1980-05-19 - Resolution 1980-25 - All preliminary (Phase1) engineering required for a project to widen and improve theRte 83 Lake Cook Rd Arlington Heights Rd . ' STATE OF TLLDIOIS Construction
- 5
RESOLUTION FOR IMPROVEMENT BY MUNICIPALITY
WNDF.R THr ILLINOIS HIGHWAY CODE
President & Board of Trustees
BE IT RESOLVED. by t1+01
..a sera nf the
Ccsia«
VillageBuffalo Grodve
- as,.Tow..re vm.eo
that the following described streets) be improved under the Illinois Highway Code:
Name at ZLwo.dldfae. awn 1,erd To
Mundelein Road I11.Rt.83 Lake-Cook Road Arlington Heights Road
•
BE IT FURTHER RESOLVED,
All preliminary (Phase I) engineering required for a
1. That the proposed improvement consist of
project to widen, reconstruct, resurface, and otherwise improve the roadway
•
*thxdtt
tX x
and shall be designated as Section 80-00024-00-RP loat "
2. That there is hereby p ted t sum Twenty-Four Thousand and no one hundreths'
xxxxxxxxxxxxxxxxx Doilxra ($24,000.00 3 ' `R ) forte
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
3. That said work shall be done by Contract and.
ooredtr Coined a Day Lbw) = x
BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the
district/regional office of the Department of Transportation.
x '• Janet M. Si rabi an Village Clerk
Mir
APPROVED I' • " can.Tare.or Woo)
in and for the Village - Buffalo Grove
nf
County Cook &'Lace`v>mse.) , hereby certify the foregoing
19 to be a true,perfect and complete copy of a resolution adopted by thePres i dent
a.prtmem of Transperreri.. and Board of Trustees at a meeting on
(Comadl or President..d Board d Trustees)
May 19, 80
. 19 • ry
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this
9 — May 80
•. District/Regional Engineer day of ,A.D.19
(SEAL) 6',�.i; wV-1)1.41.2i.,111
1age
Clerk.
(at,,Tm.or Mese)
Form SLR 414
.... _ _. _ .__— ,(Roy. 12-731