Loading...
1984-02-21 - Resolution 1984-10 - ACCEPTING AN AGREEMENT FOR SUPPLEMENTAL PHASE 1 ENGINEERING SERVICES FOR THE PHASED IMPROVEMENT OF BG RD FROM LAKE-COOK TO IL. RT. 83RESOLUTION NO. 84-10 A RESOLUTION ACCEPTING AN AGREEMENT FOR SUPPLEMENTAL PHASE I ENGINEERING SERVICES FOR THE PHASED IMPROVE;'IENT OF BUFFALO GROVE ROAD FROM LAKE-COOK ROAD TO IL. RT. 83 WHEREAS, the President and Board of Trustees of the Village of Buffalo Grove desire to cause the implementation of the phased improvement of the intersection of Buffalo Grove Road and Il. Rt.83, and; WHEREAS, the approval of an agreement with a consulting engineer is required in order to proceed with the necessary engineering of the project; NO[,J, THEREF0RE, BE IT RES0LVED by the President and Board of Trustees of the Village of Buffalo Grove, Lake and Cook Counties, Illinois that the President and Clerk be, and they are hereby authorized and directed to execute the letter agreement dated February 9, I9B4 re: "Buffalo Grove Road/Il. 83 Intersection Improvement" which relates to the phased improvement of Buffalo Grove Road from Lake-Cook Road to Il. Rt. 83. A copy of said letter agreement is attached hereto and made a part hereof. AYES: NAYES: ABSENT: PASSED: 6 Marienthal, Stone, OrRei1ly, Hartstein, clover, Reid 0 None 0 None February 2l 1984 AP PROV ED age res i den t ATTEST VJ a ge C erk Pro Tem \J Midwest Consulting Engineers, lnc. 5151 North Harlem Avenue . Chicago, lllinols 60656. (312) 792-11m February 9, 1984 Mr. Gregory P. BoysenDirector of Publi-c WorksVillage of Buffalo Grove 50 Raupp BoulevardBuffalo Grove, Illinois 60090 Reference: Buffalo crove Rd. /IL. 83Intersection Improvement Dear Mr. Boysen: work Item Enclosed is our Proposal /Agreement to furnish Engineering Ser-vices for preparation of the Addendum to the EnvirorimentalAssessment and Combined Report for Buffalo Grove Road fromLake-Cook Road to Aptakisic. The Addendum is reguired todocument the decision and receive IDOT appioval tostage-construct the improvement by constructing only the IL. g3 intersection with the 3-lane approaches at this-tj.me.- The scopeof work is outl-ined below. Manhou r s Requi red Traffic and Capacity AnalysisPrepare Intersection DesignStudy Plan Prepare Addendum Report The fee for this work willIabor costs times a factorbenefits and profit. TheS1,683, developed as folLows: 32 L2 AE on the basis of actualc-over overhead, fringefor the work will tie 4 Tota I be chargedof 2.7 2 to maximum fee 48 manhours x S12.75 avg. salary rate x 2.72 = $1,6g3 Mr. Gregory P. BoysenDirector of Public WorksFebruary 9, 1984 Page 2 The Addendum will be completed no later than March 14, lgg4,based on receiving Village authorization by February 22, L9g4. If this Proposal /Agreement isreturn one (1.) copy to us. acceptable, please sign below and Very truly yours, Midwest Consulting Engineers, Inc. rJH/dh- 2 0 Enc 1o sure Accepted By: Date 2 Z z/ +*^))+-",**. Thomas J. Hi{fter