1988-10-26 - Plan Commission - Minutes PUBLIC HEARING
BUFFALO GROVE PLAN COMMISSION
CHERBOURG TOWNHOMES
1
OCTOBER 26, 1988
Chairman Sheldon called the Public Hearing to order at 7:30 P.M
in the Municipal Building, 50 Raupp Blvd. , Buffalo Grove, IL.
Commissioners Present: Chairman Sheldon
Mr. Goldspiel
Mr. Krug
Mr. Rhodes
Ms. Howard
Mr. Braiman
Mr. Rubin
Mr. Rosenston
Commissioners Absent: None
Also Present: Mr. Timothy Hernandez, Pulte Home Corp.
Mr. Dan Boland, 295 Ardmore, Des Plaines, IL
Mr. James Sylverne, Housing and Zoning Inspector
Mr. Robert Pfeil, Village Planner
Chairman Sheldon read the notice of public hearing as published
in the Buffalo Grove Daily Herald and informed the audience of
the format for the hearing. Mr. Hernandez was sworn in.
Mr. Hernandez explained that Cherbroug is a development of 210
townhomes on a 60 acre site. The townhomes are being sold on a
fee-simple basis, so each unit will have a front and rear yard.
The site include 20 acres of open space, including lakes and
wetland areas. The approved site plan for Cherbourg clusters
dwelling units around the open space areas.
Mr. Hernandez stated that Pulte is requesting an amendment to
the approved P.U.D. to allow decks on individual lots to exceed
the Zoning Ordinance standard that limits accessory structures
to a coverage of not more than 20 percent of a rear yard area.
Mr. Hernandez reviewed several exhibits:
Exhibit 1 is a Preliminary Plan dated October 6, 1988
that illustrates the sizes of decks that could be built
under the Zoning Ordinance limit of 20 percent coverage
of a rear yard.
Exhibit 2 is a Preliminary Plan dated October 6, 1988
that depicts the sizes of decks that could be built if
the requested variation is granted.
Mr. Hernandez said that Cherbourg was designed to maximize the
amount of open space, so individual lots were deliberately made
smaller adjacent to common open space areas. He explained that
corner lots are larger than interior lots, so larger decks are
possible on corner lots based on the Zoning Ordinance standard
of 20 percent coverage of a rear yard. The proposed variation
would allow interior lots to have decks comparable to corner
lots.
Mr. Hernandez presented a Chart, Exhibit 3, which describes the
different Lots, Models, Average Width, Rear Yard Area, Maximum
Deck Area and Maximum Lot Coverage.
Comparing the Site Plans with the Chart, Mr. Hernandez noted
that on most end units, decks present no problem. The 20%
coverage restriction would affect mostly interior lots.
Mr. Hernandez said Cherbourg wants to build the best upscale
development possible. It has won awards for architecture and
landscaping. It is difficult to refuse purchaser's requests
for alternate sized decks.
Paragraph Four of Mr. Pfeil 's memo to the Plan Commission,
dated October 21 , 1988, suggests the specification of a minimum
distance between decks, or a maximum rear yard coverage ratio,
where rear yards abut other rear yards.
Mr. Hernandez said this suggestion is acceptable and said Pulte
would prefer some reasonable separations, and would be willing
to set parameters with which purchasers must comply. This
would encourage creativity.
None of the Pulte buildings are identical. The standard deck
is 100 square feet. ( 10 ' x 10 ' or 8' x 12' ) Purchasers are
offered various options, ranging up to 340 square feet.
No fencing will be permitted within the development.
Landscaping and berms have been used for separations.
Com. Goldspiel noted that there are some swales running through
some of the smaller rear yards. Decks should not be permitted
to extend over a swale.
Mr. Hernandez said the exact number of problem lots cannot be
formulated until the all the buildings have been developed, and
spot surveys have been made. Some of the lots south of Fox
Hill are being resubdivided.
Of the 54 units sold, 3 or 4 purchasers (approximately 10%)
have had a problem meeting the rear yard coverage requirements.
Some have chosen alternate lots, etc.
Buffalo Grove Plan Commission - Public Hearing - Oct. 26, 1988
Page Two
Mr. Reid recalled that the discussion at the Village Board
included consideration of whether a blanket variance should be
given, or whether individual purchasers should seek a variance
from the Zoning Board of Appeals.
Con. Rubin commented that from his experience on the ZBA,
neighbor's opinions are considered, as well as the impact a
variance will have on the surrounding neighborhood.
Mr. James Sylverne, Building Department Housing and Zoning
Inspector, was present and informed the Plan Commissioners that
the ZBA power to grant variances is limited to 1/3 of the 20%
required set back distances. Some of these cases would be
reviewed and recommendations would be sent to the Village Board
Com. Goldspiel questioned whether the Plan Commission can vary
more than the ZBA?
Mr. Raysa said the Village Board can act upon Plan Commission
recommendations to grant greater variances. He added that the
Accessory Structure Section requires that none of these decks
be nearer than 5 feet from the rear lot lines; and not be
constructed on easements. These are the standard ordinance
requirments.
Mr. Hernandez answered questions pertaining to different
possible situations and said that 360 square feet would be the
maximum size deck permitted. Most would be 340 sf. or less,
but an additional 20 feet is being requested to cover all
possible situations.
In no instance would Pulte permit decks to be contiguous. A
minimum setback of 5 feet is required by the ordinance and this
would give at least 10 feet of separation. He would agree to
specific setback limitation, as well as a percentage limit.
There are 3 or 4 requests for larger decks now, and he could
not predict how many variances would have to go to the ZBA.
No Agencies were represented.
Mr. Dan Boland, 295 Ardmore Road, Des Plaines, IL was present.
He is a future Cherbourg purchaser. He said the reason that
Cherbourg is attractive is because it features the three ( 3)
marsh type ponds, with the extensive landscaping. There is a
very scenic panorama, and the view from the three ( 3 ) unit
building they selected, is very condusive to entertainment,
The open space does not give the impression that the yards are
compressed. The standard 10 ' x 10 ' deck is too small For many
guests. They have selected Unit 7-3, with a 320 sf. deck and
there is not a problem, because it is within the 20%, but
he is present to speak for other purchasers who will want to
enlarge their decks. Because the developer is doing excellent
work, both interior and exterior, Mr. Bolen said he believes
the Village should do something for the entire development.
Buffalo Grove Plan Commission - Public Hearing - Oct. 26, 1988
Page Three
I
There being no other comments or questions, Chairman Sheldon
closed the Public Hearing at 8:45 P.M.
Respectfully submitted,
1
AS,FeL0'4,".. a-1246 -' 1
Shirley Bates,
Recording Secretary
, APPROVED BY:
.421,46d/j ._-- t ___----
Barbara Sheldon
Chairman ,
I
1
I
L
Buffalo Grove Plan Commission - Public Hearing- Oct. 26, 1988
Page Four
PUBLIC HEARING
BUFFALO GROVE PLAN COMMISSION
SEIGLE DEVELOPMENT
OCTOBER 26, 1988
Chairman Sheldon called the public hearing to order at 8:47 P.M.
in the Municipal Building, 50 Raupp Boulevard, Buffalo Grove, IL.
Commissioners Present: Chairman Sheldon
Mr. Goldspiel
Mr. Krug
Mr. Rhodes
Ms. Howard
Mr. Braiman
Mr. Rubin
Mr. Rosenston
Commissioners Absent: None
Also Present: Mr. H. Seigle, Developer
Mr. M. Seigle, V.P.
Mr. M. Schwartz, Attorney
Mr. De Mercurio, Landscaper-
Mr. J. Yerges, Acoustic Engineer
Mr. D. Cole, Real Estate Consultant
Mr. W. Magdziarz, Land Planner
Mr. D. Perlman►, Jr. , Perlman Group
Mr. S. Diamond, Land Planner
Mr. A. Kracower, Landscape Architect
Mr. K. Lockman, 192 Woodstone Circle
Mr. J. Falk, 222 Woodstone Circle
Mrs. B. Pauley, Woodstone Circle
Mr. L. Ellon, 244 Woodstone Circle
Mr. J. Orland, 1st American Bank
Mr. W. Reid, Village Trustee
Mr. W. Raysa, Village Attorney
Mr. J. Sylverne, Housing and Zoning Inspector
Mr. R. Pfeil , Village Planner
Chairman Sheldon read the notice of the public hearing as published
in the Buffalo Grove Herald and informed the audience of the format
the meeting would take. The Seigle representatives:
Messrs. M. Schwartz, H. Seigle, M. Seigle, J. De Mercurio,
J. Yerges and W. Magdziarz, were sworn in.
Mr. Schwartz made the introduction. He stated the purpose of their
presentation was to achieve approval of a preliminary plan as a PUD
for Parcels 1 and 2, currently zoned B-2; and the re-zoning of
Parcel 2 to B-4. The entire PUD includes approximately 7.3 acres.
Some minor modifications have been made to the plan that was
presented at a public hearing held on Sept. 28, 1988. The Seigle
team of representatives were introduced and Exhibits A through I
were described.
Exhibit A - Preliminary Site Plan dated October 11 , 1988
Exhibit B - Elevation of perimeter warehouse
Exhibit C - Composite of the entire quadrant in which the
parcel is located.
Exhibit D - Preliminary elevation of the commercial use.
Exhibit E - Preliminary elevation of Seigle's Home and
Building Center.
Exhibit F - Color photograph of Seigle's Barrington store.
Exhibit G - Color photograph of Seigle's Elgin store.
Exhibit H - Letter from Yerges Acoustics, dated 9/22/88;
acoustics report tendered to Mr. Seigle.
Exhibit I- Tree placement study prepared by Mr. De Mercurio.
Mr. Seigle gave a introduction of the history of Seigle's Home and
Building Centers, now operating at 6 locations. The stores are
unique because they are service orientated.
This second public hearing is being held because the Plan Commission
previously indicated that a Planned Unit Development would meet
the requirement of future control as well as meet the developer's
present needs. He read the PUD Purpose and Requirements, and the
objectives set forth in Chapter 17.28.A. of the Village Zoning
Ordinance.
Mr. Seigle read each section and stated how the proposed development
would achieve the the purpose of protecting the natural resources;
and to protect the investments of the Village, the developer and
adjacent properties. He listed the P.U.D. stipulations:
1 . The proposed PUD would have a Right In, Right Out
access to Route 83. Bank Lane will be integrated
with The Grove Shopping Centers. The North side of
Bank Lane will be paved.
2. The Burger King fast food restaurant will be set back as
requested by the 1st American Bank.
3. The warehouse setback on the East, adjoining the
Woodstone Townhomes, has been changed from 35 feet to
50 feet and additional screening will be provided.
Many of the existing trees will be saved. The additional
buffering will decrease the noise to neighboring sites.
4. The dimensions of the main building have been changed
from 200 ' wide x 185' deep to 215 ' wide x 170 ' deep,
and will be approximately 2,000 square feet smaller•.
Hr. De Mercurio described the proposed tree preservation and the
increase from one ( 1 ) layer of landscaping to two ( 2 ) layers and the
ratio is being increased approximately 60% from the previous layout.
Mr. Magdziarz, Land Planner, said he reviewed the proposed develop-
ment and stated the proposed Seigle Center will meet the needs of
the community and will not have an adverse impact on the Village or
the Town Center. It will meet the intents of the Zoning Ordinance;
and the Comprehensive Plan which encourages commercial development.
Buffalo Grove Plan Commission - Public Hearing - October 26, 1988
Page Two
Mr. Verges, Accoustic Engineer, said he made a review of the Seigle
proposed site and then visited their Geneva location, which has a
similar perimeter warehouse. He said that trees and landscaping do
little to provide acoustical isolation. He described how the noise
levels of each piece of equipment is measured running at full force.
When the noise level of the largest fork life was measured from the
outside of the perimeter warehouse, it could not be heard over the
noise levels of the background sound levels, such as traffic, birds
and wind, etc. At the Buffalo Grove site, the ambient noise level
is higher because of the heavier volumes of traffic on Lake/Cook and
and Old Mc Henry Roads. The noise level from Seigle's, with the
perimeter warehouse, will be substantially quieter than the existing
Jewel/Osco store with delivery trucks and roof top condenser units.
Com. Goldspiel questioned the reference in Mr. Yerges' report to
the noise level that is created by a direct line of sight, such as
when a door is left open?
Mr. Verges responded that when the overhead doors at the Geneva site
were left open and the saws were run, the noise was not detectable
on the opposite side of the perimeter warehouse. At the B.G. site,
as a precaution, the saws will be located away from any direct line
of sight to the open doors.
Mr. Seigle concluded the presentation with the statement that they
have met the criteria for a PUD, i.e. serving public convenience; ,
public health, safety and welfare; location and size are appropriate
to the community; the appearance of the perimeter warehouse will
harmonize with the Woodstone development; landscaping will enhance
the area sight; and the proposal will not impede the surrounding
businesses, but will enhance it. All access roads and easements
will be established. Parking is adequate. The development will be
a great benefit to the Village of Buffalo Grove.
Mr. Pfeil compared the initial B-4 request and the PUD request.
The original request for a Preliminary Plan approval covers the same
zoning change from B-2 to B-4. The current request has all that,
but a PUD will be overlaid upon those two zoning classifications,
so that an ordinance can be enacted upon by the Village Board that
will stipulate and condition this use in any way the Village deems
appropriate and that is accepted by the developer, such as controls
on the use, hours of operation, etc. Future uses can also be
specifically incorporated in the PUD.
Mr. Raysa explained the differences between the 5 Business
Districts. B-3, which is a Planned Business Center should not be
confused with a Business PUD. Page 47 of the Zoning Ordinance,
Chapter 17.2.A. - Special Use breaks down into four separate PUDs,
Residential , Planned Business, Office and Research, and Industrial.
Section 17.77.040 restricts the Bulk Requirements, and A through C
limits the use requirements. The Plan Commission can narrow the
uses under a Business Planned Unit Development, but not under the
straight Zoning District uses.
Buffalo Grove Plan Commission - Public Hearing - October 26 1988
Page Three
The fast food restaurant location was discussed. The site plan
shows it is still forward of the bank, and the reason for this is
to save more of the existing trees. The drive-thru lane has been
widened so that there is enough room for cars to pass and escape.
When the future office building was discussed, Mr. Seigle said
their long range plans call for construction of the building in
1992. It is possible that the plans could change.
Mr. Seigle agreed to add more screening to the North between the
bank and Burger King. He also agreed to pave the north half of
Bank Lane.
The windows of the warehouse building are not functional . Some are
shuttered and some are regular double hung windows with opague
glass. The elevation of the warehouse building site is 4-1/2 feet
above the Woodstone development. The height of the buildings will
be essentially the same. Woodstone is 29 feet high and the
warehouse is about 23 feet plus the additional 4-1 /2 feet. See
Exhibit B.
Wood storage sheds, for sale, are displayed outside in the daytime
hours, but they can be picked up by a lift truck and moved inside at
night. They will comply with Village rules. All storage will be
under roof.
Mr. Raysa asked that Exhibit A be corrected. It is a Business PUD.
Also, the total area of site coverage is 28,000 square feet for the
main building and 10,500 sq. ft. of exterior under roof coverage -
totaling 38,500 square feet. This is about 2,000 square feet feet
less than originally proposed.
Mr. Schwartz submitted Exhibit .l which is a letter he wrote to Bob
Pfeil, dated October 17, 1988, in which he confirmed information
obtained through a telephone call , that the developer is seeking a
Business Planned Unit Development with B-2 and B-4 underlying
zoning. The letter requests amendment of Exhibit B.
No agencies were present.
Questions and comments from the audience=
Mr. Dan Perlman, Perlman Group, General Partner of Woodstone Town-
homes presented a letter from Mr. Milton Perlman, President of
The Perlman Group. Letter is Exhibit 1 and Mr. Perlman states his
opposition to the proposed B-4 zoning classification because it
would permit a lumber yard to be operated on the Western border of
the Woodstone Development. This type of business is incompatible
with residential usage.
Mr. Perlman added that the warehouse, with the galvanized roof, is
objectionable with the Woodstone Townhomes. Storage is not closed,
but definitely open storage. The additional landscaping will help
some, but it: would have to screen the building all year around.
If the business does not last, what will happen to the warehouse.
Buffalo Grove Plan Commission - Public Hearing - October 26, 1988
Page Four
Mr. Perlman submitted Exhibit 2, a list of commercial establishments
with outdoor storage of shed-type buildings.
Regarding the acoustical engineer's test, Mr. Perlman recalled that
previously Mr. Verges stated he had not tested semis and larger
trucks which will be coming out of the lumber yard as early as 7:30
in the morning to make deliveries to builders. It has been said
that 60% of the business is with commercial builders. Also, tests
of the background noise levels were made during peak hours of the
construction activity at Woodstone.
The standards of Special Use are very specifically set out. A MIA
appraiser has said that the proposed Seigle Shopping Center will
have a negative impact on the residential homes to the East. This
land use is wrong. Property values could be deflated from $8,000 to
$10,000 and the mixed use will be detrimental to Woodstone owners.
The Woodstone residents want retail shopping, not a lumber yard.
Mr. Perlman asked about the proposed restrictions that have been
mentioned, such as hours of operation and limited use of semis?
The warehouse could be moved to the North in place of the office
building.
Mr. Allen Kracower, Urban Planner and Landscape Architect, said the
issue is not how the property is zoned. It is whether or not the
proposed use is reasonable and will it create an adverse impact on
the adjacent land uses? A warehouse business is not a commercial
use, but almost an industrial use, and does not meet Village
standards for a BAUD. It is detrimental to the public health,
safety and welfare. The perimeter warehouse structure cannot be
considered a buffer and cannot be considered harmonious or
compatible. When the Woodstone Townhomes were built, the developer
relied on a moderate intensity, commercial type land use.
Woodstone residents were present and made the following objections:
Mr. Ken Lockman, 192 Woodstone Drive: The development would not be
acceptable at the Town Center and should not be located near the
townhomes.
Mr. Jerry Falk, 222 Woodstone Circle: When the townhomes were
built, the developer had to comply with certain restrictions.
There will be a traffic pattern problem exiting the warehouse,
and it will be an ongoing situation. There are other properties
Buffalo Grove that are zoned B-4, and Seigle's should seek one.
Mr. Seigle responded that they have looked at other property and
selected this location. A Home Center is not a lumber• yard. It
is more like a 2inunerinan's Hardware Store. 60% of the customers
are shoppers and 40X are builders. All sales are taxable. He added
that the proposed use is better than many permitted B-2 uses.
Mrs. Betty Pauley, Woodstone Circle: What is being said statisti-
cally, is not what she saw visually when► she drove past the Elgin
store and she would not want to have the same business next door.
Buffalo Grove Plan Commission - Public Hearing - October 26,1988
Page Five
f
Mr. Jim Orland, 1st American Bank: The bank feels that Seigle's is
not a proper use for the property. The fast food restaurant drive
thru is getting closer. The business would be unsightly in compari-
son to the bank. Visibility would be cut down by the fast food
building. Bank Lane was initially planned for an office use and not
for semi-trailer traffic. If 60% of the business is done with
builders, truck traffic would be very heavy. The bank also objects
to the curb cut on Old Mc Henry Road.
Mr. Len Ellon, 244 Woodstone Circle: There has been little change
to the original site plan. Objects to the location next to Wood-
stone and the builder should look for a better site.
Commissioner Braiman asked Mr. Kracower what type of B-2 use would
be proper for the location?
Mr. Kracower replied that similar businesses to The Groves would not
be objectionable. There are objectionable uses within B-2 zoning.
Commissioner Braiman commented that if a similar line of stores was
built, it could have the rear wall along the eastern boundary and it
could essentially wall off the townhomes. Wouldn 't that be closer
and more objectionable than the proposed landscaped buffer?
Mr. Kracower responded: Not necessarily because there would be at
least the same 35 foot setback distance, then a service drive and
then loading docks, etc. The B-4 zoning and land use is not
appropriate. It could be possible to redesign the site and place
the warehouse away from the townhomes.
Mr. Perlman commented that the residents perceive the business as a
lumber yard and it is not acceptable.
Mr. Schwartz objected to the term "lumber yard" and asked for
Mr. Perlman 's definition of a lumber yard.
Mr. Perlman said a lumber yard is a place where lumber is bought and
sold. He took exception to Mr. Schwartz' previous statement that
the Trustees ever recommended the Home Center be located across the
street from the Town Center.
Chairman Sheldon halted the discussion and adjourned the Public
Hearing at 10:50 P.M.
Respectfully submitted,
Shirley Bates,
�/ Recording Secretary
APPROVED BY:
LaaAe 6--
Barbara Sheldon
Chairman
Buffalo Grove Plan Commission - Public Hearing - October 2.6, 1988
Page Six
SPECIAL MEETING
BUFFALO GROVE PLAN COMMISSION
OCTOBER 26, 1988
Following the two Public Hearings, Chairman Sheldon called the
special meeting to order at 11 :05 P.M.
Commissioners Present: Chairman Sheldon
Mr. Goldspiel
Mr. Krug
Mr. Rhodes
Ms. Howard
Mr. Braiman
Mr. Rubin
Mr. Rosenston
Commissioners Absent: None
Also Present: Mr. Tim Hernandez, Pulte Home Corporation
Mr. D. Boland, 295 Ardmore, Des Plaines, IL
Mr. William Reid, Village Trustee
Mr. William Raysa, Village Attorney
Mr. James Sylverne, Housing and Zoning Inspector
Mr. Robert Pfeil , Village Planner
Mr. H. Seigle, Seigle's Home Center, Developer
Mr. M. Seigle, V. P. of Seigle's Home Center
Mr. M. Schwartz
Mr. J. De Mercurio
fir. J. Yerges, Acoustic Engineer
Mr. D. Cole, Real Estate Consultant
Mr. W. Magdziarz, Land Planner
Mr. D.Perlman, Jr. , Perlman Group
Mr. S. Diamond, Land Planner
Mr. A. Krasower, Landscape Architect
Mr. K. Lockman, 192 Woodstone Circle
Mr. J. Falk, 222 Woodstone Circle
Mrs. B. Pauley, Woodstone Circle
Mr. L. Ellon, 244 Woodstone Circle
Mr. J. Orland, 1st American Bank
Approval of Minutes: None
Village Board Report: None
Com. Goldspiel reported that on Monday the new bus route for
the northeastern portion of Buffalo Grove, will begin from Old
Farm Village to the Deerfield train station. Schedules for
Rt. 691 are available at the front entrance of the Village Hall
Another- route, from Skokie to Buffalo Grove and Lincolnshire,
will be starting at the same time, but schedules are not yet
available.
Cherbourg Townhomes - P.U.D. Amendment
Chairman Sheldon asked for a motion to begin discussion.
Com. Goldspiel made the following motion:
That the Plan Commission recommend to the Village Board:
Amendment of the Planned Unit Development and
Preliminary Plan for Cherbourg, with a variation
to Zoning Ordinance, Section 17.32.020.F. to
allow Accessory Structures (wood decks ) to occupy
more than 20% of the rear yard on designated lots,
subject to the following:
that no deck could be constructed to interfere
with or cover a swale, or easement;
that 5 foot setbacks from lot lines be maintained
on both side yards of all units;
that the maximum square footage of a deck be
allowed to be 340 square feet, and further;
that no deck be constructed pursuant to this
variation within 30 feet of the rear yard line,
except that a deck may be constructed within
20 feet of a rear yard line, where that rear
yard line opens out to a common open area of
more than 20 feet in depth.
Subject further, that no deck be greater than
15 feet beyond the building except where it
would currently be allowed without this variation.
Com. Rhodes seconded the motion. Discussion followed.
Mr. Sylverne, Building and Zoning Department, Housing and
Zoning Inspector, stated that the minimum distance between
buildings must be 40 feet. The distance between decks would
be 18 to 20 feet. Under the present ordinance, without a
variance, the decks could be as close as 5 feet to the rear
lot line.
The site plan was reviewed and it was noted that the distance
between some units, that back up to each other, is very close.
There are at least four ( 4) areas with lots that are back to
back, or side to back, where larger decks would not be
suitable. The exact number of lots affected has not been
determined.
Buffalo Grove Plan Commission - Special Meeting - Oct. 26, 1988
Page Two
It was concluded that further Staff research would be helpful
to determine exactly which lots would be affected, and what
alternative solutions there could be, such as individual home-
owners going to the Zoning Board of Appeals for a variance.
Com. Goldspiel and Com. Rhodes agreed to withdraw the motion.
Com. Briaman made a motion to defer discussion of the Cherbourg
P.U.D. Amendment until Staff researches the matter and provides
specific information regarding the impact of the proposed
variation on all of the lots.
Com. Rhodes seconded the motion.
Roll Call Vote: AYES - Krug, Goldspiel, Rhodes, Howard,
Braiman, Rubin and Rosenston
NAYS - None
ABSENT - None
The motion passed - 7 to O.
STFGT_F DEVPl.c7PMENT - REZONING TO B-4 PUP AND FRFI-TMINARX PLAN
Chairman Sheldon asked Mr. Schwartz to state the exact request and
to reiterate the changes in the plan being presented at this time.
Mr. Schwartz said Seigle's Home and Building Centers specifically
requested a Preliminary Plan and Business Planned Unit Development
for Parcels 1 and 2, which are currently zoned B-2; and Rezoning of
Parcel 2 to B-4; all of this to be contained in a Business Planned
Unit Development which is a Special Use pursuant to the Zoning
Ordinance.
The changes that have been made:
1 . The location of the perimeter warehouse
has been moved farther West from its
easterly boundary from a 34 ft. average
to a 50 ft. average distance between the
rear of the perimeter warehouse and the
eastern property line.
2. The size of the Seigle's Home Center
has been decreased in size approximately
2, 000 square feet.
3. If this plan is approved, the developer
agrees to landscape continuously along the
eastern property line; and increase the
landscaping to the North to alleviate any
concerns of the 1st American Bank.
Buffalo Grove Plan Commission - Special Meeting - Oct. 26, 1988
Page Three
Commissioner Krug made the following motion:
That the Plan Commission recommend to the Village Board
approval of a Preliminary Plan and a Business Planned Unit
Development for Parcels 1 and 2, as described in the
Exhibits A through J, as presented at the Public Hearing of
this date (October 26, 1988); property currently zoned B-2
(General Retail ) District to the B-4 ( Business Services and
Wholesale) District for Parcel 2,
with the following variation of the DEVELOPMENT ORDINANCE -
Section 16.50.040.C.3 ( to allow a 4:1 side slope on two dry
detention basins instead of a 6:1 side slope as required.
The Preliminary Plan proposes a fast-food restaurant,
Seigle's Home and Building Center, and a 2-story office
building not to exceed 35 feet in height; and that the
business be limited to retail operations.
Commissioner Rubin seconded the motion.
Mr. Schwartz asked that the use be described in the motion as
Building Materials Sales per the ordinance classification.
Mr. Seigle said that they sell only to builders and consumers and all
sales are sales taxable.
Witt► this explanation, the motion was agreeable as stated.
Discussion:
Commissioner Goldspiel opposed the motion for the following reasons:
1 . The location of the fast food restaurant impacts
adversely on the bank. The setback and the angling
are incompatible with the adjacent bank; and it is
not inconsistent to pull the fast food restaurant
back to a setback line drawn between Blockbuster Video
and the corner of the bank. This is not very much and
is not an objection to the fast food restaurant.
Also, the escape area for the drive-thru is good, but
it is not necessary for the drive-thru to be 17 feet
wide for the entire length.
2. Objection to the 35 foot height of the office building.
It would be a two story building and would be higher
than the abutting residential buildings.
3. Major and most serious objection is the Use and Zoning
of the Home and Building Center. It maintains many
of the characteristics of a lumber yard, which is
depicted by the two open outside storage buildings.
The Woodstone developer and his planner were correct.
Buffalo Grove Plan Commission - Special Meeting - October 26, 1988
Page Four
The proposal fails to meet a very important provision
of the ordinance which is that developments not adversely
impact the adjacent residential property. The uses are
incompatible. ( The 50 ft. setback is better than 35 ft. )
If this use is compared with the more usual type of
commercial ( shopping center) development, there would
be a 50 foot setback and then a 30 foot driveway and
loading dock area which places the building some 70 to
90 feet away from the residential and set down somewhat.
The 4-1/2 foot height elevation is a negative aspect of
the plan. This type of use would generate more traffic
to the rear than a strip center. This is a different
quality of use than B-2 and it is inappropriate.
Commissioner Goldspiel added that when he visited the Barrington
location, he found it to be a very different type of site, near a
railroad and surrounded with other commercial. The Village has an
obligation to the residents of the townhomes to provide responsible
transitional zoning.
Commissioner Braiman asked for the motion to be amended to require
the petitioner to include to obtain the easement and pave the North
portion of Bank Lane.
Commissioners Krug and Rubin agreed to amend the motion.
Roll Call Vote= AYE - Howard, Braiman, Rubin and Rosenston
NAY - Krug, Goldspiel and Rhodes
ABSENT - None
Motion Passed - 4 to 3.
Mr. Perlman requested postponement in sending this proposal to the
Village Board. He expected more particular restrictions, such as
traffic and hours of operation, etc.
Chairman Sheldon said these decisions would be made at the Board
level and are not part of the motion.
Chairman 's Report=
Chairman Sheldon questioned the announcements in the Daily Herald
that agendas are not available for Plan Commission meetings,
including Public Hearings.
This information is always available, but Mr. Pfeil said apparently
the agendas are not received ( by mail ) in time to meet the deadline
for the publication date.
Chairman Sheldon requested that, in the future, the information be
phoned, or faxed, to the paper prior to the deadling.
Buffalo Grove Plan Commission - Special Meeting - October 26, 1988
Page Five
Future Agenda Schedule:
No meeting November 7.
Meetings will be held on Nov. 9, Nov. 16, Nov. 30,
Dec. 7, and Dec. 14.
The first meeting in 1989 will be held on Jan. 4.
No Public Comments or Questions.
Staff Report:
Mr. Raysa referred to the Draft Letter dated
October 26, 1988 to Mr. Donald L. Kirk, from Chairman Sheldon.
The Plan Commission was asked to set forth in writing specific
reasons for denial of the preliminary plan, what ordinances
pertain to the denial and what is their correlation with the
preliminary plan.
The Plan Commissioners recommended some amendments to the
letter and Com. Rhodes made the following motion:
That the Plan Commission approve the Kirk document as
prepared by Mr. William Raysa, and authorize changes
to the letter to D. L. Kirk, as drafted Oct. 26, 1988.
Com. Howard seconded the motion.
Roll Call Vote: AYES - Rhodes, Howard, Braiman,
Rubin and Rosenston
NAYS - None
ABSENT - None
ABSTAIN - Krug and Goldspiel
Motion Passed - 5 to 0, 2 abstentions
Com. Howard made a motion to adjourn. Com. Briaman seconded.
Chairman Sheldon adjourned the meeting at 12:05 A.M.
Respectfully submitted,
3-42,-"t12-"a-d
Shirley Bates,
Recording Secretary
APPROVED BY:
Barbara Sheldon
Chairman
Buffalo Grove Plan Commission - Special Meeting - Oct. 26, 1988
Page Six