Loading...
2008-28RESOLUTION NO. 2008 - 28 E A RESOLUTION APPROVING AN INTERGOVERNMENTAL AGREEMENT WITH COOK COUNTY RELATED TO LAKE COOK ROAD WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois Constitution of 1970; and, WHEREAS, the quality of life is enhanced by a high quality arterial street transportation system which operates efficiently and which does not experience extreme congestion so as to induce motorists to "cut through" neighborhood streets in order to reduce travel times; and, WHEREAS, the Village is agreeable to implementing a study of Lake Cook Road in the area between Raupp Boulevard and Hastings Lane as part of the Village's current Phase I study of Weiland Road which includes the study of the Lake Cook Road and Weiland Road intersection provided Cook County will reimburse the Village for the study's expenses; and, WHEREAS, a Reimbursement Agreement with the County of Cook is needed to establish the provisions for reimbursement to the Village of Buffalo Grove from the County of Cook so as to properly and fully reimburse the Village for involved costs of the addition of the Lake Cook Road study areas to the currently ongoing Weiland Road study. NOW, THEREFORE, BE IT RESOLVED by the Village President and Board of Trustees of the Village of Buffalo Grove, Cook and Lake Counties, Illinois, as follows: Section l: The Agreement entitled "Reimbursement Agreement" related 4 1 Pi to the addition of Lake Cook Road (Raupp Boulevard to Hastings Lane) to the Village of Buffalo Grove's current Phase I engineering study of Weiland Road, is hereby approved. Section 2: The Village President and Village Clerk are authorized and directed to execute the agreement. A copy of said agreement is attached hereto and made a part hereof. AYES: 5 - Braiman, Glover, Berman, Kahn, Trilling NAYES: 0 - None ABSENT: 1 - Rubin PASSED: September 8 , 2008 APPROVED: September 8 , 2008 ATTEST: Vi age Clerk G:\PWDlRGRP\LI-IC\LCROAD\RESOLUTION08268.doc APPROVED: e Village President • APPROVED OF COOK COUNTY s REIMBURSEMENT AGREEMENT OCT 15 2008 com THE COUNTY OF COOK LAKE COOK ROAD Raupp Boulevard to Hastings Lane VILLAGE OF BUFFALO GROVE Section: 08- A5015 -01 -ES This Agreement, made and entered into by and between the COUNTY OF COOK, a body politic and corporate of the State of Illinois, hereinafter called "COUNTY', and the VILLAGE OF BUFFALO GROVE, a body politic and corporate in the State of Illinois, hereinafter called "VILLAGE ". WITNESSETH Whereas, the VILLAGE has initiated a Phase I Engineering Study for improvement needs along Weiland Road, including its intersection with Lake Cook Road; through a design engineering consultant; and, Whereas, the COUNTY and VILLAGE, in order to facilitate the free flow of traffic and ensure the safety of the motoring public, are desirous of conducting a corridor study to identifyfuture improvement needs along Lake Cook Road from Raupp Boulevard to Hastings Lane, including the potential realignment and extension of Weiland Road south of Lake Cook Road to intersect with Buffalo Grove Road; and, Whereas, it is in the mutual best interest of the parties hereto to implement the Lake Cook Road study along with the Weiland Road study through a supplement to the current VILLAGE Study in order to most effectively accomplish labor and cost efficiencies; and, Whereas, the VILLAGE has offered to supplement its consultant engineering agreement to include the Lake Cook Road corridor study, said study to include early coordination and data collection, field topographic surveys and preparation of base maps, crash data analysis, traffic analysis, alternate geometric studies, subsurface soils and pavement investigation, preliminary structural design, location drainage study and hydraulic analyses, wetland study, highway noise analysis, air quality analysis, comprehensive impacts and measures to minimize harm, draft environmental class of action determination, draft project development report, IDOT coordination, public involvement, final environmental class of action determination, final project development report, supervision, administration and project coordination (hereinafter called "STUDY "); and, the results of said STUDY will list improvement alternatives, options, scenarios, benefits and costs so that a rational decision can be reached in determining future improvements and said STUDY is herein designated as County Section: 08- A5015- 01 -ES; Whereas, the COUNTY and the VILLAGE, by this instrument desire to determine and establish their respective responsibilities toward engineering and funding of the STUDY. Now, Therefore, in consideration of the mutual covenants contained herein and the above recitals and other good and valuable considerations, the parties hereto agree as follows: 1. The VILLAGE shall: a. serve as lead for STUDY and supplement its current engineering consultant agreement and secure COUNTY approval for said supplemental agreement for STUDY, (estimated COUNTY share $554,523.00). In the event that the costs for said STUDY exceed the total estimated cost, said additional costs shall be cause for an Amendment to this Agreement prior to reimbursement by the County; LAKE COOK ROAD -2- Section: 08- A5015 -01 -ES b. submit STUDY reports, analyses, plans, etc. to the COUNTY and to IDOT for review and secure concurrence from COUNTY and IDOT; c. bill the COUNTY for one hundred (100 %) percent of the costs for the STUDY (estimated COUNTY share $554,523.00) as follows: the first (equal to 60% of COUNTY share), following VILLAGE approval of a supplemental engineering agreement for the STUDY and execution of this reimbursement agreement by both parties; and on a progressive basis thereafter, following expenditure of the initial 60% of COUNTY share; d. reference all correspondence, bills, invoices and other documents for the STUDY with COUNTY's identifier Section: 08- A5015- 01 -ES, and said invoices shall clearly differentiate between the hours and dollars expended for the Lake Cook Road study compared to the Weiland Road study; and, e. furnish to the COUNTY three (3) copies of the final STUDY upon completion. 2. The COUNTY shall: a. review the supplemental engineering agreement for the STUDY for adequacy and acknowledge its concurrence for same to the VILLAGE; b. pay one hundred (100 %) percent of the costs for the STUDY (estimated COUNTY share $554,523.00) as specified in 1.c. hereinbefore, when invoiced by the VILLAGE; and, c. review consultant submittals in a timely manner. 3. The COUNTY and the VILLAGE further agree that their respective successors and assigns shall be bound by the terms of this Agreement. (Signature Page Follows) ' f LAKE COOK ROAD -3- Section: 08- A5015 -01 -ES IN WITNESS WHEREOF, the COUNTY and VILLAGE have caused this Agreement to be executed by their respective officials on the dates as shown. EXECUTED BY COUNTY: Todd H. Stroger, President Board of County Commissioners Cook County, Illinois ATTEST: A I ar " ul This 1ST" day of LNtk404k , 2008 CO % i,�M1,i v CGNA IISSIWi ERS OCT 1 5 2008 C RECOMMENDED BY: Superintendent o Highways EXECUTED BY VILLAGE OF BUFFALO GROVE: Elliott Hartstein, Village President ATTEST:' ft • "A Village Clerk.9 This 01 day of , 2008. (SEAL) APPROVED AS TO FORM: Richard Devine, State's Attorney By: Assists t t Att ney H: \Transportation & Planning \Planning\AGREEMENTS \INTGOVT - REIMB- LOA\A5015 -01 -ES Buff Grove Ph I Study.doc I, DAVID D. ORR, County Clerk of Cook County, in the State of Illinois, aforesaid and keeper of the records and files of said Cook County, do hereby certify that The Board of Commissioners of the County of Cook, at their regular meeting held on October 151 2008, passed the following Resolution: 08 -R- RESOLUTION Sponsored by THE HONORABLE TODD H. STROGER PRESIDENT OF THE COOK COUNTY BOARD OF COMMISSIONERS RESOLVED, that the President of the Board of Commissioners of Cook County, Illinois, on behalf of the County of Cook, is hereby authorized and directed by the Members of said Board, to execute by original signature or his authorized signature stamp, two (2) copies of a Reimbursement Agreement between the County and the Village of Buffalo Grove, attached, wherein the Village will conduct a Phase I Engineering Study (estimated cost $554,523.00) to refine an improvement scope of work along Lake Cook Road from Raupp Boulevard to Hastings Lane, including the potential realignment and extension of Weiland Road south of Lake Cook Road to intersect with Buffalo Grove Road; that said study will include early coordination and data collection, field topographic surveys and preparation- of base maps, crash data analysis, traffic analysis, subsurface soils and pavement investigation, preliminary structural design, location drainage study and hydraulic analyses, wetland study, highway noise analysis, air quality analysis, comprehensive impacts and measures to minimize harm, draft environmental class of action determination, draft project development report, IDOT coordination, public involvement, final environmental class of action determination, final project development report, supervision, administration and project coordination; that the County of Cook will pay for one hundred (100 %) percent of the costs for the study (County estimated cost $554,523.00) under County Section: 08- A5015- 01 -ES; and, the Department of Highways is authorized and directed to return an executed copy of this Resolution with Agreement to the Village of Buffalo Grove. All of which appears from the record and files of my office. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the SEAL of said County at my office in the City of Chicago, in said APPROVED BY F3DARD o County, this 15th day of October A.D. COOK COUNTY c®MMISS10NERS2008. (SEAL) OCT 1 5 2008 coM COUNTY CLERK