Loading...
2001-01RESOLUTION NO. 2001- 01 A RESOLUTION APPROVING PHASE I ADDENDUM AND PUBLIC MEETING PRESENTATION ENGINEERING SERVICES FOR THE IMPLEMENTATION OF THE DEERFIELD PARKWAY (ILLINOIS ROUTE 83 TO WEILAND ROAD) STREET IMPROVEMENT WHEREAS, the completion of the preliminary studies and preparation of presentation materials for a public meeting is desired for the implementation of the Deerfield Parkway (Illinois Route 83 to Weiland Road) Street Improvement; and, WHEREAS, consulting engineering services are required in order to thoroughly address these activities; NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS, as follows: Section 1. The letter agreement from Civiltech Engineering, Inc., RE: "Proposal for Professional Engineering Services, Phase I Addendum, Deerfield Parkway - IL. 83 to Weiland Road" dated December 6, 2000 is hereby approved. Section 2. The Village Manager is authorized and directed to execute the agreement. A copy of said agreement is attached hereto and made a part hereof. AYES: 5 - Marienthal, Braiman, Glover, Berman, Johnson NAYES: 0 - None -ABSENT: 1 - Hendricks PASSED: January 8 , 2000. APPROVED: January 8 , 2000. APPROVED: Village President ATTEST: C �.J� _ & i lage Clerk G:\PWDIRGRP\LHC\DRFLDPKWY\1200res.doc CIVILTECH ENGINEERING, INC. Mr. Gregory P. Boysen, P.E. Director of Public Works Village of Buffalo Grove 51 Raupp Boulevard Buffalo Grove, Illinois 60090 r1 December 6, 2000 Reference: Proposal for Professional Engineering Services Phase I Addendum Deerfield Parkway - IL 83 to Weiland Road Dear Mr. Boysen: PUBLIC WORKS Following is a revised fee estimate for preparing an addendum to the Project Development Report (PDR) for the Busch Road (Deerfield Parkway) Improvement. This will include updating the necessary portions of the PDR in addition to submitting new Clearinghouse forms. Based our field review and recent comments received from Lake County Division of Transportation, three Intersection Design Studies will need to be updated: Buffalo Grove Road, Highland Grove Drive and Weiland-Road. The existing, "geometry at the: IL Route 83. intersection" matchesahe geometry proposed in the PDR:' Alsa'iicluded are the,work items necessary, for holding a Public Information Meeting for the project. Following is our scope of services and estimated fee for the work. - i. SCOPE OF SERVICES 1. Data Collection /Early Coordination - Obtain A.M. and P.M. peak hour turning movement traffic counts at the Buffalo Grove Road, Highland Grove Drive and Weiland Road intersections with Deerfield Parkway. Obtain 2020 Average Daily Traffic projections for Deerfield Parkway, Buffalo Grove Road, Highland Grove Drive and Weiland Road from the Chicago Area Transportation Study (CATS). Also obtain 3 most recent years of accident data from the Buffalo Grove Police Department for Deerfield Parkway between IL Route 83 and Weiland Road. Prepare State and Sub -state Clearinghouse Forms and exhibits for submittal by the Village to the appropriate agencies. 2. Accident Analysis - Reduce accident data and prepare collision diagrams for the Deerfield Parkway intersections with Buffalo Grove. Road and Weiland Road. Prepare a revised accident analysis, 500 PARK BOULEVARD • SUITE 250 • ITASCA, ILLINOIS 60143 • (630) 773 -3900 • FAX (630) 773 -3975 30 N. LASALLE STREET • SUITE 1402 • CHICAGO, ILLINOIS 60602 • (312) 726 -5910 • FAX (312) 726 -5911 Mr. Gregory P. Boysen, P.E. Proposal for PDR Addendum Page 2 of 3 3. Traffic Analysis /Intersection Design Study - Develop 2020 peak hour turning movement volumes and perform intersection capacity analyses for both the A.M. and P.M. peak hours for the Buffalo Grove Road, Highland Grove Drive and Weiland Road intersections with Deerfield Parkway. Develop revised intersection geometry, if required, and prepare Intersection Design Studies for 2020 traffic data for each intersection. 4. Public Information Meeting - This includes the necessary work items to prepare for and hold a public Information Meeting for the project. Both a public meeting notice and a draft invitation letter will be prepared for use by the Village. The exhibit preparation will require obtaining current aerial photography for Deerfield Parkway between IL Route 83 and Weiland Road for use as a base sheet for meeting exhibits. The Phase I addendum only required redrawing the signalized intersections along Deerfield Parkway. For the meeting exhibits, it will also be necessary to reproduce the geometry proposed in the original Phase I report for the improvement between those intersections. Typical cross section, traffic and accident summary exhibits will also be prepared. Finally, this work item includes preparation of the presentation for the meeting, holding the meeting and preparing a disposition of comments. 5. Addendum to Project Development Report - Prepare a summary report for the additional analyses and changes to the original Project Development Report. Request concurrence and approval of the these changes. Ii. MANHOUR AND FEE ESTIMATE The manhour and fee estimate for these services is as follows: Item Description 1 Data Collection/Early Coordination 2 Accident Analysis 3 Traffic Analysis /IDS 4 Public Information Meeting 5 Addendum to PDR Total Manhours Direct Costs 51 $ 80 Fee Estimate: 361 hrs. X $25.00 (Avg. Hrly. Rate) x 2.65 = Direct Costs = Total = 18 0 120 0 152 200 20 0 361 $ 280 $ 23,916 280 $ 24,196 Mr. Gregory P. Boysen, P.E. Proposal for PDR Addendum Page 3 of 3 We thank you for the opportunity to submit this proposal. If it is acceptable, please execute below and return a signed copy to us. Very truly yours, CIVILTECH ENGINEERING, INC. Kathleen M. Meyerkord, F.E. Approved B pp Y Title: VIU46t, NAnAGC—Y" Date: 3p—��q zc>o