1989-10-16 - Resolution 1989-50 - APPROVING AN AGREEMENT FOR ENGINEERING SERVICES FOR THE BUSCH RD / BUSCH PKWY / DEERFIELD PKWY (IL RT 83 TO IL RT 21) STREET IMPROVEMENTRESOLUTION NO. 89- 50
A RESO1UTION APPROVING AN AGREEMENT FOR ENGINEERING SERVICES FOR TIIE BUSCH
ROAD/BUSCH PARKI.IAY /DEERFIELD PARK}'AY (IIIINOIS ROUTE 83 TO ILLINOIS ROUTE
21) STREET IMPROVEMENT
WHEREAS, the Vlllage Board destres to accomodate the tmproverent
of the artertal street corrtdor along Busch Road/Busch Parkway/Deerfleld
Parkway extending fron Illtnols Route 83 to Illtnols Route 21; and,
WHEREAS, the approval of an engineertng servtce agreement ls
required in order to proceed wlth the process of tEproving the deslred
tmprovements tn the artertal street corrldor;
NoI,r, TIIEREtr'oRE, BE IT RESo1VED by the Vl11age Prestdent and Board
of Trustees of the Vl11age of Buffalo Grove, Cook and Lake Counttes,
Illlnols as follows:
The agreement entltled, rrAgreement for Consultant Servlces between
the Vtllage of Buffalo Grove and Mldrrest Consulttng Englneers, Inc.r'
ts hereby approved.
The Vtllage Presldent and Vlllage Clerk are hereby authorlzed and
dlrected to execute sald agreement, a copy of whlch ls attached
hereto and made a part hereof.
AYES:5 - Marienthal. Glov f Re{d- Shifrin- Math ias,0rMa1ley
NAYES :0 - None
ABSENT:0 - None
PASSED:October 16 1989
1989APPRoVED: october 16
APPR
1
2
,Ja
ATTEST :
b^r* 11' tu*lrr,t,'-
vfilage clerk Ln
GPBr1c:C102:GREGC
lru///'-.tD4
age Presldent
AGREE!,IENT FOR CONSULTANTI S SERVICES
bethreen
VILI,AGE OF BUFT'AIO GROVE
and
MIDWEST CONSULTING ENGINEERS, INC.
5151 North Harlem Avenue
Chicago, Illinois 60655
DESCRI PTI ON
Phase I Engineering for the improvement of Busch
Road/Busch Parkway/Deerfie Id Parkway frorn I11. Rt. 83(!4undelein Road) to I11. Rt. 21 (Milwaukee Avenue) , adistance of 3.0 miles in Lake County, Illinois.
AGREEMENT T'OR CONSULTANT SERVICES
ROUTE :Busch Road/Busch Parkway/Deerfield Parkway
from I1I. Rt. 83 (Mundelein Road) to
II1. Rt. 21 (l,lilwaukee Avenue)
COUNTY: Lake
. Thts is an AGRXEMENT betvreen the Viilage of Buffalo
crove, Cook County, acting through its President and Board of
Trustees, hereinafter referred to as the "VILLAGErr, and Midyrest
Consulting Bngineers, Inc. 5151 North Harlem Avenue, Chicago,
Illinois 60556, a firm of Consultants, hereinafter referred to
as the "CONSULTANT".
The VILLAGE does hereby engage the CONSULTANT, antl the
CONSUTTANT hereby agrees to furnish certain professional Phase I
engineering services, described in Section 2 and including the
preparation of a Combined Location/Design Report, in connectj.on
with the proposed improvement of Busch Road/Busch Parkrray/Deer-
field Parkway from I1I. Route 83 (Mundelein Road) to I11. Route
2l (Milwaukee Avenue), a distance of 3.0 miles, in Lake County,
Il1inois, hereinafter referred to as the nPROJECfn, based upon
the following terms and conditions:
MCE044 -1-
1. INCORPORATION BY REFERENCE
The "Standard Agreement Provisions for Consultant Servj,cesrr
dated 1977, of the Department of Transportation of the State
of Illinois, hereinafter referred to as the " STANDARD
PROVISIONS", are incorporated and made part of this AGREE-
MENT except as deleted or amended hereafter.
(STANDARD PROVISfONS section references sholrn in parenthe-
ses )
1 1 (SPl) Definitions,
shalL be set 'forth
' VISIONS, amended to
as they pertain to
in bection 1of the
add the following:
1.1.1.IDOT Departnent of Transportation, State of
L.L.2 Chief of Environmental Sci.ence The Chief of
Environmental Science of IDOT.
1.1.3 Environmental Statement A $rritten statement
of the anticipated
and detrimental
may have upon the
containing an assessment
significant, beneficial
effects which the PRoJECT
human environment.
1.1.4 Categorical Exclusion - A erritten document in
support of a determination that, should the
proposed highway section improvement be
constructed, the action will not induce
significant, foreseeable alterations in land
use, planned growth, development patterns,
traffic volumes, travel patterns, or natural
or cultural resources.
MCEO44 -2-
the PROJECT,
STANDARD PRO-
Illinois
1 .1.5 Section 4 (f ) Land - Any land from a public
park, recreation area, wildl,ife and vrater
fowl refuge or historic site which a trans-
portation plan or project proposes to use
(from the Department of Transportation Act,
1966).
1.1.6 Envi,ronmental Assessment - Any action that is
not classified as a Categorical Exclusion and
for which the Environmental Studies and early
coordination indicate that the proposed
action'wil1 not have a significant impact on
the quality of human environment.
1 .1.6 Combined Report Report that contains both
1.2 (SP 1.18) Vlherever the word DEPARTUENT is used, it
shal1 be construed. to mean the VILLAGE, except the word
DEPARTITTENT shal1 also include IDOT in Subsections 2.12,
2.24, 2.3L, 2.32 and Section 6, in its entirety, of the
SIANDARD PROVISIONS.
1.3 (SP 2.41) The CONSULTANT shal1 i-nvoice the VILLAGE, not
the Liaison Engineer, as provided in Section 2.4L of
said STANDARD PROVISIONS in a format mutually agreed to
by the VILLAGE and the CONSULTANT.
MCE044
the Corridor Location Studies and the Design
. Location Studies. A combined report is
prepargd for projects in which only the
existing corridor is feasible.
-3-
2. Scope of Work
Since this PROJECT requires a Combined Corridor and Design
Location Report and a Combined Hearing, and since the
Corridor aspects of the Report are Iimited, the Design
Location Study will cover detailed variations over the
entire length of the PROJECT. It is anticj.pated that one
design will be studied in detail, and that variations to
this design in several locations will also be studied for
the entire length of the PROJECT.
Upon receipt of written authorization of notice to'proceed,
the CONSULTANT shall provide the services for environmental
studies and reports. The studies. . and reports for the
PROJECT sha1l be completed 'as set forth in applicable
provisions of 3, 4,5,6 an<i 7 (revised) of the STANDARD
PROVISIONS and applicable provisions amended.as follows:
1 (SP 3.2) Information sha1l be assembled in accordance
with Section 3.2. Sections 3.1,3.3r 3.5, and 3.6 are
not applicable provisions of this AGREEIUENT.
2 (SP 4.1) Section 4.1 of the STANDARD PROVISIONS is
de 1e ted .
3 (SP 4.2) Aerial mosaics at a scale of 1" = 50' will be
used for this PROJECT. In addition, a conventional
ground survey will be performed to obtain topographic
information suitable for the design of the PROJECT.
The ground survey work wiII be performed in accordance
with Section 6.21 of the STANDARD PROVISIONS.
2.4 (SP 4.3) The first sentence of Section 4.3 of the
STANDARD PROVISIONS is changed to read, "Using the
existing corridor, study all feasible alternate designs
to eliminate aII those which are not acceptable'r.
2
2
2
MCE0 4 4 -4-
2 5 (SP 4.35) The following is added to Section 4.35: "A11
watershed areas affecting the proposed improvement
shall- be identified and shown on a Drainage Map. This
map will include the drainage area flood plains, if
EDy, preliminary storm sewer design, and reguired
openings for all streams crossing the proposed improve-
ment, including Aptakisic Creek. Preliminary applica-
tions to the IDOT Division of Water Resources and Army
Corps of Engineers will be made. Fina1 permits will be
obtained during the final design of the PROJECT."
6 (SP 4.37) Right-of-r^ray reguirements will be defiried on
the ln = 50' scale mosaic showing the preferred plan of
improvement
2
2
2
7 (SP 4.5) Public involvement will include
(1) public meeting; either a public
meeting or a formal public hearing.:
holding one
informational
2
I (SP 4.51 & 4.62) The CONSULTANT shaI1 furnish ten (10)
copies of the Draft Report for review by the VILLAGE,
the Lake County Highway Department, IDOT and FEDERAL
HIGIIWAY ADMINI STRATION. After approval, he shall
furnish fifteen (15) copies of the final Report.
9 (SP 5.3) This section is modified to read, "Study all
feasible alternate designs in sufficient detait to
eliminate those which are not acceptable. For the
remaining alternates, follow the same procedure as
outlined in Sections 4.3, 4.4, 4.5 and 4.6 as modified
and expanded in the AGREEIIIENT".
2.L0 (SP 6.48a (2) ) Delete 6.48a (2) and insert the following
in its place: The CONSULTANT will obtain title insur-
ance reports prior to the preparation of any right-
of-way acquisition p1ans, plats and 1ega1 descriptions.
MCE0 44 -5-
),
2.11 The CONSULTANT will provide the following in addition
to items enunerated elsewhere in this AGREEITIENT:
a)Intersection Design Studies; Reproducible and
four prints of the recomrnended intersection
improvements.
c) Public Meeting Handouts 100 copies .
d)
e)Exhibits depicting socio-economic and other
factors - one original- and four prints.
The CONSULTANT sha11 exclusively furnish to the VIL-
LAGE, all reports, data or other information prepared,
obtained or assembled by him under this AGREEMENT,
unless otherwise directed by the VILLAGE.
3. The VILLAGE agrees to furnish the following items:
3.1 All presently available survey data and information
including standard details and standard specifications
adopted by the VILLAGE, and other available data,
including accident data and traffic counts, useful to
the work being done by the CONSULTANT.
PROJECT SCHEDULE
2.L2
Plan exhibits (ln = 50' scale
of-way) - Originals and four
hcceptable alternates.
showing right-
prints of a1I
work on Phase I within
of authority to proceed.
The
(s)
CONSULTANT shal1 commence
calendar days after " date
five
The
MCE044 -5-
b) Drainage l4ap; the original and four prints.
work will be completed and delivered to the VILLAGE within
the following per j.ods:
- Preliminary Geometrics(includes work under
Items 1 through 12 onExhibitD-Page1)
210 days from notice to
proceed and receiptof project data ( seeattached proj ect
schedule )
- Draft Environment Report This work wilL be
authorized upon
acceptance of thepreliminary geometrics
- Public lteeting or Hearing 30-34 days from receiptof approval for public
re lease
5 . PRII\,IE COMPENSATION
5. La Phase i - Part 1 - Preliminary Geometrics Study.
Subject to an Upper Limit of Compensation of
$112,137.00, the CONSULTANT shall receive as full
payment fo! conpleting the Phase I Part 1 work required
of him under this AGRIEMENT, reiribursement of his
eligible actual costs in accordance with Section 2.45
of the STANDARD PROVISIONS, plus a Fixed Amount of
$11r028. The Upper Limit of Compensation and Fixed
Amount are a result of the attached Exhibit D-1, Cost
Estimate of Consultant's Services for Phase I Part 1.
The retainage provisions contained in Section 2.42 of
the STANDARD PROVISIONS shall not apply to Direct Non-
Salary Costs. The attached Exhibits A, B, and. C are to
be used as set forth in Section 2.42 of the STANDARD
PROVISIONS. Invoices shall be prepared in accordance
with Section 2.4L.
5.Lb Pending VILLAGE approval of Phase I Part l, the
CONSULTANT sha11 prepare a SUPPLEMENTAL AGREEMENT for
services required to perform required work tasks for
Phase I Part 2 of this project. This work will include
MCE0 4 4 -7-
preparation of an Environmental Assessment and other
documentation required to obtain Design Approval for
the project from IDOT/I'HWA.
tr,)The Prime Compensation may be increased or decreased by
subsequent agreement bet}reen the contractual and
approving parties if there is a major change in the
scope, character or complexity of the Work. Prime
Compensation and Specific Rates for Extra Work may be
adjusted i.n accordance with Section 2.2L of the SIAN-
DARD PROVISIONS, if the duration of the work in any
phase extends more than six months beyond the date of
completion stated in Section 4 of this AGREEMENT, due
to no fault of the coNsuLTANt.
3 In all instances where the VIILAGE shalI request
specific services of the CONSULTANT, the CONSULTANT
shall indicate to the VILLAGE whether the work shall be
considered "extra workn. When requested by the VIL-
LAGE, the CONSULTANT shall prepare and submit a cost
estimate for such extra work. In the event the CONSUL-
TANT, upon written order from the VILLAGE, is requj.red
to perform Extra Work, he sha1J., in addition to the
Prime Compensation, receive payment for such Extra Work
on the following basis:
Subject to a pre-agreed Upper Limit of Compensation for
each item of Extra work, the CoNSULTANT shall be paid
at the specified hourly rate of pay for each class of
employee as listed in Exhibit "A" for the actual time
the CONSULTANT directly utilizes each such employee on
the Extra Work, plus the CONSULTANT I s payroll burden
and overhead costs as listed in Exhibits B and C, plus
actual expenses for trandportation, subsistence, and
electronic computer service incidental to the Extra
Work. Any other expenses incurred incidental to the
Extra Work shalL be considered to be overhead. costs. ,
5
-8-MCEO44
5 4 The Engineer certifies that he/she and his/her prin-
cipals have not been barred from si.gnJ.ng this agreement
as a result of vi.olation of section 33 E-3 and 33 E-4
of the Criminal Code of 1961 (Chapter 38 of the IlIi-
nois Revised Statues).
In consi-deration of these
as set forth in these pages
premi se s ,
nunbered 1
the partj.es
through 11
hereto
inc 1u-agree
This AGREEI{ENT executed this t6rh day of October
1989.
ATTEST :
BY:Y^L|A Lu^4t0.
VILI"AGE OF BUFFAI,O GROVE
N.fhillt
TITLE: Village Clerk
BY Deputy Vll1age Clerk
ATTES T :
BY:
Sec tary
BY:
(/
TITLE: Vlllasepresldenr
MIDWEST CONSULTING ENGINEERS, INC.
BY:
Pres ent
--]\.',2------;'
,.1.L.
I.{CE0 4 4 -9-
a
E{IIIBIP A
ECURiJ RAEE RA}GE
@iIST]LTAMI S REUIAR SIAFT'
GASSETCATTOLI
Pri.ncipaf lhqirEer
Project llanager
ResjdeDt Etgircer
Structural ErgiJEer
Suwry Partlt Cb-ief
Senior P:roject Egrineer .
Eoject E€lirc€E
Design ErgdrEer/Sericr Technician.
Constructicn bgjrcer
fiechnician/Survef & CcnstJnEticn
senior DraftsEn/Ti-hnician
Drafter
Clerical/v{crd Plocessor
Scn:rce: sEc,/EYE 12/37/88
Date: Argust 20, 1989
IBOI,1
$2s.00
18.50
14.00
1s. 00
11.00
18.00
14.00
11.00
12.00
7.00
11.00
5.75
6.00
$3s.00
32.00
22.00
27.00
17.50
28.00
20.00
15.50
18.50
14.50
17.00
12. OO
15. 00
10
ffic,/11
t of Di.rest
grcfucLive
9.67
0. 81
o.22
0. 70
L3.42
13.06
:.34
1.38
50. 60r
EXEIBTT B
P}JRCTL EI,RDEN & ERI}{GE @6'15
ftsderal Insurance Ccrrtri]erlicns Act.....
Stat€ Unq)lq'IrEnt Coeesation.
Federal lllgrplqilEnt CclFensati.on.
If,GlGnr s Ccrrpensatjan lllsuJ3nce....
Paid Eolldays, Vacatjott, Siclt Ieare...
Bcmis ard Incentirie Pa!'rents.....
Gtalified Defeged Retirdrent Benefits
C{:c[{) Insurance. . .. ... . .. . . . .
IUTAL PE]'ROLL H]RDEN S E?JNGE @SIS
Source! YIE L2/3L/88
sEE/40
Office Rent. .
State Incr@ Ta.es..... 1.09
Busjless Insurance, futcIudjry accident, Liability ard
va.Iuable papers.......
EKEIBIT C
OIEHEAD AIiID INDIRECT @S"1S
@recialior.
Indirect SaLaries - efuinistrative, Secretarial,
llesser€er, contracts, Negotjations, ProEEsals,
Ilnassignble Staff Ti.E, ard Professisral Earcation....
neroductiot ard kjntj-ng Cost-s.......
Office $rypIie-s
Data Plcssfulg
Professioral Sen{ces ircludfurg l€ga1 ard
Accountjng...
grplqaees kavel, B:.siress lbetirrgrs, ard Ee{orlt::nct
Eeenses.....
Telephoe ard Postaqe. .
RecnriLirrE and Releation Eeense.
ltaidng ano E&rcational lbn-SaJ.a4r D<pense......
Fees, Licenses, Dres, PubU.cations, (Tectuicaf ard
Professional)
Uti-Lities ard laaiatenance
t of Di^rect
kodurtive
PalEl)U
10.18
5.04
27.7t
i. sn
3.40
0 .61
5.33
5. 61.
1.38
0 .48
0.38
0. 99
3. 33
6.15
0.92
0.40
Explcyee ne1atisrs.
otlEr Eeenses ,....i.........
ISEAL O/BHEAD
ScR.:rce: W, L2/3L/S8
sEc,/41.
74.54*
Susch Ro6d
Lake
Co6suItsnt: Hi&cst Consutting EngiECrs, Inc.
RqJte
Sect i on
Pl.oject
County
Job [o.
cosT EsTlr TE oF coalsrlTlllc sERvlcEs
PHASE I PART I
PNELIXIIIARY GEOIETRTCS AXD
COiBI}IED LOCATIOT,/OESIGX TEPORI C'{LY
ItLinois Roqt. &3 to Ii tEuk.c Rord
Datc:09/28189
Dot LErs (3)
ITEH
1 Data col l.ction
2 f iel.d surv.y
3 Irsffic An tysi s
4 Prcl,. oesign Studics
5 ,ret. soi ts llx.
6 Drainage Studics
7 Yettsnds Study
8 ou.ntit.s t Cost Est
9 or.ft Proj.ct R.port
10 PLbt ic lrwolvqlrit
'11 Finat Proi.ct Rcport
'12 Proiect Adnin.
13 Prrt. Rot oocs. (b)
14 Envi ro.m.nt.[ Studies
lnd Report (b)
(B)
0v.rh.ad
&
t. i n9.
B.rl.f i ts
(c)
ln-Nousa
D i.cct
Costs
(0)
S(b-Tot. I
(E)
FeaI.t
(r)
(!)
Scrvicca
w
Otharr
(G),
Tot.I
(li)
Iot
cr.rd
tot.t
(l)
63
815
130
350
8
390
80
41
226
80
50
56
936
12127
20?9
5616
131
6771
1?6
639
3501
1146
815
1176
117'l
15175
2539
ru30
'161*n
1584
800
4381
1810
't 021
18/7
1635
,50
600
2m
300
450
t7L2
27A53
4568
1Z&8
e5
't 585 r
28t0
t139
8152
5556
2287
3323
241
3538
609
't685
39
2032
3E0
192
1050
a31
215
u3
1515
1023
31491
5177
14333
'tt379
't 7883
3230
1631
9202
3990
2532
3766
3.59
28.06
4.62
12.78
13 -27
15.95
2.88
't.15
8.21
3.56
2.26
3.36
TOTALS | 22e2 | 35759 | 45000 | 3so5 | 86564 | 11028 I 14545 | 112137 1100.00 |
(a) Description ol Seryices: Soits SLbconsuttant rcrk
(b) This rork ritt b. p.rfoEried in Ph.s. I Pa.t ll
EXHIBIT D
P.gr 1 of 4
BushdlA. Hkl
I
lPlyiot
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I(,ber
ol
llan
Hours
(A)
t
AVERAGE IICUNLY PROJECT IATES
ElrscH Ro D trus IxPRovErExT
VILLAGE OF EUTFALO GROIE oste: septeib.r 28, 1989
:LASSI FI CATION
SAL
ARY
ITEX 1 lTEt{ 2
oata co[ [ection Fiald survcy
I PIRT: tGT. RAIE:ZPAIT : lJGl. t lE:l PAPT : IJGT. R TE:l PART : IJGT, IATE:lP RT : IJGT. IIE
PRITICIPAL €TGIIIEER(TJH)0033
10.00 : 2.74 r 10.00 | 2.71 : 10.00 :2.71
FRoJECT ENCIIIEER (l,tRH) r'18.60 : 30.00 : 5.58 : 5.00 0.93 : 20.00 | 3.72 : 30.00 :5,58: 30.00: 5.58
DEslGrl EfcrflEER (cFR) i13.50 : 30.00 : 4.05 :: 50.00 :6.75 3 15.00: 6.08: 60.00: 8.10
slrRvEY CHIEf (000) 32'1.00 :: 15.00 :7.35:
sEH toR oRAFTSITAI r15.00:: 10.00 :1.50 : 5.00 : O.75 |
TECH}I I CIATI/SURVEY :11.00 : 35.00 : 3.85 : 60.00 3 6.60 !
DRAFTERS | 9.00:: 10.00 :0.90 : 10.00 :0.m:
CLERICAL :9.00:
AVERAGE PAYROLL RATE 85 : 100.00 :'14.88:100.00:16.05:100.001. -76.12000015.611 00
EXHIBIT O
Plgc 2 of 4Susch6.rkl
: tlEll ! : tlElt 4 : llEll 5
! fruflic Amt),ti. :Prcl. D.sigr Strtica: Pr.t. Soi[! lnv.
PRoJECT ltAllAGER (F8) :27.40 : 5.00 : 1.37 :
100.
AVERAGE [q,'RLY PROJEC] RATES
BUSCH ROIO FAUS I}IPROVE'{EIIT
VILLIGE OF BUFFALO GROVE 0.t!: septfiber 28, 1989
tTEr,r 6 IIEH 7 ITEX 8
ARY
L
Z P Rt : gcl. nATE :: PAIT : lJ6T. RATE :Z PAR' rt,Gt. RATE :Z PART : IJGT. IAIE :l PART ! llct. IATE
E}IVI RO'IXE'ITTL
SIT.D I ES
q,nxrITlEs
I COST ESrtX rE
RTNCIPAL EXGIXEER(IJI{)31.00 3.00 : 0.99
r 5.00 :'1.37: 20.00: t.48
RoJECT EIIGIIEER (tlRH) :18.60 : 35.00 : 6.51 : 45.00 :8.f7 : 20.00 z 3.72 t 40.00 :7.14: 30.00: 5.58
Eilcx EIGIIEER (GtR) :13,50 : 50.00 : 6.E : 35.00 :4.rJ : 80.00 : 10.80 : 5.00 :3.38 : 20.00:. 2.m
URVEY clllEF (ODo) :21.00 :
EXIOR ORAFTSXA}I :15.00:'t0.00 :1.50: 15.00t 2.8
ECHNI CIAIi/S1'RVEY :11.00:
tA F'TERS 15.00 :15.00 r 1.35 : '10.00 :0.90
]LERICIL 3 9.00 :5.00: 0.45: 2.00 t 0.18
AVERAGE PAYROLL RATE 377 100.00 5 0000 '15 .19 '100.00 : -'18.08
Jschd. Hk1
EXXIEIT D
Plgc 3 of 4
: llEi 9 . llE}l t0
:OR FT PROJECI nEPfiT: RBLTC lll\rollrExExT
..ASSIFICATIO}I
ORAIXAGE S'IJO I ES
RoJECT H IAGER (rs) :27.40 | 15.00 : 4.ll ! 5.00 | 1.37 z
:9,00:
:100.00 .82 100.00
AVERAGE flq',RLY PROJECT I^TES
ErrscH toAD FAUS IiPROVE EIIT
VI LLAGE OF BIJFFALO GROVE Date: scptaber 28, 1989
CLASSIFICATIOT
: SAL.
: ARY
t?Ex tl ITEIl 12 I TEI4 I3 tTE'{ l4 tTElr 15
FINAL PROJ. REPORT PROJECT TDX I X.
:: PART : UGI. RATE !Z PART : IJGT. RATE :I PART : IIGT. NATE TZ PANT : YGT. RATE :I PART : UGT. IATE
PRI}ICIPAL EXGIIIEER(TJX)33.00 :5.00 :65
oEslGtl EllclllEER (GFR). :'11.50 r 30.00: 4.05:
SURVEY CIIEF (DDO) :21.00 r
SEII IOR DRAFTSXAII :15.00 : 5.00 : 0.75 :
TEClllllClAl{/SURVEY !'11.00:
DRAFTERS : 9.00 : 10.00 : 0.90 :
CLERICAL : 9.00 : 5,00 : 0.45 :
AVERAGE PAYROLL RATE 0000 336 0000
EXHIEIT O
Plgc 4 of 4Euschd. rkl
1