1994-04-06 - Plan Commission - Minutes PUBLIC HEARING
BUFFALO GROVE PLAN COMMISSION
April 6, 1994
The Coves of Buffalo Grove
Chairman Silbernik called the meeting to order at 7:40 p.m. in the
Village Council Chambers, Buffalo Grove Municipal Building, 50
Raupp Boulevard, Buffalo Grove, Illinois. Chairman Silbernik read
the Notice of Public Hearing as published in the Buffalo Grove
Daily Herald, explained the format to be followed for the public
hearing, and swore in persons who wished to give testimony during
the hearing.
Commissioners present: Chairman Silbernik
Mr. Goldspiel
Mr. Krug
Ms. Howard
Mr. Berman
Commissioners absent: Mr. Rhodes
Mr. Rosenston
Mr. Samuels
Also present: Mr. Michael Schwartz, Attorney at Law
Mr. Edward Schwartz, Edward Schwartz & Co.
Mr. Frank Salathe, JEN Land Design Inc.
Mr. John Marienthal, Village Trustee
Mr. Richard Kuenkler, Village Engineer
Mr. Robert Pfeil, Village Planner
The following exhibits were presented by the petitioner at the
public hearing:
Exhibit A: Preliminary Plan dated March 22, 1994 by JEN Land
Design
Exhibit B: Landscape Concept Plan dated March 23, 1994 by JEN
Land Design
Exhibit C: Perspective sketch of typical building
Mr. Michael Schwartz reviewed the plan noting the property is a
1. 71-acre parcel on the north side of Park View Terrace south of
First Midwest Bank. The property is now zoned Office and Research
and the developer is requesting an R-9 P.U.D. He stated the plan
proposes three buildings consisting of 18 dwelling units which are
consistent with the adjacent development at Covington Manor. The
plan has a density of 10.5 units per acre.
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 1
Mr. Frank Salathe of JEN Land Design, Inc. , stated two variations
are being requested for the property. He noted a request for a
reduction in the minimum size of the parcel allowed under a P.U.D.
from 4 acres to 1. 7 acres which is obviously the size of the
parcel available for use in this particular case.
Mr. Salathe noted that to the west is Frenchman's Cove Park, to
the north is the bank and fire station. The bank is in the Office
and Research District and the Fire Station is in the R-1 District.
To the south is the Covington Manor subdivision zoned R-9 P.U.D.
which is the same zoning being requested for the subject site.
Mr. Salathe stated that both the gross and net density on the
proposed plan is 10.5 units per acre. He stated there is no
public right-of-way and all access is being taken off the adjacent
right-of-way of Park View Terrace. He noted that the Covington
Manor P.U.D. gross density is 9. 13 units per acre which includes
right-of-way and a stormwater detention facility. If those areas
are subtracted from the site acreage, the net density is 11.82
units per acre. This indicates that the proposed development is
compatible with the area and is actually less dense than the
adjoining development.
Mr. Salathe stated that each of the three proposed buildings would
contain six dwelling units. The two interior units are two-car
garage townhome units and the end units are flat over flat, with
one-car garages.
Mr- Salathe stated the second variance request concerns the
perimeter side yard setback. He noted the petitioner is requesting
a reduction from the required P.U.D. setback of 35 feet to 12
feet. He noted that the 12 foot setback is the standard setback
required in the R-9 district. He noted that the plan provides a
rear yard setback of 60 to 65 feet, which exceeds the 35-foot
requirement. Front yard setbacks will be 30 feet; 25 feet is the
requirement.
Mr. Salathe stated the plan provides three offstreet parking
spaces per dwelling unit, which together with the combination of
the two-car garage townhome units provides a total of 70 offstreet
spaces for an overall parking ratio of 3. 89 spaces per unit.
Mr. Salathe commented that buildings 1 and 3 are angled slightly
to provide longer driveways and a more varied orientation to the
street. He further noted the developer has provided a pathway
along the driveway at building 3 to provide pedestrian access over
to the park.
Mr. Salathe reviewed the landscape plan noting that the existing
street trees along the front of the property will be maintained as
well as extra shrubbery to break up the driveways coming out of
the building. Existing vegetation along the eastern property line
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 2
and the southwestern property line will be left in place.
Additional plant material will be provided at the rear of the
development to provide some screening from the bank parking lot
and the fire station. Some berming will be provided in the north
rear yard as part of the screening adjoining the bank property and
fire station site. He noted that stormwater detention will be
accommodated at the existing detention basin in Covington Manor.
Mr. Edward Schwartz reviewed a rendering of the building noting
the stacked flat. He stated the two-story townhomes would be 3
bedrooms, 2 1/2 baths with optional basements. He stated the
flats would be 1,350 square feet on the first floor and 1,550
square feet on the second floor ranging in price from $140,000 to
$150,000. The townhomes will be 1,500 to 1,700 square feet and
will sell from $160,000 to $170,000.
Commissioner Goldspiel inquired what the zoning is for the park.
Mr. Salathe stated it is zoned as a park under the Arlington
Heights Zoning Ordinance.
Commissioner Goldspiel noted his concern for the requested
variation of the side yard due to the proximity of the park and
the associated noise.
Mr. Salathe noted there would be a 12 foot separation from the
property line and another 15 feet to the soccer field for a total
of 24 feet from the active area of the soccer field. He noted
there are a number of ways to handle the separation. Either a low
fence or shrub screening could be used.
Commissioner Goldspiel asked if Mr. Schwartz had given any
consideration to concrete drives rather than asphalt.
Mr. Schwartz stated he would prefer to use asphalt, not concrete.
He stated that they have added so much extra driveway that the
cost would add substantially to the units.
Commissioner Goldspiel noted the carriage walk leading to the park
is four feet rather than five feet.
Mr. Schwartz stated this is not a public walk. This walk is to
accommodate anyone wishing to go to the park, and having a five-
foot width would have no advantage.
Commissioner Goldspiel asked how compatible this development is
with the development across the street on Parkview Terrace.
Mr. Salathe stated the development is very compatible with the
Parkview Terrace development in both density and the type of
building proposed. He noted that the proposed buildings are
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 3
actually smaller in footprint than the Covington Manor buildings.
Commissioner Goldspiel asked if the developer had considered
pedestrian access to Dundee Road or the bank.
Mr. Schwartz read a letter directed to the Village Manager dated
March 25, 1994 which states the bank is opposed to a public walk
for reasons of liability in the maintenance of such a walk and for
a concern for security of such an area.
Commissioner Krug inquired what the percentage of land coverage
would be for the proposed development compared to Covington Manor.
Mr. Salathe stated the building cover at the proposed development
is 26 percent and coverage at Covington Manor is 24.5 percent.
Commissioner Krug noted the presence of some trees in the areas
where driveways would be constructed. He said a tree survey should
have been done to clarify which trees would be saved or relocated.
Mr. Salathe stated there is an opportunity to transplant some of
the trees that are located in the right-of-way of Parkview Terrace
and parkway trees will be provided as required by ordinance.
Commissioner Krug asked what would happen to the honeysuckle tree
in the middle of the proposed development.
Mr. Salathe stated that this tree would be preserved if possible.
However, if the tree is within the footprint area of a building,
it_ will have to be removed.
Commissioner Krug stated that he would like the tree saved if at
all possible.
Mr. Salathe stated there was considerable interest in the existing
trees located to the east and the southwest corner. He further
stated that they have made an effort to position the driveway on
building 3 so that as much of the existing vegetation as possible
could be maintained.
Commissioner Krug noted the requested variations seemed extensive
for such a small piece of property.
Mr. Schwartz stated they are requesting a P.U.D. per discussions
with Village staff as it would provide better zoning control for
the Village. He noted that the plan conforms to the standard R-9
sideyard.
Mr. Pfeil stated that originally this development was to have a
stormwater basin on site to be maintained by an association. This
would have resulted in one zoning lot with three buildings, and
multiple buildings on a zoning lot are allowed only with P.U.D.
zoning. If the site were platted into three R-9 lots, the only
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 4
control the Village would have would be the density standards of
the R-9 District. With R-9 zoning, larger and more massive
buildings could be built on each of the three lots. In effect, the
R-9 zoning without a P.U.D. would allow greater density and larger
buildings. The P.U.D. approach gives the Village the authority to
approve a specific plan stipulating the exact size of the
buildings and the number of dwelling units. The P.U.D. will also
require a homeowners association, and maintenance of the property
will be an obligation of this association.
Commissioner Krug asked if the Village Engineer would expound on
the drainage plan for the development.
Mr. Kuenkler stated that the Covington Manor basin was originally
substantially oversized to address some situations downstream.
Some of these situations have been corrected and some additional
ones are currently being considered by Wheeling Township. He noted
that half of the site is already tributary to the Covington basin.
Commissioner Krug asked if this would put a burden on the
homeowner's association which maintains the Covington Manor basin.
Mr. Kuenkler stated that the maintenance of the facility will not
change due to the new site being added to the stormwater flow
coming into the basin.
Commissioner Howard stated she would like to see more landscaping
than what is shown on the plan for the western boundary adjoining
the soccer field.
Mr_ Schwartz stated that a berm with landscaping could be placed
along the west yard line, but he would prefer not to screen off
the open space. He further stated that there are temporary goals
on-the field, and these goals would be moved when a building is
constructed on his site.
Commissioner Howard stated that she would like to see shrubbery
screening the eastern boundary next to the church parking lot.
Mr. Schwartz stated there is really no parking lot there. If the
church does eventually extend the parking lot, then it would be
incumbent upon the church to add screening. He further stated they
would certainly address anything that is a concern for prospective
buyers.
Commissioner Howard asked if the berm on the northern boundary
would be three feet.
Mr. Schwartz stated said berm would be three feet.
Commissioner Berman stated he hoped the soccer field would not be
oriented toward the proposed buildings. However, soccer balls
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 5
often travel long distances and children are not always careful.
He noted that the building and front door orientation is towards
II'
the park and it is therefore incumbent on the developer to provide
some manner of protection against soccer balls hitting people as
they walk into the building.
Commissioner Berman noted his concern with the mass of pavement
that goes to building three. The length of driveway and pavement
and its orientation to the neighbors is of great concern
especially with regards to snow storage and impact on the other
neighbors. He stated that some expanded screening to lessen the
impact on the future neighbor would be a good idea.
Mr. Schwartz stated that the building is oriented the way it is
shown because of the existing trees in that corner. He further
stated there would be no problem in adding shrubbery to screen
from soccer balls.
Commissioner Berman noted additional landscaping next to the clump
of four or five existing trees would be welcome to protect against
the runoff and the snow and the blight of a large driveway.
Mr. Schwartz stated that he would certainly screen the driveway.
He further stated that the condominium association would be hiring
snow removal services which picks up the snow and stacks the snow.
Commissioner Berman noted there did not appear to be a tremendous
amount of green space in front of the buildings for snow stacking.
Mr. -Schwartz stated they are working within the constraints of the
property.
Commissioner Berman stated there are constraints imposed by this
property which leads him to question the plan for this particular
parcel.
Chairman Silbernik reiterated his concerns:
1. Disappointment with the lack of a tree survey
2 . Concern of positioning of the trees on the driveway in terms
of visibility when backing out of the driveway
3 . Compatibility becomes an issue with Covington Manor as they
have concrete drives and this plan proposes asphalt
4 . Concern with the lack of locations on the site for snow
storage
5. Concern with 12 foot setback adjoining the soccer field and
noise associa
ted with usage
e
parkg
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 6
6 . Concern for marketability of the units due to the proximity
of church parking lot when it is eventually constructed
Mr. Schwartz said it is a judgment call regarding concrete versus
asphalt and noted that the development will be compatible with
Covington Manor. He noted that if the Plan Commission insists on
concrete driveways, he would comply, but at a substantial
additional cost to the units.
Mr. Schwartz further stated that this property is currently zoned
for Office and Research and it would be possible to build a four
story building up to 50 feet in height which would have blacktop
driveways and parking lots all over. The proposed development is
one that blends in well with the neighborhood and even enhances
the value of Covington Manor by blocking the view of the bank and
fire station.
Mr. Gerajrz, 3320 Betty, noted his concern with the water problem
in Dunlo Acres which is east of Covington. He said the stormwater
flow onto his property is getting worse.
Roger Lundine, 376 Covington Terrace, noted his concern with the
traffic jam that will be formed on Parkview Terrace as guests will
all be parking on the street, and parking on both sides of the
street restricts the width of pavement available for larger
vehicles such as fire trucks. He stated that snow storage will be
major problem. He further stated that dogs will use the church
parking lot and the park. Although there are ordinances against
this kind of thing, it is difficult at best to enforce. He stated
this is a nice plan but not for this site.
Dick Stone, President of Kingswood Church, stated that any parking
lot extension will not come all that close to the proposed
property. He did, however, express his concern with drainage.
Mr. Schwartz noted that the water would be collected and piped
into the storm sewer system.
Ruth Reynolds, 367 Parkview Terrace, expressed concern regarding
water and drainage problems.
Mr. Schwartz stated they would do whatever needs to be done
according to the Village Engineer.
Commissioner Goldspiel asked the Village Engineer to explain some
of the changes that are taking place at the detention basin.
Mr. Kuenkler stated that Wheeling Township is studying the
drainage system in the Dunlo area. The release rate on the
restrictor in the Covington Manor basin will be reduced to lessen
the rate of water flow to the Dunlo area.
Marc Cohn, 534 Parkview Terrace, noted his concern with a P.U.D.
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 7
designation for this development as it does not fit any of the
requirements. He said he does think that the Village can vary the
minimum area requirement for a P.U.D.
Chairman Silbernik stated Mr. Schwartz could have asked for three
separate parcels with R-9 zoning and met every standard of the
District. He noted that it was the Village's determination that a
P.U.D. with variations would be a better zoning approach to
control development on this site. He noted that a P.U.D. gives the
Village long-term control on the size and number of buildings that
can be built on the site.
Tom Behan, 522 Parkview Terrace, noted this plan proposes too many
buildings in too small a space. He further noted that the soccer
games will definitely interfere with residents in building three.
He stated soccer games are played daily in tandem and all the
spectators will be pushed onto his front yard. He stated that
stormwater flow is already too heavy for the Covington basin, and
18 additional units will bring even more serious problems. He
stated that all the water draining from this mass of concrete will
run along a swale which runs through the already flooding side and
back yards of all the buildings to the south, adjacent to the
soccer field. He further stated that six more families will be
dumping garbage from building three twice weekly right in front of
his front door as it is the only logical place it can go. Lastly,
there is no place to pile the snow on the site, so it will be
dumped right in front of his door. In effect, his property value
will be greatly reduced.
Chris Haj , 441 Parkview Terrace, stated landscaping and berming is
not a very good idea with kids around to destroy same. She stated
she would like to see the area left as open space for the kids to
play. She stated that when the association takes over, the snow
removal will deteriorate and it will become a serious problem.
She further stated that when trees are moved, they rarely survive
more than a year. In addition, she noted that these units are
already being listed for sale by multiple listing service even
though the plan has not been approved.
Ms. Reedy, 502 Parkview Terrace, stated she bought at Covington
Manor for the open green space areas. She urged the proposed
buildings be pushed back to allow for more green space in the
front. She stated that parked cars along Parkview Terrace will
create serious traffic problems.
Carol Mayer, 123 McHenry Road, stated that as a realtor she would
like to say that most people are partial to concrete driveways and
urged that concrete be used rather than asphalt.
Marilyn Bell, 351 Parkview Terrace, presented pictures of the
flooding at the detention basin taken two years ago.
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 8
Felix Gervais, 1002 Brentwood Circle, stated the site is not
compatible with Covington Manor. He stated that the runoff from
the roofs and buildings will cause even more extensive flooding
along the southwest corner of the site. He stated that this
development is too great a mass for this site. He further stated
that Parkview Terrace is too narrow for both parked cars and
traffic flow.
Mr. Schwartz stated Parkview Terrace is a standard 27 foot back to
back street which is sufficient for two way traffic. He
reiterated that even if this plan is not approved, it would still
be possible to have a four story office building on this site will
all the attendant traffic problems.
Chris Haj , 441 Parkview Terrace, reiterated that fire trucks will
have a difficult time maneuvering down Parkview Terrace when there
are cars parked on the street.
Pat Reed, 1037 Brentwood Circle, noted concern with the upkeep of
landscaping which often falls off after a new development is
finished. She further noted concern with the ability of fire
trucks to maneuver the streets.
Dan Peluse, 491 Parkview Terrace, noted his concern with the
traffic on the street and lack of sidewalks.
Mr. Guy, 495 Parkview Terrace, stated guest parking on Saturday
nights will be impossible and very congested.
Mr. Schwartz stated there is off street parking available for the
proposed development.
Monique Flasch, 1012 Brentwood, stated there will not be any
available parking and guests will never park in a driveway. She
further stated that the fire department has had trouble going down
Parkview Terrace before.
Dolores Cavenaugh, 397 Covington Terrace, inquired who would clean
up after construction traffic as they always leave a terrible
mess.
Doug Sturgeon, 545 Covington Terrace, asked if there is a
limitation to the size of the buildings to be built under a P.U.D.
Chairman Silbernik stated the P.U.D. stands for Planned Unit
Development and the limitation is based on the zoning ordinances
and variances being presented by the developer. However, under an
R-9 zoning without a P.U.D. you could have a 35 unit apartment
building.
Mr. Gervais asked if the water level in the ponds will be raised
with the tightening of the restrictor.
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 9
Mr. Kuenkler stated that tightening of the restrictor will
increase the volume of the ponds. However, the previous comments
regarding detention has taken this into account.
John Allen, 367 Covington Terrace, asked if there any specific
period of time that water can persist in a detention basin.
Mr. Kuenkler stated there is no specific period of time for water
to discharge from a detention basin.
Shirley Wiest, 3319 Betty Drive, stated her yard on the east side
of Covington was lovely until Dundee Road was widened and
stormwater flow became greater. She said her area is flooded even
more since development of Covington Manor. She asked if the water
could be moved from the detention basins to Dundee Road.
Mr. Kuenkler stated that this is not possible without pumping, and
the Village does not use pumps to move water out of residential
basins.
There being no further comments or questions from anyone else
present, Chairman Silbernik closed the public hearing at 9:25 p.m.
Res tfully ubmitted,
7
Fay Rubi , Recording Secretary
RO •
MARTIN SILBERNIK, Chairman
-/
Buffalo Grove Plan Comm-Public Hearing-April 6, 1994-Page 10
1
REGULAR MEETING
BUFFALO GROVE PLAN COMMISSION
April 6, 1994
Edward Schwartz and Company - The Coves of Buffalo Grove
Park View Terrace - Rezoning from the Office and Research
District to the R-9 Multi-family District with
a Planned Unit Development (P.U.D. ) and
Approval of a Preliminary Plan
Town and Country Homes, Proposed Residential Developments
- Workshop #2
Quill (Milbro) property, south side of Route 22 across
from Stevenson High School - Annexation with R-3/R-4
Zoning and Approval of a Preliminary Plan
Billick' s Acres, east side of Prairie Road across
from District 102 Middle School -
Annexation with R-3/R-4 zoning and approval of a
Preliminary Plan
Chairman Silbernik called the meeting to order at 9:30 p.m. , in
the Village Council Chambers, Buffalo Grove Municipal Building, 50
Raupp Boulevard, Buffalo Grove, Illinois.
Commissioners present: Chairman Silbernik
Mr. Goldspiel
Mr. Krug
Ms. Howard
Mr. Berman
Commissioners absent: Mr. Rhodes
Mr. Rosenston
Mr. Samuels
Also present: Mr. Michael Schwartz, Attorney at Law
Mr. Edward Schwartz, Edward Schwartz & Co.
Mr. Frank Salathe, JEN Land Design Inc.
Mr. Vitas Maciukevicius, Metro
Transportation Group, Inc.
Mr. James Truesdell, Town & Country Homes
Mr. Peter Brennan, Attorney
Mr. Joel Finfer, District 125 School Board
Dr. Scott Guziec, Superintendent District
103
Mr. Charles Cohen, District 102
Mr. John Marienthal, Village Trustee
Mr. Richard Kuenkler, Village Engineer
Mr. Robert Pfeil, Village Planner
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 1
APPROVAL OF MINUTES
Moved by Commissioner Goldspiel, seconded by Commissioner Howard
to approve the minutes of the regular meeting of March 16, 1994.
All Commissioners were in favor of the motion and the motion
passed unanimously with Commissioners Berman and Silbernik
abstaining.
COMMITTEE AND LIAISON REPORTS
Commissioner Krug said that he attended the Village Board meeting
of March 21, 1994. One of the items discussed by President Mathias
was a proposal for a Mobil station service station and Checkers
fastfood store in Wheeling at Weiland and Lake Cook Road. The
Village of Buffalo Grove objected to the service station
originally, and President Mathias said he has sent another letter
of objection to the Metropolitan Water Reclamation District noting
that the original approval by MWRD to provide sewer service to
this Lake County site was based only on the service station, not a
fastfood store.
Commissioner Krug indicated that the following items were also
reviewed by the Board:
1. Referral of Prairie Grove II south of the previously approved
P Y PP
Prairie Grove development. This will allow for continuation
of streets.
2. --Referral of 936 S. Betty Drive concerning rezoning from B-i to
R-3 or R-4
3. Annexation of the Prairie Grove subdivision
Commissioner Krug noted that the Village's Capital Improvements
program includes a traffic signal at Buffalo Grove Road and
Checker Road.
Trustee Marienthal noted that the traffic signal will be a shared
cost between the Village and the County of Lake.
Commissioner Krug stated there was further discussion on the new
water main proposed on St. Mary' s Parkway. He further stated the
Buffalo Grove Performing Arts Council discussed their need for a
building for their use. The Village Board will appoint a blue
ribbon panel to study this issue.
Commissioner Krug also stated that John Green gave a presentation
j on the 2 . 6 miles of bikepath to be built based on agreements
between Wheeling, Buffalo Grove and the Park Districts as well as
the two Rotary Clubs. He noted that private contributions had been
received from various Village business and resources to continue
the bikepath system.
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 2
it
EDWARD SCHWARTZ AND COMPANY - THE COVES OF BUFFALO GROVE, PARK
VIEW TERRACE - REZONING FROM THE OFFICE AND RESEARCH DISTRICT
TO THE R-9 MULTI-FAMILY DISTRICT WITH A PLANNED UNIT DEVELOPMENT
(P.U.D) AND APPROVAL OF A PRELIMINARY PLAN
Moved by Commissioner Goldspiel, seconded by Commissioner Krug
that the Plan Commission recommend to the Village Board approval
for rezoning from the Office and Research District to the R-9
Multiple-Family Dwelling District and approval of a Residential
Planned Unit Development and a Preliminary Plan with the following
variations: ZONING ORDINANCE - Section 17. 12 .455 (to allow a
Planned Unit Development of 1. 71 acres instead of the minimum 4
acres) , and Section 17 .28. 050.E.4.a. (to allow a building setback
of 12 feet instead of 35 feet on the west and east side yards of
the_ site) subject to:
1. Enhanced landscaping/screening for the east and west side
yards
2 . Concrete driveways to be installed instead of asphalt
3. Four foot walkway to be a five foot walkway connecting from
Parkview Terrace to Frenchman' s Cove Park
Commissioner Goldspiel speaking in favor of the motion stated that
he is convinced that this project is compatible with the Covington
Manor development. He stated that many standards change over time
and the differences between the two developments are the results
of upgrades made over the years.
Commissioner Goldspiel noted that Parkview Terrace is 27 feet wide
and this is sufficient to handle two way traffic. If traffic is
affected by parking on both sides of the street, then it may be
necessary to look into restricting on-street parking in certain
areas .
Commissioner Goldspiel further stated that density is a non-issue
as the densities of these two developments are basically
identical. He noted his belief that this plan is the best and most
compatible use for this property. He further noted that the amount
of driveway coverage at building 3 is not an unusual circumstance
in the Covington Manor development. In addition, the testimony
from the Village Engineer and Wheeling Township seems to indicate
that the Covington Manor stormwater detention basin is working
properly and will be further enhanced to mitigate downstream water
problems.
Commissioner Krug asked Mr. Kuenkler if the pictures of the
detention basin presented by the residents appear to exceed the
high water level.
Mr. Kuenkler stated the water is not as high as it could have gone
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 3
and the 25 foot setback requirement between buildings and the high
water level is a workable standard.
Commissioner Krug asked if monuments noting the high water level
should be posted in future developments and should be so provided
for in the ordinances.
Mr. Kuenkler stated it would certainly help those people living
next to the detention areas to understand how high the water level
may rise in major storm events.
Commissioner Krug concurred with Commissioner Goldspiel's comments
concerning the suitability of the site for the proposed
residential development. -
Commissioner Howard stated her concurrence with Commissioner Krug
and Goldspiel's statements.
Commissioner Berman noted his agreement with Commissioner
Goldspiel's statements. However, he noted reservations because
the design and layout of the site is neither good planning nor
compatible with the neighborhood. He commented that Mr. Schwartz
has made efforts to improve the plan, but the site has limitations
that are difficult to overcome for the development of the proposed
units. He noted concern with building 3 and the mass of pavement
caused by the constraints imposed on this site. He stated that he
does not feel that this particular parcel is well-suited for the
three building layout that has been proposed. He further noted his
concern with the snow storage and other facets of the plan.
Chairman Silbernik noted his concern with the following:
1. No tree survey has been to document the trees that will be
preserved or relocated
2 . The lack of areas for snow storage
3 . The lack of general purpose parking for guests
4 . Trees will block visibility from driveways when residents
back their cars onto Parkview Terrace
5 . The radius of Parkview Terrace adjacent to the site is not
large enough to accommodate on-street parking in this area,
and cars parking in this area will have a negative impact on
the accessibility to driveways serving homes in Covington
Manor
Chairman Silbernik commented that the proposed density and zoning
are acceptable, but the site plan deficiencies are a great
concern.
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 4
Chairman Silbernik called for a vote on the motion and the vote
was as follows:
AYES: Goldspiel, Krug, Howard
NAYES: Berman, Silbernik
ABSTAIN: None
ABSENT: Rhodes, Rosenston, Samuels
The motion passed 3 to 2 .
TOWN AND COUNTRY HOMES, PROPOSED RESIDENTIAL DEVELOPMENTS --
WORKSHOP #2
OUILL (MILBRO) PROPERTY (68-. 9-ACRES) , SOUTH SIDE OF ROUTE 22
ACROSS FROM STEVENSON HIGH SCHOOL - ANNEXATION WITH R-3/R-4 AND
R-9 P.U.D. ZONING AND APPROVAL OF A PRELIMINARY PLAN
BILLICK'S ACRES (62 .5-ACRES) , EAST SIDE OF PRAIRIE ROAD ACROSS
FROM DISTRICT 102 MIDDLE SCHOOL - ANNEXATION WITH R-3/R-4 ZONING
AND APPROVAL OF A PRELIMINARY PLAN
Mr. James Truesdell of Town & Country Homes reviewed the original
Billick' s site plan calling for 128 single family lots and the
Quill property calling for 147 townhomes and 98 single family
homes.
Mr. Truesdell stated they have put in a contract on the Wilke
property for an additional 4 acres on the south end of the site to
accommodate the extension of Weiland Road. This additional acreage
will accommodate a right of way dedication for the future road on
the plan for the Billick property. He noted that the re-alignment
of Weiland and Prairie Road was an issue discussed at the previous
workshop. In addition, it has been determined that the gap parcel
on the site is actually part of the property and will be
incorporated into the site plan. Therefore, the plan now contains
138 units and the total site area is 62 .5 acres.
Mr. Truesdell stated they have had discussions with the Park
District regarding the area provided for parkland in the earlier
plan which backed up to the railroad tracks. The park land has now
been moved back into an area buffered from the railroad tracks and
accessible through the main streets of the subdivision. The park
will still tie in with the detention and wetlands area to the
north. This will also put the park in a location where ultimately
it can be extended south.
Mr. Truesdell stated that with the addition of the 4 acres to the
south, they have now been able to accommodate the proposed
extension of Weiland Road to Prairie Road. There are several
alternatives proposed but all will allow for a 40 m.p.h. design
speed. The gap parcel will have wetlands and will provide extra
green space for the adjacent homes and will provide an excellent
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 5
separation from the future road.
Mr. Truesdell further stated that they have relocated the access
on Prairie Road farther south so that it is now across from the
new middle school under construction. This access is now in excess
of the required 490 feet from any other access roads as per County
criteria. He stated they have proposed that ultimately a second
access point is to come out to the extension of Weiland Road and
Prairie Road. In the meantime, they will create a cul-de-sac to
serve as a temporary emergency access point to serve the
subdivision from Prairie Road. They are asking for some relief on
the radius of the cul-de-sac from a 60 foot radius to a 50 foot
radius in the right-of-way.
Mr. Truesdell noted they have now realigned side lot lines for a
clear demarcation of School Districts 102 103 within the
subdivision. He further noted they have also indicated possible
future development potential for the outlot sites and lots will be
subdivided into proper lots.
Mr. Truesdell stated they have maintained their request for lot
width. He noted they are not opposed to coming for an R-4 zoning
request with 70-foot wide lots and minimum lot areas of 10,000
square feet. This would ensure that no variations would be
necessary.
Mr. Truesdell noted that the Village and Park District have
expressed concern for maintenance of the small wetlands strip
behind the homes adjoining the railroad tracks. The plan now
proposes that the lots be platted to include the wetlands and
thereby eliminate the need for public ownership and maintenance of
the area.
Mr-. Truesdell noted some changes to the plan for the Quill
property. He stated they have provided for another access point to
adjacent property to the west. He further noted the Plan
Commission's concern with the street pattern through the
development and stated they would like to continue the street
pattern as it is set up. He stated the loop pattern would work
ideally for people coming in and leaving the subdivision because
it separates the traffic and does not force a lot of traffic unto
one street.
Mr. Truesdell noted in response to requests for buffering from the
industrial area that their intent is to use heavy landscaping
which will be shown at the Appearance Commission. He noted that
their request for 70 foot lots will provide extra space for such
heavy landscaping.
Mr. Truesdell also noted that pie-shaped lots on the site plan
will be property adjusted to provided required building setbacks.
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 6
Mr. Joel Finfer, District 125 School Board member, stated that the
district' s fiscal planning has assumed industrial/commercial use
for the Quill property. District 125 has used municipal land plans
as a guide in projecting future growth and the number of students
who will need to be accommodated. He commented that the limited
access on Route 22 will exacerbate the existing traffic problems
adjacent to the High School. He stated that District 125 objects
to the Town and Country residential plan as currently being
proposed.
Dr. Scott Guziec, Superintendent District 103, stated that the
district is going through a period of substantial growth in the
number of new students that have to be accommodated. He stated
that District 103 is studying options for dealing with the larger
enrollments, but their projections have not included residential
development for the Quill property. He said that the number of
students coming from this development will push the District
toward the option of constructing a new school, which will be very
expensive compared to other options. He said that the proposed
development will place an unexpected burden on District 103's
resources.
Mr. Charles Cohen, District 102, stated that his projections for
the Billick property have assumed residential development, but at
a somewhat lower density than the proposed plan. He stated that
District 102 is concerned with the split between District 102 and
103 that occurs on the plan for the Billick property. He suggested
that a green belt separate the two districts, and he commented
that townhome development on the 103 portion of the Billick plan
would result in a lower number of students than the proposed
single-family plan for the entire property. He said that the split
between the two districts would be less significant to homeowners
who buy the townhomes, since these buyers will not typically have
children who are elementary school age.
Commissioner Goldspiel said he would like to hear more about the
alignment of the Weiland/Prairie Road extension.
Mr. Kuenkler stated that the Village has worked with the developer
to find a feasible alignment, and the proposed plan is a
alternative. He noted that the alignment assures that right-of-way
will be dedicated on the Town and Country plan for the Billick
property. He also noted that additional right-of-way acquisition
will be needed from other properties east and south of the Billick
property to achieve the entire alignment connecting to Aptakisic
Road.
Mr. Truesdell stated that the proposed alignment would be a good
solution from the public standpoint because it involves a
substantially shorter route than other alternatives, and this will
provide a greater savings in construction and potentially in land
acquisition.
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 7
Commissioner Goldspiel noted that he would like to avoid lots with
streets on three sides.
Mr. Truesdell noted that this is not an unusual situation and that
these lots would not, of course, be the most desirable lots in the
j subdivision.
Commissioner Goldspiel stated he has a real concern with lotting
out the wetland areas and expecting same to be reasonably
maintained.
Mr. Truesdell stated they have gone this way in response to the
Park District's concern in maintaining a small strip such as this.
Mr. Brennan stated that this is something that Lake County has
recommended. He noted that Lake County has recommended creation
of conservancy easements in rear yards which was implemented in
Gurnee and has proven to be very successful.
Commissioner Goldspiel asked who does the conserving in these
conservancy districts.
Mr. Brennan stated it would be monitored by a homeowner's
association which does not necessarily own the properties. If
there is any disturbance, the homeowner' s association would be the
initial governing body, but there are provisions in the
homeowner's association documentation that would give the
municipality or county further control over the area.
Commissioner Goldspiel noted that the Village tries to avoid
having homeowner's associations for single family fee simple
properties.
Mr. Truesdell stated that in this case, even without a homeowner' s
association, the area should not require any real maintenance.
Commissioner Goldspiel said he does not think that it is a good
idea to divide the Billick property with a green belt to
differentiate school districts. He stated it is not unusual for
children living next door to each other to go to different
schools. He stated that the Village's planning philosophy is to
generally try to integrate neighborhoods rather than separate
them.
Commissioner Goldspiel also stated that he could not see any
advantage to putting up 70 foot frontage homes and calling it R-3 .
He stated that it seems misleading and is out of order. He stated
that he would be opposed to wholesale variances. He further stated
his concern that the Lake County portion of the Village is not
being planned as a balanced community. He stated that more variety
in lot sizes is needed. He noted the addition of cluster units or
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 8
smaller lot homes would be welcome thereby creating more diversity
in the area.
Commissioner Goldspiel stated that the mixed use on the Quill
property is a nice feature. He noted it would be nice to add to
the mixed use in the industrial area in order to bring in revenue
to the school district.
Commissioner Krug as if there would be sidewalks on both sides of
the street in the proposed project and if there are any bikepaths
proposed for the project.
Mr. Truesdell stated sidewalks would be on both sides of the
street.
Mr. Pfeil said that an 8-foot sidewalk is planned on the south
side of Route 22 .
Commissioner Krug stated he does not see the need for any kind of
green belt separating school districts. He further concurred with
Commissioner Goldspiel against lotting out the wetland area in the
rear of the properties on the Billick plan.
Commissioner Krug asked if there are any existing trees on the
property.
Mr. Truesdell stated the property is primarily farm land and does
not have very many trees.
i -
Commissioner Howard noted agreement with Commissioner Goldspiel
regarding R-4 zoning. She also inquired about the distance from
the rear property lines on lots 44, 45 and 46 on the Billick plan
to the railroad tracks .
Mr. Truesdell stated that the rear lines of lots 44, 45 and 46 are
75 feet from the railroad tracks. He noted that each lot would
also have a rear yard of at least 40 feet.
Commissioner Howard stated that she would prefer to see a fence at
the back yards rather than have the property lotted out to the
wetlands.
Mr. Brennan stated a fence does create a problem whereas lotting
out creates a no maintenance situation.
Commissioner Howard stated ideally she would prefer to keep the
Billick property entirely within District 102 .
Commissioner Berman noted that distinction of two school districts
does not necessarily divide a community and should not preclude
development of this plan.
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 9
Commissioner Berman inquired if there had been any specific
discussions with the County about having access directly across
Brandywyn.
Mr. Truesdell stated the meeting with the County concluded that as
long as the access is in excess of 490 feet away from Brandywyn,
it would satisfy the ordinance and give sufficient room for the
appropriate deceleration lanes and things that are required
without hurting any function of Brandywyn.
Commissioner Berman stated that he still feels that the most
logical thing to do is to line up access with Brandywyn not only
from a traffic standpoint but from a safety point for the middle
school. To have a T intersection directly across from the middle
school will cause left turn movements right in front of the school
with children trying to cross to the school, creating safety
problems.
Commissioner Berman further stated he is not pleased with the
emergency access cul-de-sac concept. He stated it would be a
great temptation to teenagers and others to use it as a
convenience entrance or exit and is not an ideal situation for the
Fire Department.
Commissioner Berman also stated if zoning is to be done as
proposed, then the project should be called R-4. He noted,
however, that he did not feel it is advisable or beneficial to the
Village to go more dense in the Lake County portion of the
Village. He stated there is an existing infrastructure,
transportation and school district problem, in the area which
would be exasperated by higher density.
Mr. Truesdell stated they would like to maintain 10,000 square
foot minimum lots in all cases as the R-3 district would require.
However, they would like to configure many of the lots with 70
foot widths and provide extra depth to achieve the 10,000 square
foot lot area. He noted that 45 percent of the lots do meet the
R-3 standard of an 80 foot width.
Commissioner Goldspiel stated that the character of a single-
family neighborhood is defined more by lot width than lot depth.
Chairman Silbernik stated he would like to see the developer get
together with the three school districts and iron out their
differences as this is a community problem. He further stated
there is a burden on the school districts today by the decrease in
tax dollars and increased costs of providing educational services,
transportation services and support services at virtually all
levels of school districts. He stated there will be a burden
placed on three of the school districts.
Chairman Silbernik stated he would like to a little more
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 10
creativity in the plans. He would like to see how the 70 foot
versus 80 foot lots lay out. He would also like to see a way of
anticipating the next step in tying in Brandywyn. He further
noted that he does not like one access only on the Billick
property and would prefer two separate access points. He noted he
would like to hear from the traffic engineer as to traffic impact
on Route 22.
Chairman Silbernik also stated he would like to hear from the
Police and Fire Departments as to their preferences prior to any
public hearing.
Commissioner Goldspiel asked if any soil investigations had been
conducted and how far along- wetland plans were.
Mr. Truesdell noted that soil borings had been done by two
different companies and they are confident that the plan will
work. He further noted that they had concluded their wetland
delineations and mitigation plans are presently be drawn up. He
further noted that preliminary detention calculations had been
done and this plan is set to work well.
Mr. Truesdell stated he had met with all three school
superintendents and asked it be kept in mind that there will be
some additional industrial property coming into the village which
will provide tax revenue to the school districts and the Village.
He also noted that Town and Country will be extending utility
lines that can be used to support other developments and provide
additional revenue to the schools.
Chairman Silbernik noted he is looking for some closure to the
school issue in order to make sure that as much as possible is
done for the schools.
Mr. Brennan stated they are willing to abide by the ordinances of
the Village for school donations.
CHAIRMAN'S REPORT - None
FUTURE AGENDA SCHEDULE
Mr. Pfeil noted the next meeting is scheduled for April 20, 1994.
PUBLIC COMMENTS AND OUESTIONS - None
STAFF REPORT - None
NEW BUSINESS - None
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 11
ADJOURNMENT
Moved by Commissioner Krug, seconded by Commissioner Berman and
carried unanimously to adjourn. Chairman Silbernik adjourned the
meeting at 11:20 p.m.
Respectfully s mitted,
Fay Rub' , ecording Secretary
APPR
IN SILBERNIK, Chairman
Buffalo Grove Plan Comm-Regular Meeting-April 6, 1994-Page 12
1