1982-01-18 - Resolution 1982-04 - APPROVING AN INTERGOVERNMENTAL AGREEMENT FOR THE PHASED IMPROVEMENT OF BUFFALO GROVE ROAD FROM IL RTE 83 TO LAKE COOK RD. RESOLUTION NO . 82 4 A RESOLUTION APPROVING AN INTERGOVERNMENTAL AGREEMENT FOR THE PHASED IMPROVEMENT OF BUFFALO GROVE ROAD FROM IL . RT . 83 TO LAKE-COOK ROAD WHEREAS , the Village of Buffalo Grove desires to facilitate the improvement of Buffalo Grove Road from Lake-Cook Road to I1 . Rt . 83 to meet existing and future vehicular and pedes- trian traffic demands ; and , WHEREAS , at the request of the Lake County Highway Depart- ment and the Village , the Village ' s consulting engineers have developed a phased improvement which is preferred by the Lake County Highway Department over the initial construction of a project fully capable of accommodating the projected twenty year traffic demands ; and , WHEREAS , the phased improvement is adequate to accommo- date existing traffic and represents an improvement over existing conditions while also being compatible with the future phased construction of the ultimately required improvements ; and , WHEREAS , the phased construction results in initial cost savings thus making it more feasible for rapid construction ; NOW , THEREFORE , BE IT RESOLVED , by the Village President and Board of Trustees of the Village of Buffalo Grove that the agreement for the phased improvement of Buffalo Grove Road from Lake-Cook Road to Il . Rt. 83 with the County of Lake , a copy of which is attached hereto and made a part hereof , is hereby approved . The Village President and Village Clerk are hereby authorized and and directed to execute the agreement on behalf of the Village . AYES : 5 - Stone, O'Reilly, Hartstein, Gerschefske, Schwartz NAPES : 0 - None ABSENT : 1 - Marienthal PASSED : January 18 , 1982 APP ' i + ED : irrtg7—p7.- eSitn:61;?;44:-' ATTEST: T - V i 1 g e ,C l.er k_ ' 7 AGREEMENT THIS AGREEMENT, entered into this I 814' day of , A.D. , 19 ,P4 by the COUNTY OF LAKE o the State of Illinois, hereinafter called the COUNTY, and the VILLAGE OF BUFFALO GROVE, acting through its PRESIDENT AND BOARD OF TRUSTEES, hereinafter called the VILLAGE. WITNESSETH WHEREAS, the COUNTY and the VILLAGE, in order to facilitate the free flow of traffic and insure safety to the motoring public, are desirous of improving approximately 0.7 mile of Buffalo Grove Road (FAU Route 2657 ) from north of Lake-Cook Road (FAU Route 1270) to and including the intersection of Mundelein Road ( Illinois Route 83 ) in the Village of Buffalo Grove and unin- corporated Vernon Township, Lake County, Illinois, Village Section 79-00019-00-PV and COUNTY Section 79-00081-02-PV, by making the following improvements : A. Widen and resurface Buffalo Grove Road from the existing two- lane roadway to 60 feet (edge to edge) to provide two 12-foot traffic lanes in each direction separated by a 12-foot painted median; -1 - B. Widen and reconstruct the existing two-lane roadway on Illinois Route 83 to provide four lanes with left-turn lanes and channelization at its intersection with Buffalo Grove Road; C. Construct curb and gutter throughout and a storm sewer system to accommodate the improvements; D. Construct a sidewalk along the west side of the proposed road- way. E . Construct a bicycle path along the east side of the proposed roadway; F . Install traffic signals at Buffalo Grove Road and Illinois Route 83; G. Install street lighting along the improvement; and by performing all other work necessary to complete the improvement in accordance with the approved plans and specifications, hereinafter called the PROJECT; and, WHEREAS, the Federal Highway Administration, on November 6, 1981, made a "Finding of No Significant Impact" determination for the PROJECT; and, WHEREAS, the Federal Highway Administration has authorized and the Illinois Department of Transportation has approved, on November 30 , 1981, the Phase II preliminary engineering services required for the PROJECT; and, -2- • WHEREAS, the COUNTY, on December 11, 1979, the VILLAGE, on December 17, 1979, and the Illinois Department of Transportation, on January 28, 1980, entered into a Joint Agreement for Preliminary Engineering outlining the financial participation in Phase I and Phase II engineering; and, WHEREAS, the COUNTY and VILLAGE desire to construct the PROJECT in two (2 ) stages as follows: STAGE I A. Widen and resurface Buffalo Grove Road from the existing two lanes to 36 feet ( edge to edge) with 4-foot paved shoulders, including a 12-foot painted median; B. Realign, channelize and signalize the Buffalo Grove Road and Illinois Route 83 intersection and realign and channelize the Checker Road intersection, as proposed in the approved Environmental Assessment and Combined Report for the PROJECT; C . Construct all major drainage facilities to be compatible with the ultimate improvement. Only the construction of curb and gutter and appurtenant drainage structures will be deferred until Stage II . In the interim, surface drainage will be collected in a system of shallow drainage ditches which will flow into the new storm sewer system; -3- D. Construct the proposed sidewalk on the west side of Buffalo Grove Road and the bikeway on the east side between the southerly project limits and Checker Road, and along the Commons Unit 1 subdivision and the Amoco Service Station, and the proposed sidewalk and bikeway along Illinois Route 83 between its project limits; E. Install street lighting at the intersections of Buffalo Grove Road with Checker Road, Common Way Drive and Illinois Route 83; F . Acquire the necessary right-of-way on Buffalo Grove Road between the southerly project limit and Checker Road and on Illinois Route 83 between its project limits. STAGE II A. Construct the additional two (2 ) 12-foot lanes with curb and gutter on Buffalo Grove Road to provide 2-lanes in each direction. B. Construct inlets, catch basins, manholes, and necessary storm sewer connections to the main drain to complete the enclosed storm drainage system; C. Construct the proposed sidewalk and bikeway on Buffalo Grove Road between Checker Road and the Stage I termini ; D . Install street lighting on Buffalo Grove Road between the intersections of Lake-Cook Road, Checker Road, Common Way Drive and Illinois Route 83; E. Obtain the necessary right-of-way between Checker Road and Illinois Route 83 ; and, -4- 40 WHEREAS, the VILLAGE 'S Board of Trustess , on October 26, 1981 has concurred in said construction staging of the PROJECT; NOW, THEREFORE, in consideration of the mutual convenants contained herein, the parties hereto agree as follows : 1 . The VILLAGE agrees , at its own expense, to cause to be prepared the Stage I plans , specifications and estimates and to obtain all necessary right-of-way for the PROJECT. The COUNTY , the Federal Highway Administration , and the Illinois Department of Transportation will reimburse the VILLAGE for a portion of these costs as hereinafter stipulated . 2. The COUNTY agrees , at its own expense, to furnish the resident engineer together with the Stage I construction engineering , proportioning of materials and inspection during the construction of the improvement, provide acceptance sampling and testing of materials in accordance with the specifications , Project Procedures. Guide and methods prescribed by the Illinois Department of Transportation , and cause the PROJECT to be built in accordance with the approved plans , specifications and contract. The VILLAGE , the Federal Highway Administration , and the Illinois Department of Transportation will reimburse the COUNTY for a portion of these costs as hereinafter stipulated . -5- 3. The VILLAGE agrees to acquire right-of-way in accordance with the Illinois Department of Transportation require- ments. 4 . The VILLAGE and COUNTY agree to enter a JOINT AGREEMENT for CONSTRUCTION of the STAGE I PROJECT with the Illinois Department of Transportation, in accordance with FAUS procedures. 5. The VILLAGE and COUNTY agree to construct STAGE II of the PROJECT as a future FAUS project if and when traffic volumes warrant the improvement. In the meantime, the VILLAGE shall secure right-of-way and financial contribu- tions from the future developers of the undeveloped land along Buffalo Grove Road for construction of the afore- mentioned STAGE II improvements. The undeveloped land is located between Checker Road and approximately Common Way Drive. 6. The VILLAGE and COUNTY agree that the financial participa- tion for the PROJECT shall be as follows: -6- . STAGE I • A. Buffalo Grove Road from Lake-Cook Road to Illinois Route 83 Item Federal County Village Construction 70 .21% 19.86% 9.93% Right-of-Way 70. 21% 19.86% 9.93% Engineering - (Phase II & III ) 70 .21% 19.86% 9.93% B. Illinois Route 83 Intersection Legs Item Federal State County Village Roadway & Drainage 70 .21% 29 . 79% 0% 0% Traffic Signals 70 . 21% 14.895% 9.93% 4.965% Sidewalk & Bikeway 70. 21 % 0% 0% 29. 79% Right-of-Way 70. 21 % 29. 79% 0% 0% STAGE II A. Buffalo Grove Road from Lake-Cook Road to Illinois Route 83 Item Federal County Village-Developers Construction 70 . 21% 29.79%* Right-of-Way 0% 100% Developer Engineering - (Phase II & III ) 70. 21% 29 .79%* *Remaining costs after Developer contributions shall be split 19 .86% County, 9.93% Village. The Village will seek developer contributions in excess of 29 .79% 1 -7- 7. This Agreement shall be binding upon and inure to the benefits of the parties hereto, their successors and assigns. ATTEST: VILLAGE OF BUFFALO GROVE 4::±_I '1. 4L.L{S�j 1 L11t i - Village Clerk By 1%6:IL President SEAL 1 , 19 gilmem ATTEST: COUNTY OF LAKE County Clerk By Chairman, County Board 19 -8-