Loading...
2008-11• 0 RESOLUTION NO. 2008- 11 A RESOLUTION APPROVING AN ENGINEERING AGREEMENT TO PROVIDE PAVEMENT EVALUATION SERVICES WHEREAS, the President and Board of Trustees of the Village of Buffalo Grove desire to cause the performance of an analysis of pavement conditions and the preparation of a five -year pavement maintenance program recommendation, and WHEREAS, the approval of an Agreement for Engineering Services is required in order to proceed with these pavement evaluations. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Buffalo Grove, Cook and Lake Counties, Illinois, that the President and Village Clerk be, and they are already authorized and directed to execute the Engineering Agreement with a subject denoted as "Pavement Management Update ", which is attached hereto and made a part hereof. AYES: 5 - Braiman, Glover, Kahn, Trilling, Rubin NAYES: 0 - None ABSENT: 1 - Berman PASSED: April 7 , 2008 APPROVED: 3, April 7 , 2008 APPROVED: Village President ATTEST: Village erk GAENGINEEMOrd & ReMes08 -1doe Village of Buffalo Grove 51 Raupp Blvd. Buffalo Grove, IL 60089 Attention: Dick Kuenkler, P.E., Village Engineer Reference: Pavement Management Update Dear Mr. Kuenkler: IMS Infrastructure Management Services is pleased to submit our proposal to update the Village's pavement management program. The project will include testing of the Village's street network including those roadways built or widened since our 2002 field survey. IMS will update the pavement management report using the current version of our PavePro Manager Software. The proposed update will ensure that the Village's pavement management program is complete and accurately reflects current conditions. Through comparison with the last survey, it will also provide information on the benefits of the rehabilitation strategies used by the Village. The report will provide several scenarios for five year maintenance and rehabilitation programs based Village approved budget levels. We look forward to our continued work with Village of Buffalo Grove. If you have any questions regarding this proposal, please feel free to contact our office. Very truly yours, IMS INFRASTRUCTURE MANAGEMENT SERVICES Donald L. Hardt Manager of Client Services IMS Infrastructure Management Services page I 0 PROJECT APPROACH 1. Surface Condition Survey 0 2. Deflection Testing Each street test section surveyed by the Laser RST will receive a deflection test. This testing will be performed using the Dynaflect and the results of this testing will permit an analysis of the structural capabilities of the existing street section. IMS utilizes all five sensors of the Dynaflect in its structural analysis. This provides valuable information on the capabilities of the pavement, base and subgrade sections, and the interaction between these sections. 3. Pavement Management Report The IMS Pave PRO Manager software program will be used to generate a series of pavement management reports individualized to the Village's needs. Field data will be provided in a database and delivered in disk or CD format with the hardcopy reports. The IMS Pavement Management report will permit Buffalo Grove to investigate several different scenarios regarding traffic, budgets, rehabilitation strategies, etc., and their effect on pavement performance levels and budgets. 4. Project Timing The data collection phase of the proposed update program including the RST survey and deflection testing will be completed within a four -week period. Data processing, the comprehensive pavement management report developed from the Pave Pro Manager software, and updated test results will be delivered within 60 days of completion of the field- testing. We would anticipate performing the field work in conjunction with other updates for cities and counties in the Chicago Metro area. IMS Infrastructure Management Services BuffaloGrove08proupdate.doc page 2 17J 5. Fee Schedule IMS proposes to provide an update to Buffalo Grove's pavement management program and test the entire street network including new or widened pavements in accordance with the following fee schedule: Project Initiation $1,500.00 • Sectioning Review $1,000.00 • Laser RST Surface Condition Survey $120.00/ mile • Deflection Testing $110.00/ mile • Pavement Management Report (hard copy) $5,000.00 6. Cost Summary IMS has developed the following cost summary for your review. The estimate is based on the 2002 network of 130 test miles (1784 test sections) plus 3 miles of new street. Project Initiation $1,500.00 Sectioning Review $1,000.00 RST Testing —133 miles @ $120.00/ mile $15,960.00 Deflection Testing -133 miles @ $110.00/ mile $14,630.00 Pavement Management Report (hard copy) $5,000.00 Pavement Management Update $38,090.00 Optional services that the Village may consider as part of this update program include: Presentation to the Village Board or selected committees $1,500.00 Services are provided on a unit -price basis and the Village will be charged only for the actual number of sections tested and included in the database. Invoices will be sent on a monthly basis for the work completed. Payment is due within 30 days of receipt of invoice. The cost summary is submitted with the assumption that the Village of Buffalo Grove will provide or assist IMS with the following information and services: • Street list and /or GIS centerline file of streets to be surveyed complete with functional classifications. • Safety vehicle to trail optional deflection - testing equipment on arterials and collectors, if requested. Notification and coordination with other Village departments or agencies, if required. This proposal is submitted in triplicate with each copy being considered as an original. Acceptance is constituted by signing and returning one copy to our office. If the Village elects to use MFT funding, IMS will prepare the appropriate Engineering Agreement in the IDOT format. ACCEPTED: Villa By: Title: Village President Date: April 7, 2008 IMS Infrastructure Management Services BuffaloGrove08proupdate.doc page 3