Loading...
2001-31RESOLUTION NO. 2001- 31 A RESOLUTION APPROVING AN INTERGOVERNMENTAL AGREEMENT WITH COOK COUNTY RELATED TO THE LAKE -COOK ROAD OVERPASS IMPROVEMENT AT THE WISCONSIN CENTRAL RAILROAD WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois Constitution of 1970; and, WHEREAS, the quality of life is enhanced by a good quality transportation systems including roadways and also sidewalk/bikeway facilities; and, WHEREAS, the completion of a section of Buffalo Grove's bikeway system which is critical to system continuity and safety, can be accomplished at a substantial cost savings if implemented in conjunction with the Lake -Cook Road Overpass Improvement at the Wisconsin Central Railroad; and, WHEREAS, a project agreement with the County of Cook is a required prerequisite for receiving Cook County funding for the improvement and having it constructed in conjunction with the larger project, in addition to providing a high quality section of arterial street lighting; NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE COOK AND LAKE COUNTIES, ILLINOIS as follows: Section 1: The agreement entitled, "Reimbursement Agreement" related to the improvement of Lake -Cook Road at the Wisconsin Central Railroad is hereby approved. Section 2: The Village President and Village Clerk are authorized and directed to execute the agreement. A copy of said agreement is attached hereto and made a part hereof. AYES: 6 — Marienthal, Braiman, Glover, Berman, Johnson, Kahn NAYES: 0 — None ABSENT :0 — None PASSED: August 20 12001 APPROVED: August 20 ,2001 APPROVED-- Village President ATTEST: Vi ge Clerk G:\PWDIRGRP\LHC\LCROAD\081001res.doc E • THE COUNTY OF COOK LAKE COOK ROAD AT WISCONSIN CENTRAL RAILROAD SECTION: 92- A5016 -03 -BR VILLAGE OF BUFFALO GROVE REIMBURSEMENT AGREEMENT This REIMBURSEMENT AGREEMENT, made and entered into by and between the COUNTY OF COOK, a body politic and corporate of the State of Illinois, hereinafter called "COUNTY ", and the VILLAGE OF BUFFALO GROVE, a body politic and corporate of the State of Illinois, hereinafter called "VILLAGE ". WITNESSETH WHEREAS, the COUNTY proposes to improve Lake Cook Road from Lexington Drive to a point west of Milwaukee Avenue by reconstructing and/or widening the existing pavement and highway grade separation over the Wisconsin Central Railroad, County Section: 92- A5016- 03 -BR; WHEREAS, the improvement requires the relocation of existing street lighting and the VILLAGE has requested that the COUNTY include in its improvement project the installation of new street lights, construction of a sidewalk/bicycle path and the addition of cyclist protection (fencing) on the grade separation structure; and, WHEREAS, the VILLAGE in a Letter dated December 10, 1999 requested relief from costs for construction of the sidewalk/bicycle path and COUNTY is agreeable to offer some measure of relief for said costs to the VILLAGE; and, WHEREAS, the COUNTY herein sets the terms of its participation in the costs of construction of the sidewalk/bicycle path, an offer equivalent to relief afforded the Village of Wheeling; and, WHEREAS, it is in the mutual best interest of the parties hereto to delineate said terms and responsibilities regarding the extent of VILLAGE work and the sharing of costs associated with said work. NOW, THEREFORE, in consideration of the mutual covenants contained herein, the above recitals and other good and valuable considerations, the parties hereto agree as follows: 1. The COUNTY will relocate thirteen (13) existing VILLAGE street lights to a new position, estimated $48,150.00 (west of bridge structure), and install > ten (10) new street lights including poles, luminaires, conduit, wiring and foundations, estimated $59,700.00 (east of bridge structure), cost of said relocations and installations solely at VILLAGE expense, estimated total $107,850.00 ; and, LAKE COOK ROAD -2- AT WISCONSIN CENTRAL RAILROAD SECTION: 92- A5016 -03 -BR 2. The COUNTY will construct a new ten (10) foot wide concrete sidewalk/bicycle path on the north side of Lake Cook Road within the project limits. One half (50 %) of the construction cost of the said sidewalk/bicycle path west of the bridge shall be at VILLAGE expense, estimated at $86,551.75 and includes the concrete sidewalk/bicycle path sub -base granular material and the hereto agreed quantity of 6,604 cubic yards of borrow for embankment. 3. The new sidewalk/ bicycle path east of the bridge structure shall be constructed at VILLAGE expense with the exception of one -half of the cost of borrow used as embankment, said cost is estimated at $66,322.50, and includes concrete sidewalk/bicycle path, sub -base granular material and the hereto agreed quantity of 2,291 cubic yards of borrow for embankment; and, 4. The COUNTY shall pay for fifty (50 %) percent of the cost for the ten (10) foot wide sidewalk/ bicycle path west of the bridge structure, estimated at $86,551.75, pay for fifty (50 %) percent of the cost of borrow used for the sidewalk/bicycle path east of the bridge structure, estimated $18,328.00, pay one hundred (100 %) percent of the cost to widen the bridge superstructure to accommodate a ten (10) foot wide sidewalk/bicycle path and one hundred (100 %) percent of the cost for design and construction engineering ; and, 5. The COUNTY will install 159 lineal feet of bridge fence railing on the north parapet of the grade separation structure, said installation solely at VILLAGE expense and estimated at $33,390.00; and, 6. The COUNTY will pay for the relocation/replacement of existing sidewalk (5 foot wide) which interferes with construction of the project solely at its expense; and, 7. Upon award of the project, the VILLAGE shall pay to the COUNTY $100,000.00 for items identified herein as VILLAGE responsibility, $100,000.00 following final inspection and the remaining balance, based upon actual costs, one year after the date of final inspection (total estimated cost $294,114.25). Payment to the COUNTY shall be made by check, payable to the Treasurer of Cook County for deposit in COUNTY's Motor Fuel Tax Fund Account 600 -600 and identified as Section: 92- A5016- 03 -BR, mailed directly to the Superintendent of Highways; and, 8. The COUNTY shall own, operate and maintain the sidewalk/bicycle path on the bridge and bridge fence railing installed as part of this project at its expense. 9. The VILLAGE shall own, operate and maintain the street lights and sidewalk/bicycle path .(except that portion noted in 8. hereinbefore) constructed as part of this project, including cost of electrical energy supply for the street lighting and this Agreement stands in lieu of a separate COUNTY Highway Permit for said facilities and the VILLAGE shall be bound to the general terms of COUNTY Highway Permits as they exist the date of execution of this Agreement by the COUNTY; and, LAKE COOK ROAD AT WISCONSIN CENTRAL RAILROAD SECTION: 92- A5016 -03 -BR -3- Further, e E herewith grants, to the COUNTY for drainage , access to its Chevy Chase Business Par - ubdivision detent' i ies (north of Lake Cook Road); and, permanently cedes to the COUN fe t of detention storage in said facilities, the volume required unde ounty Storm Water Ordinance pia water detention of the Lake oa improvement covered under this Agreement. This Agreement shall be binding and enure to the benefit of the parties hereto, their successors and assigns. IN WITNESS WHEREOF, the COUNTY and VILLAGE have caused this Agreement to be executed by their respective officials on the dates as shown. RECOMMENDED BY: Superintend I ff f Highways EXECUTED BY COUNTY: lent, Its Board of ty Commissioners r� This day of , 2001 ATTEST: County Clerk (SEAL) APPROVED AS TO FORM: Richard A. Devine, State's Attorney BY: el' ro - �� S Ao•Stant State's Attorney EXECUTED BY VILLAGE OF BUFFALO GROVE: Village President This day of 2001 O ATTEST: al Village Clerk (SEAL) APPROVED BY BOARD OF COOK. COUNTY COMMISSIONERS COM NOV 0 6 2001 0 I, DAVID D. ORR, County Clerk of Cook County, in the State of Illinois aforesaid and keeper of the records and files of said Cook County, do hereby certify that The Board of�Cqmmission rs of Th County of Cook; at their regular meeting held on _T QQ 2 2001, passed the following Resolution: RESOLUTION Resolved by the members of The Board of Commissioners of Cook County, Illinois, on behalf of the County of Cook, to authorize and direct its President to execute, by original signature or his authorized signature stamp, two (2) copies of an agreement, attached, with the Village of Buffalo Grove, wherein the County will relocate existing street lights, install new sidewalk/bicycle path and street lighting and add bicyclist protection as part of County's roadway /bridge construction project for Lake Cook Road at the Wisconsin Central Railroad, Section: 92- A5016- 03 -BR; the Village of Buffalo Grove shall reimburse the County of Cook for the costs of said improvements, estimated cost $294,114.25; and, the Department of Highways is authorized and directed to return an executed copy of this Resolution with Agreement to the Village of Buffalo Grove and implement the terms of the Agreement. all of which appears from the records and files of my office. IN WITNESS WHEREOF I have hereunto set my hand and affixed the SEAL of said Count at my o ice in the City of Chicago, thisf day �� , 2001. SEAL County Clerk APPROVED BY BOARD OF COOK COUNTY COMMISSIONERS NOV 0 6 2001 COM