Loading...
2024-06-19 - Planning and Zoning Commission - Agenda Packet � BUFFALO GROVE PLANNING AND BUIFTALO ZONING COMMISSION Regular Meeting: June 19, 2024 at 7:30 PM Jeffrey 5. Braiman Council Chambers GROVE Fifty PP Rau Blvd Buffalo Grove IL 60089-2139 1 . Call to Order a. Pledge of Allegiance b. Roll Call 2. Public Hearings/Items for Consideration Public Comment is limited to items that are not on the regular agenda. In accordance with Section 2.02.070 of the Municipal Code, discussion on questions from the audience will be limited to 5 minutes and should be limited to concerns or comments regarding issues that are relevant to Planning and Zoning Commission business.All members of the public addressing the Planning and Zoning Commission shall maintain proper decorum and refrain from making disrespectful remarks or comments relating to individuals. Speakers shall use every attempt to not be repetitive of points that have been made by others. The Planning and Zoning Commission may refer any matter of public comment to the Village Manager, Village staff or an appropriate agency for review. A. Buffalo Grove Branding Presentation (Kelly Purvis, Deputy Community Development Director, Trustee Weidenfeld) B. Consideration of a Zoning Variation for the Purpose of Constructing a Three-Season Room that Would Encroach into the Required 30-Foot Rear Yard Setback at 1343 Logsdon Lane (Andrew Binder, Trustee Weidenfeld) C. Consideration of a Petition for Approval of a Lot Consolidation Plat, an Amendment to the Special Use and Preliminary Plan Approved by Ordinance No. 2019-036 with Variations from the Zoning Code to Allow a Combined Water Fill and Weigh Station and Construction of a New Surface Parking Lot on the Combined Area Fire Training (CAFT) Facility Property at 851 Krause Drive. (Kelly Purvis, Deputy Community Development Director, Trustee Weidenfeld) 3. Regular Meeting A. Other Matters for Discussion B. Approval of Minutes C. Chairperson's Report D. Committee and Liaison Reports E. Staff Report/Future Agenda Schedule Page 1 of 2 inairt.W'd-) heairt. 50 I5raupp Eflvd, Buffalo C'rove, Ills... 60089 °,,: 04.7-459-2SOO,,s vk.g.org F. Public Comments and Questions All comments will be limited to 5 minutes and should be limited to concerns or comments regarding issues that are relevant to Planning and Zoning Commission business. 4. Adjournment The Planning and Zoning Commission will make every effort to accommodate all items on the agenda by 10:30 P.M. The Commission does, however, reserve the right to defer consideration of matters to another meeting should the discussion run past 10:30 P.M. The Village of Buffalo Grove, in compliance with the Americans with Disabilities Act, requests that persons with disabilities who require certain accommodations to allow them to observe and/or participate in this meeting or have questions about the accessibility of the meeting or facilities, contact the ADA Coordinator at 847-459-2500 to allow the Village to make reasonable accommodations for those persons. Page 2 of 2 i rh uurt. ird Il ea it . 50 I5raupp L':3Ivd, Buffalo(-",xrove, IHI 60089 °,,: 84.7-459-2SG O,/,/s vi.g.org , m m VILLAGE OF BUFFALO GROVE m PLANNING &ZONING COMMISSION STAFF REPORT MEETING DATE: June 19, 2024 SUBJECT PROPERTY LOCATION: 1343 Logsdon Lane, Buffalo Grove, IL 60089 PETITIONER: Zach Zielinski, 575 S. Arthur Ave,Arlington Heights, IL 60005 PREPARED BY: Andrew Binder, Associate Planner REQUEST: A variation to Village Zoning Ordinance, Section 17.40.020, for the purpose of constructing a 3-seasons room that would encroach into the required 30-foot rear yard setback at 1343 Logsdon Lane. EXSITING LAND USE AND ZONING: The property is improved with a single-family home and zoned R- 6A: One-Family Dwelling District. COMPREHENSIVE PLAN: The 2009 Village Comprehensive Plan calls for this property and the immediate neighborhood to be single-family detached. PROJECT BACKGROUND ""'°O The Petitioner is requesting a variation to ����I' construct a three-season room that encroaches /,��W j into the rear yard setback at 1343 Logsdon Lane. The R-6A Zoning District requires a 30 rear yard setback and the proposed addition would encroach 4'-2" into the setback as shown in Figure 1. PLANNING &ZONING ANALYSIS • The proposed addition will be located in the rear yard of the subject property. • This proposed three-season addition measures 15' in length and 15' in width, .. Subject Property which is a total area of 225 square feet. The q ao'Setback proposed sunroom will be a one-story "� ••• - Proposed Addition addition with a height of 9-6 , which will not ; � exceed the height of the existing house. • This addition will encroach 4'-2" into the Figure 1:Subject Property required 30' rear yard setback and will be located approximately 25'-10" from the rear property line. The addition will be setback approx. 24'-7" and 25'-6" from each side property line, which meets the side yard setback requirements. Page 1 of 3 Page 3 of 73 • The Planning and Zoning Commission is allowed to ° grant variations for encroachment requests up to 33%of the 30'setback requirement. In this case,the proposed rear yard encroachment of 4'-2" constitutes 13.8/of the required rear yard setback and would fall within the PZC's purview to grant full approval. VARIATION(S) REQUESTED A rear yard setback variation from Section 17.40.020 of the Buffalo Grove Zoning Code to allow the encroachment of a sunroom addition. Figure 2:Rear Face of the House DEPARTMENTAL REVIEWS Village Department Comments Engineering& Building The Village Engineer and Building Staff have reviewed the proposed sunroom addition and do not have any concerns. SURROUNDING PROPERTY OWNERS Pursuant to Village Code, the contiguous property owners were notified, and a public hearing sign was posted on the subject property.The posting of the public hearing sign and the mailed notifications were completed within the prescribed timeframe as required.As of the date of this Staff Report,the Village has not received any inquiries regarding the requested variation. No objections have been filed. STANDARDS The Planning & Zoning Commission is authorized to grant variations of the Zoning Code pursuant to Section 17.52.040 and 17.52.070, based on the following criteria: 1. The property in question cannot yield a reasonable return if permitted to be used only under the conditions allowed by the regulations of the zoning district in which it is located except in the case of residential zoning districts; 2. The plight of the owner is due to unique circumstances; 3. The proposed variation will not alter the essential character of the neighborhood. The petitioner has provided a written response to the standards for a variation which are included in the attached packet. STAFF RECOMMENDATION Staff recommends approval of the variation request for an addition to encroach 4'-2" into the rear yard setback at 1343 Logsdon Ln,subject to the conditions listed in the PZC motion below,due to the following reasons: • The proposed addition is only 225 square feet,the size of a small accessory structure,which would be a permitted encroachment in the rear yard; • The addition complies with all other zoning requirements, other than the variance requested; • The addition will not impact any easements; • The addition will not alter the character of the neighborhood. Page 2of3 Page 4 of 73 ACTION REQUESTED The Planning & Zoning Commission (PZC) shall open the public hearing and take public testimony concerning the variation.The PZC shall make a final decision on whether to approve the variation. Suggested PZC Motion PZC moves to grant a variation to Village Zoning Ordinance, Section 17.40.020, for the purpose of constructing a 3-seasons room that would encroach into the required 30 foot rear yard setback at 1343 Logsdon Lane, subject to the following conditions: 1) The proposed addition shall be installed in accordance with the documents and plans submitted as part of this petition. ATTACHMENTS 1. Petitioner's Narrative 2. Petitioner's Response to Variation Standards 3. Site Plan and Architectural Plans 4. Photo of Rear Face of the House Page 3 of 3 Page 5 of 73 To the Planning and Zoning commission of Buffalo Grove regarding the proposed variance at 1343 Logsdon Ln: We are requesting a variance because we are trying to construct a 15xl5 3 season sunroom addition and a 15x12 concrete patio. The rear yard setback requirement is 30 feet, and the room would be 25 feet and 10 inches away.The hardship that will arise if the variance is not granted is that,the shape of the lot does not dramatically change the front yard, side yard, or rear yard; The lot shape doesn't prohibit the property owner from building an addition in a manner that would meet the setback requirements. Although,the undue hardship is that the property resides close and/or beyond the front-yard/rear- yard/east side-yard setback,meaning all but the west part of the lot has a chance for buildable space. The addition has no other place besides the west facade to reside. The practical difficulty complained of was not created as a result of any action taken by the resident or its predecessors in interest of the property which was unlawful, or which could have been reasonably foreseen to create difficulty in complying with the ordinance for future improvements. Page 6 of 73 'VILLAGE, OF BUFFALO GROVE m During your testimony at the Public Hearing,you need to testify and present your case for the variance being requested. During your testimony, you need to address the three (3) Variation Standards listed below: Criteria for Zoning Variation. A. The regulations of this Title shall not be varied unless findings of fact are made based upon evidence presented at the hearing that: 1. The property in question cannot yield a reasonable return if permitted to be used only under the conditions allowed by the regulations of the zoning district in which it is located except in the case of residential zoning districts; The practical difficulty complained of was not created because of any action taken by the resident or its predecessors in the interest of the property, which could have been reasonably foreseen to develop difficulty in complying with the ordinance or future improvements. The overall purpose of the zoning and building codes , which will always be highly regarded, goes beyond the variance presented. 2. The plight of the owner is due to unique circumstances; My family is really excited about adding a sunroom to our house. My kid's idea is to have a room that can be used throughout the year so we can enjoy nature.We love our neighborhood and don't want to move to a bigger house.Also,my kid will be with us for seven more years.That's why we are eager to have this sunroom,to create some wonderful memories.When I look at my property,the only suitable location for the addition seems to be the west side.A 1 0x1 0 room won't be big enough,so we are looking to build a 15x15 room. I also think that adding a sunroom will enhance the overall look of the house 3. The proposed variation will not alter the essential character of the neighborhood The suggested addition will not change the fundamental character of the neighborhood in any manner Page 7 of 73 M z 00 M�M W w LL w O y j v nQ J p - Z '^ U a_ W J m LL oz — w a N 0 0 U) ow o CD now N / ^ r� O ^ w �l w W z Quo = [ U a LL- U/ LL- w < x m 3AIV7 1[OQSJ07 W W O N O H w w H O K O¢ 's ¢ �W x H Y U¢ U Z F H o U m jo p W �pz Z w cs w o o 0¢ (a)M„£&£Oo00 s 98no 313aONOO ¢ a F z W U 2 Q W nn _ - w z J lV$A -9i3 �NOJJ-•., a_wawa m ¢ J �a w. > �¢Na O J W C'3 U Z O U >F w x UU p U wc Ama o J Z - ,0'LZ '�3NIl Ewicri is&Z ~w J mpa M way m o w w wxo w z W ?ap > cvwuu'i w LL w� o w w~o < oz_ wa � z \ a_3 z (�1 H Z M O I N W O in O Y HJ N�.z-i ZQ Z D o z w° 0 1 O Z w Z \\\\\\\\\\SIICIII1//////////� wO w�0b O UU ��\•.......... 00 Q U¢w W .' O � �: w w J p n LL K Q J ¢J �: O mw . va o W 9 LL W //U/1/1iIII ow ? O W z w Q >2 W Z M w F Y = L -- —— — — U U o U o -a 1N3W3SV3 3`JHNIVad 9 AlllLLfl OIl9(ld,4 ¢o ii w w w (a)3„££,£Oo00 N LL w ¢ �¢ U. iv ae LLw OZ� ou- �w zuljp z w o w 00 W o LL o a w¢ �z �zc� wLLan w _p a� p d(If w LL w Z �Ow �yQ ZYMf W Z- wZZ F Y ¢ F wZZ UJ N U ¢a w w C U C Y�— ¢aF ¢ ¢o w h 4 z¢ w= w�z w F?4 i �LLZ F p ¢ o J Hzz _ y ad wQ i 3 w ii a�x iowzvwi�r � � � O VA � dad mwmmms c+��>ww.z, w _o^ J 5z26 n lu n ii N=m - U W a K ry p¢ u ¢m ma w m I g w M z 0 N Q M� W w z 00 y> v nQ J o ^ U LL O 2 z J Ul J m LL J 10 W oz — w a N o 0 (n � W wCD0N � a N L ^ O v w zEl� w w� W � "t -i czn O < LL- Q LL wa n w m _ -UNV7 AlOQSDO7 O ~W O O F J x N O H O w O¢ LL s ¢ C) x H Y U Z U Z F H o Q m jo o W �oz Z w cs w o o 0¢ (a)M„£&£Oo00 S eano 31383NOO ¢ a F z W U 2 Q W nn _ - w z JlV$A9i3 aNOJJ-•., a-wawa m �¢Na O J W .:..W C'3 U Z O U >F w x wz p o �w -U. �N=ooQz o J Z ,0'LZ '�3NIl`JNI011f18 9Z ~w J moa i F waE2 c o c6 w.. W w o w z zQo Q Z w �6'8Z ((�� Q � �� wo wam it w F Y a W Y wa w - }� \ 3 U 0w IZMm-I o �'[1 ZC_I ZQ ❑ M\Offw? \ \N VOOZZ _ LLQ `1 Zw0 wWQ �\\\\SIIIII1//Z O �\ \ C /� . S%,-\O „b/� S-,SZ wm G ¢z� � UO OJ o � � �o�Uw O! Q � uz NI w m.I_ �Z� NFU Q MJ>�� = J w w 'L � a¢im 0Q za 0 oLL m. W¢o z O on a w �j'y''oa . \�Aw z z a U Z o'z o's w ���®0//////IIIII0CIDIII �\\ o _ z z z a W F Y = U U o U o -a 1N3W3SV3 3`JHNIVad 9 lllLLfl oI18(ld,4 F m /Ct ��� 9 (a)3,i££i£0o00 N W w ¢ oa w�o iv CL ww� OZ� OU� Nw zuljo zw o w O U_ W o Z o a w¢ �z �z� wW w ao O d� W LLw ZYw ZY`� lLLU ¢z �Ow �y OU ZYMf W Z- W ZZ F Y ¢ F W Z Z U J U J i V ¢ J ¢ O ¢ U Z o Q o Q o a w w C U C z FF ✓] >o F¢Q o O � oa Qz Z ¢aF ¢ ¢o w h 4 z¢ w= w�z w F?4 i - �LLryo Hzz F x ¢ o J _ y ad wQ i� 3 w ii66, a�x iowzvwi�r O VA � dad mwmmms c+��>ww.z, w _o^ J 5z26 II lu II it N_m - U W o¢ CV) 0 0 C-) m (D woo'sao!n@s@woqXAu@//:djjq 62009 11 0290'SOJ7'998 :XV3 A 0 L '3AOdO mviino C690*cze,z4e :301330 *M NOCIS003 2t72L 90009 'T 'S1HO11H NOiONI��IV SNOI—H -Juvcj E)NvJni iAv ?inHi2IV 'S 9Z9 ONW33NIDN3 SCID-AG NMVMCI 113/N/2 :31V0 31<)S S30IM3S 3VIOH AAN3 Q L,0 w �g LLI CD Z w P Q o CI C14 N o wpmft� LL 0 LL [Ij_j m 0 a CO z Y z LIj < < Lu Lu [Ij>- -j Lu Lu 7dw aw >>Ew w a- M Ljj LL z U) 0) �Ozo c? 0 U) co 0[If (D (D z < z z 0 �fflt m -j ....41) 0 F- z z LL LL < < z < ()D 0 < m -o 0 cr) LL 0 0 -J LI: 0- LU Ld LLJ z 0 ob LLJ LLJ Ln o Ld 0 �2<Lu LL, H z < F-- F-- Cl) 0 F-z:of U 0 a--J Q C) 0 LU !�E 0 z < < C/) 9 < z F)uj z C) 0-1 U- U- 0 LU 0 D D a- CO z LU > LU US Of LLj Elf r-, Z Z �2 0 �!wo LLI a_ 0 ❑ 0 < < x ll� D C) Lu LL Lu a- ate gppOTiF .TT���W of v) 6y m of L, z 2�� .) z, Ld E LLj 0 o t 3 w If ; LLIca CN co 'IT LO Qo I- w Iz, C), C/) U) D CD LU LLJ U)ci LLI CO Z z C) 0 w 0 U 0 DO < a_ LLJ —i LU Z z C) Ln > Z 0 LU 0 0 Er LL 0 a_ 0 LU 0 co 0 ch� 3: LLJ C-) co LLJ C) LLJ 0 -j z LLJ LU M 5 :ig 0 2 0 r4 L) 0 U") cn 0 C) rl) Z U) 0� U) LU 0 0 LLJ -<j > Z: z 0 < m U) W L) =) § 0 W Z - 0 0 (D Of LLJ 0� CD 0 < < W z CD cf) a_ Z 0 z z U) 1-- 0 _j < CD LLJ o o LL LJ < 0 LLJ cn M < < LL c=Q, Z Z Z LL LL CY C� Of 0 C) LLJ z <) 0 _j 0 0 0 w w — 1--< CD 0 -1 D D "4 cooc) tiQ z 0 _j LLJ a' CY) 7D z J J > > :5 U) D < N m I < M O 0 U m wo0,sao!n @sawogXAua//:d}}y 62009 11 0890'SOb'998 :XV3 raadlaOs3O naa 3NOZ L A Z `3AOdO mV33n8 £690'cL8'L48 :301330 *M NOOS003 2b2 L 90009 'T 'S1HO13H NOlONI�?IV SNOT—H -Judd ONV�jnl 3AV ?inHi2IV 'S 9Z9 ONW33NI`JN3 SOD-A9 NMMO bZ/ZZ/£ :31VO „0-,l=„b/l 31<)S S30IM3S 3WOH MN3 N O CO2 _' (nm W J W Z wQ=�W {g 30- 3\ Ofo— =J = �U�O=w tiJyy oo� ,p wwUJ �3= oz zz �g��vm o�p m3 ��aww=00 _ _ Q h 00 — QwUpw H �W Qo QmLdJwF- Z _ =W(n _ (n J O Z g Ld J O 0_w O_ ,y'; w _, „Z-,l Sao_ Noon§XZ—U�O Qm O Q pOZQ oJ�w HLL m�� •.c�vs ______ ng .Ol-,L _ 3� Y Q Q w m Q OLLj<Q U 0 U w Y F- J m U>' F-z Z Q a L` �DfO C7��m m"N unO JO o 0 W z z wU�6 mom O W W Q— W q Z �z W 3ZO U' z U O_J�W"'Q O_!n U_O D_' Nw W zzJ (n J F-u�z�w Q Q o Q w W 0 0>W�w H O z J p�Q J— O O H U p w O W=U H—J_ W of J J LLj Qmor (Z) Q— �m�z"oW zWw�oU m �oU WW pw�oz JJY Wa JJ O~wZUUULL W Z o � O F- Qz�wQ __P Lnw ocn wO w � o�Oz�z�4� o zO �� m Ld ¢�o p Uj J cn-(n � z HWI LLJ mowv) c wow0 Z.,zW NoZg� ===OWWQmO_p LLs wn . >wNW n>ZO J� Zz�LiUJ g J QUH m m O i ooU wQoo� ¢mzz:Jo,�Uo�-z JZOQ LLJ . w z_Uwd UO=U U� V7QU7� wpL mzoES o ¢w ~ LLJ ZQ�J d J W' oW o>-zm V Zw O w H Of < Jm'�z: Ld ¢ o_ � X0 W J O Q J Q Oam QQL tY�Q U JJUw!n LuJ W(n o cn w QQ O U~i Ol - (7 W 0_UJ Ul J3 W J—p3=p a¢ w W J g z Q w O J}~W= z 0�Q w m m W D'W F U o N >QJm�Qo cngQwo-Ucn—oo' WU �UO_3 — J N WO >¢ WUIZ Q3 O_ Z wo-go- Lj 0 0 HBO_ =3F-- QwJoW¢—W o3. Of:c O W O O Z W W W O_'W J W o I n Ld> W=z p Q ZO_L,H Z ZWO_O'NHZ SO_zmmcnmd —(nQ�v) Q=w I I 0 I Q I K cv i 3NO3 I NIW I „ol w� I H. I woo Fez I aw tOZO Z�a O O I Q I I > I J z Or' L 0 s-£ L� J I z - I o Q N o J w 'ONOO ry ' o W M3N Ol z� d'3'd �w (n .9 �N _ O/ wi a U J Z O U p 3 w a z OVd o a 'ONO3 81vis ND s „b �o Ol TH 1H013H a1ViS „L / % R q v m \ __� yd Gm, 3 s«,m _ A 2 `qe Ja2e C690U2,Zve M�d *m m:yJ RG °n/n \ /� �� saae __,e._, N/. _ mama 3WO, s ma um, AANu )\ :2 J F"o \( m, aK� m;:[ \(§ . Aw \\��\_\}z _):: )(\§ §}\ ° q y = MOCINIM 7MOONK tv j�\ = —\\oLLJ \ \z \ \ �z� o z.zJ G ` z xw j — — — — — — — - . , \ } y m: MOO_ /) \\ \\ ® (\\\ \ \\\\}E ® / - , z ) y m J§2 \ /w§� \ zo \ z j / /\\/§ \ \\\ « _ =�,r , ? \ ) \ OiNl"0 A�'3z a . m_. # m _ . q 0 m (0y) 0 00 m &D woo'sao!n@s@woqXAu@//:djjq m 62009 11 0290'gOJ7'992 :XV3 raaala�aI q3NOZ L AO V '3AOdO mviino C690*Cz2,z42 :301330 TANWSM12M WM9 IPMMM NMMMV ONvJni iAv ?inHi2IV 'S 9Z9 MWWOM WD--AG NMVM0 :31V0 3WOS 533MM 3WH AAN3 W.—AV 9--- ------------------------------ 0 -,go A A; �v, Llmrc u 0 C)U 73- __jIc E W kin 2 IN paw TL____ mLmI Ab No R 18' -al; 1 ps HUT to MINE d ET 9 .111L, JCLWHIMS local"Ha MHU 16111M " 11 i ,IsdS 1 M M Pay, A tW got"" 1 fill TOM tLl ply a U9 '22 HS son I mil 1Q. 1 Ed: not vp w It to a "I Onto q 12 no Mg G" !Q gig, 0 6p�s OQ 1 oil 1 1 1 MIN H sly a AH 11 - 91t in X 10 JIM 9*21114 0112 ji JIM to Ili 1 A—M1931m- AW g JI list Koo,; i to wills 1; all log! m3jm hyp .AN 'g d" MA a 11MA 11H Npg§ 1 &1 1 Not 15 it, 1 04; 1 1 R Apsyly: M1119H QRS J11AT 19 113H is IS goo 1 MUM Eno MINI MM to SHIP it Too 1 j 1 p, 1 1 A 11filif MM 51 N jil a @ QPN j;j 1 1 HIM 1 A Not 1 1 Q HIMS; got 151 11-0 HP it! 91 ­ 9 H9 21911ph Hip"Nings A 2 1HP21611 0"�� PL1,1g.1� ,H MOP z pip, TIMM an"60,n52" LL 2 PTIM - ---------------------------------------------------------------------------------------------------------- . . ..... m M O U m woo'sao!n @sawogXAua//:d}}y 62009 11 0890'SOb'998 :XV3 raaala�a naa 3NOZ ` AO 9 `3AOdO mV33n8 £690'cL8'L48 :301330 sNolsuaa �c.�dd *M NOOSOM 2b2l 90009 'T 'S1HO13H NOlONnJV ONHJnl 3nv anHiav 'S 9Z9 `JNW33NI`JN3 S0D-A9 NMMO bd/N/F :31V0 3WOS S301A?J3S 3WOH MN3 I U W J Z Ln ..o ® U IW O[� f J� d J U� cfzi� _a _ - o� zz0 O W u v w W sz\ J v o W U 7 n 3 W O a m x �3 t'iTWoi QWz m a1 d x W z LO d a W W x N z -Q1111B oNLLSIk3 _ rl O J � �'� _ � Z �e•1JJ` K Q O - a m aQ s�> `•tyU v v, Wz s w wo o Q T� N N u N 6 Z n r ow oy E E m $o a TE wa n�o M M aZ d �� yyy P U E 1 h0 ZZ.1 W j Z Q Q O J O WO z dam. O O3� Z. -o .3 o^ ZV2 � E N o o E° °a v� N �3 x Ana �vE- • e y • R. = o ag M n O O 00O0 N N N N F=O Q QO FAO O�� Wwx W Nz No m Q III � I I ��� I �� ���1JAlIlSYVll 2llY.,� �„✓� ���r r �� /1 J J ��� � � �f� 1„� I f �� f l I JI � � � �r i ,'� f � 1 � I 1 � � . i � �� ��� , 1 � � !o� I �� 1 �� 1 % �� � � 1r� I � ���r 1 f � ��ff% t �1 %oi, I f�,f i%�o i � 1 �� ii�r�llurrro��i�/aii///%nt�f��notllolrrlfailai� ��� /%%f/ I 1 r;, , , , ,fief ��i ����/%�'�� r1f�Yf�A'70JJ1+�DlYr+��l��l'1�J'c'%ii'. ` ,' �% %%�%lj%j r ////%� % ,/ o r�� / //�%� it /, D�' A �y � %l r �� ✓ f� �'l�/�� f��� f t l,i 'f'r' �'�f�f%%/�%%�'�� � I I r // �/ o%i �� �1���1,�//,,,/l= gar ,���� � I � � ��j�f%�jf ������� � ��III i������ ��r IIIII uu� �yu 1/ / / �` II G of � � r��� � � � l , ��r� r �� �� f �i//� � , ' I„ „ i � � / � � j � , '1 � � � l� ���r r f � �' � , I� �" .;>'� � � � ��%i` r �/�/ � �� j� � �� � �� � f , I r I l✓�� � r � ;,w�, J I �� r , ;1� ��a� ,,� �ry�. ,,,, ,�� �;,, r �t�.,�, �,� � ''� �' ,,, �t�:.,,� ;r; ' 'Lid„ , , rro� �1 � � ,� 1 � e,,, � ,, ,�,,,,���„�, �� � 1 i � � � :, ��� ��o' .���1 � .,; �,'(` d � � 1 �� 1, VILLAGE OF BUFFALO GROVE PLANNING&ZONING COMMISSION STAFF REPORT MEETING DATE: June 19, 2024 SUBJECT PROPERTY LOCATION: 851 Krause Drive PETITIONER: Kyle Johnson, Assistant Public Works Director & Village Engineer PREPARED BY: Kelly Purvis, Deputy Community Development Director REQUEST: The petitioner is seeking approval of a Lot Consolidation, an Amendment to the Special Use and Preliminary Plan approved by Ordinance No. 2019-036, and Zoning Variations from the Front Yard Setback Requirements to allow the construction of a combined water and weigh station and a surface parking lot on the subject property. EXSITING LAND USE AND ZONING: The property is improved with a 3,070 square foot building and is zoned I, Industrial District. COMPREHENSIVE PLAN: The Village of Buffalo Grove Comprehensive Plan calls for this property to be Public/Semi-Public use. BACKGROUND Director andVillage Engineer l \is the (� IIIIIIIII! �I� 111i Y petitioner on behalf of the Buffalo Grove Public Works Department for zoning approvals to construct a combined water fill and truck weigh station along with a surface parking � lot on the Combined Area Fire Training(CAFT)facility property.The site is just over 4.5-acres in area, zoned for Industrial Use, and is currently improved with a 3,070 � � 4 square foot building that is used as a Fire Department training facility. Figure 1.Site Aerial In order for the project to move forward as proposed, the following approvals are needed: a Lot Consolidation Plat,an Amendment to the Special Use and Preliminary Plan approved by Ordinance No. 2019-036, and Zoning Variations to allow the infrastructure for the combined water and weigh station to be constructed within the 50-foot front yard setback and to be closer to the street than the principal structure on the lot. ZONING HISTORY Through adoption of Ordinance No. 1996-35,the Village originally approved a Special Use for the CAFT facility, including a future phase for a permanent fire station on the property.The ordinance was later Page 16 of 73 amended through adoption of Ordinance No. 2000-053 to allow a temporary classroom facility for interim use before the permanent fire station would be needed. The Ordinance placed a 10-year limitation on the temporary classroom. The Ordinance was again amended in 2010 (Ordinance No. 2010-42) to allow the training facility to be used for another 10-year period. In 2019, the Village approved the construction of the existing 3,070 square foot building and removed the time limitation for the training use on the site by adoption of Ordinance No. 2019-036 (attached). PLANNING &ZONING ANALYSIS Use: Public facilities including Police Stations, Fire Stations, and Public Works Facilities are Special Uses in the Industrial District. The Comprehensive Plan calls for this property to remain a Public/Semi-Public use. The proposed modifications to the site require an amendment to the Special Use and the Preliminary Plan. Water Fill-Up& Weigh Station Operations: The Public Works Department has been looking for an appropriate location for a combined water fill- up and truck weighing station.The facility would serve both the Buffalo Grove Public Works operations (water fill-up station) and the Buffalo Grove Police Department operations (truck weighing station), with potential for access to be granted to adjacent local police departments. The use is somewhat seasonal for the water fill-up portion of the facility with most of the activity taking place from April — September. The weigh station would be used as needed and more intermittently by the Police Department for overweight trucks. The new facilities are anticipated to have minimal truck traffic, averaging one truck per day, with a slight increase during the summer months for the water filling station (potentially 6-7 vehicles daily) and no traffic in the winter. Both stations are designed to operate continuously throughout the entire day, with the ability to weigh one truck at a time and to accommodate up to three water trucks onsite for water filling. Water filling takes between 10-30 minutes per truck depending upon its size. The weigh station will function under police supervision, and the water station will be equipped with a self-service kiosk. Lot Consolidation: The site consists of 8 individual parcels currently. As a best practice the Village will be DEERFIELD PARKWAY consolidating the property into one lot as part of this project. Proposed Plan: ,' The Petitioner is proposing to construct the ° ^ combined water and weigh station on the CAFT facility property along Deerfield Parkway.A new � ^+ access drive would be constructed on Krause "T77 I ( ` . Drive with an exit onto Deerfield Parkway. In g addition, a new 25-stall surface parking lot is proposed to the east of the existing building on the site. ,u Variations: u, Variations will be needed to allow accessory F777at structures, including the water fill-up kiosk, weigh station kiosk, and weigh station scale, closer to the street than the principal structure. Figure 2.Site Plan A second variation is needed to allow the Page 2 of 6 Page 17 of 73 accessory structures and infrastructure (the one-way drive) within the required 50-foot front yard setback, where only landscaping is permitted. Staff is supportive of the requested variations due to the unique nature of the use and the minimal impact the infrastructure will have on the character of the area. Site Access& Traffic: As part of the project, two new access drives will be added to the site for the combined water and weigh station facility.A new access drive (entrance only)will be added off Krause Drive, approximately 65 feet south of Deerfield Parkway and an exit-only/right-out only drive will be added off Deerfield Parkway approximately 315 feet east of Krause Drive. The new access drive will have one-way circulation and will connect to the new surface parking lot to the south. The traffic study indicates this use will generate significantly less traffic than a standard light industrial use, which is typical for the area. As previously indicated, the combined water and weigh station is estimated to generate an average of less than one vehicle per day.These estimates were based upon historical records of water sales(and usage)and traffic violations for overweight trucks.The study does recommend posting a "Do Not Block Driveway" sign for northbound traffic, given the proximity of the Krause Drive entrance to the intersection.Staff concurs with this recommendation and has included it in the recommended conditions of approval. Lighting: One additional light pole is proposed as part of the project. The lighting will comply with the Village requirements. Landscaping: The landscape plan includes the installation of several new trees on the site plus some evergreen shrubs and annuals. There will be some trees removed in order to make way for the new combined water and weigh station.The Village Forester has been involved in the creation of the landscape plan. Signage: No additional signage is proposed as part of the project. Stormwater& Engineering: Stormwater for this site was accounted for under the original development of the site. The Village is taking a conservative approach (not taking credit for the previously disturbed area)and providing more detention than is required per the Watershed Development Ordinance. DEPARTMENTAL REVIEWS Village Department Comments Engineering The Village Engineer has reviewed the preliminary engineering plans and does not have any concerns. Forestry The Village Forester has reviewed the landscape plan and does not have any concerns. Fire The Fire Department has reviewed the preliminary plans and does not have any concerns. Building The Building Division has reviewed the preliminary plans for ADA compliance and does not have any concerns. SURROUNDING PROPERTY OWNERS Pursuant to Village Code,the surrounding property owners within 250 feet were notified and a public hearing sign was posted on the subject property.The posting of the public hearing sign and the mailed notifications were completed within the prescribed timeframe as required. As of the date of this Staff Page 3 of 6 Page 18 of 73 Report, the Village has received a few calls and emails with general questions about the project. No objections have been filed with staff at this time. STANDARDS Special Use Requests: The Planning & Zoning Commission is authorized to make a recommendation to the Village Board on requested Special Uses based on the following criteria: 1. The special use will serve the public convenience at the location of the subject property; or the establishment, maintenance or operation of the special use will not be detrimental to or endanger the public health, safety, morals, comfort, or general welfare. 2. The location and size of the special use,the nature and intensity of the operation involved in or conducted in connection with said special use,the size of the subject property in relation to such special use, and the location of the site with respect to streets giving access to it shall be such that it will be in harmony with the appropriate, orderly development of the district in which it is located. 3. The special use will not be injurious to the use and enjoyment of other property in the immediate vicinity of the subject property for the purposes already permitted in such zoning district, nor substantially diminish and impair other property valuations with the neighborhood. 4. The nature, location and size of the buildings or structures involved with the establishment of the special use will not impede, substantially hinder or discourage the development and use of adjacent land and buildings in accord with the zoning district within which they lie. 5. Adequate utilities, access roads, drainage, and/or other necessary facilities have been or will be provided. 6. Parking areas shall be of adequate size for the particular special use, which areas shall be properly located and suitably screened from adjoining residential uses, and the entrance and exit driveways to and from these parking areas shall be designed so as to prevent traffic hazards, eliminate nuisance and minimize traffic congestion in the public streets. 7. The proposed use will conform to all other applicable regulations of the zoning district, except the variations that are being requested separately. The petitioner's responses to each of the Special Use standards are attached for the Commission's review. Zoning Variation Requests: The Planning & Zoning Commission is authorized to make a recommendation to the Village Board on requested Zoning Variations based on the following criteria: 1. The property in question cannot yield a reasonable return if permitted to be used only under the conditions allowed by the regulations of the zoning district in which it is located except in the case of residential zoning districts. 2. The plight of the owner is due to unique circumstances. Page 4 of 6 Page 19 of 73 3. The proposed variation will not alter the essential character of the neighborhood. The petitioner's responses to each of the Zoning Variation standards are attached for the Commission's review. STAFF RECOMMENDATION Staff recommends approval of the Lot Consolidation, an Amendment to the Special Use and Preliminary Plan approved by Ordinance No. 2019-036, and Zoning Variations from the Front Yard Setback Requirements to allow the construction of a combined water and weigh station and a surface parking lot subject to the conditions in the Suggested PZC Motion below. ACTION REQUESTED The Planning & Zoning Commission (PZC) shall open the public hearing and take public testimony concerning the requests for approval of a Lot Consolidation, an Amendment to the Special Use and Preliminary Plan approved by Ordinance No. 2019-036, and Zoning Variations from the Front Yard Setback Requirements to allow the construction of a combined water and weigh station and a surface parking lot on the property located at 851 Krause Drive. The PZC should make a recommendation to the Village Board concerning the requests. Suggested PZC Motion The PZC recommends approval of a Lot Consolidation, an Amendment to the Special Use and Preliminary Plan approved by Ordinance No. 2019-036, and Zoning Variations from the Front Yard Setback Requirements to allow the construction of a combined water and weigh station and a surface parking lot on the property located at 851 Krause Drive subject to the following conditions: A. The proposed development shall be developed in substantial conformance with the plans attached as part of the petition. B. The Final Engineering plans shall be submitted in a manner acceptable to the Village. C. Any directional or incidental signage added to the site shall be reviewed administratively by staff. D. A "Do Not Block Driveway' sign shall be installed on Krause Drive in accordance with the recommendation of the traffic consultant. E. The Special Use is granted to the Village of Buffalo Grove to operate at 851 Krause Drive, which shall not run with the land. F. The Special Use granted to the Village of Buffalo Grove is assignable to subsequent petitioners seeking assignment of this special use as follows: i. Upon application of a petitioner seeking assignment of this Special Use, the Corporate Authorities, in their sole discretion, may refer said application of assignment to the appropriate commission(s)for a public hearing or may hold a public hearing at the Village Board. ii. Such assignment shall be valid only upon the adoption of a proper, valid, and binding ordinance by the Corporate Authorities granting said assignment, which may be granted or denied for any reason. ATTACHMENTS • Narrative Description Page 5 of 6 Page 20 of 73 • Consolidation Plat • Site Plan • Preliminary Engineering Plans • Landscape Plan • Photometric Plan • Light Fixture Cut Sheets • Traffic Impact Analysis • Truck Turn Exhibits • Accessory Structure Cut Sheets • Response to Special Use Standards • Response to Zoning Variation Standards Page 6 of 6 Page 21 of 73 � Fil �EWALU HAMUL*DN aASSOCIATES' INC~ May 30. 2024 C ON S U LT ING E N G IN E E H S h25 Forest Edge Drive,Vernon Hills,lL60V6| Im,847.478.9700 8 Fax847.478.9701 w~nw.&bu-coAiocc,a.com Re: Project: [AFT (Combined Area Fire Training) &VVeigh/VVater Station 851 Krause Drive, Buffalo Grove, |L 60089 GHA Project No. 4798.072 NARRATIVE STATEMENT/USE DESCRIPTION Village of Buffalo Grove is developing the existing CAFT (combined area fire training) facility with a new parking lot and consolidating the eight existing parcels into o single combined parcel. In pursuit of enhancing the existing facility, we are requesting a special use amendment and zoning variation. These requests are crucial for the addition of water-fill up station and truck weigh station infrastructure, both of which will significantly benefit the community. The zoning variation arises from the location of the proposed infrastructure, which falls within the standard yard setback. We propose a revised setback that ensures the integrity of the surrounding area and the functionality of the existing [AFTfacilitv. The new facilities are anticipated to have minimal truck traffic, averaging one truck per day, with a slight increase during the summer months and no traffic in the winter. The Police Department will primarily utilize the weigh station, with potential for access to be granted to adjacent local police departments. The Village's Public Works and contractors will be the main users of the water station. Both stations are designed to operate continuously throughout the entire do>\ with the ability toweigh one truck at a time and to accommodate upto three water trucks onsite for water filling. The weigh station will function under police supervision, and the water station will be equipped with a self-service kiosk. This project is designed with high regard for safety needs and community standards, ensuring that the facility continues to serve as a vital asset tn the Village of Buffalo Grove. Page 22 of73 pa. �a�����0000000 a - Lol zroJ C..eren.00s) ,Zl n*3„LI,LZ.00S � I I 1 I I oosol I I I T� I o q mh Ihel W I - I 2WU A 222 I I i I I kzl I I a I n 1 3 m 51 -77 I a I 3 00 a� �m U O m I y x Oy y I 3 I I= 2Wry l Ia 7` _ I , In W I x now b�W W LO u s s 2 O oh O 0 ^¢ oNW ® 3 �T oho _ p =oa �g I I 3rvn�rv,a],ne,u I a 11'6465Y3MVlJtH1YM �yo oo os m m�I ,BF'SLF M.Ol,OZ005 E- Lcrs rJ (Aoo,00.00s MA w _ Page 23 of 73 ?....... CC, M 1 Nfl-'g-'A ON Es" 4 2 4 �,V EEO 2' Rp- Q - u, p" pl� , -, I"" ,-� N2 4- q, MR p OV,ao =wa =g ap a - -A 8 n" off= " ,"i vV M N 12 A 2d, a�, M MR M", qg �R h H" A wh ";'M dml iHn, M cm U § I 'M 2— JON, A' 2V, 0 �4 T, � AN2 ..... 'N 16 Q� m'Wo 1-2 zk A� �M M" p,2 k, Ra N,�, R Ho n �NzH 2 GWU Opp B IIg O mn, �,H INP H4 W ajW�10pa 1 M, q I ° �: �� _ 8 1 � ° Spa o IVY J aka � � _ �� � � a _ °� +F Page 24 of 73 r � a � 0 I O g W i�G I I ~ O ❑ B � ® pa -ooa F RrcN w N III III®LLI - N I I —I—� -- -- ----------------r--� II I 3 I 1 1 N g I;SI p0 yYJ I I Z I I a w w ; w ono cc w IL° N'LL W Q b , I o � N m I.Z"i1I h , I I o > a c W I I a I Ig_ M o �e� E 06�--------Nt, 3AIHa 3snvu I rv.ii,oi ewi a s �asao-ioi ear.u�.�aa.��s„o�o�a�. oda o�.yoe ems.oo�.o Page 25 of 73 W r a o Z a O O �Q a F F w z W Z Z Z u w a o ° O w W Ppe o ° o p W W ov��i �i a� wSg W W rc o N o a F C C C u z ¢ z H N y N o o a �o wu Z w aJ-a �a Z 0 ® G a z o oaw. w F Z Z Z H LL � a0 a a US zo WCC J Za Z Z 0 z zww o_ o Z Oa a 2 -o Na Z w LL! ZV V a aNf ° e '00X2J y o- w z�d y a Z ~ ! Z � J C W W rL F $ p W W a J J J_ J_ Z W 0 X W F oC O O W Ft70 W a O0w0O vi 3 lIJ u o N r N fM a b (d IA OD O> �r Z z o ¢ z 9,E a >N F m a 1Om = Z a N > N>� ° NNo 0 o 0 V Z H m � Q� I� p QZr-N J � �Z ttl Q W J I U c �Jw� Imo W �;ao Ugoo w m Juw�w o o. tozw w FoUw 0 O Cy w ° ��za m v w a�w x �ax f ��� a a x�m 3 v t g LLI oa. y� aZ 0 LL J a 0 zO �0, fSF LLI > LL La W U oY W>W�o>O�O a IL 0 Z W>JW O ZJ- 4 N O J W J J � a J 30 N °; el lM e'� aU 0 N LL Y Eev�a ns o ea "a �xG I d C - o�� e• Z 3zo�cQOQ-�a�z FFIB lo ~ A I _ _ IH vj v -� opow - F �oa� >>I3 w LLw�zo��oo�o �3 nv eoq eaoa w s axaio-ioiean srvsxvoaaxi yrs ssro wreazr aao anssne eazr oar o Page 26 of 73 � N o e � tu �s ag SaIT o�o _ o �~ - - �a o�o >o o o - _ - - o o - - - o - - O - - D - LLI � w J oho _ _ �3 o Z W> a� x - - _ - _ 3��Jx W IR ffi OHO cc x� .- _ - Q 1G0 W>UJ cm - o 60 - o_ - _ - - ml C.1 3� _ 4woo - - � _ - - - wo - - c� - _ �bo� - - �3 - - - - oZ. Iffi E, Q. 17 =G - - F aoJ �F pew < <= - _ - - w - - _ oQ � - - so - � e� � --_ ��� Zar r_r¢o wrcv+aor� 3�3o�c�ar r�Sl 'S=<_a a 3ma3 r -vo w Nwa rruio rza J w-�000 �w v�mm arm avi v�oorn a� r-- ¢o� W H Page 27 of 73 to P �o e � �s ag a a 4 W LL m W Bd! GrtW7 � F Z W J yH = 7 W Uf cc 0 C G LL f 1 0 p —a0 J � a � Q N m � LL N � � C7 y J J_ 7 IIg W�t Page 28 of 73 � � o T. a o WLLI a o Q> `2 8 a ., G iu of . �� I I iu i X I � I 3 —i— -- — -------------------r--� o I r' I � � I �� { uyyr. z 1 Yl�Yl� CL ✓iiii� I { � I co Q O d ' 4 tY:r+ ' { { t C �rs ' { .° : '� F ti t rk� d rr rrt(( c 6 k {t x y�cv� A a[ iSK { 1S {idlS S [ �� Y J N Z k F A 11 t 1 1{{{ { {{{ t I S A W J 4 S A W 'y rnr a O c�7 z f rc fi O w>� f fu I �l a m f C' ( p`, G ... .. ; Ili( l F l 5 I1 I o lW, - I , Y � > m ffm I LL w hld'1 I zel M M s..om LU _ 3niaa 3snva 98 o I wPI .ter h.eo,oi ezoi a: �asao-ioi ear.u�.�„oad.�ys li.o w�a�. odo o�.yoe ems.oo�.o Page 29 of 73 = a L o e J � g rc P � e ggo —� -- ---------------- -- — — r--� Ll I I � I I � a y cc a c rc O f GO x is I W w» C M1V" .F'6Z1 .f'4Zl e W N m a L c I I I aim L e li I�a I � I� 1� 'W hll Ih h1 6s a I �. Is's J eo=s I I f h W `E �v a 3niaa 3snva)Ni 0 LUR h.eo,oi ezoi a: �asao-ioi ear.uN.road.ys i.o wa�. odo o. e ems.oo.o Page 30 of 73 = o tu w - W �S 8g F Y y �® O ❑ e OO ® ® P a -,- Q a I I — -------------------r--� -- — ------ —�-- � 41. I I � I 1 1 i I 1 I I I I I I I I I I a s . o yy W I IWt � I I y z W, z w I� ; w I _ 6 a I I a I' I I C-0 �cc0 ^_ t W`>g y m o W I1j, CD LL 3a o 6 a g m I I; I w I� I � I oC a� I ov u t qq oga Ya o: LU LU .mil __ M -M ➢ 3 3 -- � 0 3niaa 3snva)I R,y,y Y C•p¢U^N �,e¢SON �— .- x — f C h.eo,oi ezoi a: asao-ioi ear.u.„oad.ys li.o wa. odo o.yoe ems.oo.o Page 31 of 73 LLILLI - -------------------r--� I � r t; > I J W W ¢arc m fIL rcJ I c W> i a a w a 14, I I to 0 LL o i I , I,oa I I I IL . �6 I w i �=a $� 16 .s =E, 000 i e s � m veo.� 3nIaa 3snva)i (Op IWR h.eo,oi ezoi a: �asao-ioi ear.u�.�„oad.�ys li.o w�a�. odo o�.yoe ems.oo�.o Page 32 of 73 tu o � LU 0 we _ IU J fA V) LU 11@0 I I 3 - -------------------r--� -- - ------ -�-- � I I I I I J I 4 a co I i I zp La ® I to 0 I Z W J Ytl ; ; 0=0 l o ® IL � QO I I e w> I o Q v 13 ,r I I z N m I I p a N a n 3 a • '------ • I I z W .N n g o > El aim LL w hlil I I L I I I ¢N9 B �v 3AIHG 3snvu)i e �- (Op „ L-P n.si,oi ezoi a: �asao-ioi ear.u�.�„oad.�ys li.o w�a�. odo o,.yoe ems.oo�.o Page 33 of 73 N V �.w —a n o zR ' z=' ig.'�3g= W wwE3y a m" >€mo w 0. F< 3Nnd- ~ ° 25 uj kw � z �� �+ e � +� ►Lr g J z a w F`w � cc z La COS to z Z w �0000 0 oomoo ~ w Ow �yM��yyy LLIcc IL 12C U) m LL Q ao C Z a O J In O w J_ O �g C E 31N w`_ LUy�� �yy R F Page 34 of 73 p�E Z y��Z C � p o Q WO F oaLLi Q �m o LL _ w ___ Hw.9 s a a m a � ✓�i uwi OM w w wz ; o w NN a N z 24 a N2 wW = " oW at a a o m < y< � ' g 9- 3iav J�z 9- rviry. s3mvn J - KZ O O ~ Z u w La _ w a ui OyO 0 cc Ee t g� a �! W W>� Z W = 4- r p m E F oo _ mC) 4 i W Z aeo £y£ a Sg s N It all _ _ xi W, n.oq.zoz ea: o.a.o-ioi ear.urv3.,wad.ys i..o w.a�. odo o...oe ems.oo.o Page 35 of 73 6 0 x x w X 6 QQ o C� N gm P �x px �S �g 3 I I I I I I I o � o o CL Iii v5# su zzz as 0 •y�' I Y✓14Y [ °sZ' Q W J (A Ow o 4 u l .at J W>Q l ~ W org W 3 s s �I 11 s s l�Vr' LU N CC,k AZ n l 6 3 (I . W 0 a O o\ W� IL x a I W e zr �o s s s LLI W �Tj JJ1 ; �9 i E Bs r a � o s � r o s s m w o t E s ° 3 Fss � soL II } W s s� \ o W 2 a 0 & R u e 3 0 �65 <s 9r p� yF 1 LUR 3AI210 3snvV j>1 Page 36 of 73 F L a is W w R A � n 0 0 x z� a _ a a w y N� yr r =q ;a 2 s p ll , nd 0 \�I. : . . �3 0 z o a f 2 LU J L-_ -- --- -- W W N> m C ICa- LU O w>l Y - - � LL O w LL L = N m L � O LL w - ) � N C LL Q W v/1 7C/1Hll�A a 4_ N� F a = idv N }•,;. '� • 1 (YI URI Page 37 of 73 N yILw N W �a �z a�a m� s = o 00 r � � 9" g I za F ;L� a .4 � ," p ii ' � f 1, i�pp sppy y9 1$I FffA y�0�g6 E $g �a { R.. e. A 351 Fi Lu W Ld J q _ S LLJ 0j0 'z .. R a ILL w LL III Q a e W J (7 J J_ 7 W 5 .g it i NU I,H, In— L - It— Rsa a( �a= C *�R.[ '�I ag s` sue = a'. all u) �1< c C N C D 21 N • 1 �YJ Page 38 of 73 rA I f, G EWA LT HAMILTON ASSOCIATES, INC. Memorandum CONSULTING ENGINEERS 625 Forest Edge Drive,Vernon Hills,11,60061 To: Mr. Kyle Johnson, PE, CFM Deputy Public Works Director I Village Engineer Tim 847,478.9700 • FAx 847.47&9701 Village of Buffalo Grove www.gha-engineers.com. From: Dan Brinkman, P.E., PTOE Date: May 24, 2024 Subject: Traffic Operations Water Filling /Weigh Station SEC Deerfield Parkway at Krause Drive Buffalo Grove, Illinois Part I. Project Context and Summary Statement Gewalt Hamilton Associates, Inc. (GHA) has completed a traffic planning analysis for the above referenced project. As proposed, the Village of Buffalo Grove proposes to construct a shared water filling station and weigh station at the southeast corner of the Deerfield Parkway intersection with Krause Drive. Additionally, a parking lot will be constructed for the adjacent Combined Area Fire Training (CAFT)facility. • The water filling station will be a mostly seasonal (spring-summer) activity for contractors to purchase water from the Village. • The weigh station will be used intermittently by the Village of Buffalo Grove Police Department and potentially other local law enforcement agencies. • The parking lot will be utilized by visitors and users of the CAFT. The following summarizes our findings and provides various recommendations for your consideration. Exhibits and Appendices referenced are centrally located at the end of this document. Part II. Background Information Site Location Map, Existing Traffic Operations, and Roadway Inventory Exhibit 1 provides a Location Map / aerial photo of the subject site and surrounding development. Pertinent comments regarding land-uses in the site vicinity and transportation components include: Area Land Uses • The water/weigh station will be constructed immediately adjacent to the existing Combined Area Fire Training (CAFT) facility. • The majority of the surrounding land use is currently a mix of office and industrial uses. • South of the CAFT facility is the Lake County Public Works water treatment plant. • To the east of the CAFT facility is the large The Wheatlands residential development. Page 39 of 73 Traffic Operations Proposed Water Fill /Weigh Station Buffalo Grove, Illinois Roadway Inventory Deerfield Parkway • Deerfield Parkway is an east-west Minor Arterial roadway under the jurisdiction of the Lake County Division of Transportation (LCDOT). • Deerfield Parkway provides two travel lanes in each direction along the site frontage separated by a landscaped boulevard style landscaped median. • Deerfield Parkway carried approximately 16,500 vehicles per day in 2023 per the IDOT webpage w .gettingaroundillinois.com. • Deerfield Parkway has a posted speed limit of 40-miles per hour(mph) along the site frontage. Krause Drive • Krause Drive is a north-south local roadway under the jurisdiction of the Village of Buffalo Grove. • Krause Drive provides a single travel lane in each direction. • No speed limit is posted on Krause Drive at Deerfield Parkway. • The north leg of the Krause Drive intersection with Deerfield Parkway is a private access for a series of office/light industrial buildings. Crash Analysis GHA reviewed crash data obtained from LCDOT Transportation Data Management System for the last five available calendar years, 2018 to 2022. Only two reported crashes occurred within 100-feet of the Krause Drive intersection. The lone injury crash involved two vehicles leaving the private drive on the north side of the intersection. The Fixed Object crash involved a DUI. No pedestrian or bicyclist crashes were reported in the 5- year period. Table 1 Crash Summary 2018-2022 No.of Severity B Crash Type° Percent Location During Crashes PI Wet/icy PD A I B C FO FTR P Conditions Intersections -Crashes within 100-feet of intersection Deerfield Parkway at Krause Drive 2 1 - - 1 1 1 - 50% Total(2018-2022) 2 1 0 0 1 1 1 0 50% A Source:Lake County Division of Transportation Data Management System for the 2018-2022 calendar years. B PD=property damage only,PI=personal injury;F=fatality. c Type A(incapacitating injury);Type B(non-incapacitating injury);Type C(possible injury). FO=Fixed Object;FTR=Front to Rear;P=Pedestrian A collision diagram is included as Appendix A. The proposed development and access operations are not anticipated to have an impact on the safety of the intersection. Gewalt Hamilton Associates, Inc. - Page 12 Page 40 of 73 Traffic Operations Proposed Water Fill/Weigh Station Buffalo Grove, Illinois Part III. Evaluation Site Plan Included as Exhibit 2 is the site plan for the proposed water fill/weigh station dated May 24,2024,and prepared by GHA. Key operational observations for the site include the following: • Two access driveways are proposed for the water fill /weigh station. o A single entrance only drive on Krause Drive 65-feet south of Deerfield Parkway. o A single exit only/ right out only drive onto Deerfield Parkway approximately 315-feet east of Kruase Drive. • An increased radius is proposed for the exit drive to help facilitate the movements of large multi-unit vehicles. • The water fill station has been located as far east as possible to maximize on-site queuing for vehicles. • A single 30-ft(edge-edge) drive is proposed to help accommodate vehicles passing each other on site. • A parking lot for the CAFT facility will be constructed concurrently with the water fill /weigh station. Traffic Generations Typically, the 11th edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual would be used to determine the anticipated traffic generated by the proposed development. However, given the unique nature of the proposed uses trip data is based on historical records of water sales and traffic violations for overweight vehicles. The following summarizes the anticipated traffic volume associated with the proposed water fill /weigh station as provided by the Village (See Appendix 8). Per the Village of Buffalo Grove Police Department an average of 98 tickets have been issued for overweight vehicles in the past 5 years, with 203 tickets issued in 2023. Assuming having a fixed scale location would increase usage by 30-50 tickets annually. Conservatively estimating that 250 trucks would be weighed on an annual basis translates to 21 trucks a month or fewer than one truck a day. The Village of Buffalo water sales over the last 5 years averaged approximately 810,650 gallons per year. Assuming the average tank truck holds 6,000 gallons equates to approximately 135 trucks per year. Further assuming the water sales are generally seasonal from April to September equates to an average of 23 trucks per month or fewer than one truck a day. For comparison, Table 2 below provides the Peak Hour and Average Daily traffic volume for a 30,000 square foot light industrial building similar to the one on the west side of Krause Drive. Table 2: Trip Generation for Comparison Weekday Peak Hours lsliillly Land Use ITE Morning i;;veinliirug 24-I1m airs Size Code In Out Sum In Out Sum In Out Sum Light Industrial-Cars 30,000 SF 110 21 3 24 3 17 20 1 32 82 164 Light Industrial-Trucks 30,000 SF 110 <1 <1 <1 <1 <1 <1 1 4 4 3 Source:ITE Trip Generation Manual, 11 th Edition Gewalt Hamilton Associates, Inc. - Page 13 Page 41 of 73 Traffic Operations Proposed Water Fill /Weigh Station Buffalo Grove, Illinois As can be seen, a relatively small light industrial building would be expected to generate significantly more traffic on a regular basis than the proposed water fill /weigh station. Part IV. Recommendations and Conclusions We believe that the proposed one-way traffic pattern and use of the combined water fill /weigh station represents a minimal impact on the Krause Drive intersection and Deerfield Parkway. Given the close proximity of the Krause Drive entrance of the facility consideration should be given to posting a"Do Not Block Driveway"sign and pavement markings on Krause Drive to help minimize the potential of vehicular traffic northbound on Krause Drive prohibiting truck traffic from entering the facility. Part V. Technical Addendum The following Exhibits and Appendices were previously referenced. They provide technical support for our observations, findings, and recommendations discussed in the text. Exhibits 1. Site Context 2. Overall Site Plan Appendices A. Collision Diagram B. Village Correspondence 4798.087 VBG Water Station Traffic 052424.docx Gewalt Hamilton Associates, Inc. - Page 14 Page 42 of 73 Traffic Operations Proposed Water Fill/Weigh Station Buffalo Grove,Illinois TECHNICAL ADDENDUM A F GEWALT HAMILEN ASSOCIATES, INC. Page 43 of 73 u / i' / i rw �r� ) �i I l i/ UW"✓N�l � r/ � i ff w , i n, � w '✓,�j�r i�rJN('u I�U Jr/I%r (, � I , /,1 , u; r ' I I U / r r r GEWAIT HAMILTON � " F 1 " ASSOCIATES, www.ghs-'glneers.com i ul Ilu � N Exhibit 1 - Location Map I inch= 250 Feet � r w M c LLI LLI LLIa m Go x a $ C/) mC o �wA n J N W0 33 o ® F al tp o ❑ B � ® p a � q � vlo F I y �a � I ZO I —I—� -- -- ----------------r--� I I L I II I 3 I 1 1 La� a I Z i I I a W cc a 2 O I o ia0 G iZ s, s lB--i-- 'I ------ ---- - I o QCO LL ,F bll W o W N m I.Z"i1I h ' I I t o C LU LU N o I I I Wil � I I a I Ig_ M o 3AIHa 3snvu I 3 � rv.ii,oi ewi a s �a9ao-ioi ear.u�.�aa. s„o o ate. oda o.yoe ems.o.,.o Page 45 of 73 Traffic Operations Proposed Water Fill/Weigh Station Buffalo Grove,Illinois APPENDICES A. Collision Diagram B. Village Correspondence A F GEWALT HAMILM ASSOCIATES, INC. Page 46 of 73 Appendix A �11' f�i 111�1 Lake County, IL O S � 7,1 Displaying 2 of 2 Records Page 1 of 1 First Page I Previous Page I Ne)d Page I Last Page Krause Drive & Deerfield Park', erfreld Parkway at Krause Drive 2018-2022 2 Crashes 1/1�2018 - 12/31/2022 (0 crash(es) not drawn) a� IIIII IIII 'C IIIII Gy W 7 Y Deerfield Parkway o I m a� 201901088743 Straight — Backing Erratic a Injury S Sideswipe Right Turn — Passing Out of Control mm, Fatality N Nighttime Left Turn U-Turn - Unknown X Pedestrian D DUI Not to Scale �--i Stopped Parked ❑ Fined Object Bicycle Printed: 502024 1 Page 47 of 73 Appendix B Dan Brinkman From: Peter Lind Sent: Tuesday, May 7, 2024 8:55 AM To: Dan Angspatt; Dan Brinkman Cc: Leo Morand; Brian Wesolowski; Lucas Deferville; Jeremy Fisher Subject: RE:Truck scales Here are the numbers. 2023-1,004,557 2022-666,300 2021-1,249,000 2020-745,648 2019-387,715 Thank you. Peter C. Lind, P.E. Project Manager II Gewalt Hamilton Associates, Inc. An (,aorril)aiiuy 625 Forest Edge Drive I Vernon Hills,Illinois 60061 Office: (847)478-9700 1 Fax:(847)478-9701 Direct: (847)821-6271 Email: clindPgha-engineers,com AAA. ha-engineers,com From: Dan Angspatt<Dangspatt@gha-engineers.com> Sent:Tuesday, May 7, 2024 8:54 AM To: Peter Lind <plind@gha-engineers.com>; Dan Brinkman <dbrinkman@gha-engineers.com> Cc: Leo Morand <lmorand@gha-engineers.com>; Brian Wesolowski<bwesolowsl<i@gha-engineers.com>; Lucas Deferville<Ideferville@gha-engineers.com>;Jeremy Fisher<jfisher@gha-engineers.com> Subject: Re:Truck scales FYI. 6,000 gallons is an average gallon capacity for a typical water truck Dan Angspatt, PE Senior Project Manager Gewalt Hamilton Associates, Inc. An (,eorril)aiiuy 625 Forest Edge Drive I Vernon Hills,Illinois 60061 Office: (847)478-9700 1 Fax:(847)478-9701 Direct: (224)352-2751 ext 6323 1 Cell: (773)573-6582 Email:dangscatt ha-en gineers,com AAA.. ha-engineers,com From: Peter Lind <plind@gha-enineers,com> Sent:Tuesday, May 7, 2024 8:46 AM To: Dan Brinkman <d nnkman@gha-en ineers.com> Cc: Leo Morand <Imorand@gha-en ineers,com>; Brian Wesolowski<bwesolowsl<i@-ha-engineers.com>; Dan Angspatt 1 Page 48 of 73 Appendix B <DanEs att@a-en ineers.com>; Lucas Deferville<Ieferville@ ha-enEineers.com>;Jeremy Fisher<jfisher@ ha- en ,ineersacom> Subject: RE:Truck scales Dan, Requested. Should hear back soon. Thank you. Peter C. Lind, P.E. Project Manager II Gewalt Hamilton Associates, Inc. An Il::rnllrlkiye Owned,d,(o(riirnlwr,any 625 Forest Edge Drive I Vernon Hills,Illinois 60061 Office: (847)478-9700 1 Fax:(847)478-9701 Direct: (847)821-6271 Email: olind ha-engineers.co MnMM.qha-_en2ineers.com From: Dan Brinkman <dbrinkmanC aha-en ineers,com> Sent:Tuesday, May 7, 2024 8:04 AM To: Peter Lind < jind@gha-en ineers.com> Cc: Leo Morand <I orand@�-ha-en ineers.com>; Brian Wesolowski<bwesolowski@ ha-en ineers,com>; Dan Angspatt <Dangs att@Bha-en ineers.com>; Lucas Deferville<deferville@ ha-enEineers.com>;Jeremy Fisher<ifisher@ ha- Subject: RE:Truck scales Pete, Can we get the average number of gallons they sell seasonally and try to back into X number of trucks a month? From: Peter Lind <plind@Eha-engineers.com> Sent:Tuesday, May 7, 2024 7:16 AM To: Dan Brinkman <dbrinkman@ha-en ineers.com> Cc: Leo Morand <Imorand@gha-en ineers.com>; Brian Wesolowski<bwesolowski@-ha-enineers.com>; Dan Angspatt <Dans�att@ha-enineers,com>; Lucas Deferville<Ideferville@gha-engineers.com>;Jeremy Fisher<ifisher@gha- en�ineers,com> Subject: Fwd:Truck scales Dan, Below is the best information Kyle could provide. Unfortunately,their water fill up currently is not that granular. It's based on the gallons. Thankyou. Gewalt Hamilton Associates, Inc. An II n°rrvllslloyee Owned,(,,,aii nl)airny 625 Forest Edge Drive I Vernon Hills,Illinois 60061 2 2 Page 49 of 73 Appendix B Office: (847)478-9700 1 Fax:(847)478-9701 Direct: (847)821-6271 Email:,Bplliiirl ,( Ilm ;;;;in, iii1ir ;; irrcn. From: Kyle E.Johnson<IK..�_01h.!rn_sn.rorga !rg> Sent: Monday, May 6, 2024 8:30:16 PM To: Peter Lind <IplJ d. glh :. rrgiiu grs: a irrrn> Subject: FW:Truck scales Kyle Johnson Deputy PubVic.Works D"ureetor/ViHage Engineer 111)ulbllliiis:Woriks Delll'saurturnerd Village of Buffalo Grove 51 Raulpp Blvd Buffalo Grove, III...60089 8 4 C-..7z/&00. w r oily ttl!B5 BUFFAL-0 GROVE smart. bd Ili(!:,::,,a I' From: Robert Broussard <RBrou s ird. y.l�.g. lr > Sent:Thursday, February 22, 2024 1:53 PM To: Kyle E.Johnson<IKJ.aah nson. y�g* rg> Subject: RE:Truck scales Let me know if you need some more detail.Thanks! 1. Increased ticketing over our current output—I am tracking this number over 20 years so perhaps it would escalate overtime, but that is for you to consider. Really need to know we ticket X amount at$X and think we could elevate to Y at$Y with the scales. Over the Inast five years, we have averaged 98 tickets annuallly, with an average boind revenue of$166K per year. Hloweveir, It"s worth noting that ticket: nuirnnbeirs were rnotaNy lower in 2020 and 2021 due to the CO ID.10 Panderrft. In 2023,there were 203 tlickets issued. It's estimated the first year of sca::aies wound boost ticket nuinnlbeirs Iby 2!5%, irncireasing a,":auir yearly inumlbeirs Icy 25 tickets. With an average Iboind of$1,600 Ipeir tiiclket, this wound iresullt: in a $401K increase in Iboinds annualllly. Ilin the follllowirng years, having a weligh station wound allllow addlitlioirntall officers to becoinne ceirtlifiied and irnnore irncllliined to enforce overweight vlollabons, as they wound Ihnave conveinlent access to sc«Hiles. Wltlhiin five years,,tll°ne addiitloinal officerrs can Ilbe expected to iincirease our totA Iby ainotlhneir 30.50 tiiclkets. 3 3 Page 50 of 73 Appendix B 2. Efficiency for staff—Any staff time (in $s with some backup info)that could be saved by having these. Could be a matter of how the data is collected or processed, coordination of staff to an on road weighing (safety factor as well), etc. Currently, staff Ipirlrnainilly relies oirn Ipoirtanlblle scanlles, weiglhiing airouind 40 Ipoiunds, for tiruuclk welighiing opeiratloiros. Il these scenes acre firequeintlly irnoved duir4)g the weighing process, posing an liincireased irislk of linjury to offlcerrs. 1::.:stabllfshling a weigh station wound ireduce the irelhance on portablle scales, im4iiirnirling the need for firegluueint rrrnoveirrneint:and Iloweiniing dine irisk of liirjUir . Additloinalllly, it wound decrease tiravell tliirnes to w6glh stautloins outside of Buffallo Grove Iby an average of 2.0 minutes, saving alplpiroxiimautelly$1.5 20 Ipeir occurrence. Unlhke dedicated t:iruclk einforceiment officers, Ipatroll officers tasked wltlln eirnfoircliing overweight:vGollat:iions do not have Ipoirta:rblle scaalle.s in their velhiclles.A weigh stat:lon wound ena Ue Ipa:tiroll officers to directly take trucks to the scalles, elhimiiinat:1rng the irneed to wait for an offiiceir to Ibirirng scalles to flheirri. Il lhis stireaimlHrned Ipirocess wound save alplproxh'nat:elly 30 irrrnlnutes of staff tlirmne Iper occurrences wll°nlclh Ihappens around 50 dimes per year.till°Here wound be airn estimated savings of$1,000 In staff time, calcullated based oirn the sallary of than lowest-paid officer, 3. Third party fees— Is there any opportunity to charge another agency or private entity fees for being able to use our scale? This could be a low fee and based upon either annual charges or a single use. Bloorvningdale has four agencies that are paying an annual'fee to use their weigh staUorn. If we weire to obtain a weigh station local agenclies seeking to use the scales would be charged an annual fee of$1,500a Bobby Broussard #614 1 Lieutenant Buffalo Grove Police Department 46 Raupp Blvd. Buffalo Grove, IL 60089 :847.777.6251 1MR: rbreussardC0v1bg.org L From: Kyle E.Johnson<KJohnso . y ogEg> Sent:Thursday, February 22, 2024 4:50 AM To: Robert Broussard <ff:$.IE�roussprc..@.yt .or > Subject: RE:Truck scales Hi Bobby, Just checking in on this to see if you will have an eta on the numbers? Thanks. Kyle E.Johnson, P.E., CFM I Deputy Public WorksDirector/Village Engineer VILLAGE OF BUFFALO GROVE 51 Raupp Blvd, Buffalo Grove IL 60089 P :847.459.2545 FX:847.537.5845 4 4 Page 51 of 73 Appendix B PUBLItWORKS NOTE: Ernalll, attachments, and responses may Ik:e.subject to irellease through the llllinolis (Freedom of information Act. From: Robert Broussard <RBrou s rd. yl�.g.,_pirg> Sent: Wednesday, February 14, 2024 2:46 PM To: Kyle E.Johnson<IKJohnson. u�g*a rg> Subject: RE:Truck scales Checking on a couple of items and then I'll have this back to you. Bobby Broussard #6 4 1 Lieutenant Buffalo Grove Police Department 46 Raupp Blvd. Buffalo Grove, IL 60089 : 847377.6251 AMR: irbroussard@vlbg.org l From: Kyle E.Johnson<IK..�r�lhnsc Sent:Tuesday, February 13, 2024 8:00 AM To: Robert Broussard <��_Brp_uass r or g pirg> Subject: FW:Truck scales Bobby, I am working to revive this consideration and wanted to get you looped in on the past information below. I can figure out all the costs for installing the scales (at least estimated for the time being). However, what I want to firm up are three cost variables that show the "revenue" side of the equation. 1. Increased ticketing over our current output—I am tracking this number over 20 years so perhaps it would escalate overtime, but that is for you to consider. Really need to know we ticket X amount at$X and think we could elevate to Y at$Y with the scales. 2. Efficiency for staff—Any staff time (in $s with some backup info)that could be saved by having these. Could be a matter of how the data is collected or processed, coordination of staff to an on road weighing (safety factor as well), etc. 3. Third party fees— Is there any opportunity to charge another agency or private entity fees for being able to use our scale? This could be a low fee and based upon either annual charges or a single use. Right now I am writing this up as the facility and water station would go in first,with the weigh station coming later but that is certainly subject to change based upon the ROL Thankyou! Kyle E.Johnson, P.E., CFIM I Deputy Public WorksDirector/Village Engineer 5 5 Page 52 of 73 Appendix B VILLAGE OF BUFFALO GROVE 51 Raupp Blvd, Buffalo Grove IL 60089 PH:847.459.2545 FX:847.537.5845 SI fPALO ,OVE PUBLItWORKS NVO..N.EM1 Emad, attachments, and responses may be subject to release through the III'inois Freedom of Nnforrnation Act. From: Michael Rodriguez<mrodnEuezC7vbg,org> Sent:Tuesday,January 18, 2022 4:09 PM To: Shannon McMillon <SMcMillon vb�.or >; Kyle E.Johnson <KJohnson vb�.or > Cc: Michael Szos<mszos_@vb .org> Subject: RE:Truck scales Sorry, I'm late to the game on this. I believe we would have an increase of at least 10% in total tickets written. We currently average 77 tickets per year over the course of the last three years (2019, 2020, 2021), and average$192k per year, over those same years. This includes the last two years which undoubtedly had an effect on our numbers/potential tickets issued with the pandemic. With the numbers we have already gotten, it would appear that the overall average is$2500 in bond money for every ticket. I don't think it would be a stretch to assume we would get at least 7-10 more overweight trucks/year with Shannon's increase in efficiency, as well as training additional overweight enforcement officers who aren't bound by needing Shannon's truck scales, and can easily get a truck to scales during non-business hours or when Shannon is off duty. I honestly believe we can get a 20% increase in total citations with permanent scales, but to be very conservative, 10% increase is almost certain—providing the Illinois legislature doesn't drastically change the overweight trucking laws or anything like that. From: Shannon McMillon <SMcMWHIon(�vb ,or > Sent:Tuesday,January 18, 2022 11:20 AM To: Kyle E.Johnson<KJohnsonvbg.org> Cc: Michael Szos<mszosvbg,org>; Michael Rodriguez<mrodriguez@vbg,org> Subject: Re:Truck scales That is over the three years. Get Outlook for iOS From: Kyle E.Johnson<KJohnson@vbf.org> Sent:Tuesday,January 18, 2022 9:07:11 AM To: Shannon McMillon <SMcMlllonvb .or > Cc: Michael Szos<mszosvbgaorg>; Michael Rodriguez<mrodriguezvbgaorg> Subject: RE:Truck scales From below,the average ticketed amount—is that how much each year or is that the amount over that 3 year period? Looking at awarding this design at the February BOT meeting. Kyle E.Johnson, P.E., CFM I Assistant Public Works Director VILLAGE OF BUFFALO GROVE 6 6 Page 53 of 73 Appendix B 51 Raupp Blvd, Buffalo Grove IL 60089 P :847.459.2545 FX:847.537.5845 .�c iR IOIG l:::amad, attaclhimernts, a ind responses may Ibe subject to irelle«:use through the Illllhi nois IFireedoim of Ilinformatiioirn Act. From: Shannon McMillon <....ppiVlcr( vlgocrg> Sent:Thursday,August 26, 2021 1:48 PM To: Kyle E.Johnson<OKJcuh n_sp_E..��vb Cc: Michael Szos<tris ps. bg r�Ug>; Michael Rodriguez<mro r g.gg.x.. vbg Eg> Subject: RE:Truck scales I don't know how I would figure that out but I will look into it. From: Kyle E.Johnson<.......................................cV rJ,,..vb > Sent:Thursday,August 26, 2021 1:31 PM To: Shannon McMillon <S_McMi.VOcp_rJ.. Ml g or > Cc: Michael Szos<u szps. y.bg..gEg>; Michael Rodriguez<mro Ep z.. vbga Ug> Subject: RE:Truck scales Given this would make you much more efficient, any estimate on how much more ticketing could be done? Kyle E.Johnson, P.E., CFM I Assistant Public Works Director VILLAGE OF BUFFALO GROVE 51 Raupp Blvd, Buffalo Grove IL 60089 PH:847.459.2523 FX:847.537.5845 ACCREDITED AGENdCY INO.I.L: Eirnad, attachments, and responses may Ilbe subject to irellease through the Illinois Fireedoirn of lir:formatlioirn Act, From: Shannon McMillon <S.IM.p1.MJ l0n.'@.va g gEg> Sent: Wednesday, August 25, 2021 9:24 AM To: Kyle E.Johnson<IK.JI_oh n_son.. b..or > Cc: Michael Szos<i s ps orb k cnirg>; Michael Rodriguez<ir>1.r. iris z b crirg> Subject:Truck scales Hi Kyle, Please see below for the average ticket amount over the course of 3 years and a breakdown of truck stop operations. Average ticketed amount: $197, 055 (2018-2020) Currently,we have portable scales located within our Truck Enforcement vehicle,which I use for majority of stops. Once I have identified a vehicle and indict for them to pull-over, I inform them that we will re-locate to a safer location to weigh their vehicle, which at times can be difficult to find as there is limited space within our Village that can 7 7 Page 54 of 73 � r t N a � � o U I I I I II I I I I \\I I I I I I I h I s I 3 I I I h � I w I I 3 I I m O m Z J I I J_ Y' W W X I I I > > ILI O M O I I cc Z IL I O IC I I W> I O w LL N m I I a N c I CD J I I > I I I, I I —oo�o sa l� .o.:o 3 3 I_W 1 1 11 i m eooi woz rz s axasao-ioiean sraxvoaaxi yrs uro w�eazr oeo onune eazr oo�r o Page 55 of 73 N N � o U I I I I I �s ag I I1 1 II I I I I I If I II II I II I j I I I � 0 , k I , y I I I h I I I I I 3 I I I h I I I I 3 I I I m O I I I y F m Z J I I J_ Y' f x W tu W I I II� , OM O I I cc7 •L d C S I I W> I e O w LL � = N a N c i a I I I J I I I I � L, I I I I I I In L M 02J X3 - -d x 3 LUR i h.eo,oi ezoi a: �asao-ioi ear.u�.�„oad.�ys li.o w�a�. odo o�.yoe ems.oo�.o Page 56 of 73 ILANCI 1 shown in optional galvanized finish AXLE SCALES i r REA NViti"M ANHD SP011.0HP'llCA"I 01101S A)IJIJE SCAUJE H114S ll"A[Jl,I LAIN, 100,C100 lb. qross r, atau air ft V 14"'or 3/9't'r(v4ad r,.�k,)Ie decking version avrAable 8 (-or-kcrete deck, vorsion aveilable • Optionval rnan�'6ole 0 l'op ac<"'ess ro, bad 111-,'eft * Stair'tess steel analog or digital e.ew-ripresslorr coh Prnn k)ad cel * Loc,-'id c6l hou�irxps, orfa IP68 * Poly coaled stairAess she oth,--d kz rjd ceH coblrtn , NEMA 0 junction box • Inspection pkites,ensuve earo5,y occess to,load cells ond facifilates ckar,.ining • Bumper c I'w'ac king systern minir-n zx.,,,s move,,rn mt to u'Aa end th( life of tht" • All sfructuralsteel is to r;ommie.rck,-al blast spec SWC-6 * Hlgi„i perfarma-ice coafing5 epoxy/polyu,eflione systerm or galvanized steel as standard offerings:. * 5-Year weighbridge and COC� 01-075 CONCENTRAIED LOAD CAPACIM 100,0,0 Ibs. WEIGHBRIDGE DECK,, 3/8"diamorrd safe'ly-plale, steel dec,,k fwekJeda or pH instal[afion with ca rcrete der:,* availoUe AVAILABLE SIZES- W'x10',, 10'xl 1 '. 10'x 12",, 10'x]5', 1 1 ',x 1', 11"x 12', '1 Px 15% 12'x 12", 12'x 15' STEEL PREPARARON: Cornrnercirjl blas% cleaning S&PC-SP6 PAINT SYSTEM: (.,',ross,Airaked 1'w'« pairl' Epoxy - 2 to 4 rnil prirrier bose coof, Two-part UV riL��iistont Polyur(:�,,,than,e -2 to 4 rnil top coafoi, golvanized as siondoird offevings LOAD CELL: Stoirfless ste-61 arialog or digik.0 comprrassion coluryin load cell LOAD CEI 1L, CABLE- Stainless 5teef sheather.3 cable wow iWi c1enr polyr-rs r NIN 31 c4',)ofing & water-fight conneclows JUNCTION BOX::11EMA 4X/IP68 itinction box WARRANTY. 5-Yertr weight)rlcige,&CP'D-Ivl km'ad warranty,C:ovw ring defec;h Bra rnaterials and web orkrnamhlp 5-Year ,orge / Ilghtnirig worra. rity fnoive6ng CPD-M lootJ re4s and, junrztkx) bcrx�es� Flart5 Qnly does not inck)de travel or expenses, WER.AINED, PF10DUC lM FROM la. ''ON'W, ........................... SCOREBOARDS TMIrPLA7WI'jRT DIGITAL INDICATORS 11 PORTALOGIC A PRODUCT OF ELEMECH, INC. WATER FILL STATION MODEL FS11=43 (Portalogic management softwareincluded) access,For controlling user flow metering,, and billing Hydrant, reuse, potable,and frac f j l t / ENCLOSURE Temperature controlled, outdoor rated, 751/ f� lockable walk in enclosure including pre-installed FS-20 control panel for a complete system. HAULER ACCESS Multiple access methods including keypad entry,swipe cards, key fobs, credit debit card,and others as required. RECEIPT PRINTER Heavy duty kiosk-style printer, ................ illuminated chute, large capacity roll ll� INTERIOR Encloses a metered valve(2"),backflow j 11 preventer,and power panel 48 POWER 240/120VAC, 20 AMP FLOW RATE Up to 1,100 gallons per min (4,164 liters per min) The FS-43 water fill station is tamper-proof and easy for haulers TEMPERATURE Operating temperature range-40°F to to use. This station provides simple and secure hauler access 1221F(-401C to 501C) by account number/PIN, or through other available methods. SOFTWARE Station interfaces with Portalogic It houses a temperature controlled metering control valve and management software for record keeping, billing, monitoring, and reporting backflow preventer, and seamlessly communicates with Portalogic CERTIFICATIONS � �!' managernernt software for simple managerent. c L us 11 m� A Outdoor rated card reader and keypad �p with sunlight visible display It Optional credit card reader C Optional illuminated receipt paper chute 111) Lockable access doors IlE Temperature controlled enclosure containing a metered valve (2") and backflow preventer mw " SOLAR POWERED Stations can be powered by solar energy for remote installations COLD CLIMATE PACKAGE Heaters, insulation,and heat tracing can be added to protect the station in cold climates HOT CLIMATE PACKAGE Air conditioners and sunshields can be added to protect the station in hot climates GATE/DOOR CONTROL The station can interface with automatic gates and doors if needed 1 Hauler connects truck to Stations come fully assembled,tested,and ready to install. outlet connection The station comes with Portalogic management software It Hauler enters ID/PIN number which can be installed on any number of the facility's PCs. or RFID swipe card (added option) 3 Hauler follows display prompts and enters information such as desired volume 13MMINNEEMEM Control valve opens and hauler begins All controller components furnished in specification to fill their truck are guaranteed for 18 months from date of shipment. 5 Water will automatically turn off or the Management software updates and phone support is hauler may press'stop' provided for two years from date of shipment. A PRODUCT OF ELEMECFI,INC. For more information about Portalogic, please visit www.portalogic.info, or contact an EleMech engineer at: EleMech, Inc. I 2275 White Oak Circle,Aurora, IL 60502 1630-499-7080 I elernechinc.com 0 O > pV x o z� o_w r w w � > , ply _ na � w Cl) Z ('7x aFK CC LNL 11 Ohs L � O 000� ¢U 2 F H ��1 o � � w rc >_ ttZ Q Z 0 _ Z Z LLO - _ am o w0 Z0=0Q�i Oo��a az Z NzozpKNQm¢¢Ow¢ �K w wFo _ _a3rc _ado- -s� e O �puoK w - wow w KQ -pU - O n_ U SwF OU>U� O �LLK000 oSLLa_m-rocii ZO � p O¢�¢w w w3z KJ fpwLw�SLL�uO Z O ne n mr m o o OZ ZO �_ wo lo. c w o - w - LL — o Qwo - o sLL F m 4 la o L U) a W LL O U O 1 ---�--- O m M O > p 04LL E E_ _ OOQ\ f m xl of L4cL tt n H o Ey_ E ¢ _ H W aO al LLI 3E ncm m if LLI��m a Od -w/ �II¢ �E3 ON OU _ dim z w ,= Page 61 of 73 NIIILILI,�!%GE OF UF N" a L0 GROVE During your testimony at the Public Hearing,you need to testify and present your case for the Special Use being requested. In doing so,you need to address the six(6) Special Use Standards listed below: SPECIAL USE STANDARDS 1. The special use will serve the public convenience at the location of the subject property; or the establishment, maintenance or operation of the special use will not be detrimental to or endanger the public health, safety, morals, comfort, or general welfare; Response: The new water fill-up and truck weigh station will enhance the Village of Buffalo Grove's infrastructure, providing essential services in line with public welfare. A dedicated area for water truck fill-ups will support various construction and operational activities. The weigh station will ensure vehicle compliance with weight regulations,thereby ensuring road safety and protecting infrastructure. Operating under safety standards,these facilities will efficiently meet public needs while safeguarding the community's health and safety. 2. The location and size of the special use, the nature and intensity of the operation involved in or conducted in connection with said special use,the size of the subject property in relation to such special use, and the location of the site with respect to streets giving access to it shall be such that it will be in harmony with the appropriate, orderly development of the district in which it is located; Response: The location and operation of the new water-fill up and truck weigh station infrastructure are designed to be in harmony with the surrounding area, ensuring that their size, nature,and intensity of operations will not adversely affect traffic on Deerfield Parkway. The facilities will serve the community's needs and contribute to the orderly development of the district. 3. The special use will not be injurious to the use and enjoyment of other property in the immediate vicinity of the subject property for the purposes already permitted in such zoning district, nor substantially diminish and impair other property valuations with the neighborhood; Response: The water fill-up and truck weigh station infrastructure are designed to ensure they do not interfere with the enjoyment or use of neighboring properties, nor will they reduce property value. Their efficient operation and minimal footprint make them a positive contribution to the area,serving the community's needs effectively. 4. The nature, location and size of the buildings or structures involved with the establishment of the special use will not impede, substantially hinder or discourage the development and use of adjacent land and buildings in accord with the zoning district within which they lie; Response: The water fill-up and truck weigh station infrastructure are strategically planned to ensure they do not obstruct or discourage the development and use of adjacent land and buildings. Operations are designed to facilitate the smooth circulation of vehicles, ensuring safe and efficient movements in and out of the area's roadway. Page 62 of 73 5. Adequate utilities, access roads, drainage, and/or other necessary facilities have been or will be provided; Response: Provisions for required utilities, access roads, and stormwater drainage are incorporated into the project plans,ensuring that the water fil-up and truck weigh station infrastructure are adequately equipped. These facilities are designed to manage traffic flow effectively,accommodating specific operational needs while maintaining smooth and safe vehicle movement. 6. Parking areas shall be of adequate size for the particular special use,which areas shall be properly located and suitably screened from adjoining residential uses, and the entrance and exit driveways to and from these parking areas shall be designed so as to prevent traffic hazards, eliminate nuisance and minimize traffic congestion in the public streets. Response: The project incorporates an onsite area for waiting vehicles,designed to accommodate the anticipated volume of vehicles. This ensures the safe and orderly movement of vehicles,alongside the effective management of vehicle flow. The strategic design is integral to the commitment to maintaining streamlined traffic within the property and optimizing overall operation efficiency. Page 63 of 73 � .m .. .. r I ILu a E OF During your testimony at the Public Hearing,you need to testify and present your case for the variance being requested. During your testimony, you need to address the three (3) Variation Standards listed below: Criteria for Zoning Variation. A. The regulations of this Title shall not be varied unless findings of fact are made based upon evidence presented at the hearing that: 1. The property in question cannot yield a reasonable return if permitted to be used only under the conditions allowed by the regulations of the zoning district in which it is located except in the case of residential zoning districts; Response: The existing zoning district regulations pose limitations on the property's financial viability. Due to the location of the existing CAFT(Combined Area Fire Training)facility,there is no availability within the current setback to accommodate safe vehicle movements for the new water fill-up and weigh station infrastructure. Note that the proposed site design considers the infrastructure locations and ensures that they would not impact traffic,other businesses,or safety. 2. The plight of the owner is due to unique circumstances; Response: The property owner is seeking a variance due to the unique circumstances specific to this particular property. The challenges arise from the location of the existing CAFT(Combined Area Fire Training)facility,which limits available space for safe vehicle movement. The location of the new water-fill up and weigh station infrastructure accommodate safe vehicle movement. The proposed site design aims to ensure traffic safety and harmony with neighboring businesses. 3. The proposed variation will not alter the essential character of the neighborhood Response: The proposed variation in setbacks for the water fill-up and weigh station infrastructure aligns with the characteristics of the surrounding neighborhood while ensuring vehicle movement safety within the industrial zoning district. Page 64 of 73 06/5/2024 MINUTES OF THE REGULAR MEETING OF THE PLANNING AND ZONING COMMISSION OF THE VILLAGE OF BUFFALO GROVE HELD IN THE COUNCIL CHAMBERS, 50 RAUPP BOULEVARD, BUFFALO GROVE, ILLINOIS ON WEDNESDAY, JUNE 5, 2024 Call to Order The meeting was called to order at 7:43 PM by Chair Mitchell Weinstein Public Hearings/Items For Consideration 1. Consideration of Petition to the Village of Buffalo Grove for Approval of an Amendment to the Planned Unit Development and Preliminary Plan for Joyce Kilmer School and Park, with Variations from the R-5 One Family Dwelling District Requirements Related to Setbacks, to Accommodate a Temporary Awning and Modular Classroom on the Subject Properties, and to Allow a Portion of the Existing School Building to Encroach on the Park Property at 655 Golfview Terrace. (Trustee Weidenfeld) (Staff Contact: Kelly Purvis) Deputy Director Purvis,provided a background on the subject property and the request. Claudia Welp, the petitioner from CAGE Engineering,provided a background on the subject property and request. Com. Moodhe asked about the timeline of the project. Welp stated that the school district is going to review the number of students coming in and take some time to get a permanent solution for the influx of students so that the trailers are not out therefor more than 2 to 3 years. Com. Moodhe asked about what if the school is not ready to move the modular buildings after 2-3 years. Welp stated that if the School District would need the modular buildings more than 2-3 years, then they would have to come back for an extension of their approval through a public hearing process. Com. Moodhe asked if the modular buildings could be moved closer to not need the awning. Welp stated that they tried to place it in a way that works for the location of the classrooms and also provides an accessible ramp. They were trying to ensure that it is placed in the best way to work with the elevation for grade utility connections. All of these factors were taken into consideration when they selected the location. Com. Moodhe asked about the raised modular building. Welp stated that the modular buildings are raised for utility connections and the buildings have a switch back ADA ramp. Chairperson Weinstein asked about the security and safety plan for the modular buildings. Micheal DeBartolo,Assistant Superintendent for School District 21, stated that the new buildings will have the same perimeter and interior security features as regular school buildings. They will have badge access to the two doors, cameras covering all four sides of the perimeter for a 360-degree view of the building, and fire and burglar alarms. The Page 65 of 73 06/5/2024 school has decided to place the fifth grade into the modular classrooms, which will limit foot traffic back and forth. Weinstein asked who maintains the blacktop. DeBartolo stated that the school district maintains the blacktop. Saxena asked if during lunch breaks and PE class, students are going back and forth from the modular buildings. DeBartolo confirmed and stated that the children are outside all day long for recess or lunch. We are familiar with securing the school's perimeter during lunch and recess, and we have supervisors outside with the students before and after school. We already have a daily security check with students,so knowing that there is a separate building 35 feet away doesn't change anything in our minds, except for ramping up security. Saxena asked if the school encourages kids to move within the rest of the park and baseball field. DeBartolo stated that the school utilizes all of the outside space including the tennis courts and baseball track. Com. Worlikar asked that with the modular building on the existing basketball courts, will the basketball rims be removed? DeBartolo stated they would remove the basketball rims and that there would be no outdoor basketball programming, only indoor basketball.A new playground will be installed this summer, which will enhance the area. Com. Worlikar asked if there will be anything different about these modular classrooms compared to a typical classroom. DeBartolo stated that there will be no difference, including classroom size, and will also have new furniture. Chairperson Weinstein asked if they would like to supplement anything else that was submitted regarding the variation standards. Welp confirmed nothing is to be added. Com Moodhe asked if there would be any changes to the existing parking lot. DeBartolo stated that no changes are required for the modular classrooms. He mentioned that they have already reviewed three of their parking lots in the past year and there are more to come. He noted they have a contract with an engineering firm that handles traffic control, and Kilmer is on the list. Com. Moodhe asked if they have any issues with the cooperation with the Park District. DeBartolo stated that the School District has had great cooperation from the Buffalo Grove Park District as well as the Village of Buffalo Grove. Com. Moodhe asked if there will be any fiscal issues with meeting the timefrome to find a more permanent solution. DeBartolo stated not at all as they have started to look at different options for how they increase space not only at one school but all schools and programming for each school. Page 66 of 73 06/5/2024 Com. Moodhe asked if the trailers would need to stay in place if there was a more permanent solution. DeBartolo confirmed that they would not need to stay in place and the modular classrooms would be removed. He stated in 2023 they started with 472 students, and ended in 2023 with 510 students. He said they began the school year last year with 540 students and ended with 585 students. He stated that the school is a destination area and the class sizes and programming took off. Com. Moodhe asked if the future solution includes two-story. DeBartolo stated that Kilmer is a challenge with the two sides that don't connect and have limited area to add new classroom space and adding certain additions could cause the school to close for up to a full year. Com. Saxena confirmed that they are looking to have the classrooms up for two years and a third year as a contingency. DeBartolo confirmed. Com. Saxena asked that since the basketball rims are being removed, will there be any requirements. Purvis stated there is no requirements to replace the existing basketball courts once they are removed. Com. Worlikar asked if the school district would need anything else from this body to help the school district with this kind of growth or expansion problem. DeBartolo stated that they are looking for funding and other types of programs to help with their expansion challenges and might have to talk with the Village as for as buying land from the Village if any becomes available. A Buffalo Grove Resident stated that he doesn't understand spending all this money and infringing on the park district. He suggested that the school should use Alcott Center instead. DeBartolo stated that Alcott Center has not been in discussion, and changes to the Alcott might outweigh the cost of the modular buildings. Michelle Dicristo, 764 Golfview Terrace, expressed her concern about the project's timeline. She said the park is being used so much more now, with kids playing basketball and playing in it after school hours. She and her neighbors would just like the park to be used as a park and would like the project to move along as quickly as possible. Vice Chairperson Richards made a motion to recommend approval of an Amendment to the Planned Unit Development and Preliminary Plan for Joyce Kilmer School and Park, with Variations from the R-5 One Family Dwelling District requirements related to setbacks, to accommodate a temporary awning and modular classroom on the subject properties, and to allow a portion of the existing school building to encroach onto the park property located at 655 Golfview Terrace,subject to the conditions listed in the staff report. Com Moodhe seconded. Chairperson Weinstein stated that the request is for zoning relief because the building has been encroaching on the park property. He stated that whether there is justification Page 67 of 73 06/5/2024 to amend the planned unit development and if setback variations are warranted. It seems like the proposal is for a temporary solution to address the need for an expanded number of students within the school and the school has found alternative places to play basketball and use the park property. It's worth noting that the school has been maintaining this property and using it. He stated that he believes the criteria for the proposal have been met. Com Moodhe mentioned that the schools in District 21 in Buffalo Grove are experiencing an increase in enrollment. He liked that the proposed solution is time-bound. Even if they need more time to come up with a permanent solution, they will have to return to the Village for approval. He stated that the permanent solution won't involve tax increases. He also commented on the increased usage of the park, expressing concern about the playground and basketball court if the issue persists. Vice-Chairperson Richards mentioned that he frequently passes by the school and park and that his first child attended Kilmer. He expressed his appreciation for the park being utilized, as it bothers him to see a beautiful baseball field go unused. He generally supports the proposal but raised concerns about the relatively short timeframe of three years. He pointed out that planning and design will take two years, leaving a decision between permanency or an extension. He anticipates the need for further discussion within a couple of years due to the time required to construct a facility. While he sees the benefits of keeping students together as the community grows, he worries about the timing. RESULT: RECOMMENDATION TO APPROVE [UNANIMOUS] AYES: Moodhe, Weinstein, Richards, Worlikar, Saxena ABSENT: Marc Spunt, Amy Au, Jason Davis 2. Consideration of a Petition to the Village of Buffalo Grove for an Amendment to the Residential PUD, Final Plat of Subdivision, and Preliminary Plan Approved by Ordinance No. 2023-106 to Allow Changes to the Approved Plans for a 41-Unit Townhome Development on the Subject Properties at 22771-22825 N. Prairie Road. (Trustee Weidenfeld) (Staff Contact: Kelly Purvis) Purvis provided a background on the subject property and the request. Daniel Shapiro, 570 Lake Cook Road, Deerfield, IL representing the petitioner, was sworn in and gave an overview of the project and the request. Vice-Chairperson Richards asked if there are any changes to the variations or setbacks that were approved from last time. Purvis stated no and that there are no changes in variances from what were originally granted. Vice-Chairperson Richards stated that at the original approval meeting, the generation of the school children from the proposed development was the biggest discussion.Asked if they have heard back from School District 125 and 103 since reaching out to them and if we are presuming they are fine with the proposal. Mr. Shapiro confirmed that they have not heard back from either districts and is presuming that they have no objections. Vice Chairperson Richards mentioned that they would like the developer to have a more active conversation between the property owner and the school district to ensure that Page 68 of 73 06/5/2024 everyone is working on the same page. He asked if there had been any direct interaction with the school districts. Mr. Shaprio stated that he had no interaction with the school districts. He stated that this is a public hearing and the school districts were notified but not aware of any less formal engagement that he is referring to. Com. Moodhe asked if there has been any movement to include parcel 2. Mr. Shaprio stated that parcel 2 is not for sale Com. Moodhe asked if there is going to be a limit on the 4-bedroom units. Mr. Shaprio stated that they are open to it and would consider it, but would like it to be a preference stating that they would like to sell these units by responding to the market with flexibility. Com. Moodhe asked why sales vs rental and asked what they are seeing in the market that has suddenly changed this proposal in the past year. Ram Prashanta, Projades, LLC, 33 W Higgins Rd, South Barrington, IL, stated that they look at every product in a different way and he stated that location here is best suited for sale compared to rent. Com. Moodhe stated that the last three projects that they have seen have been rental projects and asked what makes this project different. Mr. Prashanta stated that with interest rates going up and price points, it's hard to have a rental property and cap rate will be low with such high value homes if they were rental housing. Com. Moodhe asked if having townhomes along the railroad track priced around 500K seems to work. Mr. Prashanta stated that the biggest draw is the schools'location and easy transportation in the area. Com. Moodhe stated that the schools seem to be maxed out at Stevenson and District 102 and has some serious concerns regarding the number of school children generated, and the numbers don't add up with the addition of a 4'h bedroom. Mr. Prashanta stated that a lot of families will have senior citizens, and the addition of the fourth bedroom in the basement is a big draw. Com. Moodhe asked if he sees the market and the proposed development being for the extended family types, which will include more students. Chairperson Weinstein asked if the additional bedroom or occupancy added going to generate more cars or traffic. Mr. Shaprio stated that he does not expect that it will, as no traffic study was done since the original proposal. But stated that the 4rh bedroom being added to the development would marginally increase traffic. Com. Worlikor asked if the petitioner could explain how the student count is calculated and how adding a fourth bedroom affects the student count.Also, clarify which parameters are used, considering that the school district is a draw, and explain which factor accounts for that in the calculation. Page 69 of 73 06/5/2024 Jonathan Perman from the Perman Group at 1904 W Newport Ave, Chicago, IL provided an overview of the student calculations. He mentioned using a study from 2006 by Rutgers University Center for Policy Analysis and noted that the Village uses a formula from 1996, which may be outdated. In their fiscal impact analysis, they prefer to use a more recent study. Perman considered both studies in their estimated formula and assumed that half of the units will be three-bedroom and the other half will be four- bedroom units. Their estimate indicated less than 10 elementary and 5 high school students. However, according to the Village's formula, the results were 16 elementary students and 5 high school students. Herman mentioned that they adjusted the numbers slightly, adding two students and rounding up to 10 for elementary students, and similarly, they added another high school student, going beyond what the formula suggested. Mr. Perman presented new trends on student projections of District 125 and District 103 to the Commissioners. Com. Saxena stated that he is not sure if he agrees with the logic of the new student projection trends with the new developments in the area. Mr. Perman stated that he thinks the trends show that we have more households being formed but with fewer people per household. He mentioned that there are fewer people living in each unit compared to 20, 30, or 40 years ago. Com. Worlikar asked if the report shows a decline in population in the total population or school population. Mr. Perman stated that the whole population in the area is in a decline. He stated that District 21, mentioned on the prior agenda item, actually saw a drop in the total student population district-wide. Com. Worlikar asked if the new trends report takes into account the current classes going into District 125. Mr. Perman stated that their report does not break it down by entering class numbers, but are using a standard measurement. Com. Worlikar indicated he has concerns about capacity at Stevenson. Mr. Perman stated that Stevenson once held a couple hundred more students back in 2006 than it does today. Com. Worlikar asked if the calculation considers expanded ESL or programmatic services that are needed. Mr. Perman stated that another section of the report examines the total cost per student, which includes ESL and other special student services aggregated together. Com. Worlikar asked if the student generation is larger than expected, is there any thought of working with schools to support them in meeting the expected number of students or limiting the capacity of school-aged children as the development proceeds. Mr. Shaprio stated this is an issue that could go into a number of layers and respect the due diligence with the schools but offered to reduce or cap the proposed development to have no more than 50%or 20 units offered to be four-bedroom units. In addition, before the Village Board meeting, they would be happy to make another outreach to the school districts. Page 70 of 73 06/5/2024 Com. Saxena asked Staff if they have any view on the trend data provided. Ms. Purvis stated that the Link Crossing Development is a different kind of development that includes both single-family and townhomes, so not an apples to apples comparison, but the townhomes vary between 3 and 4-bedroom units, which is somewhat comparable. She stated that they have actual student generation numbers from Link Crossing, which is almost at full capacity, and they are producing.48 students per 3 to 4- bedroom unit, which coincides with the proposed development student generation numbers. She stated that the numbers that are projected for this project are not outside the norm. She stated that the capacity at the schools is a question she would not feel comfortable responding to and is really more a matter for the School Districts. Further discussion was made regarding the revenue the schools would generate if more students were added and the fiscal net gain to school districts. Cynthia Holtzinger, 22723 Prairie Rd. Prairie View, stated that she has been a 30-year resident and the proposed development negatively impacts her life.All of her kids went to the school districts and the schools were packed and the calculations are not correct as this is a highly desirable school district. She had concerns about traffic congestion and speeding issues along Prairie Road. She was also concerned about the negative impact to the environment with the development. Mr. Shaprio closed by reiterating that they open to reduce or cap the proposed development to have no more than 50%or 20 units offered to be four-bedroom units. Vice Chairperson Richards made a motion to recommend approval of an amendment to the Residential PUD, Final Plat of Subdivision, and Preliminary Plan approved by Ordinance No. 2023-106 to allow changes to the approved plans for a 41-unit townhome development, to be called Prairie Pointe Townhomes, located at 22771-22825 N. Prairie Road, subject to conditions in the Staff Report, with the added condition of capping the number of four bedroom units at 50%of the total number of units on the property. Com. Moodhe seconded the motion. Com. Worlikar expressed conflicting feelings about a development that would enhance the area with improvements and benefits, despite the ongoing challenges caused by the increasing number of students. He suggested that it would be helpful for the developers to obtain a letter of support from the School Districts for the project.Additionally, he proposed that if more students are generated than the estimated number, the school should consider making some concessions to address the current issue of overcrowding. Vice Chairperson Richards stated that the development is a betterment to the currently vacant property. He prefers the new design to the older one and also favors ownership over rentals because it provides more stability. Richards expressed empathy for the schools, but mentioned that the actual Link Crossing numbers of school age kids generated is lower than projected. He also pointed out that the school district has not responded since last August,suggesting that they've had ample time to voice any concerns or objections. In conclusion, he voiced his support for the project. Com. Saxena stated that he loves everything about the project but has concerns about the school district impact and would love the schools to buy-in. Com. Moodhe stated that the village has been presented with development projects for a piece of vacant land. The goal is to work with the developers to meet their objectives as Page 71 of 73 06/5/2024 well as the village's goals. There are challenges in collaborating with the school districts and considering how these projects impact them without their input, and determining what's best for the village. Chairperson Weinstein, spoke in favor of the motion. He stated that they have an approved project with an ordinance in place, approved last year. He mentioned that the request involves some modifications to the fagade changes and rental, as compared to the for-sale units. He believes they have met the criteria for the PUD amendment. Additionally, he noted that the schools are aware of the changes, and while it would be nice for the schools to provide input, it's not the Village's responsibility to dictate how the schools should operate. RESULT: RECOMMENDATION TO APPROVE [4 TO 0] AYES: Adam Moodhe, Mitchell Weinstein, Kevin Richards, Sujat Saxena ABSTAIN: Neil Worlikar ABSENT: Marc Spunt, Amy Au, Jason Davis Regular Meeting Other Matters for Discussion Approval of Minutes 1. Planning and Zoning Commission - Regular Meeting- May 15, 2024 7:30 PM The Commission accepted the minutes as presented. RESULT: ACCEPTED [4 TO 0] AYES: Adam Moodhe, Mitchell Weinstein, Neil Worlikar, Sujat Saxena ABSTAIN: Kevin Richards ABSENT: Marc Spunt, Amy Au, Jason Davis Chairman's Report None Committee and Liaison Reports Commissioner Moodhe noted all PZC items were on the consent agenda at the last meeting. Staff Report/Future Agenda Schedule Staff provided information on the future agenda schedule, and reminded the Commission of the upcoming Volunteer Reception scheduled for June 23, 2024 at 4:00pm. Public Comments and Questions None Adjournment The meeting was adjourned at 9:16 PM Page 72 of 73 06/5/2024 Action Items Kelly Purvis APPROVED BY ME THIS 5th DAY OF June 2024 Mitchell Weinstein, Commissioner Page 73 of 73