2007-15RESOLUTION NO. 2007 –15 A RESOLUTION APPROVING AN AGREEMENT FOR DESIGN ENGINEERING SERVICES FOR THE 2008 VILLAGE WIDE CONTRACTUAL STREET MAINTENANCE PROJECT WHEREAS, THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE desire to cause the implementation of the 2008 Village Wide Contractual Street Maintenance Project; and, WHEREAS, the approval of an agreement with a consulting engineer is required in order to proceed with the necessary engineering of the project. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois, that the President and Clerk be, and they are hereby authorized and directed to execute the "Village of Buffalo Grove Street Improvements, Section 07- 00093- 00 -RS, Engineering Design Services Agreement ". A copy of said contract is attached thereto and made a part thereof. AYES: 5 – Braiman, Berman, Kahn, Trilling, Rubin NAYES: 0 – None ABSENT: 1 - Glover PASSED: May 7 2007 APPROVED: May 7 2007 APPROVED: A�e —14145L� Village President ATTEST: Village rk C ADOC U M E -1 \olsonj I \LOCALS -1 \Temp \n otes6030C8 \Res07 -3.doc GV� VILLAGE OF BUFFALO GROVE, ILLINOIS 2008 STREET IMPROVEMENTS SECTION 07- 00093 -00 -RS ENGINEERING DESIGN SERVICES AGREEMENT THIS AGREEMENT is made as of the day of 2007, by and between the Village of Buffalo Grove, Illinois, hereinafter referred to as the LAGE, and Baxter & Woodman, Inc., Consulting Engineers, an Illinois Business Corporation, hereinafter referred to as the ENGINEERS, for engineering services in connection with the 2008 Street Improvements, designated as Section 07- 00093- 00 -RS, Engineer's Project No. 070592.40, hereinafter referred to as the PROJECT. Motor Fuel Tax funds, allotted to the VILLAGE by the State of Illinois under the general supervision of the State Department of Transportation, hereinafter referred to as the DEPARTMENT, will be used entirely or in part to finance engineering services as described below. N'ITNESSETH that in consideration of the mutual covenants herein, these parties agree as follows: SECTIONI. The ENGINEERS shall perform or be responsible for the performance of the following engineering services for the PROJECT: 1.1 Utilize existing subdivision drawings or digital aerial photography supplied by the VILLAGE as base sheets for the preparation of drawings. Streets to be included in the Program are described in Exhibit A of this Agreement. 1.2 Make or cause to be made subsurface investigations and analysis thereof required for the design of the proposed PROJECT in accordance with the current requirements of the DEPARTMENT. 1.3 Review and analyze traffic studies and counts to be furnished by the VILLAGE for those streets requiring a structural pavement design. 1.4 Prepare Plans, Special Provisions and Estimates of Cost. Five (5) copies of the Plans, Special Provisions, Proposals and Estimate of Cost shall be furnished to the BE B A X T E R WOODMAN VILLAGE. Additional copies of any or all documents, if required, shall be furnished to the VILLAGE by the ENGINEERS at their actual cost for reproduction. 1.5 Attend conferences to be held at the request of the VILLAGE for review and evaluation of proposed improvements. 1.6 Provide documents for bidding and assist the VILLAGE in receiving and evaluating bids, make recommendation to the VILLAGE for an award of a contract and prepare final contract documents for approval by the VILLAGE and the DEPARTMENT. SECTION 2 The VILLAGE agrees to appoint a Project Manager who shall be in responsible charge and direct control of the PROJECT at all times. The Project Manager will make available to the ENGINEERS all available reports, maps, traffic counts and data pertaining to the proposed improvements. SECTION3. The VILLAGE shall compensate the ENGINEERS for the professional services enumerated in Section 1 hereof as follows: 3.1 A lump sum of $7,699 for profit only. 3.2 Reimbursement for all costs related to the direct salaries of employees for time chargeable to the PROJECT necessary to fulfill the terms of this Agreement. 3.3 Reimbursement for overhead and/or indirect costs incurred in fulfilling the terms of this Agreement. 3.4 Reimbursement for payroll burden and fringe costs, and direct non - salary costs incurred in fulfilling the terms of this Agreement. 3.5 Travel and other out -of- pocket expenses will be reimbursed to the ENGINEERS at their actual cost. 3.6 The maximum amount of the total fee payment under this Agreement as determined in Subsections 3.1, 3.2, 3.3, 3.4 and 3.5, and in Exhibit F, shall be $66,400 unless there is a substantial change in the scope, complexity, or character of the work. 3.7 The ENGINEERS may submit monthly statements for payment of services as the PROJECT progresses. 3.8 Payments to the ENGINEERS shall be due and payable within forty -five (45) consecutive calendar days from the date of the ENGINEERS' invoice to the VILLAGE. -2- B A X T E R WC 4 WOODMAN SECTION 4. The parties hereto further mutually agree: 4.1 The ENGINEERS shall proceed with the services under this Agreement promptly after receiving the DEPARTMENT's approval and the VILLAGE's authorization to proceed. This Agreement will be in effect through February 2008 or until such time as terminated under Subsection 4.16 hereof. 4.2 All Reports, Plans, Plats and Special Provisions to be furnished by the ENGINEERS pursuant to this Agreement will be in accordance with the current standard specifications and policies of the DEPARTMENT, it being understood that all such Reports, Plats, Plans and Drafts shall, before being finally accepted, be subject to approval by the VILLAGE and said DEPARTMENT. 4.3 The basic survey notes and sketches, charts, computations and other data prepared or obtained by the ENGINEERS pursuant to this Agreement will be made available, upon request, to the VILLAGE or the DEPARTMENT without cost and without restriction or limitations as to their use. 4.4 All plans and other documents furnished by the ENGINEERS pursuant to this Agreement will be endorsed by them and will show their professional seal where such is required by law. 4.5 The ENGINEERS will submit, upon request by the VILLAGE or the DEPARTMENT, a list of the personnel and the equipment they propose to use in fulfilling the requirements of this Agreement. 4.6 Overhead and indirect costs shown on Exhibits C and D of this Agreement, as a percent of direct payroll cost, are the ENGINEERS' actual overhead and indirect costs based on the ENGINEERS' records for the past one year prior to the effective date of this Agreement.. 4.7 Payroll burden and fringe benefit costs shown on Exhibits C and D of this Agreement as a percent of direct payroll cost are the ENGINEERS' actual payroll and fringe benefits cost based on the ENGINEERS' records for the past one year prior to the effective date of this Agreement. 4.8 A schedule of the ENGINEERS' regular hourly salary range for each classification of employee expected to be productively engaged in work necessary to fulfill the terms of this Agreement, is shown on Exhibit E of this Agreement. This schedule is for calendar year 2007 and may be revised annually as necessary to provide for increases in employee wages. -3- B A X T E R L � WOO.,DMAW 4.9 The ENGINEERS agree that services stipulated in Subsection 1.2 of this Agreement, if required and mutually agreed to by the VILLAGE and the ENGINEERS, shall be paid for at the actual cost to the ENGINEERS, to be verified by copies of invoices from the parry doing the work, subject to Section 3.6 above. 4.10 The ENGINEERS warrant that they have not employed or retained any company or person, other than a bona fide employee working solely for the ENGINEERS, to solicit or secure this Agreement, and that they have not paid or agreed to pay any company or person, other than a bona fide employee working solely for the ENGINEERS, any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, the VILLAGE shall have the right to annul this Agreement without liability, or in its discretion to deduct from the Agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee. 4.11 The ENGINEERS represent that they have, or will secure at their own expense, all personnel required in performing the services under this Agreement. Such personnel shall not be employees of or have any contractual relationship with the VILLAGE. All of the services required hereunder shall be performed by the ENGINEERS or under their supervision, and all personnel engaged in the work shall be qualified and authorized under state and local law to perform such services. 4.12 The ENGINEERS shall not be responsible for any delays in the performance of services hereunder caused by strikes, action of the elements, acts of any government, civil disturbances, delays of the VILLAGE in supplying information or in approving documents submitted by the ENGINEERS, or any other cause beyond their reasonable control or for the expenses or direct or indirect costs or consequences arising from such delay. 4.13 The VILLAGE may, from time to time, require changes in the scope of the services of the ENGINEERS to be performed hereunder. Such changes, including any increase or decrease in the amount of the ENGINEERS' compensation, which are mutually agreed upon by and between the VILLAGE and the ENGINEERS, shall be incorporated in written amendments to this Agreement. 4.14 The ENGINEERS will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The ENGINEERS shall take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, color, religion, sex or national origin. Such actions shall include, but not be limited to, the following: employment, upgrading, demotions, or transfers, recruitment or recruitment advertising; layoffs or terminations; rates of pay or other forms of compensation; selection for training including apprenticeship; and B A X T E R WOODMAN participation in recreational and educational activities. The ENGINEERS agree to post, in conspicuous places available to employees and applicants for employment, notices to be provided setting forth the provisions of this non - discrimination clause. The ENGINEERS will in all solicitations or advertisements for employees placed by or on behalf of the ENGINEERS, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin. The ENGINEERS will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement so that such provisions will be binding upon each subcontractor provided that the foregoing provisions shall not apply to contracts or subcontracts for standard commercial supplies or raw materials. 4.15 If the ENGINEERS are of the opinion that any work they have been directed to perform is beyond the scope of the Agreement and constitutes extra work, they shall promptly notify the VILLAGE of that fact in writing before proceeding. No extra work shall be eligible for payment unless it is authorized in writing in advance by the VILLAGE. In the event the VILLAGE determines that such work does constitute extra work, it shall provide extra compensation to the ENGINEERS upon a fair and equitable basis. 4.16 This Agreement may be terminated, in whole or in part, in writing by either party if either of the other parties substantially fails to fulfill its obligations under this Agreement through no fault of the terminating party; or the VILLAGE may terminate this Agreement, in whole or in part, in writing, for its convenience: However, no such termination may be effected unless the terminating party gives the other party (1) not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, and (2) an opportunity for a meeting with the terminating party before termination. If this Agreement is terminated by the VILLAGE for default, the 'ENGINEERS shall be paid for services performed to the effective date of termination, including reimbursable expenses. If this Agreement is terminated by either the ENGINEERS for default or by the VILLAGE for convenience, the ENGINEERS shall be paid for services performed to the effective date of termination, including reimbursable expenses plus five percent (5 %) of the total compensation earned to the effective date of termination as extra compensation for the ENGINEERS' rescheduling adjustments, reassignment of personnel, and related costs incurred due to termination. If, after termination by the VILLAGE for failure of the ENGINEERS to fulfill contractual obligations under this Agreement, it is determined that the ENGINEERS had not so failed, the termination shall be deemed to have been effected for the convenience of the VILLAGE, and the ENGINEERS shall be paid accordingly. 4.17 The ENGINEERS certify that they have not been barred from signing this Agreement as a result of a violation of Sections 5/33E -3 and 5/33E -4 of the Criminal Code (Chapter 720 of the Illinois Compiled Statutes). -5- B A X T E R W�Cl- id,4 WOOD.MAN 4.18 The ENGINEERS agree to hold harmless and indemnify the VILLAGE and each of its officers, agents and employees from any and all liability claims, losses, or damages arising out of or alleged to arise from negligence in the performance of the services under this Agreement, but not including liability that may be due to the sole negligence of the VILLAGE or other consultants, contractors or subcontractors working for the VILLAGE, or their officers, agents and employees. The VILLAGE agrees to hold harmless and indemnify the ENGINEERS, and each of their officers, agents and/or employees from any and all liability claims, losses, or damages arising out of or alleged to arise from negligence in the performance of the services under this Agreement that may be due to the sole negligence of the VILLAGE or other consultants, contractors, or subcontractors working for the VILLAGE, or their officers, agents and/or employees. The VILLAGE acknowledges that the ENGINEER is a Business Corporation and not a Professional Service Corporation, and further acknowledges that the corporate entity, as the parry to this contract, expressly avoids contracting for individual responsibility of its officers, directors, or employees. The VILLAGE and ENGINEERS agree that any claim made by either parry arising out of any act of the other party, or any officer, director, or employee of the other party in the execution or performance of the Agreement, shall be made solely against the other party and not individually or jointly against such officer, director, or employees. 4.19 For the duration of the PROJECT, the ENGINEERS shall procure and maintain insurance for protection from claims under worker's compensation acts, claims for damages because of bodily injury including personal injury, sickness or disease or death of any and all employees or of any person other than such employees, and from claims or damages because of injury to or destruction of property including loss of use resulting there from, alleged to arise from the ENGINEERS' negligence in the performance of services under this Agreement. The VILLAGE shall be named as an additional insured on the ENGINEERS' general liability insurance policy. The limits of liability for the insurance required by this Subsection are as follows: (1) Worker's Compensation: Statutory Limits (2) General Liability Per Claim: $1,000,000 Aggregate: $2,000,000 (3) Automobile Liability Combined Single Limit: $1,000,000 B A X T E R - 4 WOODMAN E 0 (4) Excess Umbrella Liability Per Claim and Aggregate: $4,000,000 (5) Professional Liability Per Claim and Aggregate: $2,000,00053,000,000 4.20 Notwithstanding any other provision of this Agreement, and to the fullest extent permitted by law, the total liability, in the aggregate, of the ENGINEERS and their officers, directors, employees, agents, and any of them, to the VILLAGE and anyone claiming by, through or under the VILLAGE, for any and all claims, losses, costs or damages whatsoever arising out of, resulting from or in any way related to the PROJECT or the Agreement from any cause or causes, including but not limited to the negligence, professional errors or omissions, strict liability or breach of contract or warranty express or implied of ENGINEERS or their officers, directors, employees, agents or any of them, hereafter referred to as the "VILLAGE's Claims ", shall not exceed the total insurance proceeds available to pay on behalf of or to the ENGINEERS by their insurers in settlement or satisfaction of VILLAGE's Claims under the terms and conditions of ENGINEERS' insurance policies applicable thereto, including all covered payments made by those insurers for fees, costs and expenses of investigation, claims adjustment, defense and appeal. 4.21 The ENGINEERS are responsible for the quality, technical accuracy, timely completion, and coordination of all Designs, Drawings, Specifications, Reports, and other professional services furnished or required under this Agreement, and shall endeavor to perform such services with the same skill and judgment which can be reasonably expected from similarly situated professionals. 4.22 All Reports, Drawings, Specifications, other documents, and magnetic media prepared or furnished by the ENGINEERS pursuant to this Agreement are instruments of service in respect to the PROJECT, and the ENGINEERS shall retain the right of reuse of said documents and magnetic media by and at the discretion of the ENGINEERS whether or not the PROJECT is completed. Reproducible copies of the ENGINEERS' documents and magnetic media for information and reference in connection with the use and occupancy of the PROJECT by the VILLAGE and others shall be delivered to and become the property of the VILLAGE upon request; however, the ENGINEERS' documents and magnetic media are not intended or represented to be suitable for reuse by the VILLAGE or others on additions or extensions of the PROJECT, or on any other project. Any such reuse without verification or adaptation by the ENGINEERS for the specific purpose intended will be at the VILLAGE's sole risk and without liability or legal exposure to the ENGINEERS, and the VILLAGE shall indemnify and hold harmless the ENGINEERS from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any furnishing of additional copies and verification or adaptation of the ENGINEERS' -7- B A X T E R W- , - 'Cl WOODMAN documents and magnetic media will entitle the ENGINEERS to claim and receive additional compensation from the VILLAGE. Magnetic media are furnished without guarantee of compatibility with the VILLAGE's software or hardware, and the ENGINEER's sole responsibility for such media is to furnish replacements of defective disks within 30 days after initial delivery. IN WITNESS WHEREOF, the parties hereto have caused the execution of this Agreement by their duly authorized officers as of the day and year first above written. BAXTER & WOODMAN, INC. President/CEO ,d,-J�e f, Z Zda z Date of Signature (SEAL) ATTEST: Secretary Attachment I:\BFGVV\070592\40-Design\Agreement\F-ngSvc.doc JJF:py 04/09/07 W:11 VILLAGE OF BUFFALO GROVE, ILLINOIS By President ATTEST: ate of Signature (SEAL) &t& Clerk B A X T E R WOODMAN VILLAGE OF BUFFALO GROVE, ILLINOIS 2008 STREET IMPROVEMENTS SECTION 07- 00093 -00 -RS EXHIBIT A YEAR 2008 PROJECT DESCRIPTION Street Limits Strathmore Court Arlington Heights Road to end Crofton Lane Greenridge Road to Greenridge Road Greenridge Road Dundee Road to Mill Creek Drive Thornton Lane Arlington Heights Road to Radcliffe Road Radcliffe Road Thorton Lane to Mill Creek Drive Silver Rock Lane Shady Grove Lane Wyngate Lane Woodhollow Lane Twilight Pass Alden Lane Parker Lane Farrington Drive Springside Drive Springside Court Farrington Drive to Shady Grove Lane Silver Rock Lane to Checker Drive Farrington Drive to Woodhollow Lane Farrington Drive to Shady Grove Lane Checker Drive to Silver Rock Lane Ivy Hall Lane to Arlington Heights Road Ivy Hall Lane to Aspen Drive Checker Drive to Crown Point Drive Old Checker Road to Farrington Drive Springside Drive to end Thompson Boulevard Buffalo Grove Road to Highland Grove Drive Copperwood Drive Thompson Boulevard to Thompson Boulevard Newfield Drive Copperwood Drive to Copperwood Drive Newfield Court Newfield Drive to end Devonwood Court Crossfield Court Berkley Court Euclid Court Thompson Court Rolling Hills Court Hidden Lake Drive Thompson Boulevard to end Thompson Boulevard to end Thompson Boulevard to end Thompson Boulevard to end Thompson Boulevard to end Thompson Boulevard to end Deerfield Parkway to Thompson Boulevard -1- B A X T E R WOODMAN 9 0 Whitney Lane Parkside Drive to Thompson Boulevard Westchester Road Thompson Boulevard to Parkside Drive Westchester Court Westchester Road to end Parkside Drive . Hidden Lake Drive to Westchester Road Old Barn Court Hidden Lake Drive to end I:\BFGV V\ 070592 \40- Design\Agreement\EngSvc.doc -2- B A X T E R ffm M WOODMAN VILLAGE OF BUFFALO GROVE, ILLINOIS 2008 STREET IMPROVEMENTS SECTION 07- 00093 -00 -RS EXHIBIT B SCOPE OF SERVICES 1. MANAGE PROJECT - Plan, schedule, and control the activities that must be performed to complete the PROJECT including budget, schedule, and scope. Confer with VILLAGE staff, from time to time, to clarify and define the general scope, extent and character of the PROJECT and to review available data. Prepare and submit monthly invoices. Attend one meeting with the VILLAGE to review the project and establish project criteria and establish clear lines of communication. 2. PRELIMINARY PLANS, SPECIFICATIONS, AND ESTIMATE OF COST FIELD EVALUATION - Perform a field evaluation on the condition of existing pavements and curbs and gutters, and calculate quantities of pavement repair. GEOTECHNICAL REPORT — Employ the services of a geotechnical subconsultant to take pavement cores of the surface and base material to determine the composition of the existing pavement material. The geotechnical consultant will provide an analysis of the cores/borings and a soils report in accordance with the requirements of the DEPARTMENT. ■ IMPROVEMENT STRATEGY DEVELOPMENT - Develop pavement improvement strategies and estimated costs for each pavement section. ■ PRELIMINARY GEOMETRIC PLANS - Prepare schematic geometric plans (no topographic survey) for the proposed improvements. ■ ESTIMATE OF COST - Prepare a summary of quantities, schedules and an engineer's estimate of cost. ■ SPECIAL PROVISIONS — Prepare special provisions in accordance with IDOT MFT guidelines. -1- B A X T E R W� ON cm WOODMAN • AGENCY COORDINATION - Meet and coordinate the proposed improvements with the DEPARTMENT. Notify and coordinate the proposed improvements with utility companies. 3. FINAL PLANS, SPECIFICATIONS, AND ESTIMATE OF COST QC /QA — Perform an in -house peer review and constructability review of the pre -final plans, specifications, and estimates of cost for the project. FINAL CONTRACT PLANS AND CONTRACT PROPOSAL - Prepare contract documents consisting of Plans, Special Provisions, Contract Proposals, and Engineer's Estimate of Probable Construction Cost and submit these documents to the DEPARTMENT for the VILLAGE to receive construction bids. Make any necessary changes to the documents as required by the DEPARTMENT in order to secure approval. 4. ASSIST BIDDING - Provide documents for bidding and assist the VILLAGE in solicitation of bids from as many qualified bidders as possible, receive and evaluating bids, tabulate bids, and make a recommendation to the VILLAGE for an award of contract. I:\BFGVV\070592\40-Design\Agreement\EngSvc.doc -2- B A X T E R WOODMAN 0 VILLAGE OF BUFFALO GROVE, ILLINOIS 2008 STREET IMPROVEMENTS SECTION 07- 00093 -00 -RS EXHIBITS C and D Overhead* Rate as Percentage Rate of Employee Compensation Total Percent Salaries 98.00% Retirement plan 0.00% Repairs 0.00% Rents 5.00% Taxes 13.00% Interest 0.00% Contributions 1.00% Depreciation 7.00% Dues & Subscriptions 1.00% Utilities (Elec. etc.) 4.00% Insurance 18.00% Professional Services 3.00% Office Supplies & Services 5.00% Advertising & Promotion 0.00% Computer Service 1.00% Convention & Seminars 1.00% Recruitment & Relocation 0.00% Vehicle Maintenance 0.00% Reproduction 1.00% Postage 0.00% Travel 2.00% Testing 0.00% Entertainment 0.00% Uncollectible Accounts 0.00% Misc. Services & Expenses 2.00% IDOT Approved Rate 162.00% *Payroll Burden and Indirect Cost I:\BFGV V\ 070592 \40- Design\Agreement\EngSvc.doc - 1 - B A X T E R W 'C WOODMAN VILLAGE OF BUFFALO GROVE, ILLINOIS 2008 STREET IMPROVEMENTS SECTION 07- 00093 -00 -RS EXHIBIT E BAXTER &. WOODMAN, INC. 2007 SCHEDULE OF HOURLY WAGE RATES AND OVERHEAD COSTS FOR PROFESSIONAL SERVICES -1- B A X T E R K 'C WOODMAN HOURLY EMPLOYEE CLASSIFICATION WAGE RATES Principal $56 to $70 Senior Engineer $35 to $62 Planner $35 to $60 Construction Manager, Sr. $32 to $55 Designer $28 to $45 Resident Project Representative, Sr. $30 to $44 Engineer $25 to $45 Water/Wastewater Operations $30 to $38 Construction Manager $24 to $30 Resident Project Representative $29 to $38 Staff Engineer $20 to $32 CARD Operator $18 to $32 Surveyor /Technician, Sr. $20 to $30 Resident Project Representative, Jr. $16 to $30 Surveyor /Technician $14 to $30 -1- B A X T E R K 'C WOODMAN 0 0 HOURLY EMPLOYEE CLASSIFICATION WAGE RATES Administrative Assistant $12 to $28 Secretary $10 to $30 Technician $14 to $22 General and employee overhead is 162% of employee compensation. Fixed Fee Amount — as stated in Agreement. Mileage Charges — Same as the Mileage Charge set by the U.S. Internal Revenue Service. Global Positioning System Survey Equipment Usage is $60/hour. Trimble Robotic Survey Equipment Usage is $48/hour. All- Terrain Vehicle usage is $40/hour. Savannah Rain Logger usage is $10 /day. Traffic Counters $50 /day. I:\BFGV V\ 070592 \40- Design\Agreement\EngSvc.doc -2- B A X T E R W_ , WOODMAN 0 N O OI Z 0 Q p Q 0 Z _ Z 2 =) OQ o o �LL to Q Q � 0 px O 4 p � = J Z x > LU Q Q m O U U C9 00 00 V U z Op j 000000 000000 2 = W to F- f^ + } Z5 W 64 M mmMNOi V W W 0 (o I- (ohM LA fV O M Ili co Lo Mm O. 2 } Q Vt� th lam' to vNmO c0 to M + + IL It Cl) } 1 J J J O QQQq Za O r N �Op2 �F E9 EFT 1n h�I- 69 60 + J W to /R + + + J M w to JJ(`'?p aF- > 0 0 0 0 0 LL Op ffi � v9 w o e o+ In IQ ((> m mN O > « �_ J Q Q LL NODOOOiMO 0rO)613, W LL 10 NO�tt 010 04 0ari N m (n F 00cV t0 f` tF r LL �v 0 ow x N ca ffT fFT– N�661 N J c? O 00 tr) O > > O N O c 0 U r N 3 T �U a .c z O Q J zwwwP: LU LL LL LL -j W W U UXXX (if F LLEL L0Q W to to to m O g _j aa QwO 00a Q onz mhhF -U�Uu d �i CLno o M000 0 O O HLd Ld 660 m LLI C� il 00 00 00000000000000 00000000000000 000000 000000 O0000 00000 f^ N th 11-i � 64 M mmMNOi CV to In C)0N M In of (q 0 (o I- (ohM LA fV O M Ili co Lo Mm faD M O NMf�05 In (o Vt� th lam' to vNmO c0 to M d. co O I'- It Cl) M O r N M EFT 6% H9 E9 EFT 1n h�I- 69 60 N to EA vj th In (O V) fFT fFJ KT to /R E!T fFT � O O 00000000000000 69 69 O O O � 6) O O ErT O o 0 0 0 0 0 O O 00000 ffi � v9 b9 O O O O 0000m O) F 0 0 o0 O O O LL co 0) mm NODOOOiMO 0rO)613, 10 NO�tt 010 04 0ari N Orfj nm u)t�0 �NMm 00cV t0 f` tF r a �v � fA 69 b,�tt�fA 0 N 69 E99f� ffT fFT– N�661 69 f9X69 fR 0 o 0 00 C5-0 0 0 0 0 w (n 0 ri loci �� lri o �� m. V O H� Z w n o I 7 o 0 0 W ]VW z�F � us w �T n W Ij aym 0 0 00000000000o00 0 o o o O O 0 0 0 0 0 0 0 0 000000 0 0 0 0 0000M e 00 00 0 0 0 0 m x C Q 1004 OoD Zo O L(10 0c0 NatM V 00 aD mNO N1l1% tG C4 m 0 a) N 01, 0aD0 NO, t_�woO N . t a0n0 m Om Ntt MC �O�oD N 0) Q) 0000 V 0)m 1+04 NN W 03 M W N N ti fFT 6969690 vjT 69 EFT 69 fA vT 69 64 vT 6% 69 f9 nj "j, EFT EFT M w EfT G9 E9 fFT fy 69 W 5 O O O O O O O O 0 0 O O 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0000 O O O O J J 00 O O O'o O O 0 0 0 0 N t0 JO ( 0 LO lfi Lo CD OriV mGo 0d�0(0 e� -MOmtt V MIn V 0tD0 a0�m0 V W OtD ri ' ' * O)OD 'd' Mtt C6 c; �N(l').- -01 0! �N X69 E9 �flT d'�'696m96-e96F?d4�� 6n, 6460 69 R EF}696�9�w 69 EF) 61� 0 PNf�t000 (o..M c�r�NO J )J m titi to tt 0310 th th OIL (OOt01� O th tt M (o t�0(0 a? Op O 'V OD O 0F (D Cl) Cl) 04 NN(07NNNMN NMNNN .007 too MNNN NM(OON >.- vT fF) fFT KT 69 fA 69 Ef? 69 64 69 fA fA fA 4T fR E9 fA V3 EfT 613.6R. fA fN 69 69 a M O Go if) (q��.to N to to LOOM In W Lo to D LO to. NM 0ovOo- to to O < w F z- (D Fa- IQ- to�to H to F rn >-m� F¢- m w H U) ¢ � W Lu>- wa wU J� ° C�����w���rY���� zwwww(LwwwwwQwQ IrWwW�w w?wwQa. ��W w w Z ' ON w UZ_ wwwwwowwwwwwz, uj Lu0WLu o ww5 Jy CL z0 OZZZZpZzzZZvZW JC7-U' 00000' -U' U-' 35L) -O' U ZZZZLU (DLU 9Up ZZZ� OC�WU .2g aZ WZzzzQZZzZZWZW z�zzWQ zz�W wc� CLLU U) wwwwOLU LLJ wto wtowwto0 wwtorn O to U (p O U O Q Q w I- 0 a W c a 2 o to CL ° Z a H o z Q U > w p to z O z } a > a W Q' W U Q Z U) U) 0 F- to o. g Y U U O o z t N O L) W w O Q J Q a z w U LLO > o IL U Z W LL O a Q Z } oo y Z p U O r a W C7 z > W = W w> Q 0_ U v V)' dz ZO O O m F- w g � 75 ILL < n. U Z (A h I1cL1 W Cw7 a W Q Q LL inQ to J w 0- ZCi a o O O HLd Ld 660 m LLI C� il