1985-10-21 - Resolution 1985-57 - ACCEPTING THE AGREEMENT FOR PHASE 2 ENGINEERING SERVICES FOR THE IMPROVEMENT OF IL RT. 83 FROM LAKE-COOK RD TO BG RDRESOLUTION N0.85 - 57
,.A RESOLUTION ACCEPTING THE AGREEI'IENT FOR PHASE II ENGINEERING
SERVICES FOR THE IMPROVEMENT OF ILLINOIS RT. 83 FROI,'! LAKE-COOK ROAD
TO BUFFALO GROVE ROAD"
WHEREAS, the President and Board of Trustees of the
Villaqe of Buffalo Grove desire to cause the implementation of the
Illinois Rt. 83 (Lake-Cook Road to Buffalo Grove Road) Street
Improvement and;
I,IHEREAS, the approval of an agreement with a consulting
engineer is required in order to proceed with the necessary engineering
of the proj ect;
NOl,l, THEREF0RE, BE IT RES0LVED by the President and Board
of Trustees of the Village of Buffalo Grove, Cook and Lake Counties,
Ill inois that the Village Manager is hereby authorized and directed
to execute the "Agreement for Consultant Services Between the
Village of Buffalo Grove and Midwest Consulting Engineers, Inc."
A copy of said agreement is attached hereto and made a part hereof.
AYES:
NAYES:
AB SENT:
PASSED:
5 - Marienthal, Glover, Reid, Shields, Kowalski
0 - None
1 - OrRe1l1y
ocEober 21 ,1985
APPROVED:
a9e res e'1
ATTE.]T:
2
1I age Clerk Pro Tem
STATE 0F lLLtNots )
)
COUNTIES OF COOK AND LAKE )
I, JANET H. SIRABIAN, hereby certify that I am the
duly elected, qualifled and acting VILLAGE CLERK of the Village
of Buffalo Grove, Counties of Cook and Lake, lllinois, and the
keeper of its seal and records.
I hereby further certify that the attached is a true
copy of Resolut ion No.85152 adopted on tl.e2/zf lay of
, 19& by the village Board of the Vi age
of Buffalo Grove as shown by the records ln my custody.
lN I,JITNESS trHERE0F, I have hereunto set my hand and
affixed the seal of the Village of Buffalo Grove aforesaid,
at said Village, ln the County and State aforesaid,thlrcil.xL
,D6day of
a9e r
AutZ I
' ".-. --,i*e..r..-..r.
q 22.
AGREEMENT FOR CONSULTANT SERVICES
between the
VILLAGE OF BUFFAIO GROVE
50 Raupp Boulevard
Buffalo crove, Illinois 60090
and
I4IDWEST CONSULTING ENGINEERS, INC.
5151 North Earlem Avenue
Chicago, Illinois 50656
DESCRIPT I ON
Phase If Engineering for the improvement of
Mundelein Road (I11. 83) from Lake-Cook Road
to Buffalo Grove Road, a net length of
approximately 1.11 mil-es, Iocated in Lake
County, I11inois.
ryll
Lu I
Route:
Pro j ect :
County :
Section:
Job. No.:
AGREEMENT T'OR CONSULTANT SERVICES
Mundelein Road ( I1I. 83)
(Vi11age )
This is an AGREEMENT between the VILLAGE OF BUFFAIO GROVE,
50 Raupp Blvd., Buffalo crove, Illinois, 60090, hereinafter
referred to as the "VILLAGE", and MIDWEST CONSULTING ENGINEERS,
INC., 5151 North Harlem Avenue, Chicago, Il1inois, a firm of
Consultants, hereinafter referred to as the nCONSULTANT'..
The VILLAGE has retained. the CONSULTANT to furnish certain
professional services including the preparation of contract
p1ans, special provisions and cost estimates in connection with
the proposed improvement of Mundelein Road (I11. 83), hereinafter
referred to as the rrPROJECTrt.
This AGREEMENT contains aII the terms and conditions of the
agreement bets/een the VILLAGE and the CONSULTANT and any changes
in this AGREEMENT shall have no effect unless they are made in
trriting, signed by both parties and incorporated as an amend.ment
to this AGREEMENT. No other written or oral understandings,
representations or agTreements, other than those herein, have been
made by and between the partj-es hereto.
-t-MCEO 3 9
In consideration of these premises, the Parties hereto agree
as set forth in the following pages numbered 1 through 1I inclu-
sive.
This AGREEMENT executed this 2l2U^" o,
1985.
ATTEST:VILLAGE OF BUFFAIO GROVE
By R -l),..aer lla"astrBy:
Dated: t ".-4,*Jr, /l/g
Village C1 erK Name - Title
MIDWEST CONSULTING ENGINEERS, INC.
By:
Preside
APPROVED NOV14 1985
\
-r\
ATTEST :
By:2"r**
Se creta ry-Trea sure r
\\
a
I-ICE0 3 9
DISTE'Cf ENOINE€i
2
1. Incorporation b y Reference
The "Standard Agreement Provisions for Consultant
Services", dated L977, of the Department of Transportation
of the State of IlIinois, hereinafter referred to as the
" STANDARD PROVISIONSTT, are incorporated and made part of
this AGREEI\,IENT except as deleted or amended hereafter.
(References to section in the STANDARD PROVISIONS are shorrn
in parenthesis. ) :
1.1 (SP 1) Definitions as they pertain to
shall be as set forth in Section 1of
PROVISIONS, amended to add the following:
the
the
PROJECT ,
STANDARD
1.1.1 IDOT - Department of Transportation, State of
I11inois.
1.1.2 (SP 1.1.8) Wherever the word DEPARTMENT is
used, it shall be construed to mean the
VIILAGE, except the word. DEPARTMENT shall
also include IDOT in Subsections 2.L2, 2.24,
2.31 , 2.32, and Section 6 in its entirety, of
the STANDARD PROVfSIONS,
1.2 (SP 2.41) The CONSULTANT shall invoice rhe VIILAGE,
not the Liasion Engineer, as provided in Section 2.41
of said STANDARD PROVISIONS. Invoicing shall be in a
format mutually agreed to by the VILLAGE and the
CONSULTANT.
2. Scope of Work - Phase 2 Engineering
Phase 2 of the work to be done by the CONSULTANT on the
project shal1 be as set forth in Section 6 of the STANDARD
PROVISIONS, Scope of Services for Design and Preparation of
r,1cE0 3 9 -3-
I
I
2
Contract P1ans, amend.ed as follows (References to sections
in the STANDARD PROVISIONS are shown in parentheses) :
2.1 (SP 2.31b) Delete the words "or wrongful".
2 (SP 6.20) The $rork in this section will include
preparing an addendum to the approved Environmental
Assessment and Combined Report to reflect the change in
the proposed roadway cross-section for the PRO,fECT.
3 (SP 6.21) The CONSULTANT shal1 use conventional ground
survey methods to obtain topographic information for
design of the PROJECT.
2.4 (SP 6.221 The work outlined in Sections 6.22a, b, and
c will not be required for this PROJECT.
2 5 (SP 6.23) The work outlined in Sections 6.22a, b, and
f wilL not be required for the PROJECT.
2.6 (SP 6.24) Delete this work since a centerline survey
plat is not required for this PROJECT.
2.7 (SP 6.31) The work outlined in Section 6.31 is not
required for this PROJECT.
(SP 6.32) Delete 6,32 and insert the following in its
place: The CONSULTANT will contact the utility com-
panies and coordinate the required utility adjustments.
The design and plans for utility adjustments will be
prepared by the respective utility companies.
2.9 (SP 5.42) Delete 5.42 since structure plans are not
required for this PROJECT.
2
82
MCEO39 -4-
2.10 (SP 6.45) The last sentence of this section is mod-
ified to read 'rThe CONSULTAN? will enter unit prices
and accumulate costs".
2.11 (SP 6.47) The work outlined in Section 6.47 will not
be performed by the CONSULTANT.
2,12 (SP 6.48) The work outlined in Section 6.48 will not
be performed by the CONSULTANT.
2.13 (SP 6.49) This work is deleted. Staking of right-of-
way Iimits r,ri11 be performed by others during the
construction phase of the PROJECT.
2.14 The CONSULTANT sha1l furnish the VILLAGE, for transmit-
ta1 to IDOT, the following documents, plans and copies
thereof:
a) Preliminary Roadway Plans: 4 sets of prints
b)Final Contract Plans: Mylar Reproducibles (36" x
22"1 and 1 set each of prints and sepias
c)Special Provj-sions: Original typed on forms
furnished by the DEPARTMENT
d)Estimate of Time: original typed on forms fur-
nished by the DEPARTMENT
e)
The VILLAGE will be furnished two (21 copies of the
above items for their records.
Estimate of Cost: Original with prices
without prj-ces typed on forms (8t" x
nished by the DEPARTMENT.
and 1 copy
11" ) fur-
MCEO 39 -5-
3. The VILLAGE agrees to furnish the following items:
A11 presently available survey data and information, includ-
j-ng standard details and standard specifications adopted by
the VILLAGE, and other available data useful to the r,/ork
being done by the CONSULTANT.
4. Project Schedule
The CONSULTANT shal1 commence work on Phase II within five
(5) calendar days after date of authority to proceed. The
work will be completed and delj-vered to the VILLAGE and the
DEPARTMENT within 90 calendar days after notice to proceed.
The PROJECT is to be ready for a tlal. ch 27, 1986 contract
letting scheduled by the DEPARTI,IENT.
5. Prime Compensation
5 I Phase 2 - Design and Preparation of Contract plans:
Subject to an Upper Limit of Compensation of
$74,871.00, the CONSULTANT sha11 receive as fu11
payment for completing the Phase II work required of
him under this AGREEMENT reimbursement of his eligj-ble
actual costs in accordance hrith Secti.on 2.45 of the
STANDARD PROVISIONS, plus a Fixed Amount of $7,860.00.
The Upper Limit of Compensation is a result of the Cost
Estimate of Consultant's Services, attached as Exhibit
D. The retainage provisions contained in Section 2.42
of the STANDARD PROVfSIONS shall not apply to Direct
Non-Salary Costs. The attached Exhibits A, B, and C
are to be used as set forth in Section 2.42 of the
STANDARD PROVISIONS. Invoices shalI be prepared in
accordance with Section 2.4L.
2 The Prime Compensation may be increased or decreased by
subsequent agreement between the contractual and
5
McE039 -6-
5
approving parties if there is a major change in the
scope, character or complexity of the work. Prime
ComDensation and Specific Rates for Extra Work may be
adjusted in accordance erith Section 2.2L of the STAN-
DARD PROVISIONS, if the duration of the work j-n any
phase extends more than six months beyond the date of
compJ.etion stated in Section 4 of this AGREEMENT, due
to no fault of the CONSULTANT.
3 In all instances where the VILLAGE shalI request
specific services of the CONSULTANT, the CONSULTANT
prior to commitment shall indicate to the VILLAGE
whether the work shalL be considered ,extra workn.
When requested by the VILLAGE, the CONSULTANT sha11
prepare and submit a cost estimate for such extra work.
In the event the CONSULTANT, upon written order from
the VILLAGE, is required to perform Extra Work, he
sha1l, in addition to the Prime Compensation, receive
payment for such Extra Work on the following basis:
Subject to a pre-agreed Upper Lirnit of
Compensation for each item of Extra
Work, the CONSULTANT shall be paid at
the specified hourly rates of pay for
each class of employee as listed in
Exhibit for the actual time the
CONSULTANT directly utilized each such
employee on the Extra Work, plus the
CONSULTANT'S payroll burden, overhead
costs as Iisted in Exhj-bits B and C,
plus actual expenses for transportation,
subsistence r and electronic computer
service incidental to the Extra Work.
Any other expenses incurred j-ncidental
to the Extra Work shall be consi-dered to
be overhead costs.
I'lCE 0 3 9 -7-
D(}{IBIT A
HqJRLY EATE BANSE
CCI{SULTA}II I S REHJI,AR SAAFF
gNSSEIq\TIC}I
kircipal- Ergireer
ProjecE l4arager
Resident Enqjneer
StjucEura]. hgineer
Survey Gdef
kojece Egi.rteer
Design Egijreer
Construction Elgfureer
Technician/Sunrey & oonstrucEion
Senior DrafEsnan/Tedudcian
Drafters
Cleric.al fi{crd Processor
Date: llay 1, 1985
FRCI{
918. 00
17. 00
11.00
15. 00
10. 00
11.00
9. 00
9.00
7.00
11.00
6. 00
6.00
$3s.00
21. 50
19. 00
21.50
16. 00
17.50
ls.50
17.50
14. 00
ls. 50
13. 00
11.50
1I)
CEET,-8-
HIBTT B
PAYROLL BURDEN & ERING CO TS
Federal InsJrarce Contri.butions Act
State Unqrplo!'rEnt Corpeasation.
Fedelal Unarplo!/I(ent Capensation.
lqcrlqrEn I s Ccxq>ensation Insu€nc€.
Paid Holi<iays, Vacation, Sick I-eave.
Bonus and Incentive Pa!'trEnts. .
Qualified Deferred Retj-rsrent Benefits.
Gnoup InsuGnce
ICNET, PNYNOTA BURDEN & FRI]GE C6TS
Source: Piscal Year Enahg 05/31/84
e of Direct
Producti-ve
Payroll
9.95
3. 70
0. 73
0 -72
t2.84
6.62
10. 54
7.97
53. 08t
CFET?-9-
DGIISIT C
O\IAHEAD AIID INDIRffi CG'IS
Cr-r+^ Thffi rrqvad
t of Di-rect
Productive
Pavroll
0. 14
4. 85
'16 1'7
1. s3
2.78
0.73
1)1
14. 17
1.43
0. 90
0.L2
0.85
L.44
6. 10
0. 93
0.62
Depreciation. 3. 38
Busi-ness Insurance, ircluding accident, Iiabifity ar:rC
valuable papers.
Ir':dilect SalEries - A&nillistrative, Secretarial,
t€sserger, Contracts, I€gotiations, Proposals,
IJnassigrnble Staff Ti:re, and Professional- &iucation....
Reproduction and Prjllthg Costs..
office Supplies
Data Processjng
kofessional Senrices i.ncludi-ng legal and
Accountj-ng.
Elrployees ltatel, Business !&eti-ngs, ard ke<ontract
E<oenses.
Ttelephone and Postage. .
BecruitJag arvi Felocation Elpense.
TYaid-ng arxi ECucational Ncn-Salary E<pense.
Eees, Licenses, Dles, F.rblications, (Ttechn-ical and
ProfessionaL)
Utilities and l"h.i-ntenance
rtF;'i ^a D6h+
Elrployee Relations.
Other D<per:ses. . . .. ..
TOIAL O/MHEAD
Source: Fiscal Year eding 05/31/84
ctf/-,-10-
81. 97r
Route I11. 83 COgt ESTIMATE OE CCIISULTAI.II I S Sm/ICES
P}IASE II E}{GINEERI}iG
!turdelein Road (I1. 83)
Lake-Cook Road to Buffalo Grove Road
Proj ect.
County Iake
Job tto.
Consultant: I'Iidrest Consul ].neers Inc Date:10/1.5/85
Doltars ($)
llunber
of
l'lan
Horlrs
(A)
Overhead
&
Frirge
Benefits
In-Itrcuse
Direct
C-iosts
(D)
Sub-lbtaI l,Iet Fee
(a
Senrices iby:
Otlers :(c) :
Grand
Tlotal
(r)
{
yroPa I1
lbta I
(l I)Itern
.EA ndurn
& Base P
3. Soils g Bznt. Desi
Pre Contract Plans
315
2BO 3,834
1
t216 : ls
C)
1
5 178
(B)(E)
3,091
87
(F)
395
1 150
30
72
38
30
70
48 4.7
37 4.5
)
B
4
1
5
4
2
4
5
7
:1
508
484
07
686
654
2 801
27
350
400
o 4 37, 650 4 76
194 r52
r.38 145
5 275 '))
0
4,000 : 5 145
42 ,47L
83
97
66
56.7
9
7
0
7
6
&g,
6. Field &c Plan
F P1ans 2t, & Est. i 126 :3,961 :
Tbtals 1964 :$26 ,201 35,385 : $s L,425 $63,011 $7,860 $4,000 : $74,87), : 10O.0
I
I
(a) Description of Services: Item 3 - Soil borings, cores, and report by Soits Consultant
I,rEo3 9
E)G]IBTT D
Section 80-00024-0O-RP
" Dl$Ier*r
0cr 24 i985