1982-11-01 - Resolution 1982-48 - AN AGREEMENT FOR SUPPLEMENTAL ENGINEERING SERVICES RELATED TO A SEWER SYSTEM EVALUATION SURVEY r RESOLUTION NO . 82- 48 A RESOLUTION APPROVING AN AGREEMENT FOR SUPPLMENTAL ENGINEERING SERVICES RELATED TO A SEWER SYSTEM EVALUATION SURVEY WHEREAS , the President and Board of Trustees of the Village of Buffalo Grove desire to minimize any potential delays in obtaining a Federal Grant for the construction required to alleviate the problems identified in the "Sewer System Evaluation Survey Report" prepared for the Village of Buffalo Grove by Donohue and Associates , Inc . , dated July , 1981 ; and , WHEREAS , the Illinois Environmental Protection Agency has recommended that a supplemental evaluation of data which has been pre- viously developed be performed in order to minimize the potential for future delays in the process of obtaining the desired construction grant ; and , WHEREAS , the approval of an Agreement for Supplemental Engineer- ing Services is required in order to proceed with the further evalua- tion work which has been recommended by the Illinois Environmental Protection Agency ; NOW , THEREFORE , BE IT RESOLVED by the President and Board of Trustees of the Village of Buffalo Grove , Cook and Lake Counties , Illinois as follows : 1 . The letter agreement from David P . Tulp , P . E . , Vice President of Donohue and Associates , Inc . , addressed to the President and Board of Trustees of the Village of Buffalo Grove dated September 15 , 1982 a copy of which is attached hereto and made a part hereof is hereby approved . 2 . The Village President is hereby authorized and directed to execute the approved letter agreement . AYES : , 5 - Marienthal , Stone, O' Reilly, Hartstein, Gerschefske NAYS : 0 - None ABSENT : 1 - Schwartz PASSED : This 1st day of November ,1982 APPROVED : This 1st day of November ,1982 APPROVED : lag: President ATTEST : n \a 'V i 1 1 a!y--eC � � � ,^,✓���� ,.. Donohue September 15, 1982 Honorable President and Board of Trustees Village of Buffalo Grove 50 Raupp Boulevard Buffalo Grove, IL 60090 Attn: William Balling, Village Manager Greg Boysen, Director of Public Works Re: Contract Amendment Sewer System Evaluation Survey C172230 Gentlemen: We hereby propose to amend the Engineering Service Agreement, dated June 5, 1978 for the Sewer System Evaluation Survey for the Village of Buffalo Grove to include the following additional services: 1. Amend the infiltration/inflow transport/treatment unit costs used for the cost-effectiveness analysis of defects located in the Cook County portion of the Buffalo Grove sanitary sewer system. The amended transport/treatment cost shall include the capital cost for the existing MSD O'Hare Water Reclamation Facility. 2. Prepare an additional cost-effectiveness analysis of the sewer system defects located in Cook County using the transport/treatment costs discussed in paragraph 1. 3. Prepare a supplemental list of defects which become cost-effective to repair due to the adjustment in transport/treatment costs described in paragraphs 1 and 2. 4. Develop recommendations for any additional surveys which appear warranted due to the amended transport/treatment costs described in paragraph 1. 5. Prepare a report addendum summarizing the analysis and recommendations described in paragraphs 1 through 4. A discussion of the need for this additional work is presented in the letter of August 26, 1982 from the District to the Illinois Environmental Protection Agency to the Village. Donohue&Associates,Inc. 2354 Hassell Road Hoffman Estates,Illinois 60195 Engineers&Architects 312-885.0451 7 Donohii'e The estimated engineering cost for the additional surveys herein described is $21,432.00. The fixed fee shall be $2,880.00. We propose to present five draft copies of the letter report within 60 days of authorization to proceed and a final report within 15 days of receipt of comments from the Village. The Engineer will provide for use of the Owner and the reviewing agencies, a total of 15 copies of the final letter report. Very truly yours, DONOHUE & ASSOCIATES, INC. David P. Tulp, P.E. Vice President DPT/lw Enclosures ACCEPTED BY: ACCEPTED BY: DONOHUE & ASSOCIATES, INC. VILLAGE OF BUFFALO GROVE ATTEST: