1980-10-23 - Zoning Board of Appeals - Recommendation . .
► • .
VILLAGE OF BUFFALO ALO GROVE
APPE J R ANCE COMMISSION •
Recommendation Summary
•
,� Buffalo Grove Datsun Oct. 23 .1980
.i Ploeot Title : Date
B. G. Datsun - Lloyd Fried
Developer : •
Moved by : Com. Kirby Seconded by : Com. Knaak
I move we approve the 1 i ghtin g Presented by
Buffalo Grove Datsun as Presented: which would
be three (3 ) building mounted lights - Stonco
Line -- Cool Cube Floodlights with High Pressure
Sodium or Quartz Lights ( Cool White ) with the
falowing stipulations :
• 1 - The light will extend only to the
Northern edge of the parking lot
and to the East and West edges of
the Parking lot. V
2 - They are shielded so that theft do
• not shine to the rear. .
3 - The lights are to be in ooe rati on
only when Buffalo Grove Datsun is V
open for business : and will be ex-
tinguished at closing.•
4 .- They will be on the front of the
building, mounted on tot) of the
mansard, and are approximately
eighteen ( 18) inches high.
Roll Call Vote : Aye - Paolillo.► '
Kirby
Gibbs
Knaak
• Hardt
Nay. - None
•
Motion Passed 5 to 0.
sb •
r.
• .. _
•
•
• •
` J
V
��
`�
•
VILLAGE OF BUFFALO GROVE
APPELRANCE COMMISSION
Recommendation Sul mar
r•� .�ww
•
Pro jj e c t Tit 1 e : Buffalo Grnve Datsun Date : Oct. 23 1980
B. G. Datsun - Lloyd Fried •
Developer :
•
•
Moved b • C om. Gi bb6 Seconded by: C om Paolillo
I make a motion to allow Buffalo Grove Datsun
to Put up Temporary signage from Oct. 31. 1980
through Nov. 14. 1980 — 15 •days.
This temporary signage includes pennants to be
installed as they de sire: a].so Grand Opening
Banner, if they so desire
Roll Call Vote: Aye — Paolillo,
. . Knaak,
Kirby,
Gibbs,; -
Hardt
Nay - None
Motion Passed 5 to 0. • •
•
• sb
t • •
•
t
• • •
1
•
• VILLAGE OF BUFFALO GROVE
. APPEARANCE CON1 I SSION •
Recommendation Summary
Early Learning Center �. Oct. 2 l g0
Prol ect Title: Date: 3: 9
White Way Sian Co. - Geo. Woock for
Developer: Early Learning Center
Moved by: C om. Paolillo Seconded by: C om.Ki..r.by
•
I make a motion to accent the
Rainbow- Path Early Legg Center
Wall Sian as submitted.
•
• Roll Call Vote: Aye - Gibbs,
Knaak.
Kirby
Paolillo
• • Hardt
• 'Nay - None
. Motion Passed 5 to 0.
sb
•
•
•
•
• •
•
•
VILLAGE OF BUFFALO GROVE
APPEARANCE A:YCE COMMISSION
•
• Recommendation Summarz
Tanglewood —
ro.'ect Title: Sal._ Date: Oct. 23, 1980
Developer:
Pate Corn — Ms. Sharon Coved
loved ,o Seconded by: Coin Paolillo
.T Com.
Motion No. I (of 3)
•I move we accept the Pulte Sales Trailer with the
following stipulations: _
a) That."it be -skirted
b) That the stairs and porch be painted
c) The Tanglewood Information sign on the rear
be removed and the Sales Office sign to be
removed.
_ • d) The electricals are to be fixed to look better.
o.) Landscaping as -Approved for the Parking lot
• is to be started.
Roll Call Vote:. Aye -- Gibbs.
Knaak.
Paolillo
Kirby
Hardt
Motion Passed 5 to 0. .
•
sb
•
•
•
• • r
i •
• •
•
•
• •
VILLAGE OF BUFFALO GROVE
. APPEARANCE COMMISSION •
• Recommendation Summary
Tanglewood
Pulte Sales Trailer -
Pro.'ect Title: Date: Oct. 23. 1980
•
Developer:
Pulte Corp — Sharon Covey • • S
Com. Gibbs Seconded b
Moved b : Com. Knack Y
Motion No. 2 (of 3)
•
I move we approve the Information• Center sign
on the front of the SAle s Trailer.
Roll Call Vote: Aye — Gibbs,
Knaak. .
Paolillo,
Kirby,
. Hardt .
• N av — None
Motions No. 2 Passed t to 0. •
Motion No. 3 (of 3)
. Moved by Coin. Kirby Seconded by Ch. Hardt
• I move. we 'approve one (l)model sign (Under Construction)
and that 'it be placed between the two models on Gail Dr.
as presented.
•
Amendment: • That this one •(1) New Model Under Construe—
• • tion _sign be erected for a period of time
not to extend beyond 'Dee; 15, 1980. •
•
. . Roll Call Vote: Aye =- Kirby
Nay — Gibbs, Knaak, .
Pa oli_1_lo, '
• Hardt
Motion Defeated — 4 to 1 .
•
sb
ti
4_
_ _ _ _ _
l
•
•
•
VILLAGE OF BUFFALO GROVE.
APPEARANCE COMMISSION
Recommendation Summary
,Project Tit e : Firs- Federal of Chicago • Oct. 23 . 1_980
_ Date
Wilmer and .Associates. Architects
Developer .
Mi chae1 J Wimmer and Bob •Mi chaloz•rski
S1 .
•
Moved b� .
CommKnack Seconded by: C om. Kirby
• I move t*re• accent the A-rchi Lecture of the
First Federal of Chicago (Savings and Loan.)
a s nre sen+e d with the f oI 1 owtirin g stipulations:
1 White glass I. -1 11 he used
(not dark as indicated . )
-- Utilities, roof ton uni ts,
and drai nage 11 be clarified
• at a later date..
. . 3) Wyoming Whi to Quartz (as 1 er-
samnl_e) to •be used •a s submitted.
L. — Sipnage , Lighting, Landscani ng. .
and Trash re ce nti cl_e s will be
considered at a later date-.
Roh_ Call Vote: Aye — Paolill_o 0 -
Gibbs, •
Kirby, ' •
K'n a ak,
• Ha rdt
sb
•
•
•
•
•
•
• .
•
•
- • i
• i
• . _ - • •- -` >
VILLAGE 0P BUFFALO GROVE
APPEARANCE COMMISSION
ION
• Recommendation Su mar
ProjectTit 1 e: Buffalo Grove Fi re Stateion Date: Oct. 23. 1980
Developer:
Mr. Knoernei — Architect
Moved bY• Coml Kirby Seconded by: Com, Gibbs
��r /fir./I •�rrN �.�/� �../��
I move we accent the plans for the Buffalo Grove
Fire Stateion, 109 East Busch Rd.; as submitted:
Construction mate r.i al s: Brick is Cimeron Bend
from Cloud Ceramics
Drivit Material (Off whitedcream)
as per s�.mx�le e
.• Overhead doors to be a ci]_or
similar to the- brick.
Tinted bronze glass except in
the doors — which is clear
glass.
•
Exterior lights on buildine to
be druanodic bronze.
Louvers at the rear painted out
• to match the brick.No exposed vents.•Interi or drains.
• 'Ail service doors will be painted
• out to match the brick.
• Bumper Hosts painted out to match
the brick. .
Roll Call Vote: Aye - Paolillo,Knaak
• Gibbs
Kirby
• Hardt
Nay — None
Motion Passed 5 to 0.
•