Loading...
2013-20RESOLUTION NO. 2013- 20 A RESOLUTION APPROVING AN AGREEMENT FOR CONSTRUCTION ENGINEERING SERVICES FOR THE 2013 STREET RECONSTRUCTION PROJECT AND FOR CONSTRUCTION ENGINEERING SERVICES FOR THE ADDITION OF ARMSTRONG DRIVE TO THE 2013 STREET RESURFACING PROJECT WHEREAS, THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE desire to cause the implementation of the 2013 Street Reconstruction Project and the addition of Armstrong Drive to the 2013 Street Resurfacing Project; and WHEREAS, the approval of agreement with a consulting engineer is required in order to proceed with the necessary engineering of the project. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois, that the President and Clerk be, and they are hereby authorized and directed to execute the "Engineering Services Agreement - Amendment No. 1." A copy of said contract is attached hereto and made a part hereof. AYES: 5 — Trilling, Sussman, Terson, Stein, Ottenheimer NAYES: 0 — None ABSENT: 1 —Berman PASSED: May 6 '2013 APPROVED: May 6 12013 ATTEST: Village-Ct rk Res 13 -2 APPROVED: VILLAGE. OF BUFFALO GROVE. ILLINOIS ARMSTRONG DRIVE IMPROVEMENTS 2013 STREET RECONSTRUCTION PROJECT ENGINEERING SERVICES AGREEMENT AMENDMENT ND. I THIS AGREEMENTAMENDMENT is made this � day of 0-' . 2013, by and between the Village of Buffalo Grove.. Illinois, hereinafter referreA to as the Village, and Baxter & Woodman, Inc., Consulting Engineers, hereinafter referred to as the Engineers for the purpose of amending the Engineering Services Agreement between these parties dated March 4, 2013, hereinafter referred to as the Agreement. 2.1 Engineers' fee for construction- related services described in Section 2.3 will be revised to include construction- related services for the Armstrong Drive Improvements and the 2013 Street Reconstruction Project. The Engineers' total fee for the 2013 Street Resurfacing Project ($277,677), Armstrong Drive Improvements ($24.000). and the 2013 Street Reconstruction Improvements ($188,811) shall not exceed $490,488, subject to the following terms: (1) The Project construction work is to be completed by November 1, 2013. Work also includes staking -out the Projects for construction, starting on approximately May 13, 2013 (for Armstrong Drive). (2) Provide a Resident Project Representative, at the construction site on a full -time basis or ten (10) hours per day for fifty (50) days and an additional Resident Project Representative eight (8) hours per day for thirty (30) days worked (Monday through Friday), and provide four (4) Saturdays at eight (8) hours per day for one (1) Resident Project Representative. (3) Provide Resident Project Representatives for ten (10) days at ten (10) hours per day for initial survey and stakeout. Work includes setting lines and grades.. marking pavement, curb, and driveways for removal and replacement as construction proceeds. (4) The subconsultant cost for materials testing for the Projects, the 2013 Street Resurfacing Project ($21,740), Armstrong Drive Improvements ($2,000), and the 2013 Street Reconstruction Improvements ($14,380), shall not exceed S38,120.'" B A X T E R WOODMAN All other provisions of the Agreement shall remain in full force and effect. IN WITNESS WHEREOF the Village has caused the execution of this Agreement to be made by its Village President and attested by its Clerk pursuant to a resolution passed by the Board of Trustees, which resolution is considered to be part of this Agreement the same as though it were written herein, and the Engineers have hereunto set their hand and seal as of the day and year first above written. BAXTER & WOODMAN, INC. By Vice President May 13, 2013 Date of Signature ATTEST: VILLAGE OF BUFFALO GROVE, ILLINOIS ATTEST: �<✓L'LY 1� ij . CLs LC j Deputy Secretary `✓ Village Clerk 1:AItasca \BFGVV \120534.60 -2013 Street ImprovementsTrigineering Services Agreement \AMENDMENT I- As Revised MI,D& JVA.Docx B A X T E R W �L4 WOODMAN