1990-02RESOLUTION NO. 90 - 2 A RESOLUTION SUPPORTING AN APPLICATION FOR F.A.U.S. PROJECT FUNDING WHEREAS, the Northwest Municipal Conference is currently seeking applications for new FAUS (Federal Aid Urban System) Projects to be included in the 1991 multi -year plan; and WHEREAS, the Village has identified the need and projects to fill in gaps in the existing sidewalks /bikeways and street lighting systems along the existing routes of Dundee Road, Buffalo Grove, Arlington Heights Road and Old Arlington Heights Road; and WHEREAS, it is the Village's intention to fund the local match required from either its Motor Fuel Tax Fund or General Revenue funds, or a combination thereof; and WHEREAS, the Village of Buffalo Grove intends to perform the preliminary and design engineering at their cost in a timeframe to make the projects construction ready on or before August, 1990; NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Buffalo Grove, Cook and Lake Counties, Illinois, that said FAUS application for said sidewalk, bikeway and lighting improvements be submitted to the Northwest Municipal Conference for their consideration. AYES: 5 - Marienthal, Glover, Shifrin, Mathias, O'Malley NAYES: 0 - None ABSENT: 1 - Reid PASSED: January 8 , 1990 APPROVED: January 8 , 1990 APPROVED: X r Village President ATTEST: Villa Clerk D93 -2- 17I1-jr-iAG3ED OF 14Ae NQ-1. December 22, 1989 Mr. William Duggan Northwest Municipal.Conference 10 South Emerson Street Mount Prospect, I1. 60056 Subject: FAUS Project Applications Dear Mr. Duggan: B-v-1:Vg%10 G,'Xt0v3X 312 - 459 -2547 Fax 312 - 459 -7906 Enclosed are three (3) copies of our FAUS Project Application for sidewalk and street lighting improvements at various locations within the Village of Buffalo Grove. The application is.being submitted for consideration by the Transportation Committee for inclusion in the 1991 MYP. You will note that a "draft" Village Board Resolution for the project is' included in the application. The resolution will be considered by the Village Board on Monday, January 8, 1990. A certified copy will be forwarded to you following approval of the resolution. Should you have any questions, please contact me. Sincerely, VILLAGE OF BUFFALO GROVE Q, 02*- Q. . Gregor P Boysen,�P.E. Director of Public Works attachments GPB:lm:D91 A— o NORI WEST MUNICIPAL CONFERENCE APPLICATION FOR FAU PROJECT FUNDING USE THIS APPLICATION FOR ONLY ONE PR3MCT - DUPLICATE IF NECESSARY A. GENERAL INFORMATION 1. Date,of Application. December 22, 1989 2. Municipality /Lead Agency Village of Buffalo Grove Arlington Heights Road, Old Arlington Heights Road 3. Project Street Buffalo Grove Road, Dundee Road, & Lake -Cook Road 4. Limits of Project Various Iocations w /in the Village of Buffalo Grove 5. Name and Phone # of Contact Mr. Gregory P. Boysen (708)459 -2547 B. EXISTING CONDITIONS 1. Provide a brief description of the CURRENT INURE of the street or intersection to include, (but not limited to), number of lanes, width, condition, and other special characteristics. (Also attach a typical section of this in the Exhibit section.) Buffalo Grove Road (between Dundee Road and Lake -Cook Road) is currently a four -lane major north -south arterial with curb and gutter divided by a grassed non - traversible median (see Figures 1 & 2). A parkway of varying width exists along both sides of the road. A 4 -foot and 5 -foot sidewalk is present along the majority of this roadway. In addition, an 8 -foot bikepath or shared sidewalk/bikepath is located along the east side, near Dundee Road. Some overhead street lighting is located in the parkway on the west side of the street, just north of Dundee Road. Traffic signals exist at Dundee and Lake -Cook Roads. Parking is prohibited along Buffalo Grove Road. The existing right-of-way of Buffalo Grove is 100 feet. Gaps exist along Buffalo Grove Road when sidewalks and /or bikeways and street lights do not exist. Dundee Road, from Arlington Heights Road to east of Buffalo Grove Road, is a four -lane major east-west arterial with curb and gutter and is designated as Illinois Route 68. Varying -width parkways exist along both sides of Dundee, with four and five -foot sidewalks intermittently located along the street. Additionally, an 8 -foot bikepath or shared sidewalk /bikepath is located intermittently along the north side of Dundee. On- street parking is prohibited. Overhead street lighting exists at various locations along the streets. The existing right-of-way of Dundee Road is 100 feet. Gaps exist along Dundee Road where sidewalks and /or bikeways and street lighting do not exist. Lake -Cook Road, from Buffalo Grove Road to the easterly Village limits, is a four -lane major east-west arterial with curb and gutter. Four and five -foot sidewalks and /or an 8 -foot bikepath (or shared sidewalk / bikepath) exist along the street. Gaps exist along Lake Cook where sidewalks and /or bikeways do not exist. MCE070 /DF -2 -1- ' Page 2 2. Describe the current and planned land use of the corridor or area. (In addition, please indicate, in the bchibits section, on a map or photograph, any parcels that will be developed or redeveloped in the near future.) The existing land use in the area is predcadnantly residential with pockets of strip commercial use. A shopping center exists at the northwest corner of Buffalo Grove /Dundee Road. 3. Provide the current and projected ADT and Peak Hour counts, and the sources for this information. The ADT counts are not applicable, since this is not a proposed roadway improvement. 4. Provide the raw accident counts for each of the last three years, and the source for this information. The raw accident counts are not applicable, since this is not a proposed roadway improvement. MCE070 /DF -2 Page 3 1. Describe the proposed improvement and the need for the improvement. BE SURE TO MENTION ALL INTERSECTION, DRAINAGE, LANDSCAPING, LIGHTING, AND SIDEWALK WORK THAT FALLS WITHIN THE LIMITS OF THE PROPOSAL. If proposal includes widening, explain whether existing lanes will be reconstructed, resurfaced, or not utilized. The proposed improvement consists of constructing new 5 -foot. sidewalk and 8 -foot shared sidewalk /bikepath at intermittent locations along Buffalo Grove Road, Dundee Road and Lake -Cook Road. The attached Table 1 describes the location and sidewalk improvements required. The proposed improvement would also replace the existing overhead lighting along Buffalo Grove Road and Dundee Road with a new lighting system. Twenty four (24) street lights will be required along Dundee Road, eight (8) lights between Three States Blvd. to 350 feet west of Buffalo Grove Road and sixteen (16) lights between Buffalo Grove Road and Schoenbeck Road, Along Buffalo Grove road, twenty three (23) light are required from approximately 1000 feet north of Dundee Road to the Buffalo Grove /Lake Cook Road intersection. In addition, ditch construction and drainage modifications are proposed at one location. These improvements are needed to fill the gaps in existing sidewalks and bikepaths throughout this area. In addition, these improvements would match existing sidewalks and bikepaths belonging to the adjoin- ing communities, Wheeling and Arlington Heights. 2. Identify all parties interested in participating in the local match. Identify anticipated jurisdictional transfer issues. The Village of Buffalo Grove will be the sole local participant in the funding for this project. 3. Discuss the proposed improvement in light of previous studies and plans. There are no additional studies and /or plans that are known to affect the proposed projects. i MCE070 /DF -2 oPage 4 4. Why is this project regionally significant? The proposed improvement would provide continuous sidewalks and /or bikepaths throughout this area (see Figure 1). In addition, the proposed improvement would match existing sidewalks and /or bikepaths in adjoining ccamunities. These improvements would provide pedestrian safety and would serve the growing population by providing for their recreational and general mobility needs. 5. Discuss all anticipated right-of-way or easement requirements, and the number thereof. (Please identify these on a map or a photograph in the Exhibits section.) Right-- of-way or easements are not known to be required for this pro- posed improvement. 6. Identify wetlands that may be impacted, or other environmental con- cerns. There are no wetlands or floodplains involved in the implementation of this project. MCE070 /DF -2 8. Please attach a copy of a recent Board /Council resolution (or minutes) requesting consideration of the project. The resolution (Figure _A_) will be considered by the Village Board on January 8, 1990. Following approval of same, a copy will be forwarded. D. EXHIBITS (Please attach required exhibits to this form.) Figure 1 - Project Location Figure 2 - Existing Typical Section Figure 3 - Proposed Typical Section Table 1 - Proposed LTrovemnts Figure 4 - Resolution MCE070 /DF -2 Page 5 7.• Project Cost and Schedule for the Project: STAR'T'ING MO.YR. MUNICIPALS COUNTY$ STATE$ FAUS$ Phase One March, 1990 23,200 0 Phase Two May, 1990 46,400 0 Right -Of -Way None Reg 'd 0 0 Construction August, 1990 340,000 509,000 TOTAL PR3JE)CT $918,600 COST 8. Please attach a copy of a recent Board /Council resolution (or minutes) requesting consideration of the project. The resolution (Figure _A_) will be considered by the Village Board on January 8, 1990. Following approval of same, a copy will be forwarded. D. EXHIBITS (Please attach required exhibits to this form.) Figure 1 - Project Location Figure 2 - Existing Typical Section Figure 3 - Proposed Typical Section Table 1 - Proposed LTrovemnts Figure 4 - Resolution MCE070 /DF -2 1 i Chevy Chase Country Club. WHEELING i Vsrt Arlington Heights Road Old Arlington Heights Road Buffalo Grove Road, Dundee Road _ (IL Route 68), Lake -Cook Road Village of Buffalo Grove' Proposed FADS Project .I Figure 1 EXIST, R.O.W. 50' 15' 24 VAR. T T —I I EXIST. BIT. SURFACE EXIST. P.C.C. BASE EXIST. CONC. CURB 8c GUTTER EXIST. LIGHT POLE EXIST. 4' OR 5' SIDEWALK- - OR EXIST 8' BIKEPATH OR SHARED SIDEWALK /BIKE---PATH EXISTING TYPICAL SECTION _ Buffalo Grove Road',Dundee Road (IL Route 68), Lake -Cook Road. .Village of Buffalo Grove 't Proposed FAUS Project Figure 2' 0 EXIST. R.O.W. 50' 1.5r 24' EXIST. BIT. SURFACE EXIST. PC.C. BASE EXIST. CONC. CURB & GUTTER PROPOSED LIGHT POLE PROPOSED 5' SIDEWALK' OR, PROPOSED 8' PCC SHARED SIDEWALK /BIKEPATH VAR. I PROPOSED TYPICAL SECTION Buffalo'Grove Road, Dundee Road; Lake -Cook Road, Dundee Road to Lake -Cook Road Village of Buffalo Grove Proposed FAUS Project Figure 3 i Table 1 • PROPOSED SECTIONS OF SIDEWALK CONSTRUCTION NUMBER STREET SIDE LOCATION 1 Dundee Road South 313 Dundee Road 2 Dundee Road South 401 Dundee Road LENGTH WIDTH 138 ft. 5 ft. 340 ft. 5 ft. ..3 Dundee Road South Crofton Lane to 360 ft. 5 ft. 360 ft. East " 4 Dundee Road South Old Arlington Heights 120 ft. 5 ft. - Road to 120 ft. West 5 Dundee Road South Along Frenchmen's Cove 465 ft. 5 ft. and adjoining Church and Nursery Property 6 Dundee Road South 629 Dundee Road 360 ft. 5 ft. 7 Dundee Road South Betty Drive to 125 ft. 5 ft. 125 ft. East 8 Dundee Road South Property between 140 ft. 5 ft. Buffalo Grove and Wheeling 9 Arlington West Along Villa Verde 705 ft. 5 ft. Heights Rd. i 10 Arlington East Thornton to Mill Creek 1,230 ft. 5 ft. Heights Rd. Drive I Table 1 PROPOSED SECTIONS OF SIDEWALK CONSTRUCTION NUMBER STREET SIDE LOCATION LENGTH WIDTH 11 Old East Along Mill Creek Condos 730 ft. 5 ft. Arlington Heights Rd. 12 Old East Miller Lane to 330 ft. 330 ft. 5 ft. Arlington North Heights Rd. 13 Dundee Road South 915 W. Dundee 8 ft. 5 ft. 14 Dundee Road North Weidner Road to Buffalo 1,340 ft. 8 ft. Grove High School Property 15 Dundee Road North 400 W. Dundee Road 400 ft. 8 ft. (vs. 5 ft. existing) 16 Dundee Road North Along Dundee Pkwy. 760 ft. 8 ft. 17 Dundee Road North East and West of 650 ft. 8 ft. ' Oak Creek Drive (vs. 5 ft. existing) 18 Dundee Road North Buffalo Grove Road to 440 ft. 8 ft. 440 ft. East (vs. 5 ft. existing) 19 Dundee Road North Across 88 E. Dundee Rd. 225 ft. 8 ft. 9 Table 1 PROPOSED SECTIONS OF SIDEWALK CONSTRUCTION NUMBER STREET SIDE LOCATION LENGTH WIDTH 20 Dundee Road North Across new development 240 ft. 8 ft. from 88 E. Dundee Road to about 240 ft. East 21 Dundee Road North Across property from 600 ft. 8 ft. 300 E. Dundee Road to (vs. 5 ft. 600 ft. West existing) 22 Dundee Road North From Schoenbeck Road 780 ft. 8 ft. to 780 ft. West (vs. 5 ft.- existing) 23 Arlington East North and South of 1,650 ft. 8 ft. Hts. Road Beechwood Rd. (vs. 5 ft. existing) 24 Buffalo East From Buffalo Grove 260 ft. 5 ft. Grove Road. Village Limits South of Downing Rd. to 260 ft. south 25 Buffalo East From 385 S. Buffalo 1,700 ft. 8 ft. Grove Road Grove Road to (vs. 5 ft. 1,700 ft. South existing) 26 Buffalo East 385 S. Buffalo Grove Rd. 220 ft. 8 ft. Grove Road 27 Buffalo East From 385 S. Buffalo 1,850 ft. 8 ft. Grove Road Grove Road to (short) Aptakisic Road 28 Buffalo East From (short) Aptakisic 170 ft. 8 ft. Grove Road Road to 170 ft. North Grove Road Table 1 PROPOSED SECTIONS OF SIDEWALK CONSTRUCTION NUMBER STREET SIDE LOCATION LENGTH WIDTH 29 Buffalo East From 85 S. Buffalo 120 ft. 8 ft. Grove Road Grove Road to 120 ft. South 30 Buffalo East 85 S. Buffalo Grove 420 ft. 8 ft. Grove Road Road (vs. 5 ft existing) 31 Church-Road South Along St. Mary's Church 620 ft. 5 ft. Property 32. Lake -Cook Rd. North Raupp Blvd. to 200 ft. 1,180 ft. 8 ft. West of Buffalo Grove (vs. 5 ft. Road existing) 33 Lake -Cook Rd. North From Buffalo Grove 200 ft. 8 ft. Road to 200 ft. West (vs. 5 ft. existing) 34 Lake -Cook Rd. North From Buffalo Grove 500 ft. 8 ft. Road to 500 ft. East 35 Lake -Cook Rd. South From Buffalo Grove 320 ft. 5 ft. Road to 320 ft. East ',36 Lake -Cook Rd. South From Il. Rt. 83 to 400 ft. 5 ft. 400 ft. West 37 I1. Rt. 83 West From Lake -Cook Rd. to 200 ft. 8 ft. 200 ft. North (vs. 5 ft. existing) 38 Buffalo _ West Between-205 Dundee Rd. 100 ft. 5 ft. Grove Road and 960 S. Buffalo Grove Road