1990-28r 0 1 4 RESOLUTION NO. 90- 28 A RESOLUTION CONCERNING THE PROPOSED IMPROVEMENT OF ILLINOIS ROUTE 83 BETWEEN ARLINGTON HEIGHTS ROAD AND U.S. ROUTE 45 AND THE PROPOSED REALIGNMENT OF OLD MCHENRY ROAD WITH FREMONT WAY AT ILLINOIS ROUTE 53 WHEREAS, the reduction of traffic congestion is essential to the improvement and maintenance of the quality of life in suburban communities; and, WHEREAS, it is highly desirable to incorporate the planning of other transportation modes, such as pedestrian and bikeway facilities into the process of planning arterial street corridors; and, WHEREAS, the potentially negative impacts of proposed street and highway improvements should be carefully studied so that plans to mitigate potentially negative impacts can be developed and implemented; and, WHEREAS, the Village President and Board of Trustees previously adopted Resolution NO. 89 -58 on November 20, 1989 concerning the proposed improvement of Illinois Route 83 between Arlington Heights Road and U.S. Route 45; and, WHEREAS, additional information was available and additional public comment was solicited at a Public Hearing for the project which the Illinois Department of Transportation conducted on June 26, 1990; NOW, THEREFORE, BE IT RESOLVED by the Village President and Board of Trustees of the Village of Buffalo Grove, Cook and Lake Counties, Illinois as follows: 1. The improvement of Illinois Route 83 from Arlington Heights Road to U.S. Route 45 is supported. 2. The State of Illinois is encouraged to implement the improvement of Illinois Route 83 as soon as possible. The schedule for bidding the project between July 1, 1991 and June 30, 1992 and completing all construction before July 1, 1995 should be adhered to or accelerated if possible. f -2- 3. Since congestion of Illinois Route 83 is currently very severe at the intersection of Arlington Heights Road and Illinois Route 53 and the congestion is contributing to problems resulting from motorists cutting through local streets, the traffic signal and pavement improvements, traffic signal coordination and other improvements in this immediate area should be implemented as soon as possible along with any other adjacent sections of Illinois Route 83 which can be made bid ready without resulting in any additional delay. Improvements in this area should not be delayed due to funding limitations or other factors which may not allow the prompt improvement of the full length of Illinois Route 83 between Arlington Heights Road and U.S. Route 45. 4. A bikeway crossing with pedestrian signal activation on the south leg of the Arlington Heights Road and Illinois Route 83 intersection as denoted on the approved Phase I FAU Study for Illinois Route 83 (Arlington Heights Road to Lake -Cook Road) and the eight foot wide bikeway on the south side of Illinois Route 83 west of Arlington Heights Road extending to a point at the curb line of Bristol Lane as presented by I.D.O.T. at the June 26, 1990 Public Hearing should be provided as part of this project. 5. The provision of an eight foot wide pedestrian /bicycle path under the proposed bridge on Illinois Route 53 on the east side of the Buffalo Creek is a desirable addition to the proposed project which will enhance the Village of Long Grove's existing and proposed pathway system which is proposed for interconnections with the Buffalo Grove Bikeway System. -3- 6. Based upon IDOT's analysis which concluded that cut - through traffic on Fremont Way will not be significant, the proposed realignment of Old McHenry Road and Freemont Way at Illinois Route 53 is acceptable. If the initial realignment is found by the Village to be significantly contributing to problems related to traffic cutting through adjacent residential areas, IDOT will be requested by the Village to implement and fund a subsequent through movement restriction modification. 7. The realignment of Old McHenry Road and Freemont Way at Illinois Route 53 should be implemented only after the improvements to the section of Illinois Route 83 between, and including the intersection with Arlington Heights Road and Aptakisic Road are completed, including the initiation of proper operation of the traffic signal coordination system. The intent of this sequence of construction is to avoid significant additional cut- through traffic being induced by the combination of the intersection realignment and the existing congestion on Illinois Route 83. 8. The Illinois Department of Transportation should develop alternative designs to minimize noise at the existing residential area located on the south side of Illinois Route 53 and Illinois Route 83 between Fremont Way and Arlington Heights Road and meet with local residents and Village representatives to present alternative designs including the use of berms, landscaping, noise barrier walls and combinations of these and other noise barrier techniques so as to minimize noise in the adjacent residential area and to accomplish an aesthetically desirable final design. Coordination and agreement on a final noise control and landscaping design should be accomplished involving the local residents and the Village. 9. Project plans should be updated as necessary to show all currently existing sidewalk along the project located north of Illinois Route 83 and east of Arlington Heights Road. All existing sidewalk in this area should be retained with any existing gaps filled in as part of the project. 0 -4- 10. In consideration of the relatively large number of highly sensitive residences located along the south side of Illinois Route 83 and Illinois Route 53 between Fremont Way and Arlington Heights Road and the less sensitive commercial development with large setbacks or currently undeveloped agricultural property located on the north side of the roads in the area, the proposed roadway curves should be adjusted to provide at least five feet of additional distance between the back of the proposed curb and the nearest town home buildings. 11. IDOT is requested to insure that any Federal or other grant funding which may be available, be utilized to reduce any Village costs which may result from the various elements of this project. AYES: 5 - Marienthal, Reid, Mathias, O'Malley, Kahn NAYES: 0 - None ABSENT: 1 - Shifrin PASSED: July 16 , 1990 APPROVED: July 16 , 1990 APPROVED: Village President ATTEST: I !Ze� Ty�' 2UAUW'U VillaW Clerk GPB:lc:F163:GREGF N. RESOLUTION NO. 90- 28 A RESOLUTION CONCERNING THE PROPOSED IMPROVEMENT OF ILLINOIS ROUTE 83 BETWEEN ARLINGTON HEIGHTS ROAD AND U.S. ROUTE 45 AND THE PROPOSED REALIGNMENT OF OLD MCHENRY ROAD WITH FREMONT WAY AT ILLINOIS ROUTE 53. WHEREAS, the reduction of traffic congestion is essential to the improvement and maintenance of the quality of life in suburban communities; and, WHEREAS, it is highly desirable to incorporate the planning of other transportation modes, such as pedestrian and bikeway facilities into the process of planning arterial street corridors; and, WHEREAS, the potentially negative impacts of proposed street and highway improvements should be carefully studied so that plans to mitigate potentially negative impacts can be developed and implemented; and, WHEREAS, the Village President and Board of Trustees previously adopted Resolution NO. 89 -58 on November 20, 1989.concerning the proposed improvement of Illinois Route 83 between Arlington Heights Road and U.S. Route 45; and, WHEREAS, additional information was available and additional public comment was solicited at a Public Hearing for the project which the Illinois Department of Transportation conducted on June 26, 1990; NOW, THEREFORE, BE IT RESOLVED by the Village President and Board of Trustees of the Village of Buffalo Grove, Cook and Lake Counties, Illinois as follows: f 1. The improvement of Illinois Route 83 from Arlington Heights Road to U.S. Route 45 is supported. 2. The State of Illinois is encouraged to implement the improvement of Illinois Route 83 as soon as possible. The schedule for bidding the project between July 1, 1991 and June 30, 1992 and completing all construction before July 1, 1995 should be adhered to or accelerated if possible. -2- 3. Since congestion of Illinois Route 83 is currently very severe at the intersection of Arlington Heights Road and Illinois Route 53 and the congestion is contributing to problems resulting from motorists cutting through local streets, the traffic signal and pavement improvements, traffic signal coordination and other improvements in this immediate area should be implemented as soon as possible along with any other adjacent sections of Illinois Route 83 which can be made bid ready without resulting in any additional delay. Improvements in this area should not be delayed due to funding limitations or other factors which may not allow the prompt improvement of the full length of Illinois.Route 83 between Arlington Heights Road and U.S. Route 45. 4. A bikeway crossing with pedestrian signal activation on the south leg of the Arlington Heights Road and Illinois Route 83 intersection as denoted on the approved Phase I FAU Study for Illinois Route 83 (Arlington Heights Road to Lake -Cook Road) and the eight foot wide bikeway on the south side of Illinois Route 83 west of Arlington Heights Road extending to a point at the curb line of Bristol Lane as presented by I.D.O.T. at the June 26, 1990 Public Hearing should be provided as part of this project. 5. The provision of an eight foot wide pedestrian /bicycle path under the proposed bridge on Illinois Route 53 on the east side of the Buffalo Creek is a desirable addition to the proposed project which will enhance the Village of Long Grove's existing and proposed pathway system which is proposed for interconnections with the Buffalo Grove Bikeway System. r -3- 6. Based upon IDOT's analysis which concluded that cut - through traffic on Fremont Way will not be significant, the proposed realignment of Old McHenry Road and Freemont Way at Illinois Route 53 is acceptable. If the initial realignment is found by the Village to be significantly contributing to problems related to traffic cutting through adjacent residential areas, IDOT will be requested by the Village to implement and fund a subsequent through movement restriction modification. 7. The realignment of Old McHenry Road and Freemont Way at Illinois Route 53 should be implemented only after the improvements to the section of Illinois Route 83 between, and including the intersection with Arlington Heights Road and Aptakisic Road are completed, including the initiation of proper operation of the traffic signal coordination system. The intent of this sequence of construction is to avoid significant additional cut - through traffic being induced by the combination of the intersection realignment and the existing congestion on Illinois Route 83. 8. The Illinois Department of Transportation should develop alternative designs to minimize noise at the existing residential area located on the south side of Illinois Route 53 and Illinois Route 83 between Fremont Way and Arlington Heights Road and meet with local residents and Village representatives to present alternative designs including the use of berms, landscaping, noise barrier walls and combinations of these and other noise barrier techniques so as to minimize noise in the adjacent residential area and to accomplish an aesthetically desirable final design. Coordination and agreement on a final noise control and landscaping design should be accomplished involving the local residents and the Village. 9. Project plans should be updated as necessary to show all currently existing sidewalk along the project located north of Illinois Route 83 and east of Arlington Heights Road. All existing sidewalk in this area should be retained wii:h any existing gaps filled in as part of the project. . o C C -4- u 10. In consideration of the relatively large number of highly sensitive residences located along the south side of Illinois Route 83 and Illinois Route 53 between Fremont Way and Arlington Heights Road. and the less sensitive commercial development with large setbacks or currently undeveloped agricultural property located on the north side of the roads in the area, the proposed roadway curves should be adjusted to provide at least five feet of additional distance between the back of the proposed curb and the nearest town home buildings. 11. IDOT is requested to insure that any Federal or other grant funding which may be available, be utilized to reduce any Village costs which may result from the various elements of this project. AYES: 5 - Marienthal, Reid, Mathias, O'Malley, Kahn NAYES: 0 - None ABSENT: 1 - Shifrin PASSED: July 16 , 1990 APPROVED: July 16 , 1990 APPROVED: Village President ATTEST: VillaW Clerk/ GPB:lc:F163:GREGF