Loading...
1966-02-03 - Ordinance 1966-002 - APPROVING COST OF ACQUIRING LAND, AND APPROVING PLANS, SPECIFICATIONS AND COST OF CONSTRUCTING A MUNICIPAL BUILDING4- ,1-r AI.I ORDINANCE APPROVING COST OF ACqUIRING IAND, AI{D APPROVING PI.AI{S, SPECIFICATIONS AND COST OF CONSTRUCTI,NG A MI'NICIPAL BUII,DING BE IT ORDAIMD BY THE PRESIDEM AND BOARD OF TRUSTEES OF THE VILTAGE OF BIFFALo GROVE, ILLINOIS. SECTION ]..The plans, specifications and estimated cost for the construction of a munlcipal building, prepared by Joseph RaccuLia, consultlng englneer in charge (a11 of whlch have been heretofore submltted to the President and Board of Trustees) and the estLmated cost of land acqulsltlon (also heretofore subrdtted) are hereby approved. The Clerk of the Village ls dlrected to flle the eame ln her offlce for publlc inspection. SECTION 2.The President, Clerk and attorney are hereby authorized and directed to prepare, execute and deliver aL1 necessary 1ega1 data, lnc ludlng electlon data, to purchase a site and co4lete the construction of a municipal bullding; all other officers, eqloyees and agents of the Vil.lage are hereby authorized and dlrected to take all proceedlngs and to perform all acts as may be necessary from time to tlme in connection therewlth. SECTION 3. This Ordinance shall be in full force and effect i.nnediately upon its Passage and approval accordl'ng to law. AYES.NAYES: / PASSED:L966. t :a\ sa lerk APPROVED: resi ,! / ESTIMATED COST OF I.AND ACQUISITION, CON. STRUCTION OF MI,'NICIPAL BUII,DING, ARCHITECT,S FEES, ATTORNEYST FEES AND CONTTNGENCTES 1. Petmit fee 2. Test borings 3. Excavation (rough and finished gradlng) 4. Concrete 5. Precast concrete floor and beams 6. S tructural steel 7. Masonry-Brlck, Block and S tonework 8. Carpentry 9. Dryruall 10. Insulatlon 11. Finish floor (terrazo, vlnyl, asbestos, ceranric tlLe) L2. Tile wainseoat (ceramic) 13. Misc. store front, flagpole, ralling, glazLng, cell doors 14. Roofing L5. Kitchen equipment ln fire statlon 16. Palnting and decorating 17. Hardware allowance 18. Landscaptng - black toPPing 19. Plurobing 20. ElectricaL2l Heating and air conditioning 22. Archltectrs fee 23. Contingen€Y- 37. Total Contractorr s proflt and overhead Percentage increase - srJ" due to cost excalatlon since6atglnal estfunate No cost No cos t $8 15 t0 3 8 24 4 2 ,000.00 ,000 . 00 ,000 . 0o ,000 . oo 000. 000. 000. 00 00 00 troll- Atto eQvte x,c *tf contingenc ie s 000 .00 5,000.00 1,000.00 6 ,000 .00 3 ,000 . 00 600 .00 5,000.00 800 .00 12 ,000 .00 , 000 .00 9 390.00 1 ,000.00 $ 50,000.00 20 .000 . 00 $ 250 ,000 . 00 t 1 5 5 5 5 1 8 0 7 8 4 I 1 ,000 . 00 ,000.00 00 00 00 I 1 ,500 . oo 200.00 I 06 0 0 ? 07 $ ' /u '/J ^