2008-29RESOLUTION NO. 2008 -?9 A RESOLUTION APPROVING A CONSTRUCTION ENGINEERING SERVICES AGREEMENT FOR THE WHITE PINE TRAIL (BERNARD DRIVE SOUTH TO LIONS PARK) IMPROVEMENT PROJECT WHEREAS, the Village President and Board of Trustees desire to proceed with the White Pine Trail (Bernard Drive south to Lions Park) Improvement Project; and, WHEREAS, an engineering services agreement for the construction stage of the project is needed in order to proceed with the improvement; NOW, THEREFORE, BE IT RESOLVED by the Village President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois as follows: 1. The July 8, 2008 letter agreement, RE: "White Pine Drainage Channel Improvements, Construction Engineering Proposal and Agreement, Bonestroo Proposal Number: MO 1528-08008-0," related to the White Pine Trail (Bernard Drive south to Lions Park) Improvement Project is hereby approved. 2. The Village Manager is authorized and directed to execute the agreement for the Village. A copy of said agreement is attached hereto and made a part hereof. AYES: 5 - Braiman, Glover, Berman, Kahn, Trilling NAPES: 0 - None ABSENT: 1 - Rubin PASSED: September 8 , 2008 APPROVED: September 8 , 2008 Approved: or Village President ATTEST: Villag Jerk G:\P WDIRGRP \LIIC \WHTPINE \RES08.doo July 8, 2008 Mr Greg Boysen, P.E. Director of Public Works Village of Buffalo Grove 51 Raupp Blvd. Buffalo Grove, IL 60085 Re White Pine Drainage Channel Improvements Construction Engineering Proposal and Agreement Bonestroo Proposal Number. M01528- 08008 -0 Dear Mr. Boysen: • 1860 W Winchester Rd suite 106 Libertyville, IL 60048 Tel 847 -816 -1631 Fax 847 - 816 -3762 www bonestroo com 49 Bonestroo Thank you for opportunity to assist the Village with the construction engineering services portion of the proposed White Pine Drainage Channel Improvements. Our office appreciates being able to further assist the Village with the implementation of this project Project Description The Village of Buffalo Grove would like to proceed with the construction phase of the White Pine Drainage Channel Improvements project, which consists of approximately 1,800 feet of stormwater drainage conveyance improvements and the installation of a bituminous recreation trail from the southern termini, located just north of Sycamore Road to its intersection with Branard Drive. It is our understanding that the project is being partially funded through a Section 319 Grant, administered by the State of Illinois, as well as a Recreational Trails Program (RTP) Grant, administered by the Illinois Department of Natural Resources. Scope of Services Based on our current understanding of the project and the Villages construction engineering needs, Bonestroo will 1 Attend a preconstruction meeting and up to two on -site progress meetings, as needed. Provide labor, equipment and materials for the one time construction layout and staking of the proposed channel realignment and trail work as follows. a Install one grade stake with cut /fill information at the centerline of the proposed channel location at approximately 50 foot intervals and as necessary to achieve the proper channel alignment as designated on the design plans. b. Install one location stake on each side of the proposed top of bank location at st. Paul approximately 50 foot intervals, as designated on the design plans St cloud Rochester rALlwaukee Chicago Mr. Greg Boysen, P. E. July 8, 2008 village of 811A810 Grove Page 2 White Pine Drainage Channel Improvements Construction Engineering Proposal Bonestroo Proposal No.: MO 1528- 08008 -0 c. Install one grade stake with cut/fill information along one side of the proposed bituminous trail at approximately 50 foot intervals and as necessary to achieve the proper alignment as designated on the plans, d. Install one grade stake with cut /fill information at the points where the proposed retaining walls start, end, or step in elevation as designated on the plans. Provide construction observation and documentation services on a part -time basis to confirm general conformance to the contract documents. It is anticipated that the required inspection services will not exceed 15 hours per week, including travel, for an 8 week construction schedule. In addition, project management oversight and field supervisor visits will be provided on an as needed basis. No work is budgeted outside of normal business hours, or on weekends or holidays. 4. Document Contractor progress and track pay item quantities related to project scope. Review and recommend pay estimates and waiver of lien submittals from Contractor to verify compliance with the contract documents. Prepare a project punch list upon completion of restoration operations. Perform final inspections, and revietr the Contractor's final pay request. 8. Submit paperwork to the USACCE to meet permit requirements as necessary. 9. Provide submittals as necessary to comply with RTP and Section 319 Grant paperwork. 10. Respond to Homeowner complaints during construction operations. Village responsibilities: Designate a single individual to act as the Village's representative for the project. Provide access to the project and obtain any necessary easements, Pay all permit fees. Clarifications and Assumptions: Only those meetings detailed are included. Additional meetings will be billed on time and materials basis. Reasonable reimbursable expenses have been included in the estimated fees described above, and in accordance with the attached Schedule of Services and Fees. The Village will be billed monthly based on actual hours worked and expenses incurred, We have assumed that our services will not extend beyond 2008 for this phase of the work. PAMarketing \BDA proposals \_2008 proposals \M01528 -08 Buffalo Grove White Pine Construction \Letter.doc Mr. Greg Boysen, P. E. Village of Buffalo Grove White Pine Drainage Channel Improvements Construction Engineering Proposal Bonestroo Proposal No.: MO 1528- 08008 -0 July 8, 1008 Page 3 Other potential additional tasks, such as maintenance monitoring, would be in addition to the above amount or by separate proposal. Our Schedule of Fees and Services, and agreed on Standard Terms and Conditions are attached and made of this proposal. This proposal is valid for sixty (60) days from the original date of this proposal. Compensation: For the above services, we propose to complete the work for an estimated fee of $46,300.00. This fee includes all mileage, equipment, staking and material costs associated with proposed work. This letter also serves as the Agreement between the Village and Bonestroo, with the Village's revised Terms and Conditions made a part of the Agreement. If this proposal is acceptable to the Village, please sign both copies and return one copy to our office. If you require any additional information or have any questions, please contact either of the undersigned at your convenience. Sincerely, BONESTR00 S -` Thomas S. Palansky, P.E. Principal /Branch Manager TSP /JRB encl. 1 R. Briggs, RE Associate /Civil Engineering Manager Acceptance: If acceptable, please sign both copies of this document and return one (1) copy to Bonestroo. Accepted by: LA) ",1 M Authorized Signature of �wA,6c kki*6-ek Title WU4,IA44 0% PA(MM Printed Name a 14 12001 Date Standard Terms and Conditions for Village of Buffalo Grove White Pine Drainage Channel and Trail Improvement SECTION 1. ENGINEER'S SERVICES Bonestroo, Inc. ( "Engineer ") shall act as the Village of Buffalo Grove's ( "Owner') agent only as provided for within this Agreement. SECTION 2. THE OWNER'S RESPONSIBILITIES The Owner shall: 1) Provide full information as to its requirements for the Project. 2) Furnish to the Engineer, prior to any performance by the Engineer under this Agreement, a copy of any planning, design and construction standards which the Owner shall require the Engineer to follow in the conduct of its services for the Project. 3) Place at Engineer's disposal all available written data in the possession of or readily available to the Owner and pertinent to the Project, including existing reports, plats, surveys, contour mapping, utility mapping, record plans, wetlands, land -use, and zoning maps, borings and other data useful to the Engineer in the performance of its services. 4) Acquire all land, easements, and rights -of -way and provide for land surveys and the preparation of legal dessriptieas and exhibits, , as may be necessary for the Project. 5) Provide access to the Project site and make all provisions for the Engineer to enter upon public and private lands as required by the Engineer to perform its services. 6) 7) 3 9) Examine all studies, reports, sketches, Opinions of Probable Construction Costs, specifications, drawings, proposals and other documents presented by the Engineer and promptly render the Owner's decisions pertaining to each of such documents. Designate a single person to act as the Owner's Representative with respect to the Engineer's services. Such person shall have complete authority to transmit instructions, receive information, and interpret and define the Owner's policies and decisions with respect to services covered by this Agreement, subject to Owner's governing body approval when required by law. Give prompt written notice to the Engineer whenever the Owner observes or otherwise becomes aware of any defect in the Project or any development that affects the scope or timing of the Engineer's services. Furnish, or instruct the Engineer to provide at the Owner's expense, necessary "Supplemental Services" as may be provided for in this Agreement, or other services as they may be required. 10) Furnish to the Engineer, as required by the Engineer for performance of its services, information or consultations not covered in the Engineer's Basic Services, such as core borings, probings and subsurface explorations; hydrographic .surveys, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretations of all of the foregoing; property, boundary, easement, and right -of -way surveys and property descriptions; zoning and deed restrictions. 11) Furnish approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the work. 12) Provide legal review of the contract documents and provide any required accounting and insurance counseling services for the Project. 13) Act promptly on all construction Change Orders and provide authorization before Change Orders are issued to the Contractor on a Project. 14) If Owner desires, furnish inspection or monitoring services to verify that Contractor is complying with all laws or regulations and to verify that Contractor is taking all necessary safety precautions to protect persons and property, as the Engineer in this Agreement does not undertake to perform these services. In performing its services, the Engineer may rely upon the accuracy and completeness of all Owner - provided information. SECTION 3. COMPENSATION 3.1 Payment for Reimbursable Expenses Unless otherwise provided, in addition to Engineering fees, the Owner will pay the Engineer for Reimbursable Expenses on the basis of the Engineer's cost. Although not a complete list, examples of Reimbursable Expenses include: the costs of plotting drawings and the reproduction of drawings and specifications; project- specific printing, duplicating, tabs and indexes; testing; mileage; travel and per -diem expenses of the Engineer for out -of -town trips required for the Project; long distance telephone calls and faxes as required to expedite the work; the costs for cellular phone calls /service for Engineer's field personnel on a Project; project photographs taken before and during construction; construction stakes; postage and delivery charges; any new taxes, fees or costs imposed on the Engineer's services (such as sales taxes) after the date of this Agreement; and out -of- pocket expenses incurred directly for the Project. All reimbursable expenses are subject to prior Owner MDroVal. 3.2. Objections to Invoices /No Deductions It is important for the Engineer to be promptly informed of problems. If the Owner objects to any portion of an invoice, the Owner shall notify the Engineer in writing within twenty days of the invoice's receipt. The OwneF agrees to pay any undisputed paFtions of an inveffir_,e. No deductions shall be made from the Engineer's compensation on account of penalty, Revised 11/01/05 for Village of Buffalo Grove —White Pine Drainage Channel and'rrail Improvement • liquidated damages, or other sums withheld from payment to contractors, except as may be determined by mediation, arbitration, litigation or other dispute resolution mechanism to which the Engineer is a party. 3.3 Suspension of Work If the Owner fails to make payments when due or otherwise breaches this Agreement, the Engineer may suspend work after providing five days notice to the Owner. The Engineer will not be liable for any costs or damages resulting from such a suspension of work. 3.4. Progress Payments The Owner will make progress payments to the Engineer in proportion to services performed, and in accordance with the Illinois Prompt Payment Act (50 ILC5 505/1 et. se . The Engineer will invoice the Owner monthly during the progress of the work. Of such— i+weise Owner may not reserve as retainage any portion of a payment due under this Agreement. 3.5_. 4nterestfGellectfew_Cgists The Owner agrees to pay the Engineer 1,04 per menth interest on _all inveig-AS of the Engineer, with intere6t beginning tG assrtre 30 days--afte"be date of the invoiGe. if the Owner fails to pay EngineeF a 11 amGunts owiRg pursuant to the terms ef this Agreement, the Owner agrees W pay all GOStS G. G0119GtiOR, r RGIudIR9 Feasonable attemey's fees, in addition to all nth 2FROURts due uRdeF this Agreement. SECTION 4. GENERAL CONSIDERATIONS 4.1. Standard of Care The Engineer shall exercise the same degree of care, skill and diligence in the performance of its services as is ordinarily exercised by members of the profession under like circumstances. Nothing in this Agreement, or otherwise prepared as a result of the Project, shall modify the foregoing standard of care. The Engineer shall not be required to sign any documents that would result in it having to certify, guarantee or warrant the existence of conditions whose existence the Engineer cannot ascertain. 4.2. Delays Both the Engineer and the Owner will put forth reasonable efforts to complete their respective duties in a timely manner. Because the Engineer's performance must be governed by sound professional practices, the Engineer is not responsible for delays occasioned by factors beyond its control or that could not reasonably have been foreseen at the time of preparation of this Agreement.. 4.3. Opinions of Costs and Schedules Since the Engineer has no control over the cost of labor and material or over competitive bidding and market conditions, the Engineer's Opinion of Probable Construction Cost and of Project schedules can only be made on the basis of experience or qualifications as a professional engineer. The • Engineer does not guarantee that proposals, bids, actual Project costs or construction schedules will not vary from Engineer's opinions or estimates. If the Owner desires greater assurance as to the anticipated Construction Cost of the Project, the Owner shall employ, or instruct the Engineer to provide as a Supplemental Service, an independent cost estimator. 4.4. Insurance 4.4.1. The Engineer agrees to maintain a professional liability insurance policy for negligent acts, errors or omissions in an amount of at least $3,000,000 per claim and $4,000,000 annual aggregate, on a claims -made basis, as -long ,as-suGI4 The Engineer will not cancel the insurance until thirty days after providing the Owner written notice. 4.4.2. The Engineer shall maintain: 1) Statutory workers compensation and employers' liability insurance coverage. 2) Comprehensive general liability and automobile liability insurance coverage in the sum of not less than $1,000,000 each. 4.4.3. Owner shall require Contractor to purchase and maintain general liability and other insurance as specified in the contract documents and to cause the Engineer and its consultants to be listed as additional insureds with respect to such liability and other insurance purchased and maintained by Contractor for the Project. 4.5. Use of Instruments of Service Documents (including Digital Data) prepared by the Engineer, such as drawings, specifications and reports ( "Engineering Documents ") are instruments of the Engineer's professional services, and not products. The Engineering Documents are prepared for a specific Project and may not be used by the Owner for other Projects. For health and safety reasons, the Owner agrees it will not use the Engineering Documents (except for computer hydraulic or hydrologic modeling data) for other purposes or provide them to other persons. If the Owner violates this provision, it waives any resulting claims against the Engineer, and agrees to defend and indemnify the Engineer from any resulting claim or liability (including reasonable attorneys' fees). 4.6. Digital Data 4.6.1. If included in Basic Services or Supplemental Services and as a convenience to the Owner, the Engineer will furnish the Owner with electronic data versions of certain drawings or other written documents ( "Digital Data ") provided in hard copy form. In the event of any conflict between a hard copy document and the Digital Data, the hard copy document governs. The Digital Data shall be prepared in the current software in use by the Engineer and is not warranted to be compatible with other systems or software. 4.6.2. Any Digital Data submitted by the Engineer to the Owner is submitted for an acceptance period of 60 days ( "Acceptance Period "). Any defects that the Owner discovers during this period and reports to the Engineer will be corrected by the Engineer at no extra charge. For correction of defects Revised 11/01105 for Village of Buffalo Grove —White Pine Drainage Channel and Trail Improvement 2 • reported to the Engineer after the Acceptance Period, the Owner shall compensate Engineer on an hourly basis at Engineer's normal billing rates. The Owner understands that the Digital Data is perishable and the Owner is responsible for maintaining it. 4.7. Termination, Suspension or Abandonment 4.7.1. The Owner or the Engineer may terminate or suspend this Agreement for substarr#+al non - performance by the other party, including without limitation the failure to make payments in accordance with this Agreement. The party terminating or suspending this Agreement shall give seven days written notice to the other party. 4.7.2. If the Project or the Engineer's services are suspended for more than 90 days, the Engineer may terminate this Agreement upon seven days written notice to the Owner. The Engineer shall have no liability on account of a suspension by the Owner. If a suspended Project is reinstated, an equitable adjustment to the Engineer's compensation may be necessary. 4.7.3. In the event of termination or suspension permitted by this Agreement or abandonment of the Project by the Owner, the Owner shall compensate the Engineer for services performed prior to termination, suspension or abandonment and for services directly attributable to the termination, suspension or abandonment itself, together with Reimbursable Expenses. If the Owner properly terminates Engineer for cause, Owner may withhold from Engineer's compensation those damages directly attributable to the cause of the termination. 4.8. Dispute Resolution 4.8.1 In an effort to resolve any conflicts that arise out of the services under this Agreement, all disputes between the Owner and the Engineer arising out of or relating to this Agreement shall be submitted to nonbinding mediation prior to commencing arbitration or litigation. The Mediator's fee shall be shared equally and mediation shall proceed only at a place where arbitration or litigation is proper. Mediation shall not be a condition precedent to arbitration or litigation if a party refuses to make reasonable arrangements for a mediation within 20 days of demand by the other party. If a dispute relates to or is the subject of a lien arising out of the Engineer's services, the Engineer may proceed in accordance with applicable law to comply with the lien notice or filing deadlines prior to resolution of the matter by mediation or arbitration. 4.8.2 Unless the Owner and the Engineer mutually agree otherwise, all claims, disputes, and other matters in question arising out of or relating to this Agreement which are not resolved by mediation and where the amount in controversy is less than $1,000,000, shall be decided by binding arbitration in accordance with the then -most current Construction Industry Rules of the American Arbitration Association. The arbitrators will not have jurisdiction, power or authority to consider any claim or dispute: (a) where the amount in controversy is more than $1,000,000 (exclusive of interest and costs); (b) when the demand for arbitration is made after the date when a court action would be barred by any applicable statute or period of repose or limitations; or (c) when the claim or dispute is a claim for contribution or indemnity arising out of a claim by a third party who does not consent to join in arbitration. 0 4.8.3 In the event of litigation or arbitration arising from or related to the services provided under this Agreement, the prevailing party is entitled to recovery of all reasonable costs incurred, including staff time, court costs, attorney's fees and other related expenses. 4.8.4. If the Engineer or the Owner intends to assert a claim against the other as a result of a dispute with a third party, the claiming party shall notify the other party as soon as possible, and in any event prior to resolving the dispute with the third party. 4.8.5. So that any claims of the Owner may be intelligently addressed by the Engineer, the Owner agrees to make no claim for professional negligence against the Engineer unless the Owner has first provided the Engineer a written certification signed by an independent design professional licensed in Illinois and currently practicing in the same discipline. The certification shall specify every act or omission of the Engineer that is a violation of the applicable standard of care and the basis for the certifiers opinion(s). This certificate shall be provided no fewer than 30 days prior to instituting arbitration or suit. 4.8.6. Causes of action between the Engineer and the Owner relating to acts or failures to act shall be deemed to have accrued and the applicable statute of limitations shall commence to run not later than the date of substantial completion of a Project. 4.9. Hazardous Substances The Engineer's scope of services does not include any services related to hazardous or toxic materials, including asbestos and PCBs. If it becomes known that such materials may be present at or near a Project that may affect the Engineer's services, the Engineer may suspend performance of its services, without liability, and will assist the Owner to retain appropriate consultants to adequately identify and abate such materials so that Engineer's services may resume. Nothing in this Agreement shall be construed to require the Engineer to: (a) assume the status of a generator, storer, transporter, treater, or disposal facility as those terms appear within the Resource Conservation and Recovery Act, 42 USC 6901 et seq, as amended, or within any state statute governing the generation, treatment, storage and disposal of waste; or (b) arrange for the transportation, treatment, or disposal of hazardous substances, as described in the Comprehensive Environmental Response, Compensation and Liability Act, 42 USC 9601, et seq, as amended. The Owner agrees to defend, indemnify and hold harmless the Engineer, its employees, subcontractors and agents from all claims, losses, damages liability and costs, including attorneys fees, relating to or arising out of hazardous or toxic materials at or near a Project. 4.10. Governinct Law This Agreement shall be governed by the laws of the State of Illinois and any dispute or dispute resolution process shall be venued in Libel:tyville Buffalo Grove, (Cook Countyl Illinois. Revised 11/01/05 for Village of Buffalo Grove —White Pine Drainage Channel and Trail Improvement 3 4.11. Integration This is an integrated Agreement and it supersedes all prior negotiations or agreements between the parties. It shall be modified only by a written document signed by the party sought to be bound. The provisions of this Agreement are severable, and if any provision is found to be unenforceable, the remaining provisions continue to be valid, and the unenforceable provision shall be reformed with a valid provision that comes as near as possible to expressing the intention of the unenforceable provision. 4.12. Assignment and Waiver Except for the Engineer's use of necessary consultants, the Engineer and the Owner shall not assign or delegate their respective obligations under this Agreement without the written consent of the other party, which consent shall not be unreasonably withheld. The waiver of any term or condition or breach thereof by either party shall not constitute a waiver of any other term or condition or breach thereof. 4.13. Engineer's Services In performing professional engineering and related services, the Engineer is not engaged in rendering legal, insurance, or accounting services or advice. The Owner agrees that documents prepared by the Engineer, including reports, bidding materials, and form contracts will be reviewed by the appropriate representative of the Owner, such as the Owner's attorney, insurance counselor or other consultants, to the extent that Owner deems necessary to protect its interests. 4.14. Government Agencies The Engineer shall not be liable for damages resulting from the actions or inactions of government agencies, including without limitation permit processing, environmental impact reports, dedications, zoning matters, annexations or consolidations, use or conditional use permits, and building permits. 4.15 Monitoring Work If required by the scope of services, the Engineer will make visits to the Project site at intervals appropriate to the various stages of construction as the Engineer deems necessary in order to observe the progress and quality of construction. The Engineer will not be required to make exhaustive or continuous inspections on the Project site. Based on such visits, the Engineer will determine in general if the construction work is proceeding in accordance with the contract requirements, keep the Owner informed of the progress of the construction work, and will endeavor to guard the Owner against defective work. The Engineer will not supervise, direct, control, or have authority over or be responsible for the Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of the Contractor to comply with laws and regulations applicable to the work. 0 4.16. Americans with Disabilities Act The Engineer shall use reasonable professional effort and judgment in interpreting and advising the Owner as to the necessary requirements for the Project to comply with the Americans with Disabilities Act (ADA). The Engineer shall rely on the local building department for interpretations of the ADA at the time the service is rendered. The Engineer does not warrant or guarantee that the Project will fully comply with interpretations of ADA requirements by regulatory or judicial bodies. SECTION 5. LIABILITY Having considered the potential liabilities that exist during the performance of the Engineer's services, the benefits of the Project, the Engineer's fee for its services, and the promises contained in this Agreement, the Owner and the Engineer agree that risks should be allocated in accordance with this section, to the fullest extent permitted by law. 5.1 indemnification The Engineer and the Owner each agree to defend and indemnify each other from liability for claims, losses, damages or expenses (including reasonable attorney's fees) to the extent they are caused by their negligent acts, errors or omissions relating to this Agreement. In the event the claims, losses, damages or expenses are caused by the joint or concurrent negligence of the Engineer and the Owner, they shall be borne by each party in proportion to its own negligence. 5.2 Limitation of Liability The Engineer's and its employees' aggregate liability to the Owner for any and all claims, losses or damages arising out of any Project or this Agreement for any cause shall not exceed the insurance proceeds available at the time of settlement or judgment. This limitation shall apply regardless of the cause of action or legal theory pled or asserted. 5.3 Consequential Damages Neither the Owner nor the Engineer shall be liable to the other for any consequential damages incurred due to the fault of the other or their agents. Consequential damages include, but are not limited to, loss of use and loss of profit. 5.4 Design without Construction -phase Services If the Engineer's Basic Services under this Agreement do not include Project observation, or review of the Contractor's performance, or any other construction phase services, and that such services will be provided by the Owner, then the Owner assumes all responsibility for interpretation of the plans and specifications and for construction observation or review and waives any claims against the Engineer that may be in any way connected thereto. Revised 11/01105 for Village of Buffalo Grove —White Pine Drainage Channel and Trail Improvement 2008 SCHEDULE OF FEES AND SERVICES Classification Senior Principal Principal Specialist Project Manager Senior Engineers Scientist ( landscape Architect I Planner Landscape Architect Land Surveyor Engineer Planner Environmental Scientist Designer I GIS I Landscape Designer (Graphics Engineering Technician Project Technician Field Supervisor I Construction Manager Crew Chief Inspector Survey, Technician GPS Survey Equipment (per day) Total Station Equipment (per day) Flow Meter (per week) Truck Vehicle Charge (per day) Traffic Counters (per day) $ 50.00 $ 34.00 $ 200.00 $ 60.00 $ 25.00 Remarks: These rates are adjusted annually in accordance with the normal review procedures of Bonestroo and are valid through December 31, 2008. 1. All rates will be billed portal to portal, unless otherwise stated. 2. Overtime rates at 150% of base rates for Inspectors, Technicians, and other field staff will apply for any hours worked Saturday, Sundays, and holidays, or in excess of eight hours per day Monday through Friday. 3. Direct Project Expenses (including mileage, printing and reproduction, field supplies, etc.) are billed based on Engineer's actual cost. 4. Subcontractor services and rentals, if required, will be billed at cost + 10 %. 5. Services and fees not listed above will be quoted upon request. #,16 Bonestroo 0 2008 $ 130.00 - $ 160.00 $ 117.00 - $ 145.00 $ 120.00 - $ 155.00 $ 110.00 - $ 122.00 $ 103.00 - $ 130.00 $ 88.00 - $ 120.00 $ 114.00 - $ 143.00 $ 88.00 - $ 110.00 $ 88.00 - $ 110.00 $ 82.00 - $ 108.00 $ 82.00 - $ 98.00 $ 70.00 - $ 92.00 $ 50.00 - $ 68.00 $ 92.00 - $ 120.00 $ 85.00 - $ 105.00 $ 72.00 - $ 92.00 $ 65.00 - $ 72.00 $ 50.00 $ 34.00 $ 200.00 $ 60.00 $ 25.00 Remarks: These rates are adjusted annually in accordance with the normal review procedures of Bonestroo and are valid through December 31, 2008. 1. All rates will be billed portal to portal, unless otherwise stated. 2. Overtime rates at 150% of base rates for Inspectors, Technicians, and other field staff will apply for any hours worked Saturday, Sundays, and holidays, or in excess of eight hours per day Monday through Friday. 3. Direct Project Expenses (including mileage, printing and reproduction, field supplies, etc.) are billed based on Engineer's actual cost. 4. Subcontractor services and rentals, if required, will be billed at cost + 10 %. 5. Services and fees not listed above will be quoted upon request. #,16 Bonestroo 0 Cost Estimate Village of Buffalo Grove White Pine Drainage Channel Restoration Improvements A. Base Bid Items VILLAGE OF BUFFALO GROVE JUL ° 6' 2�?Q� PWADMIN 1. Clearing 1 Lump Sum $5,000.00 /LS $5,000.00 2 Temporary Construction Entrance: Installation, Maintenance and Removal 2 EA $2,500.00 /EA $5,000.00 3 Temporary Stone Silt Trap: Installation, Maintenance and Removal 1 EA $2,500.00 /EA $2,500.00 4, Tree Removal 25 In -dia. a. 6 -15" diameter $50.00 /in -dia. $1,250.00 b. Greater than 15" diameter 50 In -dia. $75.00 /in -dia. $3,750.00 5. Furnishing and Placing Erosion Mat (NAG C350) 2,350 SY $9.00 /5Y $21,150.00 6. Furnishing and Placing Erosion Mat (NAG C125) 7,700 SY $2.00 /SY $15,400.00 7. Earth Excavation 1 Lump Sum $90,000.00 /1-S $90,000.00 8. Furnishing and Placing Boulder Tree Wells 7 EA $2,500.00 1EA $17,500.00 9. Furnishing and Placing Rip Rap, 12" - 18" 100 SY $100.00 /SY $10,000.00 10. Sump Pump Extension 1 EA $500.00 /EA $500.00 11. Furnishing and Placing Topsoil, 4" 4,700 SY $4.00 /SY $18,800.00 12. General Landscaping 1 Lump Sum $15,000.00 /1-S $15,000.00 13. Low Profile Mesic with Flowers 7,700 SY $3.00 /SY $23,100.00 14. Wet Sedge Meadow Zone Mix Seed 2,350 SY $3.00 /SY $7,050.00 15. Storm Sewer Modification 1 EA $2,500.00 /EA $2,500.00 16. Manhole to be Adjusted 1 EA $500.00 /EA $500.00 17. Silt Fence: Installation, Maintenance and Removal 150 FT $4.00 /FT $600.00 18 Construction Fence: Installation, Maintenance and Removal 700 FT $3.00 /FT $2,100.00 19. Boulder Edging, 15" - 18" 3,550 FT $5.00 /FT $88,750.00 20. Fence Removal /Relocation 65 FT $20.00 /FT $1,300.00 21. Split Rail Fence 225 FT $10.00 /FT $2,250.00 22. Storm Sewer Removal 50 FT $10.00 /FT $500.00 23. End Section Removal 2 EA $500.00 /EA $1,000.00 24. Wingwall Modification 1 EA $5,000.00 /EA $5,000.00 Bonestroo Cost Estimate Village of Buffalo Grove 01528 - 05110 -0 E 0 25. Storm Sewers 30 a. RCCP ASTM C -76 CL III w/ ASTM C -443 Joint, 30" FT $80.00 $2,400.00 b. RCCP ASTM C -76 CL III w/ ASTM C -443 Joint, 36" 40 FT $90.00 $3,600.00 C. RCCP ASTM C -76 CL II w/ ASTM C -443 Joint, 42" 45 FT $100.00 $4,500.00 d. PVC SDR 26 with push on joint, 8" 60 FT $25.00 /FT $1,500.00 26 Precast Reinforced Concrete Flared End Section with Grate, 30' 1 EA $1,500.00 /EA $1,500.00 27 Precast Reinforced Concrete Flared End Section with Grate, 36' 1 EA $1,750.00/EA $1,750.00 28 Precast Reinforced Concrete Flared End Section with Grate, 42 1 EA $2,000.00 /EA $2,000.00 29. Metal End Section, 8" 1 EA $150.00 /EA $150.00 30. Manhole, Restricted Depth, 4' dia, Type 1 Frame, Closed Lid 1 EA $1,500.00 /EA $1,500.00 31. Manhole, Restricted Depth, 5' dia, Type 1 Frame, Closed Lid 2 EA $2,000.00 /EA $4,000.00 32. Sidewalk Removal 200 SF $1.00 /SF $200.00 33. PCC Pathway, 6" 700 SF $7.00 /SF $4,900.00 34. Stone Face Retaining Wall with Geogrid 430 FT $50.00 /FT $21,500.00 35. Bituminous Surface Removal (Full Depth) 110 SY $10.00 /SY $1,100.00 36. Aggregate Base Course, Type B (CA -6), 6" 2,350 SY $12.00 /SY $29,375.00 37 Hot Mix Asphalt Surface Course, Mix "C ", N50 (IL 9.5 mm), 2 2,050 SY $12.50/SY $25,625.00 38, Paint Pavement Marking (White), 6" 80 FT $5.00 /FT $400.00 39. Paint Pavement Marking (White), 12" 75 FT $10.00 /FT $750.00 40. Curb Removal /Replacement 20 FT $100.00 /FT $2,000.00 41. Rock Check Dam 1 EA $1,000 /EA $1,000.00 42. Inlet, Type A, 24 ", Type 8 Grate 1 EA $750.00 /EA $750.00 43. Sign Panel Assembly with Metal Post Installation 4 EA $250.00 /EA $1,000.00 Total $452,000.00 . Bonestroo Cost Estimate Village of Buffalo Grove 01528- 05110 -0 B. Alternate Bid #1 It is understood and agreed that the Owner may decide to add to the proposed construction additional work as further detailed on the Contract Drawings and /or described in the Specifications. The award of the Contract will be based on total bid price comprise of the Base Bid plus those Alternate Bid Items that the Owner elects to proceed with. The undersigned agrees to perform the additional work for the prices quoted below. 1. Silt Fence: Installation, Maintenance and Removal 350 FT $4.00 /FT $1,400.00 2 Construction Fence: Installation, Maintenance and Removal 400 FT $3.00 /FT $1,200.00 3. Furnishing and Placing Rip Rap, 12" - 18" 15 SY $100.00 /SY $1,500.00 4. Metal End Section, 60" 1 EA $750.00 /EA $750.00 5. Galvanized Pipe Culvert, Class C, Type 2, 60" 30 FT $100.00 /FT $3,000.00 6 Manhole, Restricted Depth, 6' dia. Neenah R- 2595 -A Frame, CL 1 EA $5,000.00 /EA $5,000.00 7. General Landscaping 1 Lump Sum $7,500.00 /LS $7,500.00 Total $20,350.00 C. Alternate Bid #2 Credit for onsite excavation respread and site restoration. Includes all equipment, labor, 1. materials, etc. to spread, compact, and provide 1 LS $ /LS general landscaping restoration for all excavated material, as shown on the plans. Total Bonestroo Cost Estimate Village of Buffalo Grove 01528- 05110 -0