Loading...
1973-02-05 - Resolution 1973-02 - Maintenance of Streets and Highways for 1973 STATE OF ILLINOIS r RESOLUTION FOR MAINTENANCE OF STREETS AND HIGHWAYS BY ;! MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE BE IT RESOLVED, by the President and Board of Trustees of the (Connell or President and Board of Trustees) Villageof Buffalo Grove Illinois, that there is hereby (City. Town or Village) - (Name) .appropriated the sum of $ 26,900. of Motor Fuel Tax funds for the purpose of maintaining streets and highways under-the applicable provisions of the Illinois Highway Code, from January 1, 19 73 o-December 31, 19 73 . BE IT FURTHER RESOLVED,that only those streets, highways, and operations as listed and described i the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates ap- proved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IS FURTHER RESOLVED, that the Clerk shall, as soon as practicable after the close of the period. =;as' ien above, submit to the Department of Public Works and Buildings, Division of Highways, on forms furnished by said Department, a certified statement showing expenditures from and balances remaining in the accounts) for this period; and, BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Public Works and Buildings, Division of Highways, at • Elgin. Illinois. • APPROVED I,� Verna L. Clayton., Village Mrs. (City.Town or Village) Clerk in and for the Village (City.Town or Village) Of Buffalo Grove , County ofCOok & Lake , 19 hereby certify the foregoing to be true,.p rfe t an complete Dept. of Public Works and Buildings rreS 1 den and Division of Highways copy of a resolution adopted by the Board of TruetPPS (Council or President and Board of Trustees) at a meeting on—kebruuay- 5, , 19 _. IN TESTIMONY WHEREOF, I have hereunto set my hand District engineer and seal this :_1 day of_ Reb-.riPry , A.D. 19 73 (SEAL) Village Clerk (City.Town or Village) Form BLR 361 (Re,.3. 6) Q 73 -=-Z z BUFFALO GROVE M F T MAINTENANCE 1973 GENERAL MAINTENANCE 1 SNOW & ICE CONTROL Estimate 16 hrs./man/month for 4 months EQUIPMENT (Village Owned) 4 - pickup w/plow hourly expense hourl expense rate plow fuel oil & grease *75% [.(1 .30 + .6011+ 1 .00 = $2.17/hr. Using $2.00/hr. ($2.00/hr. x 16 hr/M x 4M) 4 = $512 3 - 1 ton truck w/plow 3 2 ton truck w/plow *75% [(2.25 = 1.00)D + 1 .15 = $3.30/hr. Using $3.00/hr. ($3.00/hr. x 16 hr/M x 4 M) 6 = $1 ,150 1 - tractor, front end loader $10.50/hr. x 4 hr/M x 4 $168 TOTAL $1 :830 *Maximum allowable rental rate. f u u GENERAL MAINTENANCE 1 SNOW & ICE CONTROL CONT. LABOR 10 Men @$4.50/hr. ($4.50/hr. x 16 hr/M x 4 M) 10 = $2,880 MATERIAL Salt 600 tons @$8.49 = $5,094 TOTAL $9,804 2 STREET SWEEPING Estimate 7 days (56 hrs.) 1 month for 8 months EQUIPMENT (Village Owned) 1 - 3/4 C.Y. self-propelled sweeper Maximum allowable rental rate 75% of $10.35/hr. _ $7.75/hr. Using $7.00/hr. $7.00/hr. x 56 hr/M x 8 M = $3,136 LABOR 1 man @$4.00/hr. $4.00/hr. x 56 hr/M x 8 M = $1 ,792 . i TOTAL $4,928 3 BITUMINOUS PATCHING ESTIMATE 7 tons/month @$10/ton 20 hrs. patching/month for 12 months 1 truck 2 men - 1 roller (5 ton) EQUIPMENT (Village Owned) 1 - dump truck Maximum allowable rental rate 75% (2.25 + 1 .00) = $2.44/hr. Using $2.25/hr. $2.25/hr. x 20 hr/M x 12 M = $ 540 1 - 5 ton roller 75% x 5.15 = $3.86/hr. Using $3.80 $3.80 x 20 x 12 = $ 912 1 - air compressor & tools (160 CFM) 75% of $3.80 = $2.85 Using $2.80 - Assuming 10 hrs./month for 12 months $2.80 x 10 x 12 = $ 336 TOTAL $1 ,788 GENERAL MAINTENANCE 3 BITUMINOUS PATCHING CONT. LABOR 2 men @$4.50/hr. ($4.50/hr.. x 20 hr/M x 12 M) 2 = $2,160 MATERIAL Hot mix. patching asphalt 7 T/M x $8.50/T x 12 M = 715 TOTAL $4,663 4 TRAFFIC & STREET SIGN INSTALLATION EQUIPMENT 1 truck @$2.50/hr. $2.50/hr. x 480 hrs. = $1 ,200 75% (2.25 + 1 .15) = 2.55 LABOR 40 hrs./month for 12 months 11 men @$4.50/hr. for 480 hrs. $4.50 x 480 = $2,160 MATERIAL 186 @$8.00 200 signs @$10.00 = $2,000 TOTAL $5,360 5 CLEAN & REPAIR CATCH BASINS Estimate 200 CB @ hr. each 2 men & 1 truck EQUIPMENT 1 dump truck @$2.50/hr. $2.50/hr. x 100/hr. = $250 LABOR $4.50/hr. x 100 hr. x 2 = $900 MATERIAL _ $200 TOTAL $1 ,350 • GENERAL MAINTENANCE 6 LINE MARKING Estimate 60 locations @2/hr. 2 men, 1 truck, 1 marker EQUIPMENT 1 - truck $2.50/hr. x 30 hr. = $75 1 - line marker $0.90/hr. x 30 hr. = $27 TM"- LABOR $4.50/hr. x 30 x 2 = $270 MATERIAL 720' @60ct = $422 $1 .75/lb. TOTAL $804 • • • . STATE OF ILLINOIS MUNIki4i1AL ESTIMATE OF MAINTEN10E COSTS e (S6wtI oft) Period from January 1, 197 , to December 31, 1973 Municipality Village of Buffalo Grnve ESTIMATED COST OF MAINTENANCE OPERATIONS MATERIAL. EQUIPMENT, OR LABOR MAINTENANCE OPERATION OPERATION (NO.—DESCRIPTION— QUA NTITY)QUTITY) ITEM AND SPECIFICATION REFERENCE I QUANTITY I UNIT AMOUNT COST AND UNIT COST 1 . Snow & Ice Control Equipment 1830 Labor 2880 Material (Salt) 600 ton 8.49 5094 9,804 2. Street Sweeping :Equipment 3136 Labor 1792 w,.:. 4,928 3. Bituminous Patch Equipment 1788588p Labor 2) 6 Material 4,664 4. 'Traffic & Sign Installation Equipment 1200 Labor 2160 Material 2000 5,360 5. Clean & Repair Catch- Basin Equipment 250 a `Labor 900 — 'material 200 1 ,350 6. Line Marking Equipment _ 10Z jhOr 270 `Material 422 794 TOTAL. ESTIMATED MAINTENANCE COST $26,900 Submitted . 19 Examined , 19 By Municipal official This District Engineer f � Submit Four (4) Copies to District Engineer Fonts BLR 591 (1 of 2) (Rev. 2-64) }