1977-12-19 - Resolution 1977-70 - Street Maintenance for 1978 $135,145.00 REFOLUTI0 7 tr77'-70
• STATE OF ILLINOIS L�
RESOLUTION FOR MAINTENANCE OF STREETS AND HIGHWAYS BY
MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
President and Board of Trustees
BE IT RESOLVED, by the of the
(Council or President and Board of Trustees)
Village of Buffalo Grove , Illinois, that there is hereby
(City, Town or Village) (Name)
appropriated the sum of $ $137,145.00 of Motor Fuel Tax funds for the purpose of maintaining
streets and highways under the applicable provisions of the Illinois Highway Code, from January 1, 19 78
to December 31, 19 78
BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described
on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates ap-
proved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the
period as specified above.
BE IS FURTHER RESOLVED, that the Clerk shall, as soon as practicable after the close of the period
as given above, submit to the Department of Public Works and Buildings, Division of Highways, on forms
furnished by said Department, a certified statement showing expenditures from and balances remaining in
the account(s) for this period; and,
BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Public Works and Buildings, Division of Highways, at
, Illinois.
Mr• Mrs. VErna L. Clayton Village
APPROVED I, Miss --,
Mrs. (City,Town or Village)
Village
Clerk in and for the
(City,Town or Village)
of Buffalo Grove County of Cook & Lake
19 hereby certify the foregoing to be a true, perfect and complete
Dept. of Public Works and Buildings
Division of Highways copy of a resolution adopted by the President & Boas'Lot'
(Council of President and Boa nufeegis
at a meeting o , 199 t
IN TESTIMONY WHEREOF, I have hereunto set my hand
District Engineer and seal this /9164 day of ,
A.D. 19
(SEAL)
. lcrk
(City,Town o Village
Pone SLR 361 (Rev.3.68)
}M'a re",
\ / snmm O/ fWN01= `/
MUNICIPAL ESTIMATE OF MAINTENANCE COSTS
Ulnae ) .f2)
Period from January 1, 19 78 , to December 31, 19_Z8 Municipality Buffalo Grove
ESTIMATED COST OF MAINTENANCE OPERATIONS
MATERIAL EQUIPMENT. OR LABOR
MAINTENANCE OPERATION OPERATION
(NOrOESCRIPTIONTOTAI.QUANTTTY) REM AND SPECIFICATION REFERENCE I QUANTITY UNIT AMOUNT COST
AND UNIT COST
1)Snow & Ice Control #428 equipment rental var. var. 10,569
labor 1600 hrs. 5.25 8,400 _
materials (salt) State bid 1,000 tons 13.34 13,340
_$ 32,309 j
, 2)Traffic & Sign Installa- equipment rental 500 hrs 4.25 2,125
tion #431 labor 850 hrs 5.71 4,853.50
material ** var var 8,000 $14,978.50
3)Storm Sewer Maintenance equipment rental 500 hrs 4.25 2,125 _
#415 labor 800 hrs 5.00 4,200
matpria1c var var 1,400
$ 7,725.00
4) Strpal striping 4417 perma-line Contract 5 year var 1,224
Additional striping (if needed) 1,400
$ 2,624."00
S)Pitnminiona Patching aquipmant rental var var 4,587.60
#47F labor 1.000 hrs 5.25 5,250
mRi- ria7 ** Class I 250 tons 15.00 3,750
" M-11-7? 125 tons 15.00 1,875
" stone 750 yds 00 3,750
" tynrrrpte 200 c.y. 2: 00 5,600
$24,812.60_
'r'raffi^ Contrn7 .SyatF+m
6 intersections share cost with County & State 6 locations 1400 m. 16,800
405 & street lighting 520 lights 1100/ 013,200
$30,000.00
7)Sidewalk R & R #414 contract maintenance 10,000s.f. 2.00 20,000
Curb & Gutter R&R #416 If 500 1.f. 10.00 5,000
$25,000.00
•
$137,144.10
TOTAL ESTIMATED MAINTENANCE COST
Submitted , 19 Approved , 19
By
M17°i0'1 O°Iobil nu' District/Regional Enginc,r
Submit Four(4)Copies to Dist./Reg. Engineer
Form Ii1.k591(Iof2)
(Rev. 12-73)
J
MUNICIPAL REQUEST FOR EXPENDITURE OF MOTOR FUEL TAX FUNDS
Municipality Buffalo Grove
— --To the: State of Illinois Section 78-00000-00GM
Department of Transportation
BUREAU OF LOCAL ROADS AND STREETS
I hereby request authorization to expend motor fuel tax funds as itemized below:
CONSTRUCTION COSTS $
ENGINEERING COSTS • $
RIGHT-OF-WAY COSTS (As per itemization on reverse side) $
MAINTENANCE COSTS (Period from Jan. 1 to Dec. 31 ) $ 137,145.00
IMRF OR SOCIAL SECURITY $
$
$
$
$
TOTAL FUNDS REQUIRED $ 137,145.00
Date , 19
Signed by
(Title of Official)
(Submit ONE copy to the District'Regional Engineer)
(Space below for District/Regional Engineer only)
RESOLUTIONS Passed , 19— RESOLUTIONS APPROVED , 19—
, 19— p19—
TOTAL MONEY APPROPRIATED$—
ESTIMATED COST-Const. * . $ -
(plus additions Engr. . .
minus deductions) R.O.W. . —
Maint. .
TOTAL . . . . $ - ---
AUTHORIZED TO DATE—Const. $
Engr. . . .
R.O.W. . . — -
Maint. . .
TOTAL $-- '.
BALANCE IN APPROPRIATION ,
*If contract section. show contract costs instead of estimated cost. Form BLR 47r(Rev. 9-72)
,�xs.
ITEMIZATION OF RIGHT-OF-WAY QUEST '
LOCATION OF PROPERTY Acres Cost of Cost of Daman.
Between And NAME OF OWNER Right- Land to Land TOTAL
Street (Street) (Street) of-Way Taken Not Taken
•
•
TOTAL $