Loading...
1985-10-21 - Resolution 1985-57 - ACCEPTING THE AGREEMENT FOR PHASE 2 ENGINEERING SERVICES FOR THE IMPROVEMENT OF IL RT. 83 FROM LAKE-COOK RD TO BG RDRESOLUTION N0.85 - 57 ,.A RESOLUTION ACCEPTING THE AGREEI'IENT FOR PHASE II ENGINEERING SERVICES FOR THE IMPROVEMENT OF ILLINOIS RT. 83 FROI,'! LAKE-COOK ROAD TO BUFFALO GROVE ROAD" WHEREAS, the President and Board of Trustees of the Villaqe of Buffalo Grove desire to cause the implementation of the Illinois Rt. 83 (Lake-Cook Road to Buffalo Grove Road) Street Improvement and; I,IHEREAS, the approval of an agreement with a consulting engineer is required in order to proceed with the necessary engineering of the proj ect; NOl,l, THEREF0RE, BE IT RES0LVED by the President and Board of Trustees of the Village of Buffalo Grove, Cook and Lake Counties, Ill inois that the Village Manager is hereby authorized and directed to execute the "Agreement for Consultant Services Between the Village of Buffalo Grove and Midwest Consulting Engineers, Inc." A copy of said agreement is attached hereto and made a part hereof. AYES: NAYES: AB SENT: PASSED: 5 - Marienthal, Glover, Reid, Shields, Kowalski 0 - None 1 - OrRe1l1y ocEober 21 ,1985 APPROVED: a9e res e'1 ATTE.]T: 2 1I age Clerk Pro Tem STATE 0F lLLtNots ) ) COUNTIES OF COOK AND LAKE ) I, JANET H. SIRABIAN, hereby certify that I am the duly elected, qualifled and acting VILLAGE CLERK of the Village of Buffalo Grove, Counties of Cook and Lake, lllinois, and the keeper of its seal and records. I hereby further certify that the attached is a true copy of Resolut ion No.85152 adopted on tl.e2/zf lay of , 19& by the village Board of the Vi age of Buffalo Grove as shown by the records ln my custody. lN I,JITNESS trHERE0F, I have hereunto set my hand and affixed the seal of the Village of Buffalo Grove aforesaid, at said Village, ln the County and State aforesaid,thlrcil.xL ,D6day of a9e r AutZ I ' ".-. --,i*e..r..-..r. q 22. AGREEMENT FOR CONSULTANT SERVICES between the VILLAGE OF BUFFAIO GROVE 50 Raupp Boulevard Buffalo crove, Illinois 60090 and I4IDWEST CONSULTING ENGINEERS, INC. 5151 North Earlem Avenue Chicago, Illinois 50656 DESCRIPT I ON Phase If Engineering for the improvement of Mundelein Road (I11. 83) from Lake-Cook Road to Buffalo Grove Road, a net length of approximately 1.11 mil-es, Iocated in Lake County, I11inois. ryll Lu I Route: Pro j ect : County : Section: Job. No.: AGREEMENT T'OR CONSULTANT SERVICES Mundelein Road ( I1I. 83) (Vi11age ) This is an AGREEMENT between the VILLAGE OF BUFFAIO GROVE, 50 Raupp Blvd., Buffalo crove, Illinois, 60090, hereinafter referred to as the "VILLAGE", and MIDWEST CONSULTING ENGINEERS, INC., 5151 North Harlem Avenue, Chicago, Il1inois, a firm of Consultants, hereinafter referred to as the nCONSULTANT'.. The VILLAGE has retained. the CONSULTANT to furnish certain professional services including the preparation of contract p1ans, special provisions and cost estimates in connection with the proposed improvement of Mundelein Road (I11. 83), hereinafter referred to as the rrPROJECTrt. This AGREEMENT contains aII the terms and conditions of the agreement bets/een the VILLAGE and the CONSULTANT and any changes in this AGREEMENT shall have no effect unless they are made in trriting, signed by both parties and incorporated as an amend.ment to this AGREEMENT. No other written or oral understandings, representations or agTreements, other than those herein, have been made by and between the partj-es hereto. -t-MCEO 3 9 In consideration of these premises, the Parties hereto agree as set forth in the following pages numbered 1 through 1I inclu- sive. This AGREEMENT executed this 2l2U^" o, 1985. ATTEST:VILLAGE OF BUFFAIO GROVE By R -l),..aer lla"astrBy: Dated: t ".-4,*Jr, /l/g Village C1 erK Name - Title MIDWEST CONSULTING ENGINEERS, INC. By: Preside APPROVED NOV14 1985 \ -r\ ATTEST : By:2"r** Se creta ry-Trea sure r \\ a I-ICE0 3 9 DISTE'Cf ENOINE€i 2 1. Incorporation b y Reference The "Standard Agreement Provisions for Consultant Services", dated L977, of the Department of Transportation of the State of IlIinois, hereinafter referred to as the " STANDARD PROVISIONSTT, are incorporated and made part of this AGREEI\,IENT except as deleted or amended hereafter. (References to section in the STANDARD PROVISIONS are shorrn in parenthesis. ) : 1.1 (SP 1) Definitions as they pertain to shall be as set forth in Section 1of PROVISIONS, amended to add the following: the the PROJECT , STANDARD 1.1.1 IDOT - Department of Transportation, State of I11inois. 1.1.2 (SP 1.1.8) Wherever the word DEPARTMENT is used, it shall be construed to mean the VIILAGE, except the word. DEPARTMENT shall also include IDOT in Subsections 2.L2, 2.24, 2.31 , 2.32, and Section 6 in its entirety, of the STANDARD PROVfSIONS, 1.2 (SP 2.41) The CONSULTANT shall invoice rhe VIILAGE, not the Liasion Engineer, as provided in Section 2.41 of said STANDARD PROVISIONS. Invoicing shall be in a format mutually agreed to by the VILLAGE and the CONSULTANT. 2. Scope of Work - Phase 2 Engineering Phase 2 of the work to be done by the CONSULTANT on the project shal1 be as set forth in Section 6 of the STANDARD PROVISIONS, Scope of Services for Design and Preparation of r,1cE0 3 9 -3- I I 2 Contract P1ans, amend.ed as follows (References to sections in the STANDARD PROVISIONS are shown in parentheses) : 2.1 (SP 2.31b) Delete the words "or wrongful". 2 (SP 6.20) The $rork in this section will include preparing an addendum to the approved Environmental Assessment and Combined Report to reflect the change in the proposed roadway cross-section for the PRO,fECT. 3 (SP 6.21) The CONSULTANT shal1 use conventional ground survey methods to obtain topographic information for design of the PROJECT. 2.4 (SP 6.221 The work outlined in Sections 6.22a, b, and c will not be required for this PROJECT. 2 5 (SP 6.23) The work outlined in Sections 6.22a, b, and f wilL not be required for the PROJECT. 2.6 (SP 6.24) Delete this work since a centerline survey plat is not required for this PROJECT. 2.7 (SP 6.31) The work outlined in Section 6.31 is not required for this PROJECT. (SP 6.32) Delete 6,32 and insert the following in its place: The CONSULTANT will contact the utility com- panies and coordinate the required utility adjustments. The design and plans for utility adjustments will be prepared by the respective utility companies. 2.9 (SP 5.42) Delete 5.42 since structure plans are not required for this PROJECT. 2 82 MCEO39 -4- 2.10 (SP 6.45) The last sentence of this section is mod- ified to read 'rThe CONSULTAN? will enter unit prices and accumulate costs". 2.11 (SP 6.47) The work outlined in Section 6.47 will not be performed by the CONSULTANT. 2,12 (SP 6.48) The work outlined in Section 6.48 will not be performed by the CONSULTANT. 2.13 (SP 6.49) This work is deleted. Staking of right-of- way Iimits r,ri11 be performed by others during the construction phase of the PROJECT. 2.14 The CONSULTANT sha1l furnish the VILLAGE, for transmit- ta1 to IDOT, the following documents, plans and copies thereof: a) Preliminary Roadway Plans: 4 sets of prints b)Final Contract Plans: Mylar Reproducibles (36" x 22"1 and 1 set each of prints and sepias c)Special Provj-sions: Original typed on forms furnished by the DEPARTMENT d)Estimate of Time: original typed on forms fur- nished by the DEPARTMENT e) The VILLAGE will be furnished two (21 copies of the above items for their records. Estimate of Cost: Original with prices without prj-ces typed on forms (8t" x nished by the DEPARTMENT. and 1 copy 11" ) fur- MCEO 39 -5- 3. The VILLAGE agrees to furnish the following items: A11 presently available survey data and information, includ- j-ng standard details and standard specifications adopted by the VILLAGE, and other available data useful to the r,/ork being done by the CONSULTANT. 4. Project Schedule The CONSULTANT shal1 commence work on Phase II within five (5) calendar days after date of authority to proceed. The work will be completed and delj-vered to the VILLAGE and the DEPARTMENT within 90 calendar days after notice to proceed. The PROJECT is to be ready for a tlal. ch 27, 1986 contract letting scheduled by the DEPARTI,IENT. 5. Prime Compensation 5 I Phase 2 - Design and Preparation of Contract plans: Subject to an Upper Limit of Compensation of $74,871.00, the CONSULTANT sha11 receive as fu11 payment for completing the Phase II work required of him under this AGREEMENT reimbursement of his eligj-ble actual costs in accordance hrith Secti.on 2.45 of the STANDARD PROVISIONS, plus a Fixed Amount of $7,860.00. The Upper Limit of Compensation is a result of the Cost Estimate of Consultant's Services, attached as Exhibit D. The retainage provisions contained in Section 2.42 of the STANDARD PROVfSIONS shall not apply to Direct Non-Salary Costs. The attached Exhibits A, B, and C are to be used as set forth in Section 2.42 of the STANDARD PROVISIONS. Invoices shalI be prepared in accordance with Section 2.4L. 2 The Prime Compensation may be increased or decreased by subsequent agreement between the contractual and 5 McE039 -6- 5 approving parties if there is a major change in the scope, character or complexity of the work. Prime ComDensation and Specific Rates for Extra Work may be adjusted in accordance erith Section 2.2L of the STAN- DARD PROVISIONS, if the duration of the work j-n any phase extends more than six months beyond the date of compJ.etion stated in Section 4 of this AGREEMENT, due to no fault of the CONSULTANT. 3 In all instances where the VILLAGE shalI request specific services of the CONSULTANT, the CONSULTANT prior to commitment shall indicate to the VILLAGE whether the work shalL be considered ,extra workn. When requested by the VILLAGE, the CONSULTANT sha11 prepare and submit a cost estimate for such extra work. In the event the CONSULTANT, upon written order from the VILLAGE, is required to perform Extra Work, he sha1l, in addition to the Prime Compensation, receive payment for such Extra Work on the following basis: Subject to a pre-agreed Upper Lirnit of Compensation for each item of Extra Work, the CONSULTANT shall be paid at the specified hourly rates of pay for each class of employee as listed in Exhibit for the actual time the CONSULTANT directly utilized each such employee on the Extra Work, plus the CONSULTANT'S payroll burden, overhead costs as Iisted in Exhj-bits B and C, plus actual expenses for transportation, subsistence r and electronic computer service incidental to the Extra Work. Any other expenses incurred j-ncidental to the Extra Work shall be consi-dered to be overhead costs. I'lCE 0 3 9 -7- D(}{IBIT A HqJRLY EATE BANSE CCI{SULTA}II I S REHJI,AR SAAFF gNSSEIq\TIC}I kircipal- Ergireer ProjecE l4arager Resident Enqjneer StjucEura]. hgineer Survey Gdef kojece Egi.rteer Design Egijreer Construction Elgfureer Technician/Sunrey & oonstrucEion Senior DrafEsnan/Tedudcian Drafters Cleric.al fi{crd Processor Date: llay 1, 1985 FRCI{ 918. 00 17. 00 11.00 15. 00 10. 00 11.00 9. 00 9.00 7.00 11.00 6. 00 6.00 $3s.00 21. 50 19. 00 21.50 16. 00 17.50 ls.50 17.50 14. 00 ls. 50 13. 00 11.50 1I) CEET,-8- HIBTT B PAYROLL BURDEN & ERING CO TS Federal InsJrarce Contri.butions Act State Unqrplo!'rEnt Corpeasation. Fedelal Unarplo!/I(ent Capensation. lqcrlqrEn I s Ccxq>ensation Insu€nc€. Paid Holi<iays, Vacation, Sick I-eave. Bonus and Incentive Pa!'trEnts. . Qualified Deferred Retj-rsrent Benefits. Gnoup InsuGnce ICNET, PNYNOTA BURDEN & FRI]GE C6TS Source: Piscal Year Enahg 05/31/84 e of Direct Producti-ve Payroll 9.95 3. 70 0. 73 0 -72 t2.84 6.62 10. 54 7.97 53. 08t CFET?-9- DGIISIT C O\IAHEAD AIID INDIRffi CG'IS Cr-r+^ Thffi rrqvad t of Di-rect Productive Pavroll 0. 14 4. 85 '16 1'7 1. s3 2.78 0.73 1)1 14. 17 1.43 0. 90 0.L2 0.85 L.44 6. 10 0. 93 0.62 Depreciation. 3. 38 Busi-ness Insurance, ircluding accident, Iiabifity ar:rC valuable papers. Ir':dilect SalEries - A&nillistrative, Secretarial, t€sserger, Contracts, I€gotiations, Proposals, IJnassigrnble Staff Ti:re, and Professional- &iucation.... Reproduction and Prjllthg Costs.. office Supplies Data Processjng kofessional Senrices i.ncludi-ng legal and Accountj-ng. Elrployees ltatel, Business !&eti-ngs, ard ke<ontract E<oenses. Ttelephone and Postage. . BecruitJag arvi Felocation Elpense. TYaid-ng arxi ECucational Ncn-Salary E<pense. Eees, Licenses, Dles, F.rblications, (Ttechn-ical and ProfessionaL) Utilities and l"h.i-ntenance rtF;'i ^a D6h+ Elrployee Relations. Other D<per:ses. . . .. .. TOIAL O/MHEAD Source: Fiscal Year eding 05/31/84 ctf/-,-10- 81. 97r Route I11. 83 COgt ESTIMATE OE CCIISULTAI.II I S Sm/ICES P}IASE II E}{GINEERI}iG !turdelein Road (I1. 83) Lake-Cook Road to Buffalo Grove Road Proj ect. County Iake Job tto. Consultant: I'Iidrest Consul ].neers Inc Date:10/1.5/85 Doltars ($) llunber of l'lan Horlrs (A) Overhead & Frirge Benefits In-Itrcuse Direct C-iosts (D) Sub-lbtaI l,Iet Fee (a Senrices iby: Otlers :(c) : Grand Tlotal (r) { yroPa I1 lbta I (l I)Itern .EA ndurn & Base P 3. Soils g Bznt. Desi Pre Contract Plans 315 2BO 3,834 1 t216 : ls C) 1 5 178 (B)(E) 3,091 87 (F) 395 1 150 30 72 38 30 70 48 4.7 37 4.5 ) B 4 1 5 4 2 4 5 7 :1 508 484 07 686 654 2 801 27 350 400 o 4 37, 650 4 76 194 r52 r.38 145 5 275 ')) 0 4,000 : 5 145 42 ,47L 83 97 66 56.7 9 7 0 7 6 &g, 6. Field &c Plan F P1ans 2t, & Est. i 126 :3,961 : Tbtals 1964 :$26 ,201 35,385 : $s L,425 $63,011 $7,860 $4,000 : $74,87), : 10O.0 I I (a) Description of Services: Item 3 - Soil borings, cores, and report by Soits Consultant I,rEo3 9 E)G]IBTT D Section 80-00024-0O-RP " Dl$Ier*r 0cr 24 i985 Uo AzuD f ,