Loading...
2014-20RESOLUTION NO. 2014 — 20 'iL'AXb1ff__1C11 7: REHABILITATION WHEREAS, THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE desire to cause the implementation of the Phase 2 Design cf the Camelot Lift Station Rehabilitation, and WHEREAS, the approval of an agreement with a consulting engineer is required in order to proceed with the necessary engineering of the project. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois, that the President is hereby authorized and directed to execute the "Letter of Proposal for Design Engineering Services Camelot Lift Station Rehabilitation". A copy of said contract is attached hereto and made a part hereof. AYES: 6 — Berman, Trilling, Sussman, Terson, Stein, Ottenheimer NAYE8: 0 -None ABSENT: 0 -None PASSED: APPROVED: September 8, 2014