Loading...
1996-12-26 - Appearance Commission - Minutes IT feN v r Az � S , APPEARANCE COMMISSION VILLAGE OF BUFFALO GROVE, ILLINOIS THURSDAY, DECEMBER 26, 1996 I . CALL TO ORDER Chairman Richard Gordon called the Appearance Commission meeting to order at 7 :34 P.M. on Thursday, December 26, 1996 . II . ROLL CALL Commissioners Present : F. Weissman, A. Viehman, M. Cea, E. Smith, L. Dorfman, C. Masure and R. Gordon Commissioners Absent : None Bldg. Dept . Liaison: Richard Jensen, Building Inspector Village Board Liaison: DeAnn Glover, Trustee III . APPROVAL OF MINUTES December 12, 1996 minutes were Tabled. IV. BUSINESS A. Highland Park Hospital Health & Fitness Center Corporate Grove Busch Parkway, East of Milwaukee Avenue Full Review: Architecture, Materials, Colors, Landscaping and Lighting A Workshop was held on Thursday, November 14, 1996 . The Architecture, Materials and Colors were reviewed and the Appearance Commissioners had no objections to the proposed construction with the exception of the blue/green window glass . Mr. Ken Gorman, V.P. of the Power Fitness Hospital Group, Developers of the project agreed to present a colored rendering at the next Appearance Commission review. The Landscape Plan was also reviewed. Additional evergreen type material was recommended by Mr. Ray Rigsby, per his November 14, 1996 memo, on the Busch Pkwy. berm to screen the parking lot . i a 1 . Architecture, Materials and Colors Mr. Louis Cusimano, Vice-President of Power Hospital Fitness Group, 2360 North Palmer Drive, Schaumburg, IL 60173-3819 (847) 925-1300 presented a colored rendering of the building with samples of the materials . No changes have been made since the workshop except they have decided to change the color of the window glass from blue/green to a greyer tone that will blend better with the building. The base of the building will have 2 ' 8" of dark brown brick with lighter brown brick up to the second floor. The second floor will be beige dryvit . The roof tile will be charcoal grey. The window frames will match the grey glass . The sample board will be left for the Building Depart- ment to match the materials when plans are submitted. The roof top units will be screened with a 4-1/2 foot parapet . Most of the equipment will be inside the building or in the center of the roof . Each elevation was reviewed and the Commissioners had no comments . Com. Cea made a motion to recommend approval of the Elevations and Materials for the Highland Park Fitness & Health Center on Busch Road at the Corporate Grove as submitted with the exception of the window glass, a sample of which will be resubmitted for Appearance Commission review and approval . Com. Weissman seconded the motion. Roll Call Vote : AYE - Weissman, Viehman, Cea, Smith, Dorfman, Masure and Gordon NAY - None Motion Passed - 7 to 0 . APPEARANCE COMMISSION DECEMBER 26, 1996 - PAGE TWO �✓ U 2 . Landscaping: Mr. Ray Rigsby' s recommendations, per November 14 , 1996 memo, included additional evergreen plantings in the Busch Road berm and on the perimeter of the site and a revised plan was to be provided. Com. Viehman recalled the previous discussion concern- ing the need for additional plantings . Mr. Gorman had been advised to consult with Mr. Rigsby and submit a revised landscape plan, but a new plan was not prepared. When given the option of recommending approval of a revised Landscape Plan subject to Mr. Rigsby' s review, Com. Viehman said he would prefer to see a new plan. Com. Viehman made a motion to Table the Landscaping for Highland Park Hospital Health & Fitness Center. Com.Weissmann seconded the motion. Voice Vote: AYE Unanimously. 3 . Lighting: The shoebox fixtures will have 400 watt metal halide luminariess mounted on thirty foot (30 ' ) poles on 2-1/2 foot concrete bases . They will match the Corporate Grove light source . Some of the fixtures have single heads and the parking lot fixtures will have double heads . The photometric plan was acceptable. Com. Viehman made a motion recommend approval of the Lighting for the Highland Park Hospital Health & Fitness Center at the Corporate Grove, as submitted. Com. Cea seconded the motion. Roll Call Vote : AYE - Weissman, Viehman, Cea, Smith, Dorfman, Masure and Gordon NAY - None Motion Passed - 7 to 0 . Note : Signs for Corporate Grove do not require Appear- ance Commission review. They are sent to the Village Manager, Mr. William Balling for approval . APPEARANCE COMMISSION DECEMBER 26 , 1996 - PAGE THREE 4 " ' a — 1, B. Extended Stay America - Corporate Grove Northwest Corner of Busch Pkwy. and Milwaukee Ave. Full Review: Architecture, Materials and Colors, Landscaping and Lighting A Workshop was held on Thursday, December 12, 1996_ The Architecture, Materials, Colors and Landscaping were described and discussed. The Commissioners made several recommendations regarding the amount of brick, blending the air conditioners vents to match the color of the wall (green was proposed) and the location of the satellite dish and trash enclosures . Mr. Stephen Healy, Construction Manager, Midwest Zone, ESA Management, Inc . 1550 N. Northwest Highway, Suite 401 Park Ridge, IL 60068-1463 (847-375-0306) distributed revised exterior elevations and photographs of a standard Extended Stay America building (all dryvit) . With regard to the a/c vents, the rendering shows a grill that matches the background of the building. 1 . Architecture. Materials and Colors : The brick will match Pratt & Lambert "Winslow Gray" #2270 . The dryvit above the brick will match Pratt & Lambert "Silver Lining" #2288 . The aluminum gutter, fascia and trim color will be "White" and the Roof 'will be asphalt roof shingles will be Elk Prestique II, Weathered Wood. " Window frame & trim color is "Emerald Blue. " With regard to the amount of brick, Mr. Healy informed the Commissioners that the developer (Corporate Grove) requires 80% of the building to be brick and Mr. Schar said this mandate would take precedence over the Appear- ance Commission recommendation to reduce the amount of brick. Mr. Healy described the revised window treatment . There is soldier coursing over the doorway, over and under the windows, and at the top of the brick area below the dryvit . APPEARANCE COMMISSION DECEMBER 26, 1996 - PAGE FOUR q") ,N'r7:77 2 . Landscaping: A revised Landscape Plan has been submitted showing a new location for the satellite dish. They reduced the size of the dish to four feet (4 ' ) and located it within the setbacks, behind the trash area. No review was submitted by Mr. Rigsby and no action was taken. V. ANNOUNCEMENTS None . VI . ADJOURNMENT Com. Cea made a motion to adjourn. Com. Dorfman seconded the motion. Ch. Gordon adjourned the meeting at 8 :20 P.M. Respectfully submitted, Shirley Bates Recording Secretary sb APPEARANCE COMMISSION DECEMBER 26 , 1996 - PAGE SIX A I j - Com. Weissman suggested additional rows of soldier coursing around the building to break up the brick plane . Ch. Gordon said he likes the brick better than the dryvit building, but he preferred the proportions shown in the photograph. Com. Cea suggested using two (2) colors of brick, dark at the bottom and lighter at the top. Ch. Gordon disagreed because this would be stripes . Several other suggestions were made during the discussion on how to relieve the massive amount of brick: 1 . Soldier coursing between the 1st and 2nd floors below the louvers . 2 . Use of matching pre-cast concrete window sills to change the texture of the materials . 3 . Framing the windows on both floors with vertical brick piers . Mr. Healy said this could be considered only on the bump out sections . 4 . Use of some quoins at the corners or elsewhere . Mr. Healy said he would like to Table until he can discuss the Commissioners' concerns with the developer and resubmit new elevations . He would like some clear directions on how to proceed. They will try to incor- porate the Commissioners' ideas or try to achieve some compromise with the current building design with two (2) colors of brick. Com. Gordon said he preferred to lower the brick to below the second floor windows, or do the whole building in brick to achieve the look of the standard design. Com. Viehman made a motion to Table the review of the Architecture and Materials for Extended Stay America. Com. Weissman seconded the motion. Voice Vote - AYE Unanimously Mr. Healy was advised to bring samples of the materials to the next meeting. APPEARANCE COMMISSION DECEMBER 26, 1996 - PAGE FIVE