Loading...
2006-36RESOLUTION NO. 2006- 36 A RESOLUTION ACCEPTING AN AMENDMENT TO THE ENGINEERING SERVICES AGREEMENT FOR THE DUNDEE ROAD STREET LIGHTING IMPROVEMENT REQUIRED TO COMPLETE THE PLANS FOR THE COMPLETION OF THE DUNDEE ROAD STREET LIGHTING SYSTEM IN ACCORDANCE WITH THE - PROCEDURES REQUIRED FOR COMPLIANCE WITH A FEDERAL STP GRANT FOR THE PROJECT'S CONSTRUCTION WHEREAS, a complete and continuous arterial street lighting system along Dundee Road is required in order to improve the safety of after dark use of the corridor by vehicles and pedestrians; and, WHEREAS, the completion of the Dundee Road Street Lighting Project is desired to enhance the overall quality of the Dundee Road commercial areas and residential neighborhoods; and, WHEREAS, Federal construction funding has been authorized to assist in the construction of the project, subject to the completion of engineering plans and related documents; and, WHEREAS, an amendment to the consulting engineering services agreement, which was originally approved by the Buffalo Grove Village President and Board of Trustees at their May 7, 2001 meeting as Resolution No. 2001 -19, is required in order to proceed with the completion of the Dundee Road Street Lighting Project; NOW, THEREFORE, BE IT RESOLVED by the Village President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois as follows: Section 1. The October 25, 2006 letter proposal from Civiltech Engineering, Inc., RE: Dundee Road Lighting, Arlington Heights Road to Buffalo Grove Road, Design Engineering Supplement #1 Revised" to perform engineering services related to the completion of the Dundee Road Street Lighting Project is hereby accepted. Section 2. The Village Manager is authorized and directed to execute the acceptance of the above noted engineering service proposal for this project. A copy of said engineering service proposal is attached hereto and made a part hereof. AYES: 6 — Braiman, Glover, Berman, Kahn, Trilling, Rubin NAYES: 0 - None ABSENT: 0 - None PASSED: November 20 , 2006 APPROVED: November 20 , 2006 ATTEST: lag G:\PWDIRGRP \LHC \DUNDEE \stltg res06.doc ►01 Approved: Village President CIVILTECH Clviltech Engineering, Inc Transportation - Civil - Construction - Environmental - Structural - Planning - Surveying - Land Acquisition - Landscape Architecture Mr. Gregory P. Boysen, P.E. Director of Public Works Village of Buffalo Grove 51 Raupp Boulevard Buffalo Grove, Illinois 60089 Re: Dundee Road Lighting Arlington Heights Road to Buffalo Grove Road Design Engineering Supplement # 1 Revised Dear Mr. Boysen: October 25, 2006 VILLAGE OF BUFFALO GROVE r With the acquisition of STP funding for the remaining sections of roadway lighting on Dundee Road, Arlington Heights Road and Buffalo Grove Road, we are submitting for your consideration our Design Engineering Supplement # 1 Revised. This supplement is a revised version from the Supplement #I submitted dated October 6, 2003. This supplement includes items which are outlined below that are beyond the original scope of work outlined in our agreement approved on May 7, 2001 and also includes items to update plans and special provisions and get approval of the current plans for STP funding through IDOT. Per our phone discussion, I have described the rationality for our supplement. The following is a list followed by a more detailed description of each item. wmv Civiltech inc. C0111 1. Detailed utility investigation was completed which is not included in our original scope. 2. Special structural foundations were designed to resolve utility conflicts. 3. Now that the second contract has funding over 5 years after the project was started additional work is required to complete the plans for bidding. A. The plans need to be updated to the current IDOT and Village standards some changes include switching to unit duct cable and updating pole and fixture specifications. B. The project was originally surveyed 5 years ago so the project will need to be field checked /surveyed to verify that the layout is still viable. C. Additional photometric calculations are required by IDOT for sidewalks and signalized intersections. 450 E Devon Ave, Suite 300 - Itasca, Illinois 60143 30 N LaSalle St, Suite 2624 - Chicago, Illinois 60602 Tel: 630.773.3900 - Fax. 630 773.3975 Tel: 312.726.5910 - Fax: 312.726.5911 41 Dundee Road Lighting Arlington Heights Road to Buffalo Grove Road Design Engineering Supplement # 1 Revised October 26, 2006 Page 2 of 4 Our proposed fee is $111,089. The construction cost of the entire project is estimated at $1.9 million. Civiltech's fee is only 5.8% of the construction cost which is well within industry standards. Item No. 1 - Detailed Utility Investigation This work included preparing working cross sections to better determine utility conflicts. The cross sections were used to develop pole layout options and utility relocation. These sections were used to determine conflicts with overhead and underground utilities especially with Com Ed to determine clearance from overhead. lines. Developing cross sections is typically not included in roadway lighting improvements. Also as part of this investigation greater pole heights and spacings were developed to try to minimize the utility conflicts. Manufacturers were contacted to determine if Village Standard pole could be made at different mounting heights. Cross Sections = 90 manhours Photometric Calculations = 15 manhours Analysis = 12 manhours Item No. 2 - Special foundation Design The work included designing an offset foundation and spread footing foundation to resolve utility conflicts with pole locations. Foundation Design = 21 manhours Item No. 3 - Update plans and special provisions This work will consist of taking the plans that were taken to a pre -final level 3 years ago and updating them to the latest Village standards. Since the plans were last worked on the Village has changed various standards including switching to unit duct cabling and updating pole and fixture specifications. The project will also need to be field checked /surveyed to verify that the layout is still viable and make adjustments as necessary. We have noticed there are at least few parcels that have been redeveloped since the original survey. Driveway locations may have changed which will require adjustments to pole layout. Utility companies will be contacted again to determine if there are any conflicts with pole locations. Plans will be modified as required to minimize conflict areas. The plans will be reviewed by IDOT's Bureau of Electrical Operations since Dundee Road is a State route. This will likely require multiple reviews and coordination to get final approval. Based on the kick -off meeting held with Electrical Operations on photometric calculations Dundee Road Lighting Arlington Heights Road to Buffalo Grove Road Design Engineering Supplement # 1 Revised October 26, 2006 Page 3 of 4 will also need to be completed for the sidewalk and any signalized intersections. Photometrics for the intersections of Weidner Road /Crofton Drive, Golfview Terrace and Huntington Lane with Dundee Road will be analyzed. The manhours for this item have been broken down as follows: ITEM No. 4 - Design Review and Assistance This work will consist of having Burns and McDonnell assist and review the lighting design. Burns and McDonnell will seal the electrical portion of the plans. See Exhibit C for Burns and McDonnell's scope for the project. Manhours Photometric Updates and Additions 50 Field Check /Survey Update 24 Plan Updates (includes working with utility companies) 104 Specification Updates 16 Review 20 Total F 214 ITEM No. 4 - Design Review and Assistance This work will consist of having Burns and McDonnell assist and review the lighting design. Burns and McDonnell will seal the electrical portion of the plans. See Exhibit C for Burns and McDonnell's scope for the project. Dundee Road Lighting Arlington Heights Road to Buffalo Grove Road Design Engineering Supplement # 1 Revised October 26, 2006 Page 4 of 4 We are requesting an additional fee for the additional engineering services outlined above in the amount of $10,044 for Items Nos. 1-2, $18,926 item No. 3 and $9,720 for item No. 4 for the Dundee Road Lighting Improvements. Our new maximum "not -to- exceed" fee is as follows: (Original Fee $72,399) + $10,044 + $18,926 + $9,720 = $111,089 If you have any additional questions please give me a call. Approved By: t� Title: t h L- f Date: It- 11- 74,0(0 Very truly yours, CIVILTECH ENGINEERING, INC. —e-t d �24 X& Derek N. Mall, P.E. J. 111971admin1200611et2006 _7025_bg_extra. wpd