Loading...
1979-08-23 - Appearance Commission - Recommendation VILLAGE OF BUFFALO GROVE APPEARANCE COP.MMISSION Recommendation Summary Northwest Community Hospital Aug . 23. 1979 Project Title : Date : AC Chairman: Don Hardt Carl Hundreiser - 392-1900 Developer: Moved by: Com. Holland Seconded by: Com . Paolillo LANDSCAPING Com. Holland made the following motions I move we accept the Landscape Plan surrounding the building as shown on Sketch L-2 , dated 8/7/79; ' such to be subject to the Village Forester' s re- view and possible revisions . In addition, I move that the parking area be approved subject to the review of the Village Engineering Dept . Com. Paolillo seconded the motion. Roll Call: Com. Knaak - Aye Coma Paolillo - Aye Com. Gibbs - Aye Com . Holland Aye Com. Weiss - Aye Ch. Hardt - Aye Motion Passed . Note : There are to be no fences . LIGHTING I ' VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION • Recommendation Summary Project Title : Northwest Community Hospital Date : Aug. 23, 1979 Carl Hundreiser, 392-1900 AC Chairman: Don Hardt Developer: Com. Holland Com. Knaak Moved by: Seconded by: • LIGHTING - Com. Holland made the following motion: I move the Lighting for the parking lot area and drives be approved - stipulations: Model #ASL Type - Crause-Hinds Co. All lamps be 250 watt, All poles be 15 ft. in height as stipulated on the drawing SD #1, 7/3/79 Com. Knaak seconded the motion. Roll Call: Com. Knaak - Aye Com. Paolillo - Aye Com. Gibbs - Aye Com . Holland - Aye Com . Weiss - Aye Com. Hardt Aye Motion Passed. • VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION Recommendation Summary • Project Title : Highland Square Date : Aug. 23, 1979 Hoffman Group, Inc . - Unit #w AC Chairman: Don Hardt Developer: Don Alexander Com. Knaak " Com . Holland Moved by: Seconded by: GENERAL ARCHITECTURE Com. Knaak made the following motion: I move we approve all 3 Models for Unit #4, Hoffman Group, Highland Square ; with the following stipulations : Princeton - Stair railings be according •to Code ; Black - Wrought Iron Emerson - - Left side elevation on a corner to be treated with additional landscaping as in Unit #3. Hawthorne - If right side should be on a corner lot , additional landscaping as in Unit #3; Bowed window - material over the window to be galvanized aluminum to be painted out to match the trim. General Requirements for All Models : a) Wherever wood posts are utilized that come in direct contact with concrete - a metal plate will be utilizedbetween the wood post and the concrete b) B-Vents painted out to match the roof- • ing material c) Plastic Louvered (Attic) Vents to be painted to match the trim. cont'd VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION Recommendation Summary Project Title : Highland Square cont'd 2 . Date : Developer: Moved by: Seconded by: d) The 3 different models with a total of 9 elevations , to meet the Monotny Code as per Village requirements . e) Corner models with windows, muttons be carried over to the side of the house exposed to the street . Com. Holland seconded the motion. Roll Call: • Aye - Holland, Weiss , Gibbs , Paolillo , Knaak and Hardt . Motion Passed COLOR PACKAGE Com. Paolillo made the following motion: I move we approve the Highland. Square color scheme as presented with the stipulation that if the bricks are not available, something very similar will be used as a substitute . Com. Gibbs seconded the motion. Roll Call Aye - Weiss , Paolillo, Knaak, Gibbs, Holland and Knaak. Motion Passed LANDSCAPING - Model Area Com. Paolillo made the following motion: I move we accept the Landscaping and Lighting for the Model Area as submitted with the following stipulations : cont'd • VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION Recommendation Summary_ Highland Square cont'd 3. Project Title : Date : Developer: Moved by: Seconded by: • Model Area Landscaping Stipulations : a) Lighting for the Models themselves be screened with low shrubs or burmed. b) Builder agrees to meet the Village Codes when putting in sidewalk and related shrubbery that has to be replaced . • Com. Weiss seconded the motion: Roll Cali.: Aye - Gibbs , Paolillo , Weiss , Knaak Holland and Hardt . Motion Passed SIGNAGE - Sales Office, Highland. Square Models Com. Knaak made the following motion: I move we approve the Signage as indicated on Sheet #1 of the Landscaping Drawing as previously submitted, with the stipulationss a) Signs be identical in size to the signs that are in Highland Grove • b) Also, these signs not be lit individually. Com . Holland seconded the motion. Roll Call: Aye - Weiss , Paolillo, Knaak, Holland, Gibbs and. Hardt . Nfw{-i .w Dnntoi.a is VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION Recommendation Summary Project Title : Highland Square - cont'd 4. Aug. 23, 1979 Date : Developer: Hoffman Group, Inc . Moved by: Seconded by: LARGE BILLBOARD SIGN Com. Paolillo made the following motion: I move we approve the sign as submitted , with the following stipulations : a) Light fixtures now attached to the present sign be removed . b) If Highland Grove sells out - the sign shall be redesigned . c) If Highland :.Point sells out prior to Highland Grove or Highland. Square - the developer shall also come back with a new sign. d) As per the Sign Crie a 1 year time limit be set with a 1 year extention provided the sign is in good condition. Com. Weiss seconded the motion. Roll Calls Aye - Paolillo, Weiss and Hardt No - Gibbs , Knaak and Holland Motion Denied - 3 to 3 tie . Ch. Hardt advised the Developer of his right to appeal the decision to the Village Board . • • VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION Recommendation Summary Pylon Sign Project Title : Bank of Buffalo Grove Date : Aug. 23, 1979 Burt Harris AC Chairman: Don Hardt Developer: Moved by: Com. Knaak Com . Holland Seconded by: PYLON SIGN Com. Knaak made a motion to approve the ground sign for the Bank of Buffalo Grove as submitted . • Com . Holland seconded the motion. Roll Call: • Aye - Weiss , Paolillo, Knaak, Gibbs , Holland and Hardt . Motion Passed. ARCHITECTURAL MODIFICATION Com. Holland made a motion to approve the change in roofing materials for the Bank of B. G . facility at Lake/Cook and Arlington Hts . Rd . from the previously approved asphalt shingle roof to the proposed real Cedar Shake roofing submitted. Com. Gibbs seconded the motion. Roll Call : Aye - Knaak, Paolillo, Weiss , Gibbs, Holland and Hardt Motion Passed VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION Recommendation Summary Office Building - Executive Environs Project Title : Date : Aug. 23. 1979 Burt Harris Developer: AC Chairman: Don Hardt Com. Holland Com. Knaak Moved by: Seconded by: SIDEWALK Com. Holland made a motion to accept the Bomanite Pavement on the paved area of the North and South sides of the Environs Office Building: and the Flag Pole area in the parking lot . Com. Knaak seconded the motion. Roll Call: Aye - Weiss, Paolillo, Knaak Holland, Gibbs and Hardt . Motion Passed. LIGHTING - PARKING LOT Com. Gibbs made a motion to approve the lighting for the •Bank/Office Complex as presented, as specifically outlined by the K locations on the drawing E-1. Lights to be all 15 ft . high, light posts as indicated on the sheet,l 56. Color to be baked enamel - black; All light will be blocked out from the residential area . Com. Holland seconded the motion. Roll Call: Aye - Weiss , Paolillo, Knaak, Gibbs, Holland and Hardt . Motion Passed. VILLAGE OF BUFFALO GROVE APPEARANCE COMMISSION Recommendation Summary Strathmore Estates - Model Area Project Title : - Date : Aug. 23, 1979 Levitt AC Chairman: Don Hardt Developer: Moved b Com. Weiss ' Com. Holland y• Seconded by: Con. Weiss made the following motion: I move we accept the revised Landscaping Plan as shown on Balsamo/Olson drawing #206800 for the Strathmore Estates Model privacy Area; including the/fence around the model area, not to exceed 6 ft. in height; a two-rail fence as shown on the plan around the parking area. All subject to approval by the Village Forester. and the Engineering Dept . Con. Holland seconded the motion. Roll Call: Aye - Gibbs , Knaak, Paolillo, Holland Weiss and Hardt . Motion Passed . •