Loading...
1985-09-09 - Resolution 1985-45 - APPROVING AN IGA FOR THE CONSTRUCTION AND OPERATION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF LAKE-COOK RD AND LEXINGTON DRRESOLUTION NO. 85-45 A RESOLUTION APPROVING AN IMERGOVERNI.IENTAL AGREEMENT FOR TIIE CONSTRUCTION AND OPERATION OF A TRAFTIC SIGNAL AT TIIE INTERSECTION OF LAKE-COOK ROAD AND LEXINGTON DRIVE WIIEREAS, the Vlllage deairea to ioprove traffic safety by causing trafflc slgnals to be lnstaLled and operated at the lntersectlon of Lake-Cook Road and LexlngtoD Drlve; NOW, IBEREPORE, BE IT RESOLVED, by the Presldent and Board of Truatees of the Vlllage of Buffalo Grove, Cook and Lake Countles, I1llnol8 ag followa: 1. The Letter Agreeoent proposed by the Cook County Hlghrray Departnent dated August 23, L985 i.s hereby approved. 2. The Vi.llage Presldent ls hereby authorlzed and dlrected to execute the Letter Agreenent on behalf of the Vlllage. A copy of sald Letter Agreement la attached hereto and nade a part hereof. AYES:6 - ldarienthal, o'Rellly, Glover, Reld' Shields, Kor.ralski NAYES:0 - None ABSENT:0 - None PASSED:SepEember 9 1985 APPROVED : ATTEST: Vll1age Clerk e-I."^ Vlllage Presldent --?4 GEOi6E W. DUll E, Pr.rtd.nr lo.id ol Count, Commi.tion. .-.2".-._..\ v //' ( () t) .,,.-\.- ,COUNTY OF CCOK./')/ -- - .,\c'\DEPARTMENT OF HIGHWAYSi'I 'l.-:'",': i'--i l couNTY BU lLDt ilG. I m TH Ew lr. BIE SZCZAT, Ch.irm.n Committ. G on Ro.dr.nd Brid t. rII8,Ii O RTH CLARK STR E ET cxrcl'co, tllrnot s 60602 {t lt OFFICE ot th. SUPEnInTEXOEXt Ms. Verna L. Clayton, Village president Vi11a9e of Buffalo crove 50 Raupp Boulevard Buffalo crove, Illinois 60090 Attention ! Mr. W.R. Balling, Vi11a9e l,tanager Dear Ms. Clayton: hereinafter called s 94 ,000 Re: Lake Cook Road at Lexington DriveTraffic Sigmals Section 85-A50I6-OI-TL Village of Buffalo croveLetter of Agreement This letter of Agreenent_ is to bind the party represented or described a.bove(hereinafter called ,,Applicant,') and rte'co;ty of cook (hereinafter calledcounty) to the traffic sign,als instarration Jelcri.u.a as forlows:Fully activated traffic signar system at the intersection of Lake-cook Roadand Lexington Drive, pleemption for emergency vehicle, county poricy, at intersecti-ons of county highways and municipal stleets, isthat nunicipalities are to bear a share ir tie rroiect instar-Lation anc ogeratingcosts, represented by the lerative number of ]egs of the intersection which arethat municipality's responsibilities , wittr resfec*- to the total nr:mber ofintersection legs. Accordingl!,: 1. County will design and install the project, cause it to be maintai.ned andenergized, and be responsi.ble for settings and timings. the Project.The Projectrs preliminary cost estimate is Appricant will pay its share as determined. above (estimated at s 23,500) ), of the project contract costs. county will send a first statement fcrone-eiqhth (r2lt) of the project contract price at time of contract award,and a second statenent for the balance of Applicant's share of the contractpricer (adjusted, if necessary) folrowlng in'slect:on of the coxipreted project.eppucant shall pay each statenent within thj.lty (30) days of it" d"t". AI"o,after the completed prcject inspectj-on, Agplicant wiLl:a. Pay County one-fourth (25t) being one-fourth (25t) of traffic sigrnal costs (Plus fu]l cost of emergency preemption) of the nai ntenance charges, within thi:ty (3C) days of Countyrs quarterlt(3 month) statement for same, pLus the full cost of the emergency preemption installation August 23, I9B5 b. Assune electri ATTEST3 -\.I' ' , j' village clerk Tn 9""9r..^ ACCEPTED BY APPI.,ICAI.IT : VILI,AGE OF BUFFAIP GROVE vi11a Presi.dent one fourth 252 of thecalenergy c s, payable to Combnsrealth Edison Company inaccoldance rrith an eLectlical services contlact to be entered into withthat Company and County. 3. AppLicantr s payaents to'county of its share of the contract and mai.ntenancecharges shall be by check, payable to the Treasurer for Cook County fordeposit in County's Motor Fuel Tax Account 600-570, and, sent (or delivered)to the County Superintendent of Highways. If Applicant concurs in the above, the original and copy of this Letter ofAgreement should be returned to this Department, each with the attested sj.gnatureof Applicantr s chief executive belorv, and each vrith an enabl.ing resoluti-on orofficLal minutes of AppLicant I s executive board. attached, authorizing thatsigmature andl Applicant I s ass,mi.ng its obligations herein. This Dep;rtment wilrpresent this Letter of Agreement to the Board of county corurissioneis with aResolution to be attached and nade part hereof, which wi.ll authorize and bind thecounty of cook and Applicant, their respective successors and assigns, to theirrespective oblj-gati.ons herein. ?he Resolution date wi.rr be the effective dateof this Letter of Agreement. This Letter of Agreement sharr be voidable in eventCounty does not award a contract for the project within four years of theResol-ution date.-. Very truly yours, Richard H. Golternan. SuperintendenE. of llighvrays 3h-e --Carllty .of Cook By Nane & Title Byi Na$e & Title /4a-*-