Loading...
2001-05• RESOLUTION NO. 2001- 5 A RESOLUTION APPROVING AN ENGINEERING SERVICE AGREEMENT FOR THE BUFFALO GROVE GOLF COURSE EROSION CONTROL PROJECT WHEREAS, the completion of the Buffalo Grove Golf Course Erosion Control Project is desired; and, WHEREAS, consulting engineering services are required in order to proceed with the completion of this project; NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS, as follows: Section 1. The Engineering Service Letter Agreement Proposal related to Buffalo Grove Golf Course Erosion Control Project is hereby approved. Section 2. The Village Manager is authorized and directed to execute the agreement proposal. A copy of said agreement is attached hereto and made a part hereof. AYES: 6 - Marienthal. Braiman. Hendricks, Glover, Berman, Johnson NAYES: 0 - None ABSENT: 0 - None PASSED: February 5 52001 APPROVED: February 5 , 2001 APPROVED: Village President ATTEST: illage Clerk G AP W DIRGRP \LHC \B CRK \res01. do e (.'onsniting l;ngine(m 7 • Mr. Greg P. Boysen August 14, 2000 Director of Public Works Village of Buffalo Grove 51 Raupp Blvd. Buffalo Grove, Illinois 60089 -2138 Subject: Buffalo Grove - Buffalo Creek Erosion Control Improvements Dear Greg: Erosion control measures are needed along the banks of Buffalo Creek in order to reduce damage to the golf course and improve aesthetics. The Village's first priority is to control erosion at/or near four to five bridges throughout the course and then focus on improving segmental portions in greatest need along the Creek. The Baxter & Woodman team will provide the Village with a design that will co>trol erosion along the bridges and banks while also allowing for visibility and everyday golfer use. The design will also be easily maintained, have the ability to attract/ detract wildlife, and blend into the existing established landscape. The following proposal outlines the scope of services and engineering fee for this project: Scope of Services ■ Conduct topographic survey of Buffalo Creek within the limits of the Buffalo Grove Golf Course. ■ Prepare preliminary plans including alternatives for erosion control. We will utilize the most cost effective combination of vegetative, biotechnical, and hard -bank stabilization methods in order to regrade and stabilize the eroded banks. Biotechnical and vegetative methods that will be considered include native plantings, A- hacks, bio- fabrics, and hydra- seeding. Hard -bank stabili- zation that will be considered includes gabion baskets and landscaping stones. 9678 h'id;;elield K,,ad Cnstal Lake, 11. 60012 15.459. 126t t F a\ S 1,)A 5.—).0 150 Consulting l:ngirwers LA Mr. Greg P. Boysen Village of Buffalo Grove r August 14, 2000 000482 • FAe 2 ■ Meet with the Village and golf course personnel to discuss the plans. ■ Revise the plans based upon comments gained from our meeting and final design. ■ Finalize construction cost estimates ■ Prepare and submit permits to Lake County Stormwater Management mission and the Army Corps of Engineers. ■ Meet with Lake County Stormwater Management Commission and the Corps of Engineers and revise documents accordingly. ■ Prepare bid documentation, attend bid opening and submit our tion for award of the construction contract. Engineering Fee Our fee for the above outlined scope of services will be based upon our hourly rates of compensation for actual work time performed plus reimbun out -of- pocket expenses including travel which in total will not exceed $ 21 Schedule of Construction must be completed between October 1 st and March 15th in order to accommodate the golf season. Assuming a 3 -month time frame for permit auisi- tion, we will bid the project during the summer (July/ August) with construction commencing after October 1, 2001. 8. A T E R WOO'DMAN 1"-,dgi Mr. Greg P. Boysen August 14, 2000 Village of Buffalo Grove 000482 • Page 3 If you have any questions or need additional information please give me a call. We look forward to working with you on this important project. Very truly yours, BAXTER & WOODMAN, INC. CONSULTING ENGINEERS r ' John V. Ambrose, P.E. Vice President JVA:df ACCEPTED BY: Village William R Balling, Village fzc b � , 2001