Loading...
2011-17•` • RESOLUTION NO. 2011- 17 Resolution for improvement by 111InOLS Department Municipality Under the Illinois Of Transportation Highway Code BE IT RESOLVED, by the President and Board of Trustees of the Council or President and Board of Trustees Village of Buffalo Grove Illinois City, Town or Village that the following described street(s) be improved under the Illinois Highway Code: Name of Thoroughfare Route From To See attached list BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of curb and gutter, base course restoration and resurfacing, design engineering and construction engineering and shall be constructed 35' and 27' B -B wide and be designated as Section 11- 00102 -00 -RS 2. That there is hereby appropriated the (additional ❑ Yes ® No) sum of One million two hundred ninety -three thousand three hundred seventy -four Dollars ( $1,293,374.00 ) forthe improvement of said section from the municipality's allotment of Motor Fuel Tax funds. 3. That work shall be done by contract ; and, Specify Contract or Day Labor BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the district office of the Department of Transportation. Approved b/y�2o !� Date Department of Transportation �D--�. M. Regional Engineer I, Janet M. Sirabian, Village Clerk Clerk in and for the Village of Buffalo Grove City, Town or Village County of Cook and Lake hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the President and Board of Trustees Council or President and Board of Trustees at a meeting on May 16, 2011 Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 16th day of May, 2011 (SEAL) City, Town, or Village Clerk Printed 5/9/2011 BLR 09111 (Rev. 11/06) 'r P • • VfLLAGE OF BUI,FAI -O GROVE, ILLINOIS 2012 STREET IMPROVEMENTS EXFIIBI "F B PROJECT DESCRIPTION The PROJECT includes curb repair or replacement, sidexvalk repair, minor drainage improvements, and Hot -Mix Asphalt resurfacing or pavement pulverization on the following streets: STREET Horatio Boulevard .Joel Lane Parkchester Road Newtown Drive Golfview Terrace Parkview Terrace Covington Terrace Brentwood Circle FROM Marie Avenue Parkchester Road Newtown Drive Weiland. Road Dundee Road Golfview Terrace Golfview Terrace Parkview "Terrace TO Parkchester Road Horatio Boulevard Horatio Boulevard Horatio Boulevard Covington Terrace End Parkview Terrace End Thompson Boulevard Arlington Heights Road Qrandywyn bane Kingsbridge Way Thompson Boulevard Brandywyn Lane Heatherdown Way Kingsbridge Way Brandywyn. Lane Logsdon Lane Thompson Boulevard Thompson Boulevard Larchmont Drive . Thompson Boulevard Thompson Boulevard Busch Parkway Krause Drive Gardenia Lane Windover Circle Common Way Rose Boulevard Rose Court Fast Rose Court West Cameron Way Rachel Lane Countryside. Drive Nichols Road Pine Tree Circle S Pine Tree Circle N Deerfield Parkway Deerfield Parkway Harris Drive Harris Drive Harris Drive Milwaukee Avenue End End Gardenia Lane Buffalo Grove Road Nichols Road Und Rose Boulevard End Rose Boulevard I.`nd Nichols Road Countryside Drive Cameron Way Cameron Way Hidden Lake Drive Hidden Lake Drive I: \Crystal Lake \BFGVV \110167 -2012 St Main \Contract`.ESA Exhibit B.Doc End Rose Boulevard Rose Boulevard Arlington I leights Road E'iid End