only when expressed in writing and duly signed and executed by the parties
hereto.
-31-
7. It is mutually agreed by and between the parties hereto that THIS AGREEMENT
shall not be construed, in any manner or form, to limit the power or authority of the
COUNTY or the COUNTY's County Engineer to maintain, operate, improve,
construct, reconstruct, repair, widen or expand County Highways as best determined
as provided by law.
It is further mutually agreed by and between the parties hereto that THIS
AGREEMENT shall not be construed, in any manner or form, to limit the power or
authority of the VILLAGE to maintain, operate, improve, construct, reconstruct,
repair, widen or expand VILLAGE Streets as best determined as provided by law.
8. THIS AGREEMENT shall be binding upon and inure to the benefit of the parties
hereto, their successors and assigns.
9. THIS AGREEMENT shall remain in force and effect until such a time as the parties
hereto mutually annul THIS AGREEMENT.
10. THIS AGREEMENT shall be considered null and void in the event the construction
contract for the Stage I improvement of Busch Road/Parkway/Deerfield Parkway is
not awarded by November 30, 1995.
ATTEST:
ViH,Yde Clerk
V } age of Buffalo ove
ATTEST: -
lbt
County Clerk
County of Lake
-32-
VIL �OF B FAL O_.G- OVE
By
�llage President "
Village of Buffalo Grove
Date: & ` I
RECOMN[ENDED FOR EXECUTION
Lak unty
Director of Transportation/
County Engineer
:
Chairman
Lake County Board
Date: