Loading...
1980-10-23 - Zoning Board of Appeals - Recommendation . . ► • . VILLAGE OF BUFFALO ALO GROVE APPE J R ANCE COMMISSION • Recommendation Summary • ,� Buffalo Grove Datsun Oct. 23 .1980 .i Ploeot Title : Date B. G. Datsun - Lloyd Fried Developer : • Moved by : Com. Kirby Seconded by : Com. Knaak I move we approve the 1 i ghtin g Presented by Buffalo Grove Datsun as Presented: which would be three (3 ) building mounted lights - Stonco Line -- Cool Cube Floodlights with High Pressure Sodium or Quartz Lights ( Cool White ) with the falowing stipulations : • 1 - The light will extend only to the Northern edge of the parking lot and to the East and West edges of the Parking lot. V 2 - They are shielded so that theft do • not shine to the rear. . 3 - The lights are to be in ooe rati on only when Buffalo Grove Datsun is V open for business : and will be ex- tinguished at closing.• 4 .- They will be on the front of the building, mounted on tot) of the mansard, and are approximately eighteen ( 18) inches high. Roll Call Vote : Aye - Paolillo.► ' Kirby Gibbs Knaak • Hardt Nay. - None • Motion Passed 5 to 0. sb • r. • .. _ • • • • ` J V �� `� • VILLAGE OF BUFFALO GROVE APPELRANCE COMMISSION Recommendation Sul mar r•� .�ww • Pro jj e c t Tit 1 e : Buffalo Grnve Datsun Date : Oct. 23 1980 B. G. Datsun - Lloyd Fried • Developer : • • Moved b • C om. Gi bb6 Seconded by: C om Paolillo I make a motion to allow Buffalo Grove Datsun to Put up Temporary signage from Oct. 31. 1980 through Nov. 14. 1980 — 15 •days. This temporary signage includes pennants to be installed as they de sire: a].so Grand Opening Banner, if they so desire Roll Call Vote: Aye — Paolillo, . . Knaak, Kirby, Gibbs,; - Hardt Nay - None Motion Passed 5 to 0. • • • • sb t • • • t • • • 1 • • VILLAGE OF BUFFALO GROVE . APPEARANCE CON1 I SSION • Recommendation Summary Early Learning Center �. Oct. 2 l g0 Prol ect Title: Date: 3: 9 White Way Sian Co. - Geo. Woock for Developer: Early Learning Center Moved by: C om. Paolillo Seconded by: C om.Ki..r.by • I make a motion to accent the Rainbow- Path Early Legg Center Wall Sian as submitted. • • Roll Call Vote: Aye - Gibbs, Knaak. Kirby Paolillo • • Hardt • 'Nay - None . Motion Passed 5 to 0. sb • • • • • • • • VILLAGE OF BUFFALO GROVE APPEARANCE A:YCE COMMISSION • • Recommendation Summarz Tanglewood — ro.'ect Title: Sal._ Date: Oct. 23, 1980 Developer: Pate Corn — Ms. Sharon Coved loved ,o Seconded by: Coin Paolillo .T Com. Motion No. I (of 3) •I move we accept the Pulte Sales Trailer with the following stipulations: _ a) That."it be -skirted b) That the stairs and porch be painted c) The Tanglewood Information sign on the rear be removed and the Sales Office sign to be removed. _ • d) The electricals are to be fixed to look better. o.) Landscaping as -Approved for the Parking lot • is to be started. Roll Call Vote:. Aye -- Gibbs. Knaak. Paolillo Kirby Hardt Motion Passed 5 to 0. . • sb • • • • • r i • • • • • • • VILLAGE OF BUFFALO GROVE . APPEARANCE COMMISSION • • Recommendation Summary Tanglewood Pulte Sales Trailer - Pro.'ect Title: Date: Oct. 23. 1980 • Developer: Pulte Corp — Sharon Covey • • S Com. Gibbs Seconded b Moved b : Com. Knack Y Motion No. 2 (of 3) • I move we approve the Information• Center sign on the front of the SAle s Trailer. Roll Call Vote: Aye — Gibbs, Knaak. . Paolillo, Kirby, . Hardt . • N av — None Motions No. 2 Passed t to 0. • Motion No. 3 (of 3) . Moved by Coin. Kirby Seconded by Ch. Hardt • I move. we 'approve one (l)model sign (Under Construction) and that 'it be placed between the two models on Gail Dr. as presented. • Amendment: • That this one •(1) New Model Under Construe— • • tion _sign be erected for a period of time not to extend beyond 'Dee; 15, 1980. • • . . Roll Call Vote: Aye =- Kirby Nay — Gibbs, Knaak, . Pa oli_1_lo, ' • Hardt Motion Defeated — 4 to 1 . • sb ti 4_ _ _ _ _ _ l • • • VILLAGE OF BUFFALO GROVE. APPEARANCE COMMISSION Recommendation Summary ,Project Tit e : Firs- Federal of Chicago • Oct. 23 . 1_980 _ Date Wilmer and .Associates. Architects Developer . Mi chae1 J Wimmer and Bob •Mi chaloz•rski S1 . • Moved b� . CommKnack Seconded by: C om. Kirby • I move t*re• accent the A-rchi Lecture of the First Federal of Chicago (Savings and Loan.) a s nre sen+e d with the f oI 1 owtirin g stipulations: 1 White glass I. -1 11 he used (not dark as indicated . ) -- Utilities, roof ton uni ts, and drai nage 11 be clarified • at a later date.. . . 3) Wyoming Whi to Quartz (as 1 er- samnl_e) to •be used •a s submitted. L. — Sipnage , Lighting, Landscani ng. . and Trash re ce nti cl_e s will be considered at a later date-. Roh_ Call Vote: Aye — Paolill_o 0 - Gibbs, • Kirby, ' • K'n a ak, • Ha rdt sb • • • • • • • . • • - • i • i • . _ - • •- -` > VILLAGE 0P BUFFALO GROVE APPEARANCE COMMISSION ION • Recommendation Su mar ProjectTit 1 e: Buffalo Grove Fi re Stateion Date: Oct. 23. 1980 Developer: Mr. Knoernei — Architect Moved bY• Coml Kirby Seconded by: Com, Gibbs ��r /fir./I •�rrN �.�/� �../�� I move we accent the plans for the Buffalo Grove Fire Stateion, 109 East Busch Rd.; as submitted: Construction mate r.i al s: Brick is Cimeron Bend from Cloud Ceramics Drivit Material (Off whitedcream) as per s�.mx�le e .• Overhead doors to be a ci]_or similar to the- brick. Tinted bronze glass except in the doors — which is clear glass. • Exterior lights on buildine to be druanodic bronze. Louvers at the rear painted out • to match the brick.No exposed vents.•Interi or drains. • 'Ail service doors will be painted • out to match the brick. • Bumper Hosts painted out to match the brick. . Roll Call Vote: Aye - Paolillo,Knaak • Gibbs Kirby • Hardt Nay — None Motion Passed 5 to 0. •