Loading...
1986-03-03 - Resolution 1986-17 - APPROVING A JOINT VILLAGE/STATE AGREEMENT FOR THE CONSTRUCTION OF IL RT 83 FROM LAKE-COOK RD TO BUFFALO GROVE RDRESOLUTION NO. 86 - 17 A RESOLUTION APPROVING A JOINT VILLAGE/STATE AGREEMENT FOR THE CONSTRUCTION OF ILLINOIS ROUTE 83 FROM LAKE-COOK ROAD TO BUFFALO GROVE ROAD IIHEREAS, the President and Board of Trustees of the Village of Buffalo Grove desire to cause the implementation of the Illinois Route 83 (Lake-Cook Road to Buffalo Grove Road) Street Improvement; and, WHEREAS, the approval of an agreement with the State of Illinois is required in order to proceed with the completion of the desired project; N0}.l, THEREF0RE, BE IT RES0LVED by the President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois as fol I ows : I. The agreement entitled, "Agreement for Federal Project lX-872(73)" is hereby approved. 2. The Village Manager is hereb.y authorized and directed to sign the agreement, a copy of which is attached hereto and made a part hereof. AYES: 5 - Marienthal, O'Reil1y, Glover, Reid, Kowalski NAYES: 0 - Ilone ABSENT: PASSED: 1- Shields March 3 1986 APPROVED: aqe res en ATTEST: --&r1""* Vi I Iagd{ lerk AGREEI{I]NT FOR FEDERAL PROJECT IX-872( 73) THIS ACREEMENT is entered inro rhis 3rd day of March A.D., 19-86 , by and between rhe STATE OF ILLINOIS, acting by and rhrough irs DEPARTI.{ENT OF TRANSPORTATION, hereinafter called Ehe STATE, and rhe VtLtAcE OF BUFFAIO GROVE, acting lhrough irs PRESIDENT AND BOARD OF TRUSTEES, hereinafrer called the VILLAGE. I.IITNESSETH WIIEREAS, the STATE and the VILIAGII, in order to facilitate the free flow of traffic and insure safety to the Eoloring public, are desirous of inproving approxinately 0.7 nile of uundelein Road (FAp Roure 872) (lllinois Route g3) from norEhwest of Buffalo Grove Road to north of Lake-Cook Road in the Village of Buffalo Grove, Lake County, lllinois, VTLLAGE Secrion 80-00024-00-Rpr STATE Section 44t{RS-l(86), STATE Job No. C-91-031-86, Federal projecr LX-872(73), said iuprovement to consist of the folloving: A. Widening and resurfacing the existing tuo-lane roadway to provide four thru traffic lanes and a 12-too! nountable nedian, with left-turn lanes at various locaEions; B. Constructing new curb and gutter throughout and a 6forn sever systeD to acco@odate the iuprovement; C. Adjusting the existing traffic signals at Buffalo Grove Road; and perforning all other eork necessary to conplete the iEproveEent in accor- dance with the approved plans and specifications, hereinafter called the PROJECT; and WIIER"EAS, rhe saoe uill be of S r-<t and the VILLAGE are desiroue 1-, said PROJECT in that imediate benef it to the VILLAGE I S residenE8 .rrd p"rr"r,.oa i.r, nature; and I{HEREAS, the VILLAGE has heretofore caused e Design Report to be completed for the PROJECT (Phase I Engineering); NOt{ ' TIIEREF0RE, in consideration of the mutual covenanta contained herein, the parties herelo agree as follors: l. The VILLAGE, at iEs own expenae, ghall cause the Design Report to be satisfactorily amended for the PROJECT, and prepare or cauae to be prepared the contract plan8, specifications and esti.Eate (Phase lI Engineering). 2. Ihe VILLAGE, at its ot,n expenae, shall obtain or cauae to be obEained Ehe necessary right-of-way (including all temporary and permanent easemente) for the PROJECT in accordance with rhe f ollowing requireoents : A. Said right-of-way shall be acquired in accordance rith Land Acquisition Policies and procedures of the STATE, in the naoe of the STATE, on standard State forns which rill be provided for that purpose. B, No award of a contract shall be made to cover con8truc- tion of the PROJECT, or any part thereof, vithout there first having been Bade a Eitle approval by the Attorney General of lllinois on each individual parcel ot said right-of-ray, the coneideration for rshich exceeds $2,500.00, iocluded uiEhin euch conatrucrion. A title approval shall be rnade by the STATE on each individual parcel of ssid right-of-ray acquired for the PROJECT rshere the coneideration is 12,500.00 or leas. lo the -2- 3. event-t/cquisit ion of eai.d right-of-wai/e by condem- nation, then such accion Eust be brought in Ehe name of the State by Ehe Attorney General and an Assi8tant Attorney General appointed by trim. C. The coet of said right-of-uay shall include the pur- chase price thereof as vell as the coat of negotiators, Special Assistant Attoroeys General, appraieale, title evidence, relocation asaistance and payEents, property management, and such legal eervice as may be necessary to acquire said right-of-way. D. All parties engaged in the acguisition of said right- of-way shall be approved in advaoce by rhe STATli. E. Any phase of the Staters Relocation Assistance pro- cedures to be performed by any qualified agency other Ehan the STATE shall be covered by separate contrec- tual egreement or agreeEents with said agency. F. The STATE shall provide such guidance, assiatance and supervision, and monitor and perforn audits, to the exEent necessary Eo assure compliance irith the STATETS Land Acquisition Policies and procedures. G. The VILLAGE shall furnish the STATETS DistricE Engineer the original cooveyance instruments and right-of-ray plat, including any tenporary or peruanent eaaeoents, irmediately after guch docuoents are properly recorded. Ihe STATE shall furnish the resident engineer together rith the consEruction engineering, propor!ioning of materials and inspec- tion during Ehe construction of the ioprovenent, provide accep- tance sampling and testing of materials and cauae the PROJECT to -3- 4 \2v be built in accordance with the approved plans, specifications and contract. The STATE, after approving the plans, shall receive bids and award the contract for construction of the PROJECT. 5 The VrLLAGE, or, 0ctober 21, 1985 , appropriated, by se parat e reso lut ion, $295 ,000 . 00 to pay its share of Ehe cosE of the 6 PROJECT. The VILLAGE agrees to adopt, and put into effect prior to the STATE advertising for the sork to be perforned hereunder, an ordinance requiring that parking be prohibited on the inproved roadway sithin the limits of the PRoJECT. The VILLAGE agrees to adopt, and put into effect prior to the STATE advertising for Ehe sork !o be perforned hereunder, an ordinance prohibiting the discharge of sanitary and/or indus- !ria1 uasCe uater into any atorm 6euer conatrucled as a part of EhE PROJECT. The VILLAGE agrees not to authorize or pernit any operation, practice or encroachment rrhich will change, inpede or inEerrupt the orderly flow of vehicular traffic on lhe completed PROJECT, and to enforce such traffic regulations and local ordinances that affect traffic operations thereon. The disposition of encroachnenta, if any, 8ha11 be cooperatively deternined by representaEives of the STATE and the VILLAGE. The V ILIAGE agreea not to permit driveray entrance openings to be rnade in the curb aa constructed eithout the irritten conaent of the STATE. 10. 7 8 9 -4- 11. 12. 13. 14. 15. The VILLAOi,6hall exerciee its franchise rig.l, ro the extent thet the VILLAGETS franchise agreement allows, to cause utilities to be relocated at no expenae to the STATE. The VILLAGE further agrees to regulate or cauge t'o be regulated on a continuing basi.s the use of highway rights-of-vay by utitities in the llanner set forth in the currenr Staters Utility Accomodarion policy appli- cable to the highway systeu involved. The STATE shall, upon compleEion of the PROJECT and so long as l,lundelein Road (IIlinois Route 83) is used as a Stete Highvey, Eaintain on said route the thru traffic lanes, turnj.ng lanes, roedians, curb and gutter flags adjacent to the thru traffic lanes, and paveuent markings vithin the limits of tire PRoJECT. The VILLAGE shall, upon conpletion of the PROJECT, maintain or cause to be oaintained all portions of the PROJECT not epecified Eo be maintained by the STATE in lteo 12 of this Agreeuent, in- cluding manholes, inlets, catch basins, 6torn aesers, sidenalks and VILLAGE-owned utilities and appurtenancea. Upon acceptance by Ehe STATE of the traffic 6igna1 sork included herein, lhe responsibility for maintenance and electrical energy for the operaEion of the signals shall coDtinue to be as outlined in Ehe Master Agreement executed by February 9, L982 ( amended Septenber The estiuated cost of the PRoJECT i8 *Preliuinary Engineering Costs . . Right-Of-Way Acquisition Cosrs. . Contract Construction Co6ts . . . Construction Engineering Costs. . TOTAL . the STATE and the VTLLAGE on 7, 1984). as follows: ......$ 75,ooo.oo ......$ t4o,ooo.oo . $r,ooo,ooo.oo $85 000 . 00 Renaining Phase I plue all of Ptraee Il. -5- f1,3oo, ooo. oo 16. The d ividr={r of costs shall be as follows:\z V l LI.AGE STATE Cost 7 Cost 7 I'EDERAL Cost TOTAL Preliruinary Engr. Right-Of-tlay Acquis. Contract Const. Construc t ioo Engr. I00 IO0 N/A N/A N/A N/A r5 15 N/A N/A 85 85 75,000 140,000 N/A* N/A* N/A N/A 150 ,000 L2 ,7 50 N/A N/A 850, 000 72,250 75 ,000 140, ooo 1,000 ,000 85,000 L7. 215,000*t62 ,7 50 922,?50 1,300,000 VILLAGE shall contribute an additional lunp suo of $200,000 to Ehe STATE for use at Ehe STATE'S discreEion. Ihe VILLAGE agrees to pay the entire cost of Preliminary Engineering and Right-Of-t{ay Acquisitioo. The STATE agrees to pay the Eotal contract construction and con- struction engineering cosEs, subject Eo reinburseuent of the Federal share of 852 thereof, in accordance f,rith current billing procedures established for Federal-Aid projects. A. Upon award of the contract for construction of the PROJECT the VILLAGE agrees ro pay to the STATE, as the VILLAGETS total contribution toward the construction of the iEprovement, a lunp suE auount of $200,000.00 frox0 any funds alloEted to the VILLAGE. This AgreemenE and the covenants contained herein shall becone null and void in the event the conEract covering the construction work conEenplated herein is not auarded prior Eo January 1, 1989. 18. I9. -6- TOTALS 20. ATTEST: This Agres.-;nt shall be binding upon and iix-re to the benefits of the parties hereto, their successors and aesigns. VILLAGE OF BUFFAIO GROVE VILLAGE MANAGER STATE OF ILLINOIS, DEPARTMENT OF TRANSPORTATION DIREOTOR OI' DaEe z, ?8""X-^- LEA Ls66 -7 - .,I LLAGE CLERK /%,/ ttls Ris \i\[R 519s6 \ \ \ \-%'ffil 1t \ I STATE OF I LL INO IS COUNTIES OF COOK AND LAKE I, JANET l{. SIRABIAN, hereby certlfy that I am the duly elected, qualifled and acting VILLAGE CLERK of the Village of Buffalo Grove, Counties of Cook and Lake, llllnois, and the keeper of lts seal and records. I hereby further certify that the attached is a true copy of Resolution No. t/r-t? adopted on the 3J day of ---{71A/\4.1^-- -, DtrL, by the Vi I I age Board of the Vi l Iage of Buffalo Grove as shovrn by the records in nry custody, lN t{ITNESS IrHEREOF, I have hereunto set my hand and affixed the seal of the Village of Buffalo Grove aforesaid, at said Village, in the County and State aforesaid, this 4C/, day of q , n' -, DfZ, T\ Bra!'.^*, ) ) ) 9e er lllinois Department of T1_qnsportation 23OO South Dirksen Farkway/ Springtield, lllinois/62764 R EC E lv E D March 28, 1.986 APR 2 ES6 Buff al O GrOve vltLqcE {.\r secti on B0-00024_00_Rp BUEFALo GRovE Project lX-872(73) - Construction Job No. C-91-031-86 Mundelein Road (FAP 872) from northwest of Buffalo Grove Road to north of Lake-Cook Road Ms. Janet M. S irabi an Village CIerk 50 Raupp Bou levard Buffalo Grove, II li nois 60090 Dear Ms. S irabi an : The joint agreement for the subject section was executed by the department on March 25, 1986. Your copy of the executed agreement is being returned herewith. Very truly yours, Melvin ti. 9nith Acting Engi neer of Local Roads and Streets € b+*-) By:yd E. Di xon Local Project Implementation Engi neer cc- Gregory P. Boysen, Dir. of Pub. hlks.. C. tJehner Attn : R. l,l. Harr i s. J. Kehl Attn: Sandy Meyer avid G. Campbel'l Attn: Dan Erwin ale A. Janik Attn: Robert L. Plunk L R E D D ti R l, . E. Burns Attn:. l{. Jones Attn: eorge l,lober 1y Attn John R. 0lds Attn: l',l. E R.E:J Don . Stubbs. Craven oe Hill Henn i ng