Loading...
2000-44RESOLUTION NO. 2000- 44 A RESOLUTION APPROVING AN AGREEMENT FOR ENGINEERING SERVICES FOR THE WEILAND ROAD PEDESTRIAN CROSSING IMPROVEMENT WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois Constitution of 1970; and, WHEREAS, the Village desires to implement an improvement on Weiland Road which includes minor widening of Weiland Road, a traffic signal installation at the north entrance of the Aptakisic Junior High School and interconnection with Deerfield Parkway and new pavement markings and resurfacing of Weiland Road within the improvement limits and, WHEREAS, the approval of an agreement for the provision of necessary engineering services is required in order to proceed with the project; NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS as follows: Section 1: The attached agreement entitled "Preliminary Engineering Service Agreement for Motor Fuel Tax Funds" is hereby approved. Section 2: The Village President is authorized and directed to execute the agreement. A copy of said agreement is attached hereto and made a part hereof. AYES: 4 - Marienthal, Braiman, Glover, Berman NAYES: 0 - None ABSENT: 1 - Hendricks PASSED: August 7 , 2000 APPROVED: August 7 , 2000 APPROVED: Villag ��l� ATTEST: q�f-A . i Vill ge Clerk G:\PWDIRGR-P\LHC\WEILRD\RESOOENG.DOC Municipality Illinois Department Name VILLAGE OF BUFFALO GROVE L of Transportation CIVILTECH ENGINEERING, Inc. O C -7 C O Township A N Address Vernon L Preliminary Engineering S 500 Park Boulevard, Ste. 250 A G Service Agreement For Motor Fuel Tax Funds U L T County City Lake E A Itasca N N Section C T State Y Illinois, 60143 THIS AGREEMENT is made and entered into this day of , 2000 between the above Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the improvement of the above SECTION. Motor Fuel Tax Funds, allotted to the LA by the State of Illinois under the general supervision of the State Department of Transportation, hereinafter called the "DEPARTMENT', will be used entirely or in part to finance ENGINEERING services as described under AGREEMENT PROVISIONS. Section Description Name WEILAND ROAD Route CH73 Length 0.23 KM. (Structure No. ) Termini Adiacent to Aptakisic -Tripp Junior High School Description: The proposed improvement consists of minor widening of Weiland Road at the north entrance of the Junior High School, traffic signal installation at the north entrance and interconnection with Deerfield Parkway as well as new pavement markings and resurfacing of Weiland Road within the improvement limits. Agreement Provisions The Engineer Agrees, 1. To perform or be responsible for the performance of the following engineering services for the LA, in connection with the proposed improvement hereinbefore described, and checked below: a.(x) Make such detailed surveys as are necessary for the planning and design of roadways and /or bridges and for the preparation of detailed construction plans. b.() Make stream and flood plain hydraulic surveys and gather high water data, and flood histories for the preparation of detailed bridge plans. c.(x) Make or cause to be made such soil surveys or subsurface investigations including borings and soil profiles and analyses thereof as may be required to furnish sufficient data for the design of the proposed improvement. Such investigations are to be made in accordance with the current requirements of the DEPARTMENT. d.() Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient data for the design of the proposed improvement. e.() Prepare Army Corps of Engineers Permit, Division of Water Resources Permit, Bridge waterway sketch, and /or Channel Change sketch, Utility plan and locations, and Railroad Crossing work agreements. f.() Prepare Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or culvert BLR 4301 (Rev. 5/97) (Sheet 1 of 4) types) and higher effects on roadway overflows and bridaproaches. g.() Make complete general and detailed plans, special provisions, proposals and estimates of cost and furnish the LA with five (5) copies of the plans, special provisions, proposals, and estimates. Additional copies of any or all documents, if required, shall be furnished to the LA by the ENGINEER at his actual cost for reproduction. Note: Four copies to be submitted to District Engineer h.() Furnish the LA with survey and drafts in quadruplicate of all necessary right -of -way dedications, construction easements, and borrow pit and channel change agreements including prints of the corresponding plats and staking as required. i.(x) Assist the LA in the tabulation and interpretation of the contractors' proposals. j.() Prepare the necessary environmental documents in accordance with the procedures adopted by the DEPARTMENT'S Bureau of Local Roads & Streets. k.() Prepare the Project Development Report when required by the DEPARTMENT. 1.(x) The attached "Scopes of Services" dated July 21, 2000 and designated Exhibit B shall amend and supplement the services designated and outlined above. (2) That all reports, plans, plats and special provisions to be furnished by the ENGINEER, pursuant to this AGREEMENT, will be in accordance with current standard specifications and policies of the DEPARTMENT. It is being understood that all such reports, plats, plans and drafts shall, before being finally accepted, be subject to approval by the LA and the DEPARTMENT. (3) To attend conferences at any reasonable time when requested to do so by the representatives of the LA or the DEPARTMENT. (4) In the event plans or surveys are found to be in error during construction of the SECTION and revision of the plans are necessary, the ENGINEER agrees that he will perform such work without expense to the LA, even though final payment has been received by him. He shall give immediate attention to these changes so there will be a minimum delay to the Contractor. (5) That basic survey notes and sketches, charts, computations and other data prepared or obtained by the ENGINEER pursuant to this AGREEMENT will be made available, upon request, to the LA or the DEPARTMENT without cost and without restriction or limitations as to their use. (6) That all plans and other documents furnished by the ENGINEER pursuant to this AGREEMENT will be endorsed by him and will show his professional seal where such is required by law. The LA agrees, (1) To pay for services stipulated in paragraphs 1 through 6 inclusive at actual cost of performing such work plus 165 percent to cover profit, overhead, and readiness to serve — "actual cost" being defined as actual payrolls. subconsultant expense, traveling and other out -of- pocket expenses for additional services will be reimbursed to the ENGINEER at his actual cost. Subject to the approval of the LA, the ENGINEER may sublet all or part of the services provided under the paragraphs cited above. The maximum "not -to- exceed" fee for this work shall be $100,820.00. (See Exhibit A - Cost Estimate of Consultant Services) The classifications of the employees used in the work should be consistent with the employee classifications for the services performed. If the personnel of the firm, including the Principal Engineer, perform routine services that should normally be performed by the lesser salaried personnel, the wage rate billed for such services shall be commensurate with the work performed. (2) That payments due the ENGINEER for services rendered in accordance with this agreement will be made as soon practicable after the services have been performed, in accordance with the following schedule: a. Upon completion of detailed plans, special provisions, proposal and estimate of cost - -being the work required by paragraphs 1 a through 11 under THE ENGINEER AGREES -- to the satisfaction of the LA and their approval BLR 4301 (Rev. 5197) (Sheet 2 of 4) by the DEPARTIVI0 100 percent of the total fee due under tOGREEMENT. b. By mutual agreement, partial payments may be made from time to time as the work progresses. The frequency of partial payments shall not exceed one per month. (3) That should the improvement be abandoned at any time after the ENGINEER has performed any part of the services provided for in paragraphs 1a through 11 and prior to the completion of such services, the LA shall reimburse the ENGINEER for his actual cost plus 165 percent plus reimburse the ENGINEER for any direct costs and /or subconsultant expense incurred up to the time he is notified in writing of such abandonment — "actual cost" being defined as in paragraph 1 above. (4) That, should the LA require changes in any of the detailed plans, specifications, or estimates, exceptforthose required pursuant to paragraph 4 of THE ENGINEER AGREES, after they have been approved by the DEPARTMENT, the LA will pay the ENGINEER for such changes on the basis of actual cost plus 165 percent to cover profit, overhead, and readiness to serve -- actual cost being defined as in paragraph 1 above plus direct expense and subconsultant expenses. It is understood that "changes" used in this paragraph shall in no way relieve the ENGINEER of his responsibility to prepare a complete and adequate set of plans and specifications. It is Mutually Agreed, (1) That any difference between the ENGINEER and the LA concerning the interpretation of the provisions of this AGREEMENT shall be referred to a committee of disinterested parties consisting of one member appointed by the ENGINEER, one member appointed by the LA and a third member appointed by the two other members for disposition and that the committee's decision shall be final. (2) This AGREEMENT may be terminated by the LA upon giving notice in writing to the engineer at his last known post office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all surveys, permits, agreements, preliminary bridge design and hydraulic report, drawings, specifications, partial and completed estimates, and data if any from traffic studies and soil surveys and subsurface investigations with the understanding that all such material becomes the property of the LA. The ENGINEER shall be paid for any services completed and any services partially completed in accordance with Section 3 of THE LA AGREES. (3) That the ENGINEER warrants that he has not employed or retained any company or person, other than a bona fide employee working solely for the ENGINEER, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the ENGINEER, any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warranty the LA shall have the right to annul this contract without liability. BLR 4301 (Rev. 5/97) (Sheet 3 of 4) IN WITNESS WHEREOF, the parties have caused this AGREEMENT to be executed in quadruplicate counterparts, each of which shall be considered an original by their duly authorized officers. Executed by the LA: Village of Buffalo Grove of the (Municipality/Township /County) State of Illinois, acting by and through its President & Village Board ATTEST: / By. �a K. �� - e��u By: .42 %21� Village Clerk Village President (Seal) Executed by the ENGINEER: ATTEST: By: Title: Secretary (Seal) Civiltech Engineering, Inc. 500 Park Boulevard, Ste. 250 Itasca, Illinois 60143 Title: President BLR 4301 (Rev. 5/97) (Sheet 4 of 4) N W U Z LU N W W o 0 H Z R t Q Z w N > F- W c 'o^ V Q U) `� C r m Q V 7 7 X u_ a O W 0 03 r 0 � Q V �° > O:f C r CL to w 0 a N G U m m U c E m Of m n N C rnm rn o `x `o x a 41 L m O m � yMq X i0 x m (T6 N m LO o O c N 4 E E a) 4) X UJW v O C 0) L C O > a. u) N IT r N 0) d N 0) L O O L U O O II � 0) O O O O CO v .? c. N N U L Q7 N > O i clL m t' N N ao G = c6 m °u H m e O O O~ H H N $ N W m � O' vOi � � O ta G 103: 0 M w N M r a r m N � W W ' m G Oct X W 1 LL LL w w co A w m oO e M G O Wes^ N m = (X00 Z aU N W T e o OD QO WN W (�� tn0_ m v N 001 ,y z ELLI m N N Q C m M a w w (0 N e ^ m N UA 20 z = T � i°m m 00 P N N H 0 d QI e UN w e o g m go o o c � rm m N v r e N CA al fG � � N V) W N $ cp y) ° N 41 c 'R O c H w G $ N N d`W w o e CO e v� ° La r y y O 4 L m � us N 00 C 1 m d a d � � a di `m E U CL a y m 8u m d 2 I a m c v c ar uj d cn a m d c E m t � c 2 o .. m ° m a.. •°- m 7 0 c =a c d 3 n 2 L o N m m w O m @ LL o E umi v O U o y 2 c 9 atOi c m y N 5 vi A . a1 O O d . S to LL C ¢ N d U LL > i- O O 6 :c U d N y e m m U c E m Of m n N C rnm rn o `x `o x a 41 L m O m � yMq X i0 x m (T6 N m LO o O c N 4 E E a) 4) X UJW v O C 0) L C O > a. u) N IT r N 0) d N 0) L O O L U O O II � 0) O O O O CO v .? c. N N U L Q7 N > O i • EXHIBIT B • WEILAND ROAD PEDESTRIAN SIGNAL IMPROVEMENT AT APTAKISIC -TRIPP JUNIOR HIGH SCHOOL July 21, 2000 I. SCOPE OF SERVICES Following is our anticipated scope of services for the project: Part 1 - Contract Plans, Specifications and Estimate 1. Data Collection -Obtain existing roadway and signal plans from LCDOT and utility atlases from the Village and utility companies. This work item also includes completion of a photolog and a field check of existing plans. This item will also include obtaining a soil boring in the pavement widening area along with two (2) pavement cores. 2. Design Survey /Base Sheet Preparation -We will perform a detailed design survey of the project limits plus 200 feet beyond each limit. We will prepare base sheets at a scale of 1" = 20' of the project including all known utility information. 3. Pre -Final Contract Plans and Documents - We will prepare pre -final contract plans, specifications, cost estimate and bid documents. The plans will be prepared in accordance with the Exhibit entitled "Proposed Traffic Signal & Pavement Marking Modifications" dated May 23, 2000. The documents will be prepared in accordance with current Lake County design standards and practices. The proposal booklet will be prepared in an MFT format. We anticipate that the contract plans will contain the following drawings: Title & Index of Sheets General Notes /Summary of Quantities Existing & Proposed Typical Sections /Details Maintenance of Traffic Plan (2 sheets) Plan & Profile /Drainage & Utility Plan (2 sheets) Landscaping, Signing & Striping Plan Erosion Control Plan Traffic Signal /Interconnect Plans & Details (9 sheets) These documents will be submitted concurrently to the Lake County Division of Transportation, the Village, the Illinois Department of Transportation and the School District for review. We will also submit the contract plans to the utility companies in the project area. We will contact the local electric company and make the necessary arrangements to obtain electric service for the traffic signal installation and assist in securing the necessary electrical agreements. 4. Submittals & Review -Once the contract documents have been reviewed by all the agencies we will meet with each agency individually or collectively to go over their comments and concerns. We will obtain the necessary permits form the Lake County Division of Transportation and the Lake County Stormwater Management Commission. 5. Final Contract Plans and Documents - Once we have received all the comments from the various agencies we will finalize the contract documents and distribute to all agencies involved forfinal approval. We will make any last minute changes to the plans requested by the agencies and obtain the necessary construction permits. 6. Advertisement for Bidders and Contract Administration - We will furnish the Village fifteen (15) complete sets of the contract documents for distribution to prospective bidders. We will attend the bid opening, review the bid proposals, tabulate bids and furnish the Village a letter of recommendation for contract award. We will assist the Village in the execution of contract and contract performance bond. Part 2 - Construction Inspection 1. Pre - Construction Meeting /Shop Drawing Review- Attend pre- construction meeting. Review shop drawings and equipment catalog cuts for conformance to specifications. 2. Construction Inspection and Layout - Attend construction meetings as required. Provide full -time inspection of construction activities. Lay out locations of pavement widening, pavement markings, signal foundations and detector EXHIBIT B 0 WEILAND ROAD PEDESTRIA IGNAL IMPROVEMENT AT APTAKISIC -TRIPP JUNIOR HIGH SCHOOL July 21, 2000 loops. 3. Measurement and Documentation - Measure and document quantities in accordance with plans and specifications. 4. Final Inspection - Attend final inspection and signal turn -on. Prepare final punch list. Prepare record drawings for LCDOT.