Loading...
2009-030 ; ` • RESOLUTION NO. 2009- 3 A RESOLUTION APPROVING A DESIGN ENGINEERING SERVICES AGREEMENT FOR FLOOD RISK REDUCTION PROJECTS WHEREAS, the Village President and Board of Trustees desire to proceed with specific Flood Risk Reduction Projects; and, WHEREAS, an engineering services agreement for the design stage of the projects is needed in order to proceed with the improvements; NOW, THEREFORE, BE IT RESOLVED by the Village President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois as follows: 1. The letter agreement as revised January 6, 2009, RE: "Proposal for Professional Design Engineering and Permitting Services - 2008 Flood Risk Reduction Projects" is hereby approved. 2. The Village Manager is authorized and directed to execute the agreement for the Village. A copy of said agreement is attached hereto and made a part hereof. AYES: 5 - Braiman, Berman, Kahn, Trilling, Rubin NAYES: 0 - None ABSENT: 1 - Glover PASSED: January 19, , 2009 APPROVED: January 19 , 2009 Approved: Village President ATTEST: a"" Vill�a-d Clerk G:\PWDIRGRP\LHC\STORMS\RES09.doc