Loading...
1995-24RESOLUTION #95 -24 A RESOLUTION APPROVING AN AGREEMENT FOR FINAL DESIGN AND CONSTRUCTION ENGINEERING SERVICES RELATED TO THE BUSCH ROAD AND WEILAND ROAD INTERSECTION IMPROVEMENT WHEREAS, the Village of Buffalo Grove desires to cause the implementation of the construction of the Busch Road /Busch Parkway and Weiland Road Intersection Improvement; and, WHEREAS, an engineering services agreement is required in order to provide for necessary final design engineering services and construction engineering services; NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS, as follows: 1. The attached agreement entitled "Construction Engineering Services Agreement For Federal Participation" with the denoted project name "Busch Road /Weiland Road Intersection Improvements" dated April 3, 1995 is hereby approved. 2. The Village Manager is hereby authorized and directed to execute said agreement, a copy of said agreement is attached hereto and made a part hereof. AYES: 5 - Marienthal•Rdid, Braiman, Hendricks, Moons NAYES: 0 - None ABSENT: 1 - Rubin PASSED: April 3 , 19 95 APPROVED: April 3 , 19 95 APPR D: Vi a es ent ATTEST: V4. ! �i e Clerk ID G94C150 0 40 _ 40 V Municipality Name Village of Buffalo Grove L � f DAMES & MOORE, INC. County C T gf1�0 gtjO�nt 0 Address Lake A L N S 1701 Golf Road, Suite 404 Township city Vernon Construction Engineering U Rolling Meadows A Services Agreement L Section G For T State E N Federal Participation A N Illinois Project No. C (Type of Funding) T Zip Code Y 60008 Job No. Existing Structure No. THIS AGREEMENT is made and entered into this 3rd day of April , 19 95 between the above Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the construction of the above SECTION. Federal -aid Funds allotted to the LA by the State of Illinois under the general supervision of the State Department of Transportation, hereinafter called the "STATE", will be used entirely or in part to finance ENGINEERING services as described under AGREEMENT PROVISIONS. WHEREVER IN THIS AGREEMENT the following terms are used, they shall be interpreted to mean: District Engineer District Engineer, Department of Transportation Resident Engineer LA employee directly responsible for construction of SECTION Contractor Company or Companies to which the construction contract was awarded Project Description Name Busch Road/Weiland Road Intersection Improvements Route FAU 1257 Length 1.30 Mi. Termini Busch Road Station 63 +20 to Station 102 +75 Weiland Road Station 6 +00 to Station 34 +85 Description: Roadway reconstruction, concrete pavement, bituminous base course, bituminous binder and surface curb and gutter, construction of storm sewer, roadway lighting, traffic signals, landscaping, pavement markings and all incidental work. Agreement Provisions The Engineer Agrees, To perform or be responsible for the performance of the following engineering services for the LA, in connection with the proposed improvement hereinbefore described, and checked below: a #) Proportioning and testing of concrete mixtures in accordance with the "Manual of Instructions for Concrete Proportioning and Testing" issued by the Bureau of Materials and Physical Research, of the STATE and promptly submit reports on forms prepared by said Bureau. b.(x) Proportioning and testing of bituminous mixtures (including extraction test) in accordance with the "Manual of Instructions for Bituminous Proportioning and Testing" issued by the Bureau of Materials and Physical Research, of the STATE, and promptly submit reports prepared by said Bureau. c.(x) All compaction tests as required by the specifications and report promptly the same on forms prepared by the Bureau of Materials and Physical Research. d.(x) Quality and sieve analyses on local aggregates to see that they comply with the specifications contained in the contract. BLR 4352 (Rev. 11/89) AGMT10 /BUFFGROV (Sheet 1 of 7) e.(x) inspection of an nais wnen inspection is, not provded a sour y the. Bureau, of Materials and Physical Research, -)f the S , and submit inspection reports . the LA the STATE in accordance with the policies of the said STA f #) Inspect, document, and inform the resident engineer of the adequacy of the establishment and maintenance of the traffic control. g #) Geometric control including all construction staking and layouts. h #) Quality control in the construction work in progress and the enforcement of the contract provisions in accordance with the STATE Construction Manual. i #) Measurement and computation of pay items. j.(x) Maintain a daily record of the contractor's activities throughout construction including sufficient information to permit verification of the nature and cost of changes in plans and authorized extra work. k #) Preparation and submission to the LA in the required form and number of copies, all partial and final payment estimates, change orders, records, documentation, and reports required by the LA and the STATE. I #) Revision of contract drawings to reflect as built conditions. 2. Engineering services shall include all equipment, instruments, supplies, transportation and personnel required to perform the duties of the ENGINEER in connection with the AGREEMENT. 3. To furnish the services as required herein within twenty -four hours of notification by the RESIDENT ENGINEER or authorized representative. 4. To attend conferences and visit the site of the work at any reasonable time when requested to do so by the LA or representatives of the STATE. 5. That none of the services to be furnished by the ENGINEER shall be sublet, assigned, or transferred to any other party or parties without the written consent of the LA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this AGREEMENT. 6. That payment by the LA shall be as hereinafter provided. The ENGINEER shall submit invoices, based on his progress reports, to the RESIDENT ENGINEER, no more than once a month for partial payment on account for his work completed to date. Such invoices shall represent the value, to the LA of the partially completed work, based on the sum of the actual costs incurred, plus a percentage (equal to the percentage of the construction engineering completed) of the fixed fee for the fully completed work. 7. That the engineer is qualified technically and is entirely conversant with the design standards and policies applicable to improvement of the SECTION; and that he has sufficient properly trained, organized and experienced personnel to perform the services enumerated herein. 8. That the ENGINEER shall be responsible for the accuracy of the ENGINEER'S work and correction of any errors, omissions or ambiguities due to the ENGINEER'S negligence which may occur either during prosecution or after acceptance by the LA. Should any damage to persons or property result from his error, omission or negligent act, the ENGINEER shall indemnify the LA and its employees form all accrued claims or liability and assume all restitution and repair costs arising from such negligence. He shall give immediate attention to any remedial changes so there will be minimal delay to the contractor and prepare such data as necessary to effectuate corrections, in consultation with and without further compensation from the LA. 9. That the ENGINEER will comply with applicable Federal Statutes, State of Illinois Statutes, and local laws or ordinances of the LA. BLR 4352 (Rev. 11/89) AGMT10 /BUFFGROV (Sheet 2 of 7) The classifications of the a ees Used in the work should be consis h the' employee classifications and estimated manhours s in EXHIBIT A. If�the personnel of the fir , cluding the Principal Engineer, perform routine services that ould normally be performed by lesser - salaried personnel, the wage rate billed for such services shall be commensurate with the work performed. In the event that additional classes of employees must be utilized or if salary adjustments are made, the above data may be modified by agreement between the ENGINEER and the LA. Costs related to salaries shall include actual withholdings and contributions by either the employee or the ENGINEER for the approved payroll burden items set forth in Exhibit A of this AGREEMENT. b. The ENGINEER shall be reimbursed for his direct non -salary costs which are directly attributable and properly allocable to the Project. (1) Direct non -salary costs paid by the ENGINEER may also include in -plant and travel expenses. Travel expenses within the State of Illinois only, that are necessary to fulfill the terms of this AGREEMENT, may be directly charged to the SECTION. Reimbursable travel expenses shall include the reasonable cost of meals, lodging, incidental expenses, and transportation for regular employees and principals of the ENGINEER only while away from their regular place of duty and directly engaged on the SECTION. Travel expenses may be based on actual costs, or on an agreed per diem or mileage basis, or on a combination of the two, provided the resulting charge is reasonable. The ENGINEER will not be required to submit receipts for reimbursement of in -plant and travel expenses, but will be required to submit a detailed listing of such actual expenses certified by him to be direct SECTION costs that are not included in overhead. (2) The withholding provisions contained in Section 5a and 5b of this AGREEMENT shall not apply to costs enumerated in Section 4b above. C. The ENGINEER shall be reimbursed for his actual overhead or indirect costs to the extent that they are property allocable to the SECTION. Such costs shall be established in accordance with sound accounting principles and business practices. Such costs are included in the overhead and expense rate set forth in EXHIBIT A of this AGREEMENT. The rate shown in EXHIBIT A is provisional for use in computing partial payments. Upon completion of the SECTION, final payment for indirect costs will be determined by audit of the ENGINEER'S accounts to establish the actual indirect costs incurred during the period of this AGREEMENT which are properly allocable to it. d. The ENGINEER shall be paid fixed fee (lump sum) of $43,751.00 to cover profit only, of which $28,319 is Federal -Aid Participating and $15,432 is not. The maximum total amount payable, including actual costs, fixed fee, and contingencies, shall not exceed $415,983.00, of which $277,924 is Federal -Aid Participating and $138,059 is not, unless there is a substantial change in the scope, complexity, or character of the work, or there is a substantial overrun in the time necessary for the ENGINEER to complete the work due to causes beyond his control. Under these circumstances, adjustments in total compensation to the ENGINEER shall be determined through negotiation between the parties of this AGREEMENT and concurred in by the STATE. 5. Partial Payments. The LA, for and in consideration of the rendering of the engineering services enumerated herein, agrees to pay to the ENGINEER for rendering such services the basic fee hereinafter established in the following manner: a. For the first 50% of completed work, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to 90% of the value of the partially completed work (See Section 6 of THE ENGINEER AGREES) minus all previous partial payments made to the ENGINEER. b. After 50% of the work is completed, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments covering work performed shall be due and payable to the ENGINEER, such payments to be equal to 95% of the value of the partially completed work (See Section 6 of THE ENGINEER AGREES) minus all previous partial payments made to the ENGINEER. C. Final Payment - Upon approval by the LA but not later than 60 days after the work is completed and all final measurements and reports have been made and accepted by the LA, a sum of money equal to the basic fee as determined in this AGREEMENT less the total of the amounts of partial payments previously paid to the ENGINEER under Section 5a and 5b of this AGREEMENT shall be due and payable to the ENGINEER. BLR 4352 (Rev. 11189) AGMT1 BUFFGROV (Sheet 4 of 7) he Engineer Further Agre(W) to comply with all applicable Equal Employment and Nondiscrimination Acts, Executive Orders, and Regulations required by the U.S. Department of Transportation (DOT) including: a. 23 USC 710.405(b), Nondiscrimination on Basis of Sex in Right -of -Way Acquisition. b. 42 USC 2000d -1, Title VI of the Civil Rights Act of 1964 (Nondiscrimination on Basis of Race, Color, or National Origin). C. 49 CFR 21, Nondiscrimination in DOT Programs. d. 49 CFR 23, participation by MBE's in DOT Programs. It is the policy of the U.S. Department of Transportation that Minority Business Enterprises, as defined in 49 CFR Part 23, shall have the maximum opportunity to participate in the performance of contracts /agreements financed in whole or in part with Federal funds under this AGREEMENT. The ENGINEER agrees to ensure that minority business enterprises, as defined in 49 CFR Part 23, have the maximum opportunity to participate in the performance of this AGREEMENT. In this regard, the ENGINEER shall take all necessary and reasonable steps in accordance wit 49 CFR Part 23, to ensure that minority business enterprises have the maximum opportunity to compete for and perform portions of this AGREEMENT. The ENGINEER shall not discriminate on the basis of race, color, national origin, or sex in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The ENGINEER shall include the provisions of this "Policy" in every subcontract, including procurement of materials and leases of equipment. Failure to carry out the requirements set forth above shall constitute a breach of this AGREEMENT and may result in termination of the AGREEMENT or such remedy as deemed appropriate. 49 CFR 27, Nondiscrimination on Basis of Handicap. The LA Agrees, 1. To furnish a RESIDENT ENGINEER to be in responsible charge of general supervision of the construction. 2. To furnish the necessary plans and specifications. 3. To notify the ENGINEER at least twenty four hours in advance of the need for personnel or services. 4. That for the performance by the ENGINEER of the services set forth above, the LA shall pay the ENGINEER on the following basis of payment: Amount of Basic Fee. The ENGINEER shall receive, as full payment for completing all work required of him under this AGREEMENT, a basic fee, consisting of payment for the items shown in Section 4(a), (b), (c) and (d) hereof. a. The ENGINEER shall be reimbursed for his actual costs related to the salaries of his employees for the time directly attributable and properly chargeable to the SECTION under the terms of this AGREEMENT, including salaries of principals of the ENGINEER for time they are productively engaged in work necessary to fulfill the terms of this AGREEMENT. A tabulation showing the present regular hourly salary range for each class of employee expected to work on this SECTION is as follows: Hourly Rate Range Classification From To Principal Engineer $ 35.00 $ 45.00 Project Manager 25.00 38.00 Resident Engineer 17.00 28.00 Construction Engineer 14.00 20.00 Construction Technician 10.00 17.00 Clerical 7.00 13.00 Drafter 10.00 16.00 BLR 4352 (Rev. 11/89) AGMT10 /BUFFGROV (Sheet 3 of 7) It is Mutually Agreed 0 • That the ENGINEER and his subcontractors will maintain all books, documents, papers, accounting records and other evidence pertaining to cost incurred and to make such materials available at their respective offices at all reasonable times during the AGREEMENT period and for three years from the date of final payment under this AGREEMENT, for inspection by the STATE, Federal Highway Administration, or any authorized representatives of the Federal Government and copies thereof shall be furnished if requested. 2. That all services are to be furnished as required by construction progress and as determined by the RESIDENT ENGINEER. The ENGINEER shall complete all services specified herein within a time considered reasonable to the LA, after the CONTRACTOR has completed the construction contract. 3. That all field notes,test records and reports shall be turned over to and become the property of the LA and that during the performance of the engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein enumerated while they are in his possession and any such loss or damage shall be restored at his expense. 4. That this AGREEMENT may be terminated by the LA upon written notice to the ENGINEER, at his last known post office address, with the understanding that should the AGREEMENT be terminated by the LA, the ENGINEER shall be paid for any services completed and any services partially completed. The percentage of the total services which have been rendered by the ENGINEER shall be mutually agreed by the parties hereto. The fixed fee stipulated in Section 4d of THE LA AGREES shall be multiplied by this percentage and added to the ENGINEER'S actual costs to obtain the earned value of work performed. All field notes, test records and reports completed or partially completed at the time of termination shall become the property of, and be delivered to, the LA. 5. That any differences between the ENGINEER and the LA concerning the interpretation of the provisions of this AGREEMENT shall be referred to a committee of disinterested parties consisting of one member appointed by the ENGINEER, one member appointed by the LA, and a third member appointed bythe two other members for disposition and that the committee's decision shall be final. 6. That in the event the engineering and inspection services to be furnished and performed by the LA (including personnel furnished by the ENGINEER) shall, in the opinion of the STATE be incompetent or inadequate, THE STATE shall have the right to supplement the engineering and inspection force or to replace the engineers or inspectors employed on such work at the expense of the LA. 7. That the ENGINEER has not been retained or compensated to provide design and construction review services relating to the Contractor's safety precautions, except as provided in Section 1f of the ENGINEER AGREES. Successors and Assigns That the LA and the ENGINEER bind themselves, their successors, executors, administrators, and assigns to the other party of this AGREEMENT, and to the successors, executors, administrators, and assigns of such other party in respect to all covenants of this AGREEMENT. Executed by the LA: ATTEST: By: Clerk VILLAGE OF BUFFALO GROVE of the (Municipality/Township/County) State of Illinois, acting by and through its By:_ Title: (SEAL) Executed by the ENGINEER: DAMES & MOORE, INC. ATTEST: By: � � Title: AGMT10 /BUFFGROV 1701 Golf Road, Suite 404 Rolling Meadows Illinois 60008 By:� Title: ernor ro)ect anager BLR 4352 (Rev. 11/89) (Sheet 5 of 7) Federal -Aid Proje Certification of Engineer V Ar I hereby certify that I am the ip and duX thorrized representative of the firm of DAMES & MOORE, INC., whose address is 1701 Golf Road, Suite 404, Rolling Meadows, I�inois 60008, and that neither I nor the firm I herein represent has: (a) employed or retained for a commission, percentage, brokerage, contingent fee, or other considerations, any firm or person (other than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this AGREEMENT, (b) agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or person in connection with carrying out the AGREEMENT, or (c) paid, or agreed to pay to any firm, organization or person (other than a bona fide employee working solely for me or the above ENGINEER (any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out the AGREEMENT. In addition, I and the firm I herein represent: (d) are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (e) have not within a three -year period preceding this AGREEMENT been convicted of or had a civil judgement rendered against them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal, State or local) transaction or contract under a public transaction: violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction or records, making false statements, or receiving stolen property; (f) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (e) of this certification; (g) have not within a three -year period preceding this AGREEMENT had one or more public transactions (Federal, State or local) terminated for cause or default; Where the ENGINEER is unable to certify to any of the statements in this certification, such ENGINEER shall attach an explanation to this AGREEMENT. I acknowledge that this certificate is to be furnished to the LA and the STATE, in connection with this AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. -� �9 1°r ') -S (Date) /_ G (Signature) Certification of LA I hereby certify that I am the of Village of Buffalo Grove (County Board Chairman/Mayor/Village President) (County/Muniapality/ rownship) and that the above ENGINEER or his representative has not been required directly or indirectly as an express or implied condition in connection with obtaining or carrying out this AGREEMENT to: (a) employ or retain, or agree to employ or retain, any firm or person, or (b) pay, or agree to pay, to any firm, person or organization, any fee, contribution, donation, or consideration of any kind; except as herein expressly states (if any); I acknowledge that this certificate is to be furnished to the STATE, in connection with this AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. (Date) (Signature) BLR 4352 (Rev. 11/89) AGMT10 /BUFFGROV (Sheet 6 of 7) EAlblt A Construction Engineering Route FAU 1257 * Firm's approved rates on file with Local Agency. Village of Buffalo Grove Busch Road/Welland Road IDOT's Bureau of Accounting and (Municipality/Township /County) Intersection Improvements Auditing: Section: Village of Buffalo Grove Payroll Burden & Fringe Rate % Project: Overhead & Expense Rate % Job No.: * MOT Approved Combined Rate = 155% Cost Estimate of Consultant's Services in Dollars 4 Element of Work 1. Construction Engineering 2. Construction Survey 3. Inspection 4. Documentation Reports and Shop Drawings 5. Materials Testing 6. Vehicles Federal -Aid Participating Subtotal 7. Design Engineer Services (Non - Participating) 8. Direct Costs (Non - Participating) Non - Participating Subtotal Grand Total AGMT10 \BUFFGROV Employee Classification Man- Hours Pay- Roll Rate Pay- Roll Costs Payroll Burden, Overhead & Fringe Costs Profit See Exh. B 360 26.00 9,360 14,508 3,169 See Exh. B 720 14.14 10,181 15,781 3,447 See Exh. B 2,825 18.08 51,076 79,168 17,293 See Exh. B 695 18.74 13,024 20,187 4,410 See Proposal See Exh. D Estimate of Manhours based on the Probable Construction Schedule /Staffing ExhibR C 4,600 83,641 129,644 28,319 See Exh. E 2,340 45,065 69,852 15,432 2,340 45,065 69,852 15,432 6,940 128,706 199,496 43,751 Total 27,037 29,409- 147,537 37,621 24,500 11,820- 277,924 130,849 7,210 138,059 415,983 (Sheet 7 of 7) STATE OF ILLINOIS DRUG FREE WORKPLACE CERTIFICATION This certification is required by the Drug Free Workplace Act (Ill. Rev. Stat., ch. 127, par. 152.311). The Drug Free Workplace Act, effective January 1, 1992, requires that no grantee or contractor shall receive a grant or be considered for the purposes of being awarded a contract for the procurement of any property or services from the State unless that grantee or contractor has certified to the State that the grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of the contract or grant and debarment of contracting or grant opportunities with the State for at least one (1) year, but not to be more than five (5) years. For the purpose of this certification, "grantee" or "contractor" means a corporation, partnership, or other entity with twenty -five (25) or more employees at the time of issuing the grant, or a department, division, or other entity with twenty - five (25) or more employees at the time of issuing the responsible for the specific performance under a contract or grant of $5,000 or more from the State. The contractor /grantee certifies and agrees that it will provide a drug free workplace by: A. Publishing a statement: 1. notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance, including cannabis, is prohibited in the grantee's or contractor's workplace; 2. specifying the actions that will be taken against employees for violations of such prohibition; 3. notifying the employee that, as a condition of employment on such contract or grant, the employee will: a. abide by the terms of the statement; and b. notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5) days after such conviction; B. Establishing a drug free awareness program to inform employees about: 1. the dangers of drug abuse in the workplace; 2. the grantee's or contractor's policy of maintaining a drug free workplace; AGMT10 \BUFFGROV 3. any available drug counseling, rehabilitation, and employee assistance programs; and 4. the penalties that may be imposed upon an employee for drug violations. C. Providing a copy of the statement required by sub - paragraph (a) to each employee engaged in the performance of the contract or grant and to post the statement in a prominent place in the workplace. D. Notifying the contracting or granting agency within ten (10) days af receiving notice under part (b) of paragraph (3) of subsection (a) above fro an employee or otherwise receiving actual notice of such conviction. E. Imposing a sanction on, or requiring the satisfactory participation in a dn� abuse assistance or rehabilitation program by, an employee who is convicted, as required by section 5 of the Drug Free Workplace Act. F. Assisting employees in selecting a course of action in the event drug. counseling, treatment, and rehabilitation is required and indicating that, a trained referral team is in place. G. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act. THE UNDERSIGNED AFFIRMS, UNDER PENALTIES OF PERJURY, THAT HE OR SHE IS AUTHORIZED TO EXECUTE THIS CERTIFICATION BEHALF OF THE DESIGNATED ORGANIZATION. DAMES & MOORE, INC. Prin eo Organizatio Signature of Authorized 1 L > A0,% . /J►SSF-,J 'E>" Pt.�, + /"ono Printed Name and Title 95- 4316617 Requisition/Contract /Grant ID Number ✓v(.�...4 Z°l i°c °ice Date 49 EXHIBIT B AVERAGE HOURLY PROJECT RATES CONSTRUCTION ENGINEERING BUSCH ROAD/WEILAND ROAD VILLAGE OF BUFFALO GROVE Dames & M-oo-r-e,-Tn-c-. AGMT10 \BUFFGROV ITEM 1 ITEM 2 ITEM 3 ITEM 4 CLASSIFICATION SAL- ARY CONSTRUCTION CONSTRUCTION INSPECTION DOCUMENTATION ENGINEERING SURVEY REPORTS & SHOP DRAWINGS % ; WGT. % ; WGT. % ; WGT. % ; WGT. PART ; RATE PART ; RATE PART ; RATE PART ; RATE PROJECT MANAGER 30.00 50.00 i 15.00 i i 8.35 i 2.51 22.00 50.00 i 11.00 16.67 i 3.67 48.67 i 10.71 43.16 i 9.50 RESIDENT ENGINEER CONSTRUCTION ENGINEER 15.50 i 38.89 i 6.03 40.71 i 6.31 34.10 i 5.29 CONSTRUCTION /SURVEY 10.00 i 44.44 i 4.44 10.62 i 1.06 14.39 i 1.44 TECHNICIAN AVERAGE PAYROLL RATE 100.00 i 26.00 100.00 ; 14.14 100.00 i 18.08 100.00 i 18.74 Dames & M-oo-r-e,-Tn-c-. AGMT10 \BUFFGROV EXHIBIT C BUSCH ROADMEILAND ROAD VILLAGE OF BUFFALO GROVE PROBABLE CONSTRUCTION SCHEDULE BUSCH RD.XCNSTSCH.WK4 PAGE 1 «4 5*�, • e El 0 11117 11124 1 1211 1218 12115 TEMPORARY PAV'TWIDENING/SIGNALS PAVEMENT REMOVAL POROUS GRANULAR EMBANKMENT COMB. CONC. CURB & GUTTER BITUMNOUS BASE -COURSE 10- CONCRETE PAVEMENT. l(r BUSCH RD.XCNSTSCH.WK4 PAGE 1 «4 5*�, • e El o • o e W LL m N � � Q U 5 v N m m 1 a UNION mill IIIIIIIIININ 1111111 ME ME Mill ME .......... ......... EXHIBIT C BUSCH ROADNVEILAND ROAD VILLAGE OF BUFFALO GROVE PROBABLE CONSTRUCTION STAFFING BEGIN LAYOUT.-.... ............................. August2B. 19D5 BEGIN INSPECTION ......... .......................Sapbmbar 5, 1995 MONTH INTER SUSPENSION ... .......................Dacambar 18, 1995 -Minch 31, 1998 WEEKENDING COMPLETE INSPECTION ......................Aupuat 30, 190 ON FRIDAY COMPLETE DOCUMENTATION ........... Sa mbar 13, 1998 SEPTEMBER 9/1 918 9/15 972 929 OCTOBER 10A 10113 10/20 10/27 NOVEMBER 11/3 11110 11117 11/24 DECEMBER 1211 12/8 12/15 12/12 TOTAL TECHNICAL STAFF MANHOURS Ra Wsnt En nw 1,975 40 48 54 54 54 54 54 64 54 54 48 48 48 45 45 45 40 Construction En inw 1,867 40 40 48 48 48 48 48 48 48 48 45 45 45 40 40 o .trucSWS— Tachnioian 720 40 40 40 40 40 40 40 40 40 40 FrojW Managw 238 18 al 8 6 B 8 6 8 8 8 8 8 8 8 8 6 16 TOTALS 4,80D 138 148 148 1481 148 148 148 148 148 w 99 0 91 91 51 58 BUSCH RD.ICNSTSCH.WK1 PAGE30F4 E* / 1 J u F p t.j EXHIBITC BUSCH ROADAVEILAND ROAD VILLAGE OF BUFFALO GROVE PROBABLE CONSTRUCTION STAFFING W LAYOUT ......... ............................Aug u128.1095 M INSPECTION ....... .........................SBPbMW S. 1906 MOWIH INTER SWENSION ............ .............. D —bx 18. 1905 - M" 31, 1998 WEEK ENDING OOMPLETE ......................ALUM 30. 1908 ON FRIDAY COMPLETE DOCUMENTATION........... b 13, IM MARCH Wo APRIL 4/5 {/12 {/10 1/!8 MAY 5/3 SHO SH1 5124 5/31 JUNE &T &11 SI1 8/18 JULY 1- 1 1112 719 AUGUST SEPTEMBER &13 TECMCAL STAFF P-W.ft 40 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 20 20 tructlon 40 10 40 40 40 48 IB 48 48 48 48 48 48 48 48 48 48 48 48 48 48 20 T4e.+a4I1 40 40 40 40 40 b 40 40 M 18 41 41 4 411 I 1 4 1 I 4 1 { 1 1 I 4 I 1 4 1 1 { 1 8 TOTALS 1361 1321 132 021 021 100 100 140 1401 140 140 1401 100 100 lool 100 100 lool Iwl 100 100 52 52 44 28 BUSG1181.1CNST -SMV K/ PAGE40F4 E J e E O • � O VEHICLE COST Average Monthly Ownership Cost = $ 310.00 Average Monthly Insurance Cost = 110.00 Average Monthly Maintenance (Operating Cost) = 210.00 $ 630.00 Based on 21 days per month vehicle use, the daily cost = $30.00 Vehicle #1 - 10 weeks @ 5 days x $30.00 /day = $ 1,500.00 Vehicle #1 - 30 weeks @ 6 days x $30.00 /day = 5,400.00 Vehicle #2 - 28 weeks @ 5 days x $30.00 /day = 4,200.00 Vehicle #2 - 4 weeks @ 6 days x $30.00 /day = 720.00 TOTAL VEHICLE COSTS: $11,820.00 EXHIBIT D AGMT10 \BUFFGROV 0 0 DESIGN ENGINEERING SERVICES All professional engineering services required to complete plans, specifications, and a cost estimate for the construction section entitled, 'Busch RoadMeiland Road Intersection Improvements ". Such professional services shall include but not be limited to: Field Survey, Design of Roadways, Drainage, Traffic Signals, Lighting and other appurtenant features, as enumerated in Schedule E, attached hereto. These professional engineering services shall be non - participating with respect to the Federal -Aid funded elements of this contract. p.w8W+)PtWbOM EXHIBIT E . OVERHEAD RATE: EXHIBIT E COST ESTIMATE OF CONSULTING SERVICES PHASE II DESIGN ENGINEERING FOR BUSCH ROADMEILAND ROAD LAKE COUNTY Route Section Project County Lake Job No. Consultant: Dames & Moore/MCE ITEM 1 QA/QC AND ADMINISTRATION 2 SURVEY /BASE SHEET PREPARATION 3 SUPPL. SOILS SURVEY 4 PH I SUPPLEMENT 4a PH I ADDENDUM 5 PLANS /SECTIONS /ETC 6 DRAINAGE PLANS 6a CULVERT DESIGN 7 TRAFFIC SIGNAL PLANS 8 LIGHTING PLANS 9 SPECIFICATIONS 10 PRE -FINAL PLANS 11 FINAL PLANS 12 INTERSECTION ALTERNATE STUDIES 6947 Date: 03/29/95 TOTALS 2340 45065 69852 1210— 116127 " NET FEE = 0.145[(2.3 + R)(B) + (D)]; R = COMPLEXITY FACTOR = 0.035 IDOT APPROVED COMBINED BURDEN & FRINGE PLUS GENERAL OVERHEAD = 155% PAUSER\BPTALBOTBUFGR SD.WK4 % of Grand Total 5.5 3.9 5.8 6.2 2.0 32.2 4.1 2.2 6.8 2.4 2.7 3.9 4.6 17.8 15432 6500 138059 100 Page 1 of 4 e C] c: Dollars ($) Number Overhead (a) - -� of & In -House Direct Costs Man Payroll Fringe Direct Sub -Total Net Fee* Not Eligible Total Hours Benefits Costs For Profit (A) (B) (C) (D) (E) (F) (G) (H) 100 2630 4077 - -- -- 6707 — ---- — ------ — 890 ------ ---- -- - --- - ---- - - - - - -- 7597 110 1793 2779 200 4772 636 5408 20 530 822 1352 179 6500 8031 140 2918 4523 100 7541 1002 8543 50 906 1404 100 2410 321 2731 850 15394 23861 39255 5212 44467 100 1940 3007 4947 657 5604 50 1050 1628 2678 356 3034 170 3239 5020 8259 1097 9356 60 1164 1804 2968 394 3362 65 1251 1939 60 3250 432 3682 100 1865 2891 4756 631 5387 100 1885 2922 750 5557 747 6304 425 8500 13175 21675 2878 24553 TOTALS 2340 45065 69852 1210— 116127 " NET FEE = 0.145[(2.3 + R)(B) + (D)]; R = COMPLEXITY FACTOR = 0.035 IDOT APPROVED COMBINED BURDEN & FRINGE PLUS GENERAL OVERHEAD = 155% PAUSER\BPTALBOTBUFGR SD.WK4 % of Grand Total 5.5 3.9 5.8 6.2 2.0 32.2 4.1 2.2 6.8 2.4 2.7 3.9 4.6 17.8 15432 6500 138059 100 Page 1 of 4 e C] c: AVERAGE HOURLY PROJECT RATES 38.00: 5.00: 1.90: BUSCH ROAD/WEILAND ROAD VILLAGE OF BUFFALO GROVE 27.00: 50.00: 13.50: PHASE II 13.50: 15.00: 4.05 PROJECT MANAGER 26.00: 25.00: 6.50: Date: 03/29/95 1.30: 50.00: ITEM 1 ITEM 2 ITEM 3 _- --- - -- - ----- - - - - -- ITEM 4 - -- - --- -- - - - -- - ITEM 5 PROJECT ENGINEER QA/QC AND :SURVEY/ : SUPPLEMENTAL : PHASE I : ROADWAY PLANS SAL- : ADMINISTRATION : BASE SHEET : SOILS SURVEY : SUPPLEMENT : AND SECTIONS CLASSIFICATION ARY : PREPARATION ---- % PART : WGT. RATE : % PART : WGT. RATE : % PART : WGT. RATE ------- -- -- - - -- : % PART : WGT. RATE ----- - - - - -- ------ - - ---- - - : % PART : WGT. RATE PRINCIPAL 38.00: 5.00: 1.90: SENIOR PROJECT MANAGER 27.00: 50.00: 13.50: 50.00: 13.50: 15.00: 4.05 PROJECT MANAGER 26.00: 25.00: 6.50: 5.00: 1.30: 50.00: 13.00: 10.00: --- -- --- 2.60: --- ------ ------------ 5.00 : - - - - -- - 1.30: PROJECT ENGINEER 22.00: 20.00: 4.40: - - _ _ - -- --- - - - -- ------ 42.00: - - - - -- -- 9.24: - ----------------- 25.00: 5.50 STAFF ENGINEER 18.00: ---- ---- - - - - -- - - -- -- _ _ - -- - -- -- - - - - -- ----- 27.00: - - -- -- 4.86 ENVIRONMENTAL SPECIALIST 19.00 :CHIEFOFSURVEY 30.00: 5.00: --- -- 1.50: -- --- --- - -- --- - - - - -- - --- ---- --- -- ------ - --- ------------------ SURVEY PARTY CHIEF 18.00: __ - - 35.00: _ - - -- -- - ---- 6.30 ---- --- - - ---- ------ - - - - -- ------------ -- ---- - -- ---- - - - -- ------------------- TECHNICIAN /SURVEYOR 12.00: 35.00: 4.20 SENIOR DRAFTER 15.00 - - -- - ---- ------ - ----- -- --- - - - - -- ------------ -- - - -- --- -- -- --- - -- -------------------- CADD TECHNICIAN 15.00: 20.00: 3.00: 33.00 4.95: 43.00 -� - 6.45 WORD PROCESSOR 12.00 AVERAGE PAYROLL RATE : 100.00: 26.30 : 100.00 : 16.30: 100.00: 26.50 : 100.00 : 20.84 : 100.00 : 18.11 : EXHIBIT E P:WSER%BPTALB0TIBUFGR_SD.WK4 Page 2 of 4 AVERAGE HOURLY PROJECT RATES BUSCH ROADMEILAND ROAD VILLAGE OF BUFFALO GROVE PHASE II ITEM 6 ITEM 7 ITEM 8 ITEM 9 : ITEM 10 DRAINAGE PLANS : TRAFFIC SIGNAL : LIGHTING PLANS : SPECIFCATIONS : PRE -FINAL PLANS SAL- : PLANS ARY % PART : WGT. RATE : % PART WGT. RATE : % PART : WGT. RATE : % PART : WGT. RATE : % PART : WGT. RATE Date: 03/29/95 CLASSIFICATION PRINCIPAL 38.00 SENIOR PROJECT MANAGER 27.00 PROJECT MANAGER 26.00 5.00 - 1.30 - 5.00 PROJECT ENGINEER 22.00 55.00 12.10 50.00 STAFF ENGINEER 18.00 - ENVIRONMENTAL SPECIALIST 19.00: CHIEF OF SURVEY 30.00 : - -- -- SURVEY PARTY CHIEF 18.00 TECHNICIAN /SURVEYOR 12.00: SENIOR DRAFTER 15.00 CADD TECHNICIAN 15.00 40.00 6.00 45.00 WORD PROCESSOR 12.00 AVERAGE PAYROLL RATE 100.00: 19.40: 100.00 P:UISEMBPTALB0TIBUFGR S0.WK4 15.00: 1.30: 5.00: 1.30: 25.00 11.00: 55.00: 12.10 _ 15.00 6.75: 40.00: 6.00 - - - -45.00 4.05: 5.00: 1.35 6.50: 5.00: 1.30 3.30: 25.00 : - 5.50 25.00: 4.50 40.00 : 6.00 5.40 : 19.05 : 100.00 : 19.40 : 100.00 : 19.25 : 100.00 : 18.65 : EXHIBIT E Page 3 of 4 AVERAGE HOURLY PROJECT RATES BUSCH ROADMEILAND ROAD VILLAGE OF BUFFALO GROVE PHASE 11 Date: 03/29/95 AVERAGE PAYROLL RATE 100.00 18.85: 100.00 20.00 P:VJSER%BFrALB0`nBUFGR-SD.WK4 EXHIBIT E Page 4 of 4 ITEM 11 __ - --- - - ------- - ----- - ITEM 12 ITEM 13 ITEM 14 ITEM 15 FINAL PLANS INTERSECTION SAL- :ALTERNATE CLASSIFICATION ARY STUDIES ------ -- -- - - -- --- - - - - - --- - ----------- - - - % PART WGT. RATE % PART WGT. RATE % PART WGT. RATE % PART WGT. RATE % PART WGT. RATE 138059 PRINCIPAL 38.00 SENIOR PROJECT MANAGER 27.00 5.00: 1.35: PROJECT MANAGER 26.00 10.00: 2.60 20.00 5.20 PROJECT ENGINEER 22.00 20.00 - ---- – -- – ------ – ----- - 4.40 40.00 8.80: STAFF ENGINEER 18.00: 25.00 -- -- -- -- ---- — - --------- - ------- - 4.50 ENVIRONMENTAL SPECIALIST 29.00 CHIEF OF SURVEY 30.00 - - -- -- - - --------------- ------------ ------------------- ------------ ------------------- SURVEY PARTY CHIEF 18.00 TECHNICIAN/SURVEYOR 12.00 -- --- - - --- -- ----------- ------------------- -- — ------ – – ----- - SENIOR DRAFTER 15.00 CADD TECHNICIAN 15.00 40.00 - -- - --------- - -- - 6.00 40.00 6.00 WORD PROCESSOR 12.00 — --- — ----- – – - ----- – --- – - ---- AVERAGE PAYROLL RATE 100.00 18.85: 100.00 20.00 P:VJSER%BFrALB0`nBUFGR-SD.WK4 EXHIBIT E Page 4 of 4