Loading...
1979-11-29 - Appearance Commission - Recommendation • VILLAGE OF BUFFALO GROVE • APPEARANCE COMMISSION Recommendation Summary • Project Title : Jack Robbins (Plaza Verde))ate: Nov. 29, 1979 Developer: White Way Sign Co. (George doock) Moved b Com. Gibbs Seconded by Com. Knaak I move we accept the variance for the style of lettering for the sign for the Jack Robbins store ; but do not make- any exception to the height of lettering as per the Sign Package. for Plaza Verde. Roll Call Vote: Aye '- Paolillo, Holland, Knaak, Gibbs and Hardt Nay - None Motion Passed. Chairman Hardt explained to the representatives • for Jack Robbins Men's Store that they could meet the height of the Sign Package, or they could appeal to the Village Board. • VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION • Recommendation Summary Project Title : Buffalo Grove Datsun Date: Nov. 29 , 1979 Developer: Trebor Corp. - Bob Stavin(Datsun) • Moved by: Oorp. Knaak Seconded by Com. Gibbs I move we accept the temporary construction sign for Buffalo Grove Datsun as depicted on the blueprints. Colors as shown; with reduction in size of Datsun portion from 6 ft. to 4 ft in height, in proportion to what is shown. Roll Call Vote: Aye - Paolillo, Knaak, Gibbs, Holland and Hardt Nay - None Motion Passed. VILLAGE OF BUFFALO GROVE • APPEARANCE COMMISSION • Recommendation Summary • Project Title : Villas of Buffalo Creek Date: Nov. 29, 1979 Developer: Levitt Homes - Harry Sleek - Moved by: Com. Paolillo Seconded by Com. Knaak I move we accept the architecture for the Villas of Buffalo Creek, models JB 01, JB 02, and JB 03 with the following stipulations: • a) Vents on front elevation to be painted out to natch the siding b)' Light fixtures be the same as were ap- • proved for the other models; if available OR of similar design and quality • c) Construction materials similar to that ap- • proved for the other models; if brick is not available then it must be of comparable quality and appearance.; d) Light fixtures as required by Code on rear elevations e) Corner elevations are to have landscape treatment as approved for the other models f) Railings to be painted black Roll Call Vote: Aye - Holland, Gibbs, Knaak, Paolillo and Hardt Nay - None Motion Passed. • VILLAGE OF BUFFALO GROVE • APPEARANCE COMMISSION Recommendation Summary Project Title :�' xlls of Buffalo Creek Date, Nov. 29, 1979 Developer: Levitt Homes (-Harry 319ak) i Moved by: Com. Paolillo Seconded by Com. Holland I move we accept the architecture for the Villas of Buffalo Creek, Models JN 01, JN 02, and JN 03 with the following stipulations: a) Roof Vents to be painted out b) Light fixtures and all exterior construction materials will -be similar to those approved for the rest of the models; but if - the same materials are not avail- - able - materials of like quality . • will be acceptable. • c) JN 03 overhang shall be a minimum of 6 ft. from ground level (bracket) d) Muttons to be on side windows on corners e) Muttons on the rear to be optional to • the buyer • • Roll Call Vote: • Aye — Gibbs, Paolillo,- Holland and Hardt Nay - Knaak (because of his desire to have Muttons on ALL the windows) Motion Passed.