1972-08-08 - Resolution 1972-21 - Agreement between VBG and Hattis Associates for the contruction of a detention basin ont eh Arlington Golf Course and extension of storm water sewer on the east side of BG Road. " 77 LLAGE � ,'' _ "� BUFF., LO GROVE
Ratifth Xivcl. �ujai° geove, gel. 60090
Verna L- Clayton (3/2)537-8984
villa. clea
•
August 11, 1972
•
Mr.. Sigmund Z ie j ewsk i
Division of Highways
•
595 S. State Street
Elgin, Illinois
Attention: Mr.- RonaldJankauskus
Department of Transportation
Gentlemen :
Enclosed are two (2) certified copies of Resolution
72-21 and Resolution 72-22.
Also enclosed is a copy of an agreement between the
Village and Hattis Associates for the construction of
• a detention. basin on, the Arlington Golf Course and
the extension of the storm water sewer on the east
side of Buffalo Grove Road.
Sincerely,
VILLAGE OF BUFFALO GROVE
•
Verna L. Clayton
Village Clerk
VLC/nk
Enclosures
Z2 — I
STATE OF ILLINOIS Construction
RESOLUTION FOR IMPROVEMENT BY MUNICIPALITY
UNDER THE ILLINOIS HIGHWAY CODE
President and Board at Trustees
BE IT RESOLVED, by the of the
�11 4 Council or President and Bored of Trusted
of fall , Illinois
City.Town,or Village
that the following described street(s) be improved under the Illinois Highway Code:
Amoeba
Name of Thoroughfare Spa From To
outtalk* Grow* Rd. 475' X. et Rd. 950' W. of Doodles Rd.
BE IT FURTHER RESOLVED,
The design and construction et 1. That the proposed improvement consist of roximatelY
' of large di (66* ,±) store sewer together with necessary
hydraulic structures to carry the discharge free the Dundee Road Maw
grow ent storm some system to a detention basin en the Arles
Golf Club.
and Shall be designated as Section 6 C.S.
2. That there is hereby appropriated the sum of $ Five Ithcsisand
Dollars ($ 45j 000 --- ) for the
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
3. That said work shall be done by_
Cttataart ; and,
(Specify Contract or Day Labor)
BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to
the Department of Public Works and Buildings, Division of Hi hways, through its District Engineer.
APPROVED I, • —' clerk
Mrs. (cup. suss.a )
in and forth
(City,T .or
County of -" ' , hereby certify ' g
19 to be t ect and c mplete copy of a resolution adopted by
Dept.of
DivisionPuPublic
Works of and Buildings
At a meeting on
(Council or President and Board of Trustees)
, 19Z-2
ESTIMON HE OF, I have hereunto set my hand and seal this
Chief Highway Reglowr - d� , .D.
- (S_EAL)--
-�- Clerk.
Itr.Town.or Village)
Form eBv. 12-42)LR 414
(R
,..y�.:q.r 33 � '•. ,a 3 f �=`- •
/ 11
1 ttj
w '. a "�. � _....., .. � \ _ � -,.. _ 1!-YN_
:
- 4