1973-12-17 - Resolution 1973-26 - Buffalo Grove offersIllinois Board of Higher Education and Harper College to secure a second location in Buffalo Grove RESOLUTION NO. 73-25 WHEREAS, the State of Illinois, Department of Transportation is responsible for the improvement of Route 68 commonly called Dundee Road within the Village of Buffalo Grove; and which also is classified as a Federal Aid Primary street within the Federal Road- way Aid System (FAS Route 115 ; Illinois Route 68, State Section 3041-15D-Z-R) , and WHEREAS, the State of Illinois did enter into an agreement with the Village of Buffalo Grove on March 20, 1972 for the reconstruction of Dundee Road into a four lane divided highway; and WHEREAS, the State of Illinois did enter into a contract with Greco Construction Company of Rosemont, Illinois in September 1972 for the reconstruction of the road and previously with Di Paolo Company of Niles, Illi- nois for the installation of the storm sewer system; and WHEREAS, the storm sewer was installed with minimal inconvenience to the motorists using Dundee Road; and WHEREAS, the construction of Dundee Road which included clear- ing the right of way and preparing the road base for paving began on October 15, 1972 ; and WHEREAS, the paving of the northern two lanes of Dundee Road has just started after several months of no road construction during one of the best construction seasons in several years ; causing the Village resi- dents to wonder if the road would be finished be- fore the first winter snows; NOW, THEREFORE, BE IT RESOLVED, by the Village President and Board of Trustees of Buffalo Grove, Illinois, Counties of Cook and Lake, that : SECTION 1. The Village of Buffalo Grove desires that the two northern lanes of Dundee Road be completed prior to December 1, 1973; SECTION 2. All efforts to be made to insure the completion of the Arlington Heights Road realignment at Dundee Road and Buffalo Grove Road realignment at Dundee Road prior to December 1, 1973 ; SECTION 3. The State of Illinois require work crews to work on Saturdays and Sundays until this portion of the road project is complete; and I t 4F �4040 `/ r _ L./ SECTION 4. The State of Illinois insist upon good highway safety measures during this road construction period and that no excavation of the south two lanes be permitted until April 1, 1974; and SECTION 5. Gravel be installed between the new road lanes and the existing road lanes to prevent cars from falling into this uprotected area. SECTION 6. Copies of this resolution be forwarded to Governor Daniel Walker; State Senators Glass and Berning; State Representatives Porter, Duff, Katz, Murphy, Pierce and Deuster ; and Secretary Bond of the Department of Transportation. VILLAGE OF BUFFALO GROVE, BUFFALO GROVE, ILLINOIS 04010 BY AIIii 4:✓LI( ar'11W mstron I age eside t ATTEST: �..' Vi7Jags C1 k Dated this / day of /1 1973. - r \ 4