Loading...
2020-11-04 - Planning and Zoning Commission - Agenda Packet Meeting of the Village of Buffalo Grove Planning and Zoning Commission Regular Meeting November 4, 2020 at 7:30 PM Fifty Raupp Blvd Buffalo Grove, IL 60089-2100 Phone: 847-459-2500 I. Call to Order 2. Open Meetings Act Compliance Pursuant to orders issued in response to the COVID-19 pandemic, this Public Hearing is closed to in-person, public attendance. The hearing is being held via Zoom web conference meeting, which permits the public to fully participate in the virtual Public Hearing via Zoom on a computer, tablet or phone. Details on how to access and participate in this online virtual hearing are available below. More information pertaining to the meeting information and links to the virtual meeting can be found at: You are invited to a Zoom webinar. When: Nov 4, 2020 07:30 PM Central Time (US and Canada) Topic: PZC Please click the link below to join the webinar: <https://us02web.zoom.us/j/84068673693> Or iPhone one-tap : US: +13126266799,,84068673693# or +19294362866,,84068673693# Or Telephone: Dial(for higher quality, dial a number based on your current location): US: +1 312 626 6799 or +1 929 436 2866 or +1 301 715 8592 or +1 253 215 8782 or +1 346 248 7799 or +1 669 900 6833 Webinar ID: 840 6867 3693 International numbers available: <https://us02web.zoom.us/u/kvQ7jFZcy> II. Public Hearings/Items For Consideration 1. Consider Variations from the Sign Code to Allow for Two Wall Signs at 960 S Buff alo Grove Rd. (Trustee Weidenfeld) (Staff Contact: Nicole Woods) 2. Consider an Amendment to Ordinance 83-8 for a New Outbuilding, Special Use for a Drive-Through Facility, and a Preliminary Plan Approval with Variations to the Zoning Ordinance and Sign Code at Spoerlein Commons Shopping Development at 1131 -1271 McHenry Road. (Trustee Johnson) (Staff Contact: Nicole Woods) III. Regular Meeting A. Other Matters for Discussion B. Approval of Minutes 1. Planning and Zoning Commission - Regular Meeting - Oct 21, 2020 7:30 PM C. Chairman's Report D. Committee and Liaison Reports E. Staff Report/Future Agenda Schedule F. Public Comments and Questions IV. Adjournment The Planning and Zoning Commission will make every effort to accommodate all items on the agenda by 10:30 p.m. The Board, does, however, reserve the right to defer consideration of matters to another meeting should the discussion run past 10:30 p.m. The Village of Buffalo Grove, in compliance with the Americans with Disabilities Act, requests that persons with disabilities, who require certain accommodations to allow them to observe and/or participate in this meeting or have questions about the accessibility of the meeting or facilities, contact the ADA Coordinator at 459-2525 to allow the Village to make reasonable accommodations for those persons. Updated: 10/30/2020 12:51 PM Page 1 Action Item : Consider Variations from the Sign Code to Allow for Two Wall Signs at 960 S Buffalo Grove Rd. Recommendation of Action Staff recommends approval, subject to the conditions in the attached staff report. The Petitioner, Jennifer Boenzi on behalf of Nino's Pizzeria at 960 S Buffalo Grove Rd is seeking to install two wall signs on the east and north elevations of the Nino's Pizzeria Building. Variations are required to allow for the two wall signs to exceed the number of permitted wall signs; exceed the maximum permitted sign length; and exceed the maximum permitted sign area. ATTACHMENTS:  Staff Report (DOCX)  Plan Set (PDF) Trustee Liaison Staff Contact Weidenfeld Nicole Woods, Community Development Wednesday, November 4, 2020 2.1 Packet Pg. 3 VILLAGE OF BUFFALO GROVE PLANNING & ZONING COMMISSION STAFF REPORT MEETING DATE: November 4, 2020 SUBJECT PROPERTY LOCATION: 960 S Buffalo Grove Road PETITIONER: Jennifer Boenzi on behalf of Nino’s Pizzeria PREPARED BY: Rati Akash, Village Planner REQUEST: The petitioner is seeking variations from the Sign Code for an east elevation wall sign which exceeds the length of the sign, and exceeds the maximum permissible area of the sign; and a north elevation wall sign which exceeds the number of wall signs permitted, exceeds the length of the sign, and exceeds the maximum permissible area of the sign. EXSITING LAND USE AND ZONING: The property is improved with a Nino’s Pizzeria (Restaurant) and is zoned B-2 Business District COMPREHENSIVE PLAN: The Village of Buffalo Grove Comprehensive Plan calls for this property to be a commercial use PROJECT BACKGROUND The Petitioner, Jennifer Boenzi on behalf of Nino’s Pizzeria at 960 S Buffalo Grove Rd is seeking to install two wall signs on the east and north elevations of the Nino’s Pizzeria Building which requires the following variations: East elevation wall sign 1. Section 14.16, which exceeds the length of the wall sign. 2. Section 14.16, which exceeds the maximum permissible area of the sign. North elevation wall sign 1. Section 14.16, which exceeds the number of wall signs permitted. 2. Section 14.16, which exceeds the length of the wall sign. 3. Section 14.16, which exceeds the maximum permissible area of the sign. 2.1.a Packet Pg. 4 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) PLANNING & ZONING ANALYSIS Length  Nino’s Pizzeria have recently proposed façade improvements to the existing building at 960 S Buffalo Grove Road. The proposed wall signs are part of these improvements.  The east and north elevation wall signs are LED powered signs. East elevation:  The east elevation wall sign measures 24’-1” in length, and exceeds the required 33% of the 60’ store frontage by 4’-1”. North elevation:  The north elevation wall sign measures 21’-6” in length, and exceeds the required 33% of the 49’- 6” store frontage by 5’-1”.  The north elevation wall sign exceeds the maximum permissible wall signs per development. Only one wall sign is permitted per Code. Size East elevation:  The proposed wall sign measures 82.28 square feet in area.  The proposed wall sign exceeds the permissible sign area of 42.67 square feet by 39.61 square feet. North elevation:  The proposed wall sign measures 60 square feet in area.  The proposed wall sign exceeds the permissible sign area of 25.6 square feet by 34.4 square feet. Variation Requested East elevation wall sign 1. Section 14.16, which exceeds the length of the wall sign. 2. Section 14.16, which exceeds the maximum permissible area of the sign. North elevation wall sign 1. Section 14.16, which exceeds the number of wall signs permitted. 2. Section 14.16, which exceeds the length of the wall sign. 3. Section 14.16, which exceeds the maximum permissible area of the sign. SURROUNDING PROPERTY OWNERS Pursuant to Village Code, the surrounding property owners within 250’ were notified and a public hearing sign was posted on the subject property. The posting of the public hearing sign and the mailed notifications were completed within the prescribed timeframe as required. As of the date of this Staff East elevation North elevation 2.1.a Packet Pg. 5 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) Report, the Village has received two calls from the surrounding properties, however no concerns were raised. STANDARDS The Planning & Zoning Commission is authorized to make a recommendation to the Village Board based on the following criteria: A. Except for Prohibited signs (Chapter 14.32), the Village Planning & Zoning Commission may recommend approval or disapproval of a variance from the provisions or requirements of this Title subject to the following: 1. The literal interpretation and strict application of the provisions and requirements of this Title would cause undue and unnecessary hardships to the sign user because of unique or unusual conditions pertaining to the specific building, parcel or property in question; and 2. The granting of the requested variance would not be materially detrimental to the property owners in the vicinity; and 3. The unusual conditions applying to the specific property do not apply generally to other properties in the Village; and 4. The granting of the variance will not be contrary to the purpose of this Title pursuant to Section 14.04.020 B. Where there is insufficient evidence, in the opinion of the Planning & Zoning Commission, to support a finding under subsection (A), but some hardship does exist, the Planning & Zoning Commission may consider the requirement fulfilled if: 1. The proposed signage is of particularly good design and in particularly good taste; and 2. The entire site has been or will be particularly well landscaped. The petitioner shall provide a response to the standards at the public hearing. STAFF RECOMMENDATION Staff recommends approval of the variation for the size and length for the east elevation wall sign; and the number of signs, size and height of the north elevation wall sign provided: 1. The proposed wall sign must be installed in accordance with the documents and plans submitted as part of this petition. ACTION REQUESTED The Planning & Zoning Commission (PZC) shall open the public hearing and take public testimony concerning the variation. The PZC shall make a recommendation to the Village Board concerning the variation requests. Suggested PZC Motion PZC recommends approval for variations to Section 14.16 of the Buffalo Grove Zoning Code to allow for an east elevation wall sign to exceed the maximum permissible length by 4’-1”, and to exceed the size of the sign by 39.61 square feet; and for a north elevation sign to exceed the maximum permissible number of signs, to exceed the maximum permissible length by 5’-1”, and to exceed the size of the sign by 34.4 square feet. The wall signs shall be installed in accordance with the documents and plans submitted as part of this petition. 2.1.a Packet Pg. 6 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) 2.1.b Packet Pg. 7 At t a c h m e n t : P l a n S e t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) 2.1.b Packet Pg. 8 At t a c h m e n t : P l a n S e t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) I HAVE PROOFED MY ORDER FOR SPELLING, GRAMMAR, LOCATION AND PRINT COLORS AND APPROVE THE FINISHED JOB. I REQUEST THAT PRODUCTION BEGIN AND UNDERSTAND THAT I AM RESPONSIBLE FOR ERRORS AND FURTHER CHANGES. YES. This artwork proof and its details are correct. NO. This artwork proof is not correct. See changes indicated (A new proof will be re-sent with changes for approval.) AUTHORIZED SIGNATURE DATE SIGN (1) FACING NORTH SIGN (2) FACING EAST EAST NORTH 2.1.b Packet Pg. 9 At t a c h m e n t : P l a n S e t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) 12 X X XX XX W G . N O .S H E E T TASK NO. XXX ECT NO.QTY. TYPE: YPE: The concept illustrated is for representational purposes only. Structural, resolution, and/or specification changes may occur during the design and implementation process that may result in changes from this illustration. Environmental conditions at the site may a ect final results. This drawing remains the exclusive property of Sign Central. It is submitted for your consideration in the purchase of the product(s). This design cannot be copied in whole or in part, altered or exhibited in any manner without written permission of Sign Central. Exceptions are previously copyrighted artwork supplied by client. - PROJECT TITLE ORDER TITLE: Building ID City/State Buffalo Grove, IL PHONE NUMBER WING DATE SALES REPXX PROJECT MGR. REVISION HISTORY DATE PREV DRWG DESCRIPTION 34039 N. Hainesville Road Round Lake, IL 60073 847.543.7 600 Nino’s Pizzeria and Catering Est. 1987 24’ 64” 258” 33.5”12” 5.5” 2.1.b Packet Pg. 10 At t a c h m e n t : P l a n S e t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) 12 X X XX XX W G . N O .S H E E T TASK NO. XXX ECT NO.QTY. TYPE: YPE: The concept illustrated is for representational purposes only. Structural, resolution, and/or specification changes may occur during the design and implementation process that may result in changes from this illustration. Environmental conditions at the site may a ect final results. This drawing remains the exclusive property of Sign Central. It is submitted for your consideration in the purchase of the product(s). This design cannot be copied in whole or in part, altered or exhibited in any manner without written permission of Sign Central. Exceptions are previously copyrighted artwork supplied by client. - PROJECT TITLE ORDER TITLE: Building ID City/State Buffalo Grove, IL PHONE NUMBER WING DATE SALES REPXX PROJECT MGR. REVISION HISTORY DATE PREV DRWG DESCRIPTION 34039 N. Hainesville Road Round Lake, IL 60073 847.543.7 600 Nino’s Pizzeria and Catering Est. 1987 20’ 40’ 64” 289” 41”15” 8” 2.1.b Packet Pg. 11 At t a c h m e n t : P l a n S e t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) X X XX XX TASK NO. XXX ECT NO.QTY. TYPE: YPE: The concept illustrated is for representational purposes only. Structural, resolution, and/or specification changes may occur during the design and implementation process that may result in changes from this illustration. Environmental conditions at the site may a ect final results. This drawing remains the exclusive property of Sign Central. It is submitted for your consideration in the purchase of the product(s). This design cannot be copied in whole or in part, altered or exhibited in any manner without written permission of Sign Central. Exceptions are previously copyrighted artwork supplied by client. PROJECT TITLE ORDER TITLE: Building ID City/State Buffalo Grove, IL PHONE NUMBER WING DATE SALES REPXX PROJECT MGR. REVISION HISTORY DATE PREV DRWG DESCRIPTION 34039 N. Hainesville Road Round Lake, IL 60073 847.543.7 600 Nino’s Pizzeria and Catering 2.1.b Packet Pg. 12 At t a c h m e n t : P l a n S e t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S B u f f a l o G r o v e R d . ) 2.1.b Packet Pg. 13 At t a c h m e n t : P l a n S e t ( C o n s i d e r V a r i a t i o n s f r o m t h e S i g n C o d e t o A l l o w f o r T w o W a l l S i g n s t o a t 9 6 0 S Updated: 10/30/2020 1:10 PM Page 1 Action Item : Consider an Amendment to Ordinance 83-8 for a New Outbuilding, Special Use for a Drive-Through Facility, and a Preliminary Plan Approval with Variations to the Zoning Ordinance and Sign Code at Spoerlein Commons Shopping Development at 1131-1271 McHenry Road. Recommendation of Action Staff recommends approval, subject to the conditions in the attached staff report. The Petitioner, Spoerlein Commons Shopping Development at 1131-1271 McHenry Road, is seeking to construct a new 2,388 square foot Dunkin Donuts and Baskin Robbins outbuilding with a drive-through. The proposed project requires: an amendment to Ordinance 83-8 for a new outbuilding; a special use for a drive-through facility in the B3 Planned Business District; and a preliminary plan approval with variations to the Zoning Ordinance and Sign Code. ATTACHMENTS:  Staff Report (DOCX)  Plan Set (PDF) Trustee Liaison Staff Contact Johnson Nicole Woods, Community Development Wednesday, November 4, 2020 2.2 Packet Pg. 14 VILLAGE OF BUFFALO GROVE PLANNING & ZONING COMMISSION STAFF REPORT MEETING DATE: November 4, 2020 SUBJECT PROPERTY LOCATION: 1131-1271 McHenry Road, Buffalo Grove PETITIONER: Whitestone REIT Operating Partnership LP PREPARED BY: Rati Akash, Village Planner REQUEST: Petition to the Village of Buffalo Grove for an amendment to Ordinance 83-8 for a new Dunkin Donuts outbuilding with a drive-through facility in Spoerlein Commons Shopping Development, special use for a drive-through facility in the B3 Planned Business District, a preliminary plan approval with variations to the Buffalo Grove Zoning Ordinance and Sign Code. EXSITING LAND USE AND ZONING: Existing Spoerlein Commons Development in the B3 Planned Business District COMPREHENSIVE PLAN: The approved Village Comprehensive Plan calls for this property to be commercial. PROJECT BACKGROUND In 1983, the Village approved Ordinance 83-8 for the Spoerlein Commons Development. The existing development consists of approximately 41,180 square feet of commercial and office space in multiple buildings. The original development was approved with a second phase allowing for additional 2,000 square feet of retail space. The second phase was never constructed and the current owner (Whitestone REIT Operating Partnership LP) is seeking an amendment to the original Ordinance to allow for the construction of a 2,388 square foot outbuilding with a Dunkin Donuts and Baskin Robins drive-through establishment which will require the following: 1. Amendment to Ordinance 83-8; 2. Special use for a drive-through facility in the B3 Planned Business District; 3. Preliminary Plan approval with the following variations: 2.2.a Packet Pg. 15 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Zoning Ordinance: a) A Variation to Section 17.36.040 of the Zoning Ordinance to allow for a reduction to the minimum number of parking spaces required for both the Spoerlein Commons Development and the outbuilding. Sign Code: a) A Variation to Section 14.16 of the Sign Code to allow for two extra wall signs on the east and south elevations of the proposed outbuilding. b) A Variation to Section 14.16 of the Sign Code to allow for the wall signs on the east and south elevations of the proposed outbuilding to exceed the maximum allowable height of the sign. PLANNING & ZONING ANALYSIS Zoning History  The existing property is zoned B3 Planned Business Center, and Spoerlein Commons Development was improved in 1983 as part of Ordinance 83-8. The approved development included a total of 51,050 square feet of office and retail space.  The subject property is currently improved with approximately 41,180 square feet of commercial and office space in multiple buildings in the Spoerlein Commons Development.  The development was approved for two additional outbuildings (2,000 square feet total), which were never constructed. Based on staff’s research, we have found an approved set of drawings from 1989 which shows two 1,000 square foot outbuildings (combined total of 2,000 square feet). PZC Workshop October 26, 2018  At the October 26, 2018 PZC meeting, the owner presented their concept plan for Dunkin Donut outbuilding to the Commission. Minutes have been attached.  The discussion primarily included the entry and exit out of Route 83 and driveway stacking requirement which the Petitioner (Owner) has addressed in the Traffic Memo and plan set attached.  The PZC was supportive of the overall outbuilding orientation and parking, requested for the traffic counts to be included which has been attached in the traffic memo. 2.2.a Packet Pg. 16 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Site Plan  The owner is seeking an amendment to the development to allow for the construction of a new 2,388 square foot Dunkin Donuts outbuilding with drive- through facility.  Dunkin Donuts is currently located in the southwest corner unit of the existing retail building and is looking to expand their services by including a drive-through.  To accommodate the new building, parking would be relocated to the open area originally identified for the 2 outbuildings.  There are no changes being made to the existing buildings.  The proposed new building would be 26’ in height to the top of the tower, 16’ in height to the top of the roof building.  The outbuilding is setback approximately 91’ from Route 83. Pursuant to the Zoning Ordinance, the building is to be setback the same distance as the height of the building (26’).  The outbuilding meets all the setback requirements as outlined in B3 Planned Business District.  The following is a summary of the proposed development as it relates to the Village’s bulk requirements: B3 District Dimensional Requirements Vs Proposed Development B3 District Requirements Proposed Development Se t b a c k s Front (north) Minimum 26’ Approx. 91’ Rear (south) N/A Approx. 145’ Side (east) N/A N/A Side (west) N/A Approx. 31’ Building Height N/A 26’ top of the tower, 16’ top of the roof building height Parking & Traffic  The proposed outbuilding of 2,388 square feet with a drive-through will be located along Route 83 in the west portion of the site.  Access into Spoerlein Commons and the outbuilding will remain the same with access points on the South from Route 83, access on the west from Courtland Drive, and access on the east from Ranchview Court. 2.2.a Packet Pg. 17 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l )  The petitioner has provided a traffic analysis from Kimley Horn consultants who have indicated that the existing traffic conditions can accommodate the Dunkin Donuts outbuilding with the drive-through facility.  The existing development currently has 161 parking spaces for the 41,180 square foot development, which does not meet our current code requirements.  It should be noted that the 161 parking spaces were intended to serve both the existing 41,180 square feet but also the additional 2,000 square feet, which was not built. As a result of the change, a total net increase in square footage would be approximately 800 square feet.  With the proposed outbuilding for Dunkin Donuts a total of 164 parking spaces will be provided.  As per Section 17.36.040 a variance will be required for the parking requirements based on the existing and future tenant uses with a deficit of 40 parking spaces. However, it should be noted that the parking supply provided is able to accommodate the Spoerlein Commons at full occupancy and the proposed Dunkin Donuts outbuilding with a drive through establishment as per the parking analysis provided by Kimley Horn consultants.  Staff also had our Village traffic consultant, Gewalt Hamilton & Associates (GHA) to review the parking memo and proposed plans. GHA found that the proposed development would provide sufficient parking. Drive-through  The proposed 2,388 square foot Dunkin Donut outbuilding includes a drive through.  Pursuant to the Zoning Code in the B-3 Planned Business District, eating and drinking establishments that have a drive-through require a special use permit.  Additionally, the drive-through must have a stacking of 10 vehicles. The proposed Dunkin Donuts outbuilding provides stacking of 10 vehicles lined up against the west property line and meets Code.  The proposed stacking of 10 vehicles and the orientation of the parking lot on the North allows for effective traffic circulation within the Spoerlein Commons Development as depicted in the traffic analysis. Stormwater  The petitioner has provided a preliminary storm water report.  The proposed project meets the storm water requirements.  The preliminary engineering plans as proposed have been reviewed by the Village Engineer. As a condition of approval, final engineering will have to be submitted in a manner acceptable to the Village. Landscaping  The petitioner has proposed trees and shrubs in the landscape islands as depicted in the plan set.  The Village Forester has reviewed the landscape plan and is supportive of the trees in the landscape islands which will provide shade and mitigate storm water run-off as well. 2.2.a Packet Pg. 18 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Building Elevations  The proposed elevations of the outbuilding include an overall building height of 16’ including the sloping roof, and a 26’ tall tower with a cross roof towards south portion of the building.  The proposed outbuilding will comprise of white siding in attempt to match the existing Spoerlein Commons color scheme. The tower has the Dunkin Donuts orange brand color to complement the white siding.  Overall, Staff finds that the elevations are nicely done and supports the appearance of the new outbuilding. Signs  The petitioner is proposing a total of five signs which include 2 wall signs (Dunkin and Baskin Robbins), 1 channel letter wall sign, one clearance bar, and a menu board sign.  The 2 wall signs on the tower and one channel letter wall sign on the building require a variance to allow for 2 extra wall signs. Pursuant to the Sign Code only 1 wall sign is permitted per development.  The 2 wall signs on the tower building require a variance for height.  The clearance bar, menu board sign and channel letter wall sign meet all requirements of the Sign Code. Tower Sign  The Petitioner is proposing 2 wall signs on the east and south elevations on the tower of the Dunkin Donuts building which requires a variance. East Elevation Sign:  The east elevation wall sign measures 6’-5” in height and 4’ in length which includes both Dunkin Donut and the Baskin Robins Sign.  The east elevation wall sign exceeds the maximum permissible height of the sign by 10”, and hence requires a variance.  This sign otherwise meets all the Code requirements. South Elevation Sign:  The south elevation wall sign measures 6’-5” in height and 8’-10” in length which includes both Dunkin Donut and Baskin Robins Sign.  The south elevation wall sign exceeds the maximum permissible height of the sign by 10”, and hence requires a variance. East elevation wall sign South elevation wall sign 2.2.a Packet Pg. 19 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) APPROVALS REQUIRED 1) Amendment to Ordinance 83-8. The petitioner is seeking an amendment to the original Ordinance to allow for the construction of a 2,388 square foot outbuilding with a Dunkin Donuts and Baskin Robins drive- through establishment. 2) Special Use. The petitioner is seeking a special use for a drive-through facility in the B3 Planned Business District. Standards The following are the standards for a special use and the Petitioner has addressed the special use standards in the memo to the PZC. 1. The special use will serve the public convenience at the location of the subject property; or the establishment, maintenance or operation of the special use will not be detrimental to or endanger the public health, safety, morals, comfort, or general welfare; 2. The location and size of the special use, the nature and intensity of the operation involved in or conducted in connection with said special use, the size of the subject property in relation to such special use, and the location of the site with respect to streets giving access to it shall be such that it will be in harmony with the appropriate, orderly development of the district in which it is located; 3. The special use will not be injurious to the use and enjoyment of other property in the immediate vicinity of the subject property for the purposes already permitted in such zoning district, nor substantially diminish and impair other property valuations with the neighborhood; 4. The nature, location and size of the buildings or structures involved with the establishment of the special use will not impede, substantially hinder or discourage the development and use of adjacent land and buildings in accord with the zoning district within which they lie; 5. Adequate utilities, access roads, drainage, and/or other necessary facilities have been or will be provided; 6. Parking areas shall be of adequate size for the particular special use, which areas shall be properly located and suitably screened from adjoining residential uses, and the entrance and exit driveways to and from these parking areas shall be designed so as to prevent traffic hazards, eliminate nuisance and minimize traffic congestion in the public streets. 3) Preliminary Plan approval with the following variations: A. Variation to the Zoning Ordinance. A Variation to Section 17.36.040 of the Zoning Ordinance to allow for a reduction to the minimum number of parking spaces required for both the Spoerlein Commons building and the outbuilding. With the proposed outbuilding for Dunkin Donuts a total of 164 parking spaces will be provided for the outbuilding and the Spoerlein Commons Development. A variance will be required for the parking requirements based on the existing and future tenant uses 2.2.a Packet Pg. 20 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) with a deficit of 40 parking spaces. However, it should be noted that the parking supply provided is able to accommodate the Spoerlein Commons at full occupancy and the proposed Dunkin Donuts outbuilding with a drive through establishment as per the parking analysis provided by Kimley Horn consultants. Staff also had our Village traffic consultant, Gewalt Hamilton & Associates (GHA) to review the traffic anlaysis. GHA found that the proposed development would provide sufficient parking. Standards The following are the applicable standards for a variation and the petitioner shall address the required standards for a variation during the meeting. 1. The property in question cannot yield a reasonable return if permitted to be used only under the conditions allowed by the regulations of the zoning district in which it is located except in the case of residential zoning districts; 2. The plight of the owner is due to unique circumstances; 3. The proposed variation will not alter the essential character of the neighborhood. B. Variations to the Sign Code. A Variation to Section 14.16 of the Sign Code to allow for two extra wall signs on the east and south elevations of the proposed outbuilding The petitioner has proposed 3 wall signs for the Dunkin Donuts outbuilding, only 1 wall sign is permitted per development as per the Sign Code. The two extra signs on the South and East elevation will require a variance. A Variation to Section 14.16 of the Sign Code to allow for the wall signs on the east and south elevations of the proposed outbuilding to exceed the maximum allowable height of the sign. The east and south elevation signs on the tower building measure 6’-5” in height and exceeds the maximum permissible height of the sign by 10”. Standards The Planning & Zoning Commission is authorized to make a recommendation to the Village Board for a variation to the Sign Code based on the following criteria. During the meeting, the petitioner shall address the required standards for a variation. A. Except for Prohibited signs (Chapter 14.32), the Village Planning & Zoning Commission may recommend approval or disapproval of a variance from the provisions or requirements of this Title subject to the following: 1. The literal interpretation and strict application of the provisions and requirements of this Title would cause undue and unnecessary hardships to the sign user because of unique or unusual conditions pertaining to the specific building, parcel or property in question; and 2. The granting of the requested variance would not be materially detrimental to the property owners in the vicinity; and 3. The unusual conditions applying to the specific property do not apply generally to other properties in the Village; and 2.2.a Packet Pg. 21 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 4. The granting of the variance will not be contrary to the purpose of this Title pursuant to Section 14.04.020 B. Where there is insufficient evidence, in the opinion of the Planning & Zoning Commission, to support a finding under subsection (A), but some hardship does exist, the Planning & Zoning Commission may consider the requirement fulfilled if: 1. The proposed signage is of particularly good design and in particularly good taste; and 2. The entire site has been or will be particularly well landscaped. PUBLIC COMMENTS Pursuant to Village Code, the contiguous property owners were notified and a public hearing sign was posted on the subject property. The posting of the public hearing sign and the mailing of the notifications were both completed within the required timeframe. As of the date of this Staff Report the Village has had a 6 inquiries some of whom requested more information on the project. DEPARTMENTAL REVIEWS Village Department Comments Engineering The Village Engineer has reviewed the proposed plans and has no specific comments regarding the preliminary plans. Final engineering will be required prior to the start of construction. Fire Department The Fire Department has reviewed the proposed plans and has no specific comments regarding the preliminary plans. Forestry Department The Forestry Department has reviewed the proposed plans and has no specific comments regarding the preliminary plans. STAFF RECOMMENDATION Staff recommends approval of the amendment to Ordinance 83-8 for a new Dunkin Donuts outbuilding in the Spoerlein Commons development which is in the B3 Planned Business District; special use for a drive- through facility in the B3 Planned Business District; preliminary plan approval with variations to the reduction in the number of parking spaces, and allowing for 2 extra wall signs on the outbuilding, and allowing for the east and south elevation wall signs to exceed the height of the sign by 10” provided: 1. The proposed development shall be developed in substantial conformance to the plans attached as part of the petition. 2. The final engineering plans shall be submitted in a manner acceptable to the Village. 3. All conditions of Ordinance 83-8, except those amended by this project, shall remain in full force and effect. 4. The special use granted may be assignable to subsequent petitioners seeking assignment of this special use as follows: i. Upon application of a petition seeking assignment of this special use, the Village of Buffalo Grove, in their sole discretion, may approve the assignment administratively, or may refer it to the Planning & Zoning Commission and/or the Village Board for a public hearing. 2.2.a Packet Pg. 22 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) ii. Such assignment shall be valid only upon the written approval of the Village of Buffalo Grove granting said assignment, which may be granted or denied for any reason. ACTION REQUESTED The Planning & Zoning Commission (PZC) shall reopen the public hearing and take public testimony concerning the revised plans. The PZC shall make a recommendation to the Village Board. Suggested PZC Motion PZC recommends approval of approval of the amendment to Ordinance 83-8 for a new Dunkin Donuts outbuilding in the Spoerlein Commons development which is in the B3 Planned Business District; special use for a drive-through facility in the B3 Planned Business District; preliminary plan approval with variations to the reduction in the number of parking spaces, and allowing for 2 extra wall signs on outbuilding and allowing for the east and south elevation wall signs to exceed the height of the sign by 10” provided: 1. The proposed development shall be developed in substantial conformance to the plans attached as part of the petition. 2. The final engineering plans shall be submitted in a manner acceptable to the Village. 3. The special use granted may be assignable to subsequent petitioners seeking assignment of this special use as follows: i. Upon application of a petition seeking assignment of this special use, the Village of Buffalo Grove, in their sole discretion, may approve the assignment administratively, or may refer it to the Planning & Zoning Commission and/or the Village Board for a public hearing. ii. Such assignment shall be valid only upon the written approval of the Village of Buffalo Grove granting said assignment, which may be granted or denied for any reason. 2.2.a Packet Pg. 23 At t a c h m e n t : S t a f f R e p o r t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 20789 North Pima Road, Suite 210 • Scottsdale, Arizona 85255 • www.whitestonereit.com September 25,2020 Planning and Zoning Commission Village of Buffalo Grove 50 Raup Boulevard Buffalo Grove, Illinois 60089 Re: Spoerlein Commons Dunkin’ Donuts Drive Thru Background Spoerlein Commons was planned and developed as part of the Spoerlein Farm development. The plan was proposed by Midwest Development and approved by the Village of Buffalo Grove in 1983. Part of the approved commercial center plan included two small free standing buildings located along the western most part of the center. During the development of the property the plan for those building was modified to what is illustrated on the proposed Concept Plan as Proposed Future Building Expansion. Our research indicates that this is the current record plan of development. Those two buildings totaled approximately 4,480 sq. ft. and were never built. Spoerlein Commons was purchased by Whitestone REIT in 2009. Since that time Whitestone has concentrated on property maintenance, some improvements and stabilizing the tenant base. One of the long-term tenants, Dunkin Donuts, has expressed the need for a drive thru facility to serve the growing morning demand for quick serve coffee and breakfast. That market need has caused several planning exercises to accommodate Dunkin Donuts. The attached plan is the one preferred by Whitestone and their client. The Concept Plan A Concept Plan was prepared and presented to the Planning & Zoning Commission in November, 2018. That Concept Plan illustrated that in lieu of the previously approved buildings, the proposal would satisfy the need for a drive thru with a proposed 2,800 sq. ft. building. The new building would house Dunkin Donuts and Baskin Robbins. This would require the reconfiguration of some of the existing parking lot with no loss of the total number of parking spaces. The building’s drive thru would accommodate stacking for 9 cars. The drive thru would minimize peak time parking conflicts with no additional impact on the other retail and office users. A Parking Study was authorized and concluded that the parking is adequate for the existing uses and for the proposed. The reconfigured parking would be more convenient to these other tenants. Very preliminary building elevations, landscape and civil engineering were also presented to support the Concept. 2.2.b Packet Pg. 24 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2600 South Gessner Suite 500 • Houston, Texas 77063 • Toll Free 866.789.7348 • Fax 713.465.8847 • www.whitestonereit.com 2 While the Commission was generally favorable, considerable detail and some refinement were necessary. Those details and refinements have been completed and a full set of Plans and studies are part of this submittal for review, comment and approval. Refined Submittal The refined submittal consists of a 14 page set of drawings which includes a site plan, architecture, civil engineering and landscape plans. Also included are a Parking Memo, Traffic Memo, Driveway Spacing Exhibit and a Preliminary Storm Water Management Report. These exhibits and reports respond to the comments from the Commission during the Concept Plan review as outlined below. Parking/Stacking With the completion of the architecture and more detailed site plan address: •Designate employee parking near drive thru stacking- the revised site plan has reconfigured the drive thru stacking to eliminate conflicts with the parking field •Parking area for drive thru waiting- illustrated on the revised site plan •Coordinate handicap spaces with building entry(ies)-Illustrated on the revised site plan •Drive thru stacking- Stacking has been revised to show 10 stacking in the drive thru Traffic/Circulation •Traffic counts on Rt. 83- Addressed in the Traffic Memo •Internal circulation- in/out at main entry and each of the other two- Addressed in the Traffic Memo •Main entry location and/or minor modifications to improve circulation- Driveway Spacing Exhibit illustrates the potential conflicts which occur with a relocated driveway. The Traffic Memo addresses other modifications. •With sign package- internal wayfinding- The wayfinding signage is illustrated on the site plan. Architecture •Seating capacity inside and patio- Noted on the architecture •Building height- compare to existing- Noted on the architecture •Location of order box- Illustrated on the Site Plan •Details as required for submittal- Considerable detail included. Operations •Cook to order? Time to complete/stacking? •Manager should attend Hearing- Manager will attend and address operations Civil Engineering •Detention details-Addressed in the Storm Water Report 2.2.b Packet Pg. 25 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2600 South Gessner Suite 500 • Houston, Texas 77063 • Toll Free 866.789.7348 • Fax 713.465.8847 • www.whitestonereit.com 3 Other •Need sign package and landscape plan- Included in the package. Note that the concepts discussed with the Concept Plan are largely maintained with the more detailed plans. The proposed building was reduced in size from 2,800 sf to 2,388 sf. With the more detailed planning efforts the layout and circulation have been improved. We understand that the drive thru requires a Special Use permit. The standards for reviewing that aspect of the proposal are as follows: All special uses shall meet the following criteria: 1.The special use will serve the public convenience at the location of the subject property; or the establishment, maintenance or operation of the special use will not be detrimental to or endanger the public health, safety, morals, comfort, or general welfare; The restaurant use is existing. They have many customers who park and run in, run out for service. The drive thru will serve those customers without impacting the provided parking. It represents an improvement and therefore is not detrimental. 2.The location and size of the special use, the nature and intensity of the operation involved in or conducted in connection with said special use, the size of the subject property in relation to such special use, and the location of the site with respect to streets giving access to it shall be such that it will be in harmony with the appropriate, orderly development of the district in which it is located; The freestanding drive thru restaurant is smaller than the previously approved “out lots”. Therefore is in harmony with the appropriate, orderly development of the shopping center. 3.The special use will not be injurious to the use and enjoyment of other property in the immediate vicinity of the subject property for the purposes already permitted in such zoning district, nor substantially diminish and impair other property valuations in the neighborhood; The proposed is an improvement to the functionality of the shopping center for reasons noted above. It is not injurious to the use and enjoyment nor will it impair the property values in the neighborhood. 4.The nature, location and size of the buildings or structures involved with the establis hment of the special use will not impede, substantially hinder or discourage the development and use of adjacent land and buildings in accord with the zoning district within which they lie; 2.2.b Packet Pg. 26 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2600 South Gessner Suite 500 • Houston, Texas 77063 • Toll Free 866.789.7348 • Fax 713.465.8847 • www.whitestonereit.com 4 The establishment of this drive thru has no impact on adjacent land and uses. Note that is located immediately adjacent to a drive thru car wash on a neighboring property. 5.Adequate utilities, access roads, drainage, and/or other necessary facilities have been or will be provided; The proposed engineering plan and traffic study addresses all the necessary facilities. They are adequate. 6.Parking areas shall be of adequate size for the particular special use, which areas shall be properly located and suitably screened from adjoining residential uses, and the entrance and exit driveways to and from these parking areas shall be designed so as to prevent traffic hazards, eliminate nuisance and minimize traffic congestion in the public streets. The parking and traffic studies address this point and find all related infrastructure to be adequate. To summarize the Special Use request, we believe that it in keeping with the overall Spoerlein Commons Shopping Center with no negative impacts. The Planning Staff has identified two variations to the Village Zoning Code in order to permit the development as submitted. They are as follows: Zoning Ordinance: a)A Variation to Section 17.36.040 of the Zoning Ordinance to allow for a reduction to the minimum number of parking spaces required for both Spoerlein Commons Building and the Outlot Building in total. The Parking Study address this in detail and finds that based on actual observations of parking demand the parking is more than adequate. It is consistent with the 1983 approved plan. Sign Code: a)A Variation to Section 14.16 of the Sign Code to allow for four extra wall signs on the east and s outh elevations of the proposed outlot building. 2.2.b Packet Pg. 27 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2600 South Gessner Suite 500 • Houston, Texas 77063 • Toll Free 866.789.7348 • Fax 713.465.8847 • www.whitestonereit.com 5 There are 2 businesses in the proposed building, Dunkin Donuts and Baskin Robbins. The signs as proposed are part of the Next Generation corporate branding and we believe are appropriate for this location. b) A Variation to Section 14.16 of the Sign Code to allow for the wall signs on the east and south elevations of the proposed outlot building to exceed the maximum allowable height of the sign. Same response as outlined in a) above. We look forward to the presentation and your questions and comments. We believe that this is an appropriate use and is conformance with the approved plan and the continuing success of Spoerlein Commons. Rick Burton Land and Entitlement Consultant WHITESTONE REIT 2.2.b Packet Pg. 28 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) En g i n e e r i n g , L L C Ci v i l E n g i n e e r i n g R e a l E s t a t e C o n s u l t i n g P r o j e c t M a n a g e m e n t 97 5 E . 2 2 n d S t , S u i t e 4 0 0 Wh e a t o n , I L 6 0 1 8 9 63 0 . 4 8 0 . 7 8 8 9 ww w . r w g - e n g i n e e r i n g . c o m SP O E R L E I N C O M M O N S - P R O P O S E D D R I V E T H R U BU F F A L O G R O V E , I L L I N O I S 1 4 EX I S T I N G C O N D I T I O N S P L A N PRELIMINARY- FOR REVIEW ONLY 2.2.b Packet Pg. 29 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) En g i n e e r i n g , L L C Ci v i l E n g i n e e r i n g R e a l E s t a t e C o n s u l t i n g P r o j e c t M a n a g e m e n t 97 5 E . 2 2 n d S t , S u i t e 4 0 0 Wh e a t o n , I L 6 0 1 8 9 63 0 . 4 8 0 . 7 8 8 9 ww w . r w g - e n g i n e e r i n g . c o m SP O E R L E I N C O M M O N S - P R O P O S E D D R I V E T H R U BU F F A L O G R O V E , I L L I N O I S 2 4 PR E L I M I N A R Y S I T E G E O M E T R I C A N D P A V I N G P L A N PRELIMINARY- FOR REVIEW ONLY 2.2.b Packet Pg. 30 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) En g i n e e r i n g , L L C Ci v i l E n g i n e e r i n g R e a l E s t a t e C o n s u l t i n g P r o j e c t M a n a g e m e n t 97 5 E . 2 2 n d S t , S u i t e 4 0 0 Wh e a t o n , I L 6 0 1 8 9 63 0 . 4 8 0 . 7 8 8 9 ww w . r w g - e n g i n e e r i n g . c o m SP O E R L E I N C O M M O N S - P R O P O S E D D R I V E T H R U BU F F A L O G R O V E , I L L I N O I S 3 4 PR E L I M I N A R Y G R A D I N G P L A N MODULAR BLOCK RETAINING WALL ALONG DRIVEWAY ADJACENT TO EXISTING DETENTION BASIN PRELIMINARY- FOR REVIEW ONLY GRADING LEGEND 2.2.b Packet Pg. 31 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) En g i n e e r i n g , L L C Ci v i l E n g i n e e r i n g R e a l E s t a t e C o n s u l t i n g P r o j e c t M a n a g e m e n t 97 5 E . 2 2 n d S t , S u i t e 4 0 0 Wh e a t o n , I L 6 0 1 8 9 63 0 . 4 8 0 . 7 8 8 9 ww w . r w g - e n g i n e e r i n g . c o m SP O E R L E I N C O M M O N S - P R O P O S E D D R I V E T H R U BU F F A L O G R O V E , I L L I N O I S 4 4 PR E L I M I N A R Y U T I L I T Y P L A N PRELIMINARY- FOR REVIEW ONLY UTILITY LEGEND 2.2.b Packet Pg. 32 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) TRASH ENCLOSURE DRIVE THRU WINDOW 4 1 8 9 9 15 23 3 12 LOADING AREA 1 11 11 12 12 13 14 15 3 16 16 16 16 5 5 9 10 19 22 21 20 18 1 SCHEMATIC SITE PLAN 1" = 20'NOTE: 1.LOCATE EXTERIOR MENU SYSTEM AT 5th CAR FROM THE DRIVE THRU WINDOW, PREVIEW BOARD AT 2nd CAR BEHIND. REFER TO SITE PLAN. 2.CONSULT APPLICABLE CODES, ORDINANCES AND LAWS FOR ALL SPECIFIC SITE DESIGN REQUIREMENTS. 3.CURB RAMP, SEE CIVIL DRAWINGS. 4.PARKING SPACE AND DRIVEWAY DIMENSIONS MAY VARY PER LOCAL CODE. 5.CONCRETE PAD AT DRIVE THRU LOOP/DETECTORS SHOULD MATCH THE ADJACENT LOT SURFACE MATERIAL AS MUCH AS POSSIBLE-PROVIDE BLACK STAINED CONCRETE WHEN USED ADJACENT TO ASPHALT MATERIAL. 6.REFER TO CONSTRUCTION SPECIFICATIONS ON GN-1 SHEETS FOR ADDITIONAL SITE PLAN INFO. 7.G.C. TO COORDINATE W/ FRANCHISEE EXACT SIZE OF PAD FOR MENUBOARD, SPEAKER TOWER, CANOPY & ORDER CONFIRMATION BOARD - SEE WEBSITE FOR MOUNTING REQUIREMENTS & FOR COMPLETE INSTALLATION INFORMATION AND DETAILS, http://extranet.dunkinbrands.com. 8.G.C. TO PROVIDE PVC CONDUIT FOR ALL NEW LOCATIONS, REFER TO ELECTRICAL DRAWING FOR ADDITIONAL INFORMATION ON LOOP REQUIREMENTS; SAW-CUT AT EXISTING LOCATION WHERE NECESSARY. 9.DRIVE-THRU MENU SHOULD BE PLACED AT A 30°ANGLE TO ONCOMING TRAFFIC WITH THE EXCEPTION OF THE "ALL IN ONE" CANOPY/DIGITAL MENU BOARD OPTION. 10.HOME RUN CONDUIT TO DRIVE THRU TIMER MONITOR ADJACENT TO DRIVE THRU WINDOW. 11.20'x10' THICK CONC. PAD W/ 18"X54" GROUND LOOPS; TOP OF SLAB SHALL BE FLUSH WITH PAVEMENT, SEE DETAIL # 2 / SP-1.1. 12.18"X54" GROUND LOOP (TYP.), REFER TO ELECTRICAL DWGS. FOR CONDUIT REQUIREMENTS @ LOOP. 13.D/T STACK & MENU BOARD CAMERA MTD. TO BUILDING. COORD. FINAL LOCATION w/ OWNER. 14.WELCOME POINT BRANDED GATEWAY WITH HEIGHT LIMITATION BAR, SEE DETAIL # 1 / SP-1.1. 15.ORDER LANE SPEAKER ORDER CONFIRMATION LOOP. 16.DRIVE THRU BRANDED GRAPHIC, PAINT TP-04 ORANGE. 17.PARKING LINES TO BE PAINTED TP-01 WHITE (TYP.). 18.DD "SEE YOU SOON" / "DO NOT ENTER" DIRECTIONAL SIGN, SEE DETAIL # 8 / SP-1.2. 19.DD "WELCOME BACK" / "SEE YOU SOON" DIRECTIONAL SIGN, SEE DETAIL #8 / SP-1.2. 20.ARROW BRANDED GRAPHIC (SEE NATL. ACCOUNTS) TP-04 ORANGE. 21.DD "DRIVE-THRU" / "DRIVE-THRU" DIRECTIONAL SIGN, SEE DETAIL #8 / SP-1.2. 22.DD "DUNKIN" / "SEE YOU SOON" DIRECTIONAL SIGN, SEE DETAIL #8 / SP-1.2. SITE NOTES: SPACE ALLOCATION & TRASH ENCLOSURE GUIDELINES 1.PROVIDE CONCRETE PAD AND FENCE AROUND DUMPSTER. FENCE TO BE CHAIN LINK WITH VINYL SLATS. ALTERNATE TO BE RECLAIMED WOOD AND PLASTIC FENCE OR CMU BLOCK ENCLOSURE. 2.DUMPSTER ENCLOSURE MUST ABIDE BY LOCAL COMMUNITY CODE. 3.GENERALLY, IF (2) 8-YARD TRASH DUMPSTERS ARE REQUIRED, DUNKIN BRANDS RECOMMENDS 16'X10' IF WOOD/FENCE ENCLOSURE OR 18'X10' IF CMU BLOCK ENCLOSURE. STANDARD 8-YARD DUMPSTER DIMENSIONS ARE NOMINAL 7'-0" (6'-10")W BY 7'-10"D. 4.(2) 8-YARD TRASH DUMPSTERS WILL NOT FIT INSIDE 12'-0" X 10'-0" FENCED OR CMU BLOCK ENCLOSURE. 1.LOOP PLACEMENT IS DEFINED IN TERMS OF WHERE THE VEHICLE ENGINE BLOCK WOULD BE OVER THE LOOP IF THE CENTER OF THE DRIVER'S SIDE WINDOW IS AT THE SERVICE POINT . THE GOAL IS TO ENSURE THERE IS ONLY ROOM FOR ONE VEHICLE BEHIND THE PREVIOUS LOOP AND THE MERGE POINT; THIS IS HOW SEQUENCING IS POSSIBLE. 2.REFER TO ELECTRICAL DRAWINGS FOR FURTHER INFORMATION ON CONDUIT LOCATIONS AND QUANTITY CORRESPONDING TO EACH DRIVE THRU SET UP OPTION. 3.REFERENCE TO MASTER SCHEDULE FOR TRAFFIC STRIPING PAINT. GENERAL NOTES 2 DRIVE THRU PICKUP WINDOW DETAIL 3/16" = 1'-0"NOTE: 3 DIGITAL SET UP EXPERIENCE SITE LAYOUT 3/16" = 1'-0"NOTE: NO DA T E DE S C R I P T I O N DR A W N B Y DU N K I N ' D O N U T S SP O E R L E I N C O M M O N S 11 5 1 M c H E N R Y R O A D BU F F A L O G R O V E , I L 6 0 0 8 9 IS S U E D A T E S / R E V I S I O N S CH E C K E D B Y DA T E PR O J E C T N o 18 0 5 4 S H E E T - IS S U E F O R C L I E N T R E V I E W 12 - 1 0 - 1 9 - - - - - - - - - - - - - - - - - - - - - 12 . 1 0 . 1 9 WJ TW 19 N . G r e e l e y S t . P a l a t i n e , I L 6 0 0 6 7 T ( 8 4 7 ) 3 5 9 - 9 6 1 6 SP-1.0 SC H E M A T I C S I T E P L A N , L O O P LO C A T I O N S , D E T A I L S & N O T E S 2.2.b Packet Pg. 33 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) DUNKIN DONUTS SPOERLEIN COMMONS 1151 MCHENRY ROAD BUFFALO GROVE, IL 60089 PRELIMINARY LANDSCAPE PLAN L0.1 WARREN JOHNSON ARCHITECTS, INC. PALATINE, IL MARCH 25, 2020 ALGONQUIN IL 60102 847 878 4019 526 SKYLINE DRIVE PROJECT TEAM DEVELOPER: DUNKIN DONUTS ARCHITECT: WARREN JOHNSON ARCHITECTS, INC. 19 N. GREENLEY STREET PALATINE, IL 60067 TEL (847) 369-9616 CONTACT: WARREN JOHNSON / TRACY WILLIE CIVIL ENGINEER: RWG ENGINEERING, LLC 975 E. 22ND STREET, SUITE 400 WHEATON, IL 6089 TEL (630) 480-7889 LANDSCAPE ARCHITECT: DICKSON DESIGN STUDIO, INC. 526 SKYLINE DRIVE ALGONQUIN, IL 60102 TEL (847) 878-4019 CONTACT: SHARON DICKSON SHEET KEY L0.1 PROJECT TEAM GENERAL LANDSCAPE NOTES PLANTING DETAILS PLANT SYMBOLS KEY L1.1 OVERALL LANDSCAPE PLAN - SHEET KEY PLANT & MATERIALS LIST DETAIL: GUARD RAIL FENCE DETAIL: TREE PROTECTION FENCE L1.2 LANDSCAPE PLAN - PROPOSED L1.3 LANDSCAPE PLAN - PROPOSED GENERAL LANDSCAPE NOTES CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED. ALL CONSTRUCTION SHALL CONFORM TO APPLICABLE STANDARDS AND CODES. CALL J.U.L.I.E. UTILITY LOCATING SERVICE (TEL 800.892.0123), 48 HOURS PRIOR TO THE START OF ANY DIGGING. GENERAL PLANT NOTES: A. ALL PLANT MATERIAL SHALL CONFORM IN SIZE AND GRADE IN ACCORDANCE WITH AMERICAN STANDARD FOR NURSERY STOCK. B. ALL PLANT MATERIAL SHALL BE MAINTAINED ALIVE, HEALTHY, AND FREE FROM DISEASE AND PESTS. C. ALL NEW PLANT MATERIAL SHALL BE FROM A LOCAL SOURCE WHENEVER POSSIBLE (LESS THAN 50 MILES). D. PLANTS SHALL BE ALLOWED TO GROW IN THEIR NATURAL FORM / HABIT. PLANTS SHALL NOT BE PRUNED/HEDGED UNLESS ABSOLUTELY NECESSARY (DUE TO VISIBILITY OR HAZARD OBSTRUCTION). E. ALL LANDSCAPED AREAS SHALL BE FREE OF WEEDS, LITTER, AND SIMILAR SIGNS OF DEFERRED MAINTENANCE. F. MAINTENANCE AND CARE OF PLANT MATERIAL SHALL INCLUDE, BUT NOT BE LIMITED TO, WATERING, FERTILIZING (IF NECESSARY), DEAD-HEADING, WEEDING, AND MULCHING. LOCATIONS OF PROPOSED PLANT MATERIAL MAY BE ADJUSTED AT TIME OF INSTALLATION DUE TO FINAL ENGINEERING AND FINAL LOCATION OF SITE UTILITIES. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND SPREADING TOPSOIL (6"-12" DEEP), FINE GRADING, AND PREPARATION OF ALL LAWN AND LANDSCAPE AREAS. ALL SOILS SHALL BE FREE OF CONSTRUCTION DEBRIS, PRIOR TO INSTALLING ANY PLANT MATERIAL. PRIOR TO SPREADING TOPSOIL, THE LANDSCAPE CONTRACTOR SHALL INSPECT AND ACCEPT ALL BASE GRADES. ANY DEVIATION FROM GRADES INDICATED ON THE GRADING PLAN SHALL BE CORRECTED BEFORE PLACING ANY TOPSOIL. ALL SHRUB, GROUNDCOVER, PERENNIAL, AND ANNUAL PLANTING BEDS SHALL BE PREPARED WITH A SOIL AMENDMENT MIX - 1/3 TOPSOIL, 1/3 MUSHROOM COMPOST, AND 1/3 TORPEDO SAND. MATERIAL SHALL BE ROTO-TILLED JUST PRIOR TO THE INSTALLATION OF PLANT MATERIAL. ALL PLANTING ISLANDS SHALL BE MOUNDED TO A CENTER HEIGHT OF TWELVE INCHES (12"). ALL PLANTING BEDS ADJACENT TO LAWN AREAS SHALL HAVE A SPADED EDGE BORDER, UNLESS METAL OR OTHER BORDER IS SPECIFIED. ALL PLANTING BED AREAS SHALL MAINTAIN A MAX. 3" DEEP LAYER OF SHREDDED HARDWOOD MULCH (COLOR: NON-DYED, BROWN). LANDSCAPE CONTRACTOR SHALL COORDINATE PLANTING SCHEDULE WITH LANDSCAPE MAINTENANCE CONTRACTOR, TO ENSURE PROPER WATERING OF PLANTED AND SODDED AREAS AFTER INITIAL INSTALLATION. LANDSCAPE CONTRACTOR SHALL COORDINATE WORK WITH OTHER CONTRACTORS ON SITE TO MINIMIZE ANY REDO OF COMPLETED LANDSCAPE WORK AND DAMAGE TO PLANT MATERIAL. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS/HER OWN LAYOUT WORK. UPON REQUEST, LANDSCAPE ARCHITECT SHALL BE AVAILABLE TO ASSIST/APPROVE CONTRACTOR LAYOUT. EVERY ATTEMPT HAS BEEN MADE TO DEPICT ALL EXISTING UTILITY LINES. CONTRACTOR SHALL USE PRECAUTION WHEN DIGGING. CONTRACTOR SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO ANY DIGGING, VERIFYING LOCATIONS AND DEPTHS OF ALL UTILITIES. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE PRIOR TO BID SUBMITTAL, TO BECOME FAMILIAR WITH EXISTING CONDITIONS AT THE SITE. PLANT LIST QUANTITIES PROVIDED AT TIME OF FINAL PLANS ARE APPROXIMATIONS. CONTRACTORS ARE RESPONSIBLE FOR COMPLETING THEIR OWN QUANTITY TAKE-OFFS. IF A DISCREPANCY IS FOUND BETWEEN THE PLAN AND THE PLANT LIST, THEN THE PLAN SHALL PREVAIL. PLANT SUBSTITUTIONS ARE ALLOWED DUE TO PLANT AVAILABILITY OR PLANTING TIME OF YEAR, ONLY WITH THE PRIOR CONSENT OF THE LANDSCAPE ARCHITECT. IF SUBSTITUTIONS ARE MADE WITHOUT PRIOR CONSENT, THE LANDSCAPE ARCHITECT MAINTAINS THE RIGHT TO REJECT MATERIAL IN THE FIELD, AT THE COST TO THE CONTRACTOR. CONTRACTOR TO PROVIDE TEST OF EXISTING AND IMPORTED SOILS PER SPECIFICATIONS. PLANTING SOIL SHALL BE AMENDED PER SPECIFICATIONS. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IF AREAS OF POOR DRAINAGE OR OTHER UNUSUAL SUBSURFACE CONDITIONS ARE ENCOUNTERED DURING EXCAVATION FOR PLANTING PITS. ALL TURF SHALL SHALL BE KENTUCKY BLUEGRASS BLEND SOD (MINERAL, NOT PEAT), UNLESS OTHERWISE NOTED ON THE PLAN. CONTRACTOR SHALL RESTORE LAWN AREAS THAT HAVE REMAINED PARTIALLY INTACT, TOP DRESSING WITH SOIL, SCARIFYING, AND SEEDING TO FORM A SMOOTH, FULL, EVEN LAWN, FREE OF BARE SPOTS, INDENTATIONS, AND WEEDS. LANDSCAPE DETAILS SHOWN ARE FOR DESIGN INTENT ONLY, LANDSCAPE ARCHITECT ASSUMES NO LIABILITY. CONTRACTOR IS RESPONSIBLE FOR ERECTING AND INSTALLING PROPERLY BUILT AMENITIES PER CODE, PER SITE CONDITIONS (FINAL GRADING & UTILITY LOCATIONS), AND PER AREA CLIMATE CONDITIONS. ALL LANDSCAPE SITE DETAILS FOR STRUCTURES AND FOOTINGS SHALL BE REVIEWED & APPROVED BY A STRUCTURAL ENGINEER. CONTRACTOR INSTALLATION BIDS SHALL INCLUDE A ONE-YEAR WARRANTY ON ALL PLANT MATERIAL, IN PERPETUITY. (IF APPLICABLE) CONTRACTOR INSTALLATION BIDS SHALL INCLUDE A THREE-YEAR MONITORING AND MAINTENANCE PROGRAM ON ALL NATURALIZED DETENTION AREAS. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 3" MULCH MIN. SHRUB PLANTING TO REMOVE AIR POCKETS 3" CONTINUOUS RIM SPECIFIED PLANTING MIX. WATER & TAMP FORM SAUCER WITH PERENNIAL PLANTING PREPARE BED AS PER WRITTEN SPECIFICATION INSTALLED BEFORE PLANTING 3" COMPOST/LEAF MULCH PLANT SPACING AS MULTI-TRUNK TREE STAKING 2" X 2" HARDWOOD STAKES DRIVEN FIRMLY A MINIMUM OF 24" INTO THE SUBGRADE PRIOR TO BACKFILLING 2-STRAND 12-GAUGE GALV. WIRE TWISTED AND ENCASED IN RUBBER HOSE 6 - 9" FROM TOP OF STAKE 2 WIRE SUPPORTS SHALL BE USED ON MAIN STRUCTURAL BRANCHES STAKE TO FIRST BRANCHES AS NECESSARY FOR FIRM SUPPORT WIRE SHALL NOT TOUCH OR RUB AGAINST TRUNKS OR BRANCHES FORM SAUCER WITH 3" CONTINUOUS RIM SPECIFIED PLANTING MIX WATER & TAMP TO REMOVE AIR POCKETS 2 X BALL DIA. 3" MULCH MIN. PLANTING NOTES: STAKING AS REQUIRED NOTE: FORM SAUCER WITH MIX. WATER & TAMP SPECIFIED PLANTING 3" CONTINUOUS RIM POCKETS TO REMOVE AIR HILLSIDE PLANTING 3" MULCH MIN. PLANT SO THAT TOP OF ROOTBALL IS EVEN WITH THE FINISHED GRADE BACKFILL TO MEET EX. GRADE AND CREATE LEVEL GRADE AT ROOT BALL. EXISTING GRADE 2-STRAND 12-GAUGE GALV. WIRE TWISTED PLANTING NOTES: NOT TO SCALE TREE PLANTING & STAKING NOTE: OV E R A L L H T . TR U N K H T . 4' - 0 " STAKING AND WRAPPING 2 X BALL DIA. FORM SAUCER CANOPY SPREAD SPECIFIED PLANTING MIX WATER & TAMP TO REMOVE AIR POCKETS PLANT SO THAT TOP OF ROOT BALL IS EVEN/SLIGHTLY ABOVE FINISHED GRADE 3" MULCH MIN. TRUNKS OR BRANCHES TOUCH OR RUB ADJACENT STAKING WIRE SHALL NOT FIRM SUPPORT AS NECESSARY FOR STAKE TO FIRST BRANCHES PRIOR TO BACKFILLING 24" INTO THE SUBGRADE DRIVEN FIRMLY A MINIMUM OF 2-3, 2" X 2" HARDWOOD STAKES BRANCHES ON MAIN STRUCTURAL SUPPORTS SHALL BE USED FROM TOP OF STAKE 2 WIRE IN RUBBER HOSE 6-9" WIRE TWISTED AND ENCASED 2-STRAND 12-GAUGE GALV.TREE WRAP AS REQUIRED 2" X 2" HARDWOOD STAKES DRIVEN FIRMLY A MINIMUM OF 24" INTO THE SUBGRADE PRIOR TO BACKFILLING AND ENCASED IN RUBBER HOSE 6 - 9" FROM TOP OF STAKE STAKE AND GUY AS NEEDED STRAND TWISTED. AT WHICH TREE GREW FINISHED GRADE 2 x ROOTBALL DIA. EVERGREEN TREE PLANTING DO NOT CUT OR DAMAGE LEADER 12-GUAGE GALVANIZED WIRE, DOUBLE SET ROOTBALL 3" HIGHER THAN GRADE 4" DEEP WATER RETENTION BASIN APPLY SPECIFIED MULCH 3" DEEP TO REMAIN PERMANENTLY UNDISTURBED SUBGRADE PLANTING NOTES: PER PLAN PLANTING DETAILS NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE PLANT SYMBOLS KEY EXISTING DECIDUOUS TREE SHADE / CANOPY TREES, EVERGREEN TREES, ORNAMENTAL TREES, SMALL, EVERGREEN SHRUBS, LARGE, DECIDUOUS SHRUBS, SMALL, DECIDUOUS SHRUBS, 3" CALIPER 36" TALL/WIDE 18"-24' TALL 3" CALIPER / 8' TALL EXISTING EVERGREEN TREE 36" TALL SMALL ORNAMENTAL GRASS, LARGE, ORNAMENTAL GRASS, 1 GALLON 3 GALLON 6' TALL PERENNIAL FLOWERS & GROUNDCOVER, 1 GALLON NOTE! NOT ALL PLANT SYMBOLS MAY BE DEPICTED ON PLANS. 2.2.b Packet Pg. 34 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) CARRIAGE BOLTS - 5/8" X 12" GALVANIZED 6" 12 " 12 " 6" 12 " 12 " 6" 8" (42" MINIMUM DEPTH) CHAMFERED EDGE CONCRETE FOOTING PRESSURE TREATED - PRESSURE TREATED -6'-0" ON CENTER 30 " 2" X 12" RAIL 6" X 8" POSTS CANOPY DRIP LINE LIMITS OR FURTHER 4' PROTECTION FENCE TO EXTEND OUT TO FENCE TO BE PROVIDED AROUND ALL OFF-SITE TREES WHOSE CANOPY DRIP-LINE EXTENDS ACROSS BOUNDARIES OF PROJECT SITE. FENCE IS FOR PROTECTION OF ZOOT ZONES. FENCE SHALL REMAIN IN PLACE ON PROJECT SITE UNTIL ADJACENT CONSTRUCTION IS COMPLETE. FENCE SHALL BE 4' TALL, ORANGE, SNOW-FENCE (OR APPROVED EQUAL), POSTED WITH A SIGN THAT READS: "TREE PROTECTION ZONE - KEEP OUT" SECURE FENCE TO WOODEN STAKES OR METAL POLES, SPACED NO GREATER THAN 8' ON CENTER NOTE! AFTER EXISTING TREES ARE FENCED, NOTHING IS TO BE DISTURBED, STORED, PARKED, ETC., INSIDE CONSTRUCTION FENCE. REMOVE FENCE ONLY AFTER ALL CONSTRUCTION WORK HAS BEEN COMPLETED. NORTH SCALE: 1" = 20'-0" PROPOSED CONDITIONS PLAN - LANDSCAPE, SHEET KEY ALGONQUIN IL 60102 847 878 4019 526 SKYLINE DRIVE L1.1 WARREN JOHNSON ARCHITECTS, INC. PALATINE, IL DUNKIN DONUTS SPOERLEIN COMMONS 1151 MCHENRY ROAD BUFFALO GROVE, IL 60089 PRELIMINARY LANDSCAPE PLAN MARCH 25, 2020 SHEET L1.3 SHEET L1.2 PLANT & MATERIALS LIST DETAIL: GUARD RAIL FENCE ELEVATION VIEW PLAN VIEW SECTION VIEW DETAIL: TREE PROTECTION FENCE 2.2.b Packet Pg. 35 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 3-VJ 13-CKF3 25-SHT 1-SGF 4-HPB 3-SGF 115-PGC ONSITE: EXISTING DECIDUOUS TREE - TO REMOVE ONSITE: EXISTING EVERGREEN TREE - TO REMOVE ONSITE: EXISTING EVERGREEN TREE - TO REMOVE ONSITE: EXISTING DECIDUOUS TREE - TO REMAIN GUARD RAIL FENCING BEGINS HERE - APPROX. 128 L.F. GUARD RAIL FENCING ENDS HERE 4-VDDF TREE PROTECTION FENCING SURROUNDS TREE, 8' SQUARE - APPROX. 32 L.F. RETAINING WALL (REFER TO CIVIL ENGINEERING) 1-PDM 1-HAA 19-SHT NEW SOD - APPROX. 405 S.F. NEW SOD / RESTORED TURF - APPROX. 225 S.F. NEW SOD - APPROX. 585 S.F. NEW SOD - APPROX. 185 S.F. NEW SOD / RESTORED TURF - APPROX. 2,055 S.F. (HATCHED AREA, TYPICAL) MATCH TO SHEET L1.3 MATCH TO SHEET L1.3 1-TSS 1-TSS RE-GRADE & RESTORE BASIN (SHADED AREA) - APPROX. 760 S.F. EXISTING BASIN AREA TO REMAIN UNDISTURBED 1-SGF 1-TOS ALGONQUIN IL 60102 847 878 4019 526 SKYLINE DRIVE L1.2 WARREN JOHNSON ARCHITECTS, INC. PALATINE, IL DUNKIN DONUTS SPOERLEIN COMMONS 1151 MCHENRY ROAD BUFFALO GROVE, IL 60089 PRELIMINARY LANDSCAPE PLAN MARCH 25, 2020 NORTH SCALE: 1" = 10'-0" PROPOSED CONDITIONS PLAN - LANDSCAPE 2.2.b Packet Pg. 36 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 4-VDDF 11-SHT 4-CKF3 EXISTING TIMBER WALL AND EXISTING TREES SHALL REMAIN 1-NS 3-RGL 14-SHT 7-HPB 3-RGL 3-RGL 14-SHT 7-HPB 3-RGL 1-SRIS 2-TOS 9-SHT 2-VJ 3-HAA NEW SOD / RESTORED TURF - APPROX. 630 S.F. NEW SOD - APPROX. 195 S.F. NEW SOD - APPROX. 275 S.F. MATCH TO SHEET L1.2 MATCH TO SHEET L1.2 NORTH SCALE: 1" = 10'-0" PROPOSED CONDITIONS PLAN - LANDSCAPE ALGONQUIN IL 60102 847 878 4019 526 SKYLINE DRIVE L1.3 WARREN JOHNSON ARCHITECTS, INC. PALATINE, IL DUNKIN DONUTS SPOERLEIN COMMONS 1151 MCHENRY ROAD BUFFALO GROVE, IL 60089 PRELIMINARY LANDSCAPE PLAN MARCH 25, 2020 2.2.b Packet Pg. 37 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 38 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 39 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 40 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 41 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 42 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 MEMORANDUM To: Daniel Kovacevic – Whitestone REIT Rick Burton – Whitestone REIT From: Tim Sjogren, P.E., PTOE – Kimley-Horn Rory Fancler, AICP, PTP – Kimley-Horn Date: July 10, 2020 RE: Parking Summary for Spoerlein Commons Buffalo Grove, Illinois Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by Whitestone REIT to perform a parking analysis for Spoerlein Commons, a shopping center located on the northeast quadrant of McHenry Road and Arlington Heights Road in Buffalo Grove, Illinois (Exhibit 1). The parking analysis was completed in order to evaluate existing parking occupancy and assess future parking conditions with the addition of a new freestanding eating and drinking establishment with drive- through window along McHenry Road near the western boundary of the site. Executive Summary Spoerlein Commons currently provides a total of 161 parking spaces. With the proposed development, the northwest portion of the parking lot would be reconfigured and a total of 163 parking spaces would be provided. Based on a review of the existing and future tenancy, the proposed parking supply requires approval of a variance from Section 17.36.040 (Schedule of Parking Requirements) of the Village of Buffalo Grove Code of Ordinances. While a parking variance is required, the overall parking supply is expected to accommodate Spoerlein Commons at full occupancy and the proposed eating and drinking establishment. A summary of key findings is provided below.  Currently, peak parking occupancy occurs during the weekday at approximately 3:00PM. During this peak period, approximately 50 percent of the parking spaces (80 spaces) are unused.  Based on a conservative review of future parking conditions with full occupancy and development of the proposed eating and drinking establishment, peak occupancy is anticipated to be 91 percent (148 spaces).  The analysis of future parking conditions is conservative and assumes Code-required parking for the vacant tenant spaces and proposed eating and drinking establishment; the analysis does not reflect the respective peak hours. The proposed eating and drinking establishment is expected to experience peak parking demand during the morning commute period when a number of the existing retail, service, and restaurant tenants (e.g., My Choice Nails, Payless Tobacco, Rosati’s Chicago Pizza, and Chinn’s Restaurant) are closed. 2.2.b Packet Pg. 43 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 83 AR L I N G T O N H E I G H T S R O A D MCHE N R Y R O A D SITE COURTLAND DRIVE A C C E S S A AC C E S S B ACCE S S C EXHIBIT 1 LOCATION MAP N R A N C HVIEW C O U R T 2.2.b Packet Pg. 44 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 3 kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 In order to enhance efficient use of the parking supply, coordination with existing and future tenants is recommended to reserve parking spaces in the front of the buildings for customers and visitors and direct employees to the spaces further from the buildings. Existing and Proposed Site Development Spoerlein Commons includes an in-line multi-tenant building as well as a freestanding building located at the southeast corner of the site. Approximately 32,000 square feet is currently occupied with various retail, restaurant, office, and service uses. In addition, the development contains approximately 9,180 square feet of vacant tenant spaces for a total building area of approximately 41,180 square feet. A total of 161 parking spaces are currently provided at Spoerlein Commons. The parking is shared across all tenants. Whitestone REIT proposes to develop a new eating and drinking establishment with drive-through window along the McHenry Road frontage at the west boundary of the site. According to property records obtained by Whitestone REIT, the proposed development is generally consistent with the development plan approved by the Village of Buffalo Grove in 1983. The approved development plan included a total of 51,050 square feet with 31,250 square feet of retail use and 19,800 square feet of office use. The approved development plan, provided as Attachment 1, included two freestanding buildings near the northwest portion of the site and a total of 191 parking spaces. During the initial development, these two freestanding buildings were never constructed and the overall site plan was modified to reflect a future building expansion plan totaling approximately 4,480 square feet. Based on the approved development plan and current market conditions, Whitestone REIT seeks to develop an approximately 2,388 square-foot eating and drinking establishment with drive- through window. The proposed development represents an approximately 47 percent decrease in square footage compared to the previously contemplated 4,480 square-foot building expansion. With the proposed development, an overall total parking supply of 161 spaces would be provided for Spoerlein Commons, consistent with the existing parking supply. The proposed site plan provided as Attachment 2. A summary of the approved development plan compared to both existing conditions and the proposed development is provided in Table 1. Table 1. Development Plan Comparison Site Plan Square Footage Parking Spaces Office Retail Total Approved 1983 Development Plan1 19,800 31,250 51,050 191 Existing Conditions 20,200 20,980 41,180 161 Proposed Conditions (with Development) 20,200 23,368 22,568 163 1The approved plan included two freestanding buildings which were never constructed and the overall site plan was modified to reflect a future building expansion plan totaling approximately 4,480 square feet. Table 2 on the following page summarizes the parking required for the existing and proposed uses at Spoerlein Commons per Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances. As shown in the table, based on the current tenant mix a total of 188 spaces are required for Spoerlein Commons. This includes 37 spaces required for the existing vacant tenant spaces, which were assumed as general commercial/retail uses. 2.2.b Packet Pg. 45 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 4 kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 With the proposed development, a total of 203 spaces would be required. This includes Code- required parking for the proposed 2,388 square-foot eating and drinking establishment and the associated future vacancy of Suite 120A (highlighted in Table 2). With the proposed development, Spoerlein Commons would provide a total of 163 spaces. The proposed supply is 40 fewer spaces than required by Code; therefore, a parking variance is required. Table 2. Village of Buffalo Grove Required Parking Suite Tenant Size1 Parking Class2 Parking Ratio3 Required Spaces Existing 101 Once Upon a Grooming 565 General commercial/retail 1 / 250 sq. ft. 2 102a The Colorist Hair Studio 821 General commercial/retail 1 / 250 sq. ft. 3 102b Vacant 1,388 General commercial/retail 1 / 250 sq. ft. 6 103 Dutch Maid Dry Cleaners 1,031 General commercial/retail 1 / 250 sq. ft. 4 104 Chinn’s Chinese Restaurant 983 Eating and drinking establishment 1 / 100 sq. ft. 10 105 Rosati’s Chicago Pizza 917 Eating and drinking establishment 1 / 100 sq. ft. 9 106 My Choice Nails 910 General commercial/retail 1 / 250 sq. ft. 4 107a Vacant 1,150 General commercial/retail 1 / 250 sq. ft. 5 107b Excel Eye Care 715 Dental and medical clinic or office 5 / 1000 sq. ft. 4 108 Excel Eye Care 1,032 Dental and medical clinic or office 5 / 1000 sq. ft. 5 109 Dr. Smith Chiropractor 1,293 Dental and medical clinic or office 5 / 1000 sq. ft. 6 110 World of Discovery Montessori 1,782 Day care center, child care center, nursery school, pre-school 2 / 1000 sq. ft. 4 120a Dunkin Donuts 1,537 Eating and drinking establishment 1 / 100 sq. ft. 15 120b Payless Tobacco 1,045 General commercial/retail 1 / 250 sq. ft. 4 120c Vacant 857 General commercial/retail 1 / 250 sq. ft. 3 121a Allstate Insurance 1,179 Business and professional offices 1 / 300 sq. ft. 4 121b Kula Yoga Lifestyle 1,890 General commercial/retail 1 / 250 sq. ft. 8 130a Vacant 1,631 General commercial/retail 1 / 250 sq. ft. 7 130b Dr. Paul Kentor, MD 2,186 Dental and medical clinic or office 5 / 1000 sq. ft. 11 201 Chmela Fluency Center 1,145 Dental and medical clinic or office 5 / 1000 sq. ft. 6 202a Titan Trucking 576 Business and professional offices 1 / 300 sq. ft. 2 202b Titan Trucking 642 Business and professional offices 1 / 300 sq. ft. 2 203 Whitestone 679 Business and professional offices 1 / 300 sq. ft. 2 204 Vacant 1,071 General commercial/retail 1 / 250 sq. ft. 4 205a Bill Gerdes (Lake Cook Piano Studio) 300 Business and professional offices 1 / 300 sq. ft. 1 205b Vacant 499 General commercial/retail 1 / 250 sq. ft. 2 206a Vacant 867 General commercial/retail 1 / 250 sq. ft. 3 206b1 Peter Lee (Real Estate) 531 Business and professional offices 1 / 300 sq. ft. 2 206b2 One Global 531 Business and professional offices 1 / 300 sq. ft. 2 206b3 Charles Schneider (Legal) 531 Business and professional offices 1 / 300 sq. ft. 2 206b4 Ted 531 Business and professional offices 1 / 300 sq. ft. 2 206c Ted 250 Business and professional offices 1 / 300 sq. ft. 1 1Pursuant to Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances, required parking is based on floor area which shall mean the gross floor space of a building or structure. 2The parking class is based on the land use categories outlined in Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances. 3The Code-required parking ratio is defined by Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances. 2.2.b Packet Pg. 46 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 5 kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 Table 2. Village of Buffalo Grove Required Parking (continued) Suite Tenant Size1 Parking Class2 Parking Ratio3 Required Spaces Existing (continued) 208 Vacant 1,402 General commercial/retail 1 / 250 sq. ft. 6 209 Vanguard Capital 834 Business and professional offices 1 / 300 sq. ft. 3 211 Jen Cupari (Newcastle Dance and Theater Supply) 320 General commercial/retail 1 / 250 sq. ft. 1 212b Vacant 315 General commercial/retail 1 / 250 sq. ft. 1 214 Hana Travel 517 Business and professional offices 1 / 300 sq. ft. 2 215 Lake Cook Dental Center 1,200 Dental and medical clinic or office 5 / 1000 sq. ft. 6 217a Farmers Insurance 573 Business and professional offices 1 / 300 sq. ft. 2 217b Rebecca Kiel, LCPC 521 Dental and medical clinic or office 5 / 1000 sq. ft. 3 218a VCR Senior Care 550 Business and professional offices 1 / 300 sq. ft. 2 218b Carla Leoni (North Suburban Family Psychologists) 250 Dental and medical clinic or office 5 / 1000 sq. ft. 1 218c David Park (Construction) 400 Business and professional offices 1 / 300 sq. ft. 1 230 Christina Bailey, PsyD 300 Dental and medical clinic or office 5 / 1000 sq. ft. 2 232 Leslie Cisar (Vital Naturopathic) 300 Dental and medical clinic or office 5 / 1000 sq. ft. 2 233 Bruce Siegel (American Family Insurance) 435 Business and professional offices 1 / 300 sq. ft. 1 233a Muriel Flanders, LCSW 455 Business and professional offices 1 / 300 sq. ft. 2 234 Intourist 300 Business and professional offices 1 / 300 sq. ft. 1 235 Dr. Cindy 479 Dental and medical clinic or office 5 / 1000 sq. ft. 2 236 Michelle Magide, LCPC 300 Dental and medical clinic or office 5 / 1000 sq. ft. 2 237 Janine Kasner, LCSW 365 Business and professional offices 1 / 300 sq. ft. 1 238 Affiliated Clinicians 300 Dental and medical clinic or office 5 / 1000 sq. ft. 2 Existing Code-Required Parking 188 Existing Parking Supply 161 ∆ -27 Proposed 120a Dunkin Donuts (to be relocated) 1,537 Eating and drinking establishment 1 / 100 sq. ft. -15 120a Vacant 1,537 General commercial/retail 1 / 250 sq. ft. 6 New Dunkin’ Donuts 2,388 Eating and drinking establishment 1 / 100 sq. ft. 24 Future Code-Required Parking (with Development) 203 Future Parking Supply (with Development) 163 ∆ -40 1Pursuant to Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances, required parking is based on floor area which shall mean the gross floor space of a building or structure. 2The parking class is based on the land use categories outlined in Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances. 3The Code-required parking ratio is defined by Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances. 2.2.b Packet Pg. 47 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 6 kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 Existing Parking Demand To determine actual parking demand for the existing and proposed uses, Kimley-Horn conducted hourly parking occupancy counts during a typical weekday and weekend as follows:  Thursday, May 17, 2018, from 7:00AM to 7:00PM  Saturday, May 19, 2018, from 7:00AM to 7:00PM The count periods captured the peak periods of parking demand for the existing shopping center and were identified based on data provided by the Urban Land Institute (ULI) Shared Parking, Second Edition. During the study periods identified above, the existing parking supply was verified and the number of parked vehicles were documented. Other observations regarding curbside and delivery truck loading activity were noted. Table 3 summarizes the observed parking occupancy at Spoerlein Commons. During the weekday, the peak occurred at 3:00PM with 81 occupied spaces (50 percent). On Saturday, the peak occurred at 11:00AM with 49 occupied spaces (30 percent). Table 3. Observed Parking Occupancy Time of Day Thursday, May 17, 2018 Saturday, May 19, 2018 Occupied Spaces Percent Occupied Occupied Spaces Percent Occupied 7:00AM 10 6% 5 3% 8:00AM 14 9% 14 9% 9:00AM 34 21% 32 20% 10:00AM 58 36% 44 27% 11:00AM 77 48% 49 30% 12:00PM 68 42% 37 23% 1:00PM 66 41% 33 21% 2:00PM 66 41% 25 16% 3:00PM 81 50% 23 14% 4:00PM 74 46% 22 14% 5:00PM 78 48% 15 9% 6:00PM 54 34% 14 9% 7:00PM 42 26% 8 5% Average 56 34% 25 15% The observed parking occupancy reflects the mix of uses and respective peak hours and the ability to use shared parking to accommodate parking demand for Spoerlein Commons. Although a review of Code-required parking (Table 2) suggests the site provides insufficient parking, based on the observed parking occupancy approximately 50 percent of the spaces are unused during peak conditions. Therefore, actual parking demand for the retail, restaurant, office, and service uses is less than the Code requirements. 2.2.b Packet Pg. 48 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 7 kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 Proposed Parking Supply Evaluation To assess future parking conditions with the proposed development, full occupancy of Spoerlein Commons was assumed. In order to present a conservative estimate of potential future parking conditions, Code-required parking was assumed for the vacant tenant spaces and the proposed development. Based on the parking requirements presented in Table 2, a total of 43 spaces are required for the existing vacant tenant spaces and future vacancy of Suite 120a (i.e., existing Dunkin Donuts) assuming future general commercial/retail uses. Based on the parking occupancy data presented in Table 3, the potential future parking conditions were calculated as summarized in Table 4. As shown in this table, with the addition of Code-required parking for the existing vacant tenant spaces and future vacancy of Suite 120a (43 spaces) and the Code-required parking for the proposed eating and drinking establishment (24 spaces), a future parking need of 149 spaces is estimated for peak parking conditions. With the proposed development, Spoerlein Commons would provide an overall parking supply of 161 spaces; therefore, the parking supply is expected to accommodate future parking conditions. Table 4. Conservative Estimate of Future Parking Occupancy Time of Day Weekday Saturday Occupied Spaces Code-Required Parking Total Parking Occupied Spaces Code-Required Parking Total Parking Vacant Tenants1 Proposed Development2 Vacant Tenants1 Proposed Development2 7:00AM 10 43 24 77 5 43 24 72 8:00AM 14 43 24 81 14 43 24 81 9:00AM 34 43 24 101 32 43 24 99 10:00AM 58 43 24 125 44 43 24 111 11:00AM 77 43 24 144 49 43 24 116 12:00PM 68 43 24 135 37 43 24 104 1:00PM 66 43 24 133 33 43 24 100 2:00PM 66 43 24 133 25 43 24 92 3:00PM 81 43 24 148 23 43 24 90 4:00PM 74 43 24 141 22 43 24 89 5:00PM 78 43 24 144 15 43 24 82 6:00PM 54 43 24 121 14 43 24 81 7:00PM 42 43 24 109 8 43 24 75 Average 56 -- -- 123 25 -- -- 92 1Vacant tenant spaces were assumed to be occupied by general commercial/retail uses which require parking at a ratio of 1 space per 250 square feet per Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances. 2Per Section 17.36.040 (Schedule of parking requirements) of the Village of Buffalo Grove Code of Ordinances, eating and drinking establishments are required to provide 1 parking space per 100 square feet. This estimate is assumed to be conservative as peak parking demand for an eating and drinking establishment typically occurs during the morning commute period (7:00-9:00AM) when the parking lot at Spoerlein Commons is less than 25 percent occupied (Table 3). While the proposed eating and drinking establishment is expected to generate parking demand throughout typical hours of operation, peak periods of demand during the morning commute period would occur when many of the retail, service, and restaurant uses (e.g., My Choice Nails, Payless Tobacco, Rosati’s Chicago Pizza, and Chinn’s Restaurant) are closed. 2.2.b Packet Pg. 49 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 8 kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 Conclusion Spoerlein Commons currently provides a total of 161 parking spaces. An overall total of 163 spaces would be provided with development of the proposed eating and drinking establishment. The proposed parking supply requires approval of a variance from Section 17.36.040 (Schedule of Parking Requirements) of the Village of Buffalo Grove Code of Ordinances. Based on the observed peak parking demand for existing tenants and a review of the Code- required parking for vacant tenants and the proposed development, the proposed parking supply of 163 spaces is expected to support the overall Spoerlein Commons, including the proposed freestanding eating and drinking establishment. Spillover parking into the adjacent residential neighborhood is not anticipated. In order to enhance efficient use of the proposed parking supply, coordination with existing and future tenants is recommended to reserve parking spaces in the front of the buildings for customers and visitors and direct employees to the spaces further from the buildings. Please do not hesitate to contact us with any questions related to the information in this memorandum. 2.2.b Packet Pg. 50 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) En g i n e e r i n g , L L C Ci v i l E n g i n e e r i n g R e a l E s t a t e C o n s u l t i n g P r o j e c t M a n a g e m e n t 97 5 E . 2 2 n d S t , S u i t e 4 0 0 Wh e a t o n , I L 6 0 1 8 9 63 0 . 4 8 0 . 7 8 8 9 ww w . r w g - e n g i n e e r i n g . c o m SP O E R L E I N C O M M O N S - P R O P O S E D D R I V E T H R U BU F F A L O G R O V E , I L L I N O I S 2 4 PR E L I M I N A R Y S I T E G E O M E T R I C A N D P A V I N G P L A N PRELIMINARY- FOR REVIEW ONLY ATTACHMENT 1 2.2.b Packet Pg. 51 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r kimley-horn.com 4201 Winfield Road, Suite 600, Warrenville, IL 60555 630 487 5550 MEMORANDUM To: From: Date: RE: Daniel Kovacevic – Whitestone REIT Rick Burton – Whitestone REIT Rory Fancler, AICP, PTP – Kimley-Horn Tim Sjogren, P.E., PTOE – Kimley-Horn July 10, 2020 Traffic Summary for Spoerlein Commons Buffalo Grove, Illinois Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by Whitestone REIT to perform a review of existing and future (build) traffic conditions for Spoerlein Commons, a shopping center located on the north side of McHenry Road east of Arlington Heights Road in Buffalo Grove, Illinois. The analysis of build conditions considers the development of a new freestanding coffee shop with drive-through window along McHenry Road near the western boundary of the site. This memorandum presents and documents Kimley-Horn’s data collection, summarizes the evaluation of existing and projected build traffic conditions, and identifies recommendations to address the potential impact of site-generated traffic. Executive Summary Existing and build traffic conditions were evaluated for the signalized intersection of McHenry Road/Arlington Heights Road and the existing site access driveways. Based on a review of traffic conditions, it is anticipated that site-generated trips would be accommodated at the study intersections. With the addition of site-generated traffic, Access A (Courtland Drive) and Access C (Ranchview Court) are expected to operate with limited delay and queues. At Access B (McHenry Road), the outbound approach is projected to operate with increased delay and queues. The projected delay and queues are internal to the site and are not expected to impact operations of McHenry Road. However, in order to enhance access to the proposed drive-through window and facilitate circulation through the parking lot, onsite wayfinding is recommended. In addition, installation of minor-leg stop control at Access B and Access C (existing stop sign posted at Access A) is recommended with the proposed outlot development. Existing and Proposed Development Spoerlein Commons is an existing commercial shopping center totaling approximately 41,180 square feet of commercial space. The shopping center is occupied by a mix of retail, restaurant, service, and office uses. Whitestone REIT proposes to develop a new 2,388 square-foot coffee shop with drive-through window along the McHenry Road frontage at the west boundary of the site. The proposed outlot development would accommodate an existing coffee shop tenant in the inline commercial building. The conceptual site plan is provided as Attachment 1. 2.2.b Packet Pg. 52 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 2 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 Existing site access for Spoerlein Commons would be maintained with the outlot development. Access would continue to be provided by full-access driveways to Courtland Drive (Access A), McHenry Road (Access B), and Ranchview Court (Access C). An aerial view of the study location and surrounding roadway network is presented in Exhibit 1. Data Collection Kimley-Horn performed traffic counts at the signalized intersection of McHenry Road/Arlington Heights Road and the existing site access driveways. The traffic counts were conducted from 7:00 to 9:00AM and 4:00 to 6:00PM on a typical weekday, and from 11:00AM to 1:00PM on a typical Saturday. The traffic count data indicates that the peak trip generation period for Spoerlein Commons occurs from 7:30 to 8:30AM and 4:45 to 5:45PM on a typical weekday. During the Saturday midday period, the peak hour occurs from 11:00AM to 12:00PM. Peak traffic volumes at the adjacent intersection of McHenry Road/Arlington Heights occur from 7:15 to 8:15AM and 4:45 to 5:45PM on a typical weekday. On Saturday, the intersection peak hour occurs from 11:45AM to 12:45PM. For purposes of this analysis, the Spoerlein Commons peak hours were analyzed in order to evaluate the periods of highest activity at the existing commercial site. Existing peak hour traffic volumes are presented in Exhibit 2. For purposes of this analysis, the traffic volumes were rounded to the nearest multiple of five. The detailed traffic count worksheets are provided as Attachment 2. Weekday count data reveals traffic volumes on McHenry Road are higher in the eastbound direction during the morning peak hour. In the evening peak hour, traffic volumes are higher in the westbound direction, which reflects local commute patterns. During the Saturday midday peak hour, traffic volumes on McHenry Road are generally evenly distributed. Traffic volumes on Arlington Heights Road are generally higher in the northbound direction during each peak hour. Site-generated traffic for Spoerlein Commons is generally consistent across the three peak hours analyzed. Trip Generation & Assignment In order to calculate trips generated by the proposed outlot development, data was referenced from the Institute of Transportation Engineers (ITE) manual titled Trip Generation, Tenth Edition. Trip generation rates for the ITE Land Use Code (LUC) corresponding to the proposed use are shown in Table 1. In addition, the peak hour trips generated by the existing tenant in the inline commercial building (i.e., coffee shop without drive-through window) were calculated using ITE data. For purposes of this analysis, the trips generated by the existing coffee shop tenant were assumed to be removed from the study intersections with the proposed outlot development. 2.2.b Packet Pg. 53 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 83 AR L I N G T O N H E I G H T S R O A D MCHE N R Y R O A D SITE COURTLAND DRIVE A C C E S S A AC C E S S B ACCE S S C EXHIBIT 1 LOCATION MAP N R A N C HVIEW C O U R T 2.2.b Packet Pg. 54 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) NOT TO SCALE N SITESITE A C C E S S A A C C E S S A AC C E S S B AC C E S S B PR I V A T E D R I V E W A Y PR I V A T E D R I V E W A Y A R L I N G T O N H E I G H T S R O A D A R L I N G T O N H E I G H T S R O A D ACCESS CACCESS C McHEN R Y R O A D McHEN R Y R O A D COURTLAND DRIVECOURTLAND DRIVE RAN C H V I E W C O U R T RAN C H V I E W C O U R T LEGEND Weekday AM Peak (7:30 – 8:30am) Weekday PM Peak (4:45 – 5:45pm) Saturday Peak (11:00am – 12:00pm) Existing Signalized Intersection Assumed Stop Sign Existing Stop Sign Less than Five Vehicles xx (xx) [xx] 83 EXHIBIT 2 EXISTING (2019) TRAFFIC VOLUMES 30 ( 5 5 ) [ 6 0 ] 12 5 ( 2 5 5 ) [ 1 0 5 ] 45 ( 6 0 ) [ 5 5 ] 415 (1205) [510] 170 (370) [175] 15 (25) [20] [ 1 7 5 ] ( 1 7 0 ) 4 9 0 [ 4 7 5 ] ( 8 3 5 ) 5 8 5 [ 9 5 ] ( 1 6 5 ) 2 0 0 [560] ( 5 5 0 ) 1 0 8 5 [615] ( 7 6 0 ) 8 3 0 [60] (55) 85 [5] ( - ) 5 [1 0 ] ( 1 0 ) 5 [- ] ( - ) - [2 0 ] ( 3 5 ) 1 5 [790] ( 7 4 0 ) 1 5 5 0 [5] (15) 5 [10] (1 0 ) 2 0 20 ( 2 0 ) [ 2 5 ] - ( - ) [ - ] 10 ( - ) [ 1 0 ] [15] ( 3 0 ) 1 0 [5] ( 1 5 ) 2 5 45 (3 0 ) [ 1 5 ] - (-) [ - ] 575 (15 8 0 ) [ 6 9 0 ] 15 (55) [ 3 5 ] 15 (20) [ 1 5 ] 15 ( 2 5 ) [ 2 0 ] - ( - ) [ - ] [10] (1 0 ) - [-] (-) - - (-) [ - ] 20 ( 1 0 ) [ 2 0 ] [10 ] ( 1 5 ) 5 [2 5 ] ( 3 5 ) 5 [-] ( 5 ) - 2.2.b Packet Pg. 55 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 5 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 Table 1. ITE Trip Generation Data1 ITE Land Use Weekday Saturday Daily AM Peak Hour PM Peak Hour Midday Peak Hour Existing Land Use Coffee/Donut Shop without Drive- Through Window (LUC 936) 932.392 50% in / 50% out 101.14 51% in / 49% out 36.31 50% in / 50% out 59.01 49% in / 51% out Proposed Land Use Coffee/Donut Shop with Drive- Through Window (LUC 937) 820.38 50% in / 50% out 88.99 51% in / 49% out 43.38 50% in / 50% out 87.70 50% in / 50% out 1Trip generation data is presented as trips per 1,000 square feet of gross floor area. 2ITE data is not provided for Daily trips for LUC 936 (Coffee/Donut Shop without Drive-Through Window); therefore, the rate is calculated based on the ratio of trip generation rates provided for AM Peak Hour of Adjacent Street Traffic and Weekday Daily for LUC 937 (Coffee/Donut Shop with Drive-Through Window). Directional distribution from LUC 937 applied. For the purpose of this study, site-generated trips are expected to exhibit multiple routing patterns when traveling to and from the subject site, as described below: Pass-by – Pass-by traffic reflects the travel patterns of motorists who are already traveling on the adjacent study roadways and stop at the site en-route to another destination. Data in the ITE Trip Generation Handbook, Third Edition was used to estimate pass-by trips. ITE data is not provided for Coffee/Donut Shop without Drive-Through Window (LUC 936) or Coffee/Donut Shop with Drive-Through Window (LUC 937); therefore, data for Fast-Food Restaurant with Drive-Through Window (LUC 934) was assumed for each peak hour. Based on ITE data, approximately 49 percent of trips are pass-by during the morning peak hour, and 50 percent of trips are pass-by in the evening peak hour. ITE data is not provided for Daily trips and Saturday peak hour trips; therefore, an average of the morning and evening peak hour data (50 percent) was used to estimate pass-by trips during these periods. Primary Trips – Vehicles that travel to the subject redevelopment and then return directly to their place of origin are called “primary trips.” Primary trips reflect new traffic volumes generated by the proposed redevelopment that would approach and depart on the same route. Trips to/from the site that are not pass-by trips are expected to be primary trips. Per these assumptions, site-generated traffic projections are presented in Table 2. 2.2.b Packet Pg. 56 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 6 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 Table 2. Site-Generated Traffic Projections Land Use Size Weekday Saturday Daily AM Peak PM Peak Midday Peak Hour In Out Total In Out Total In Out Total Proposed Land Use Coffee/Donut Shop with Drive-Through Window 2,388 sq. ft. 1,970 110 105 215 55 55 110 105 105 210 Less Pass-by Trips1 -980 -55 -55 -110 -30 -30 -60 -55 -55 -110 Subtotal – Proposed Land Use 990 55 50 105 25 25 50 50 50 100 Existing Land Use (To Be Removed) Coffee/Donut Shop without Drive-Through Window 1,537 sq. ft. 1,430 80 80 160 30 30 60 45 45 90 Less Pass-by Trips1 -710 -40 -40 -80 -15 -15 -30 -45 -45 -90 Subtotal – Existing Land Use 720 40 40 80 15 15 30 20 20 40 Net New Trips 270 15 10 25 10 10 20 30 30 60 1Pass-by trips were estimated based on data in the ITE Trip Generation Handbook, Third Edition. ITE data is not provided for Coffee/Donut Shop without Drive-Through Window (LUC 936) or Coffee/Donut Shop with Drive-Through Window (LUC 937); therefore, data for Fast-Food Restaurant with Drive-Through Window (LUC 934) was assumed for each peak hour. Based on ITE data, approximately 49 percent of trips are pass-by during the morning peak hour, and 50 percent of trips are pass-by in the evening peak hour. ITE data is not provided for Daily trips and Saturday peak hour trips; therefore, an average of the morning and evening peak hour data (50 percent) was used to estimate pass-by trips during these periods. Site-generated traffic is expected to travel to and from the site in a manner that is proportional to existing travel patterns. Therefore, the existing traffic volumes presented in Exhibit 2 were used to estimate the trip distribution patterns for both the existing coffee shop and the proposed outlot development. Pass-by trip distribution estimates account for the expectation that site trips are likely to travel along McHenry Road. Total site trip assignment for the existing coffee shop tenant are depicted in Exhibit 3. For the proposed outlot development, site trip assignments for primary trips and pass-by trips are illustrated on Exhibit 4 and Exhibit 5, respectively. Total site trip assignment for the proposed outlot development is depicted in Exhibit 6. 2.2.b Packet Pg. 57 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) NOT TO SCALE N SITESITE A C C E S S A A C C E S S A AC C E S S B AC C E S S B PR I V A T E D R I V E W A Y PR I V A T E D R I V E W A Y A R L I N G T O N H E I G H T S R O A D A R L I N G T O N H E I G H T S R O A D ACCESS CACCESS C McHEN R Y R O A D McHEN R Y R O A D COURTLAND DRIVECOURTLAND DRIVE RAN C H V I E W C O U R T RAN C H V I E W C O U R T LEGEND Weekday AM Peak (7:30 – 8:30am) Weekday PM Peak (4:45 – 5:45pm) Saturday Peak (11:00am – 12:00pm) Existing Signalized Intersection Existing Stop Sign Proposed Stop Sign Less than Five Vehicles xx (xx) [xx] 83 EXHIBIT 3 EXISTING COFFEE SHOP TRIP ASSIGNMENT - TOTAL -15 (-5) [-10] -5 (-5) [-5] [ - ] ( - ) - 5 [-5] (-) -10 [-20] (- 5 ) - 4 5 -3 0 ( - 2 0 ) [ - 2 0 ] -4 0 ( - 5 ) [ - 1 5 ] [-5] ( - 5 ) - 1 5 -20 (-15 ) [ - 1 5 ] -1 0 ( - 5 ) [ - 5 ] [-5] (-) - [-5 ] ( - 5 ) - 10 (10) [ 5 ] [15] (5) 3 0 NOTE: Negative numbers represent existing site- generated traffic to be removed with the proposed outlot development. Positive numbers are pass-by trips which are to remain with the proposed outlot development. 2.2.b Packet Pg. 58 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) NOT TO SCALE N SITESITE A C C E S S A A C C E S S A AC C E S S B AC C E S S B PR I V A T E D R I V E W A Y PR I V A T E D R I V E W A Y A R L I N G T O N H E I G H T S R O A D A R L I N G T O N H E I G H T S R O A D ACCESS CACCESS C McHEN R Y R O A D McHEN R Y R O A D COURTLAND DRIVECOURTLAND DRIVE RAN C H V I E W C O U R T RAN C H V I E W C O U R T LEGEND Weekday AM Peak (7:30 – 8:30am) Weekday PM Peak (4:45 – 5:45pm) Saturday Peak (11:00am – 12:00pm) Existing Signalized Intersection Existing Stop Sign Proposed Stop Sign Less than Five Vehicles xx (xx) [xx] 83 EXHIBIT 4 PROPOSED OUTLOT TRIP ASSIGNMENT - PRIMARY 20 (10) [20] 10 (5) [10] [ 5 ] ( - ) 5 [10] ( 5 ) 1 0 [15] (5) 1 5 25 ( 1 0 ) [ 2 5 ] 10 ( - ) [ 5 ] [5] ( 5 ) 2 0 15 (10) [ 2 0 ] 10 ( 1 0 ) [ 1 0 ] [10] (5) 5 [10 ] ( 5 ) 5 5 (5) [5] 2.2.b Packet Pg. 59 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) NOT TO SCALE N SITESITE A C C E S S A A C C E S S A AC C E S S B AC C E S S B PR I V A T E D R I V E W A Y PR I V A T E D R I V E W A Y A R L I N G T O N H E I G H T S R O A D A R L I N G T O N H E I G H T S R O A D ACCESS CACCESS C McHEN R Y R O A D McHEN R Y R O A D COURTLAND DRIVECOURTLAND DRIVE RAN C H V I E W C O U R T RAN C H V I E W C O U R T LEGEND Weekday AM Peak (7:30 – 8:30am) Weekday PM Peak (4:45 – 5:45pm) Saturday Peak (11:00am – 12:00pm) Existing Signalized Intersection Existing Stop Sign Proposed Stop Sign Less than Five Vehicles xx (xx) [xx] 83 EXHIBIT 5 PROPOSED OUTLOT TRIP ASSIGNMENT - PASS-BY [30] (1 0 ) 4 0 15 ( 2 0 ) [ 2 5 ] 40 ( 1 0 ) [ 3 0 ] 15 (20) [ 2 5 ] -15 (-20 ) [ - 2 5 ] [-30] (- 1 0 ) - 4 0 2.2.b Packet Pg. 60 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) NOT TO SCALE N SITESITE A C C E S S A A C C E S S A AC C E S S B AC C E S S B PR I V A T E D R I V E W A Y PR I V A T E D R I V E W A Y A R L I N G T O N H E I G H T S R O A D A R L I N G T O N H E I G H T S R O A D ACCESS CACCESS C McHEN R Y R O A D McHEN R Y R O A D COURTLAND DRIVECOURTLAND DRIVE RAN C H V I E W C O U R T RAN C H V I E W C O U R T LEGEND Weekday AM Peak (7:30 – 8:30am) Weekday PM Peak (4:45 – 5:45pm) Saturday Peak (11:00am – 12:00pm) Existing Signalized Intersection Existing Stop Sign Proposed Stop Sign Less than Five Vehicles xx (xx) [xx] 83 EXHIBIT 6 PROPOSED OUTLOT TRIP ASSIGNMENT - TOTAL 20 (10) [20] 10 (5) [10] [ 5 ] ( - ) 5 [10] ( 5 ) 1 0 [45] (15 ) 5 5 40 ( 3 0 ) [ 5 0 ] 50 ( 1 0 ) [ 3 5 ] [5] ( 5 ) 2 0 30 (30) [ 4 5 ] 10 ( 1 0 ) [ 1 0 ] [10] (5) 5 [10 ] ( 5 ) 5 -10 (-15 ) [ - 2 0 ] [-30] (- 1 0 ) - 4 0 2.2.b Packet Pg. 61 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 11 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 In order to project build traffic volumes with development of the outlot, the trips attributable to the existing coffee shop (Exhibit 3) were removed existing traffic volumes (Exhibit 2), and the total site trip assignment (Exhibit 6) was added. The estimated build traffic volumes are presented in Exhibit 7. Capacity Analysis Synchro capacity software was used to evaluate existing and build operational conditions at the site access driveways and nearby intersection of McHenry Road/Arlington Heights Road. The analysis was completed for the weekday and Saturday peak hours. The capacity of an intersection quantifies its ability to accommodate traffic volumes and is expressed in terms of level of service (LOS), measured in average delay per vehicle. LOS grades range from A to F, with LOS A as the highest (best traffic flow and least delay), LOS E as saturated or at-capacity conditions, and LOS F as the lowest (oversaturated conditions). The lowest LOS grade typically accepted by jurisdictional transportation agencies in Northeastern Illinois is LOS D. The LOS grades shown below, which are provided in the Transportation Research Board’s Highway Capacity Manual (HCM), quantify and categorize the driver’s discomfort, frustration, fuel consumption, and travel times experienced as a result of intersection control and the resulting traffic queuing. A detailed description of each LOS rating can be found in Table 3. Table 3. Level of Service Grading Descriptions1 Level of Service Description A Minimal control delay; traffic operates at primarily free-flow conditions; unimpeded movement within traffic stream. B Minor control delay at signalized intersections; traffic operates at a fairly unimpeded level with slightly restricted movement within traffic stream. C Moderate control delay; movement within traffic stream more restricted than at LOS B; formation of queues contributes to lower average travel speeds. D Considerable control delay that may be substantially increased by small increases in flow; average travel speeds continue to decrease. E High control delay; average travel speed no more than 33 percent of free flow speed. F Extremely high control delay; extensive queuing and high volumes create exceedingly restricted traffic flow. 1Highway Capacity Manual 2010 The range of control delay for each rating (as detailed in the HCM) is shown in Table 4. Because signalized intersections are expected to carry a higher volume of vehicles and stopping is required during red time, note that higher delays are tolerated for the corresponding LOS ratings. 2.2.b Packet Pg. 62 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) NOT TO SCALE N SITESITE A C C E S S A A C C E S S A AC C E S S B AC C E S S B PR I V A T E D R I V E W A Y PR I V A T E D R I V E W A Y A R L I N G T O N H E I G H T S R O A D A R L I N G T O N H E I G H T S R O A D ACCESS CACCESS C McHEN R Y R O A D McHEN R Y R O A D COURTLAND DRIVECOURTLAND DRIVE RAN C H V I E W C O U R T RAN C H V I E W C O U R T LEGEND Weekday AM Peak (7:30 – 8:30am) Weekday PM Peak (4:45 – 5:45pm) Saturday Peak (11:00am – 12:00pm) Existing Signalized Intersection Existing Stop Sign Proposed Stop Sign Less than Five Vehicles xx (xx) [xx] 83 EXHIBIT 7 BUILD TRAFFIC VOLUMES 30 ( 5 5 ) [ 6 0 ] 12 5 ( 2 5 5 ) [ 1 0 5 ] 45 ( 6 0 ) [ 5 5 ] 420 (1210) [520] 175 (370) [180] 15 (25) [20] [ 1 8 0 ] ( 1 7 0 ) 4 9 0 [ 4 7 5 ] ( 8 3 5 ) 5 8 5 [ 9 5 ] ( 1 6 5 ) 2 0 0 [565] ( 5 5 5 ) 1 0 8 5 [615] ( 7 6 0 ) 8 3 0 [60] (55) 85 [5] ( - ) 5 [1 0 ] ( 1 0 ) 5 [- ] ( - ) - [2 0 ] ( 3 5 ) 1 5 [775] ( 7 3 5 ) 1 5 4 0 [5] (15) 5 [35] (2 0 ) 3 0 30 ( 3 0 ) [ 5 5 ] - ( - ) [ - ] 20 ( 5 ) [ 3 0 ] [15] ( 3 0 ) 1 0 [5] ( 1 5 ) 3 0 45 (3 0 ) [ 1 5 ] - (-) [ - ] 575 (15 7 5 ) [ 6 7 5 ] 15 (55) [ 3 5 ] 25 (35) [ 4 5 ] 15 ( 3 0 ) [ 2 5 ] - ( - ) [ - ] [15] (1 5 ) 5 [-] (-) - - (-) [ - ] 20 ( 1 0 ) [ 2 0 ] [15 ] ( 1 5 ) 1 0 [2 5 ] ( 3 5 ) 5 [-] ( 5 ) - 2.2.b Packet Pg. 63 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 13 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 Table 4. Level of Service Grading Criteria1 Level of Service Average Control Delay (s/veh) at: Unsignalized Intersections Signalized Intersections A 0 – 10 0 – 10 B > 10 – 15 > 10 – 20 C > 15 – 25 >20 – 35 D > 25 – 35 > 35 – 55 E > 35 – 50 >55 – 80 F2 > 50 > 80 1Highway Capacity Manual 2010 2All movements with a Volume to Capacity (v/C) ratio greater than 1 receive a rating of LOS F. Based on these standards, capacity results were identified for the study intersections under existing conditions. In order to evaluate existing traffic operation, signal timings for the McHenry Road/Arlington Heights Road intersection were obtained from the Illinois Department of Transportation (IDOT). For purposes of a conservative analysis, right-turn-on-red (RTOR) movements were not included in the analysis of the signalized intersection. Minor-leg stop control was assumed for the analysis of Access B and Access C (existing stop sign posted at Access A). It should be noted that this study does not consider the effects of platooned vehicle progression along McHenry Road for the analysis of Access B. Vehicle platooning often increases the number of gaps available to minor-street vehicles, thereby reducing actual vehicle delay relative to the results projected by the model; as such, the results contained within this study can be considered conservative. The results of capacity analysis for existing conditions are summarized in Table 5. In this table, operation on each approach is quantified according to the average delay per vehicle and the corresponding level of service. Overall intersection operations are reported for the signalized intersection. Overall intersection level of service is not reported for minor-leg stop-controlled intersections, since the majority of vehicles are able to move through the intersection with little to no delay. The results presented in Table 5 are based on Synchro’s HCM 2010 reports. A copy of the capacity analysis reports is provided as Attachment 3. 2.2.b Packet Pg. 64 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 14 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 Table 5. Existing and Build Levels of Service Intersection Existing Traffic Conditions Build Traffic Conditions (with Outlot Development) Weekday Saturday Weekday Saturday AM Peak Hour PM Peak Hour Midday Peak Hour AM Peak Hour PM Peak Hour Midday Peak Hour Delay (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS Delay (s/veh) LOS McHenry Road / Arlington Heights Road  Eastbound 42 D 66 E3 24 C 42 D 66 E3 24 C Westbound 40 D1 65 E 13 B 41 D1 65 E 14 B Northbound >120 F 77 E2 >120 F >120 F 77 E2 >120 F Southbound 71 E2 96 F 49 D1 71 E2 96 F 484 D1 Intersection 70 E 71 E 70 E 70 E 71 E 70 E Access A / Courtland Drive  Westbound (Left) 7 A 7 A 7 A 7 A 7 A 7 A Northbound (Access A) 9 A 9 A 9 A 9 A 9 A 9 A Access B / McHenry Road  Eastbound (Left) 9 A 15- B 9 A 9 A 15 C 9 A Westbound (Left) 15+ C 10- A 10- A 15- B 10- A 10- A Northbound 74 F >120 F5 24 C 87 F >120 F5 27 D Southbound 41 E >120 F5 21 C 70 F >120 F5 33 D Access C / Ranchview Court  Eastbound (Access C) 9 A 9 A 9 A 9 A 9 A 9 A Northbound (Left) 7 A 7 A 7 A 7 A 7 A 7 A 1Left-turn movement operates at LOS E. 2Left-turn movement operates at LOS F. 3Right-turn movement operates at LOS F. 4Decrease in delay as compared to existing conditions is attributable to additional green time allocated to the southbound approach under the build condition. 5Based on volume of traffic along McHenry Road, delay and 95th percentile queues not reported. Assumed delay exceeds 120 seconds (LOS F). 2.2.b Packet Pg. 65 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Page 15 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 With the addition of site-generated traffic, the signalized intersection of McHenry Road/Arlington Heights Road is expected to operate similar to existing conditions. The proposed outlot is not expected to materially impact delay or queue conditions at the signalized intersection. The site access driveways are also expected to operate similar to existing conditions. At Access A (Courtland Drive) and Access C (Ranchview Court), limited delay is projected. The 95th percentile queues for outbound traffic are estimated to be approximately one vehicle or less during each peak hour, consistent with existing conditions. At the intersection of Access B/McHenry Road, the eastbound and westbound left-turn movements are projected to continue to operate at LOS C or better during each peak hour. The 95th percentile queue projected for each turn lane is approximately one vehicle or less during the peak hours. The northbound and southbound approaches are expected to operate at LOS F during the weekday peak hours. During the Saturday midday peak hour, the northbound and southbound approaches are projected to operate at LOS D. The high average delay estimated for the northbound and southbound approaches is not unusual for a minor-street stop-controlled intersection with a heavily traveled arterial such as McHenry Road. These results are based on a conservative analysis that does not consider the effects of platooned vehicle progression from the signalized intersections along McHenry Road. Based on the capacity analysis, the projected 95th percentile queue for outbound traffic at Access B is two vehicles during the weekday morning and Saturday midday peak hours. During the evening peak hour, 95th percentile queues are not reported for Access B under the existing and build conditions due to the volume of traffic along McHenry Road. During each peak hour, the 95th percentile queues projected for Access B would be internal to the site and are not expected to impact operations along McHenry Road. The current site access and onsite circulation configuration provides flexibility for motorists to select an alternate outbound access driveway (i.e., Access A or Access C) if long delays or queues are observed at Access B. Furthermore, the proposed outlot development is considered a discretionary use; and therefore, if motorists experience significant delays or queues, alternate coffee shop locations may be selected. In order to enhance access to the proposed drive-through window and facilitate circulation through the parking lot, onsite wayfinding is recommended. Installation of minor-leg stop control is recommended for Access B and Access C (existing stop sign posted at Access A). Conclusion Based on an evaluation of existing and build traffic conditions, the following recommendations have been identified for Spoerlein Commons as part of development of the proposed outlot: Minor-leg stop control should be posted for outbound traffic at Access B and Access C. Onsite wayfinding should be installed to facilitate inbound and outbound access for the proposed drive-through window. 2.2.b Packet Pg. 66 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 16 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 Regardless of the final configuration of the intersection geometrics, several additional items should be taken into consideration when preparing the site plan for the subject development. As the site design progresses, care should be taken with landscaping, signage, and monumentation at the site access locations to ensure that adequate horizontal sight distance is provided. If alterations to the site plan or land use should occur, changes to the analysis provided within this traffic impact study may be needed. 2.2.b Packet Pg. 67 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 17 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 ATTACHMENTS 1. Conceptual Site Plan 2. Traffic Count Data 3. Synchro Capacity Reports Existing Conditions Build Conditions 2.2.b Packet Pg. 68 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 18 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 CONCEPTUAL SITE PLAN 2.2.b Packet Pg. 69 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) En g i n e e r i n g , L L C Ci v i l E n g i n e e r i n g R e a l E s t a t e C o n s u l t i n g P r o j e c t M a n a g e m e n t 97 5 E . 2 2 n d S t , S u i t e 4 0 0 Wh e a t o n , I L 6 0 1 8 9 63 0 . 4 8 0 . 7 8 8 9 ww w . r w g - e n g i n e e r i n g . c o m SP O E R L E I N C O M M O N S - P R O P O S E D D R I V E T H R U BU F F A L O G R O V E , I L L I N O I S 2 4 PR E L I M I N A R Y S I T E G E O M E T R I C A N D P A V I N G P L A N PRELIMINARY- FOR REVIEW ONLY 2.2.b Packet Pg. 70 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Page 19 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 TRAFFIC COUNT DATA 2.2.b Packet Pg. 71 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Time Period Class. U L T R I O U L T R I O U L T R I O U L T R I O Total AM Peak Hour Lights 4 81 1069 807 1961 998 0 168 399 14 581 1592 0 566 198 481 1245 1092 0 42 117 29 188 293 3975 Specified Period %100% 96% 99% 97% 98% 96% 0% 98% 96% 88% 97% 98% 0% 96% 99% 98% 97% 97% 0% 95% 94% 94% 94% 98% 97% 7:30 AM - 8:30 AM Mediums 0 1 11 15 27 23 0 3 8 2 13 21 0 13 2 8 23 25 0 2 7 2 11 5 74 One Hour Peak %0% 1% 1% 2% 1% 2% 0% 2% 2% 13% 2% 1% 0% 2% 1% 2% 2% 2% 0% 5% 6% 6% 6% 2% 2% 7:30 AM - 8:30 AM Articulated Trucks 0 2 3 6 11 16 0 0 8 0 8 4 0 8 0 1 9 6 0 0 0 0 0 2 28 %0% 2% 0% 1% 1% 2% 0% 0% 2% 0% 1% 0% 0% 1% 0% 0% 1% 1% 0% 0% 0% 0% 0% 1% 1% Total 4 84 1083 828 1999 1037 0 171 415 16 602 1617 0 587 200 490 1277 1123 0 44 124 31 199 300 4077 PHF 0.5 0.88 0.93 0.95 0.95 0.84 0 0.87 0.89 0.8 0.92 0.99 0 0.8 0.85 0.91 0.91 0.95 0 0.69 0.89 0.86 0.96 0.85 0.93 HV %0% 4% 1% 3% 2% 4% 0% 2% 4% 13% 3% 2% 0% 4% 1% 2% 3% 3% 0% 5% 6% 6% 6% 2% 3% PM Peak Hour Lights 0 54 545 752 1351 2087 0 371 1200 26 1597 777 0 830 163 172 1165 1376 0 60 253 57 370 243 4483 Specified Period %0% 100% 99% 99% 99% 99% 0% 100% 100% 96% 100% 99% 0% 99% 99% 100% 99% 99% 0% 100% 99% 100% 99% 99% 99% 4:45 PM - 5:45 PM Mediums 0 0 6 7 13 10 0 0 6 1 7 6 0 4 1 0 5 9 0 0 2 0 2 2 27 One Hour Peak %0% 0% 1% 1% 1% 0% 0% 0% 0% 4% 0% 1% 0% 0% 1% 0% 0% 1% 0% 0% 1% 0% 1% 1% 1% 4:45 PM - 5:45 PM Articulated Trucks 0 0 1 0 1 3 0 0 0 0 0 1 0 3 0 0 3 0 0 0 0 0 0 0 4 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 54 552 759 1365 2100 0 371 1206 27 1604 784 0 837 164 172 1173 1385 0 60 255 57 372 245 4514 PHF 0 0.68 0.91 0.87 0.9 0.94 0 0.96 0.91 0.84 0.95 0.96 0 0.94 0.71 0.83 0.9 0.94 0 0.75 0.85 0.75 0.86 0.74 0.95 HV %0% 0% 1% 1% 1% 1% 0% 0% 0% 4% 0% 1% 0% 1% 1% 0% 1% 1% 0% 0% 1% 0% 1% 1% 1% Study Name Arlington Heights Rd & McHenry Rd Date Thursday, March 07, 2019 Report Summary Eastbound Westbound Northbound Southbound 2.2.b Packet Pg. 72 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Time Period Class. U L T R I O U L T R I O U L T R I O U L T R I O Total SAT Peak Hour Lights 3 59 560 605 1227 1036 0 174 503 21 698 788 0 471 94 175 740 882 0 53 103 59 215 174 2880 Specified Period %100% 100% 100% 98% 99% 99% 0% 99% 99% 100% 99% 100% 0% 99% 99% 100% 99% 98% 0% 98% 99% 100% 99% 99% 99% 11:00 AM - 12:00 PM Mediums 0 0 1 10 11 8 0 1 4 0 5 2 0 4 1 0 5 12 0 1 1 0 2 1 23 One Hour Peak %0% 0% 0% 2% 1% 1% 0% 1% 1% 0% 1% 0% 0% 1% 1% 0% 1% 1% 0% 2% 1% 0% 1% 1% 1% 11:00 AM - 12:00 PM Articulated Trucks 0 0 0 2 2 1 0 0 1 0 1 0 0 0 0 0 0 2 0 0 0 0 0 0 3 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 3 59 561 617 1240 1045 0 175 508 21 704 790 0 475 95 175 745 896 0 54 104 59 217 175 2906 PHF 0.75 0.82 0.88 0.93 0.91 0.94 0 0.83 0.88 0.66 0.94 0.92 0 0.93 0.88 0.89 0.94 0.93 0 0.96 0.93 0.82 0.92 0.99 0.97 HV %0% 0% 0% 2% 1% 1% 0% 1% 1% 0% 1% 0% 0% 1% 1% 0% 1% 2% 0% 2% 1% 0% 1% 1% 1% Study Name Arlington Heights Rd & McHenry Rd Date Saturday, March 09, 2019 Report Summary Eastbound Westbound Northbound Southbound 2.2.b Packet Pg. 73 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Time Period Class. U L T R I O U L T R I O U L T R I O U L T R I O Total AM Peak Hour Lights 0 18 1529 7 1554 574 1 15 550 13 579 1553 0 4 1 15 20 22 0 8 0 20 28 32 2181 Specified Period %0% 100% 99% 100% 99% 96% 100% 94% 96% 100% 96% 99% 0% 100% 100% 94% 95% 96% 0% 100% 0% 100% 100% 100% 98% 7:30 AM - 8:30 AM Mediums 0 0 18 0 18 17 0 1 17 0 18 19 0 0 0 1 1 1 0 0 0 0 0 0 37 One Hour Peak %0% 0% 1% 0% 1% 3% 0% 6% 3% 0% 3% 1% 0% 0% 0% 6% 5% 4% 0% 0% 0% 0% 0% 0% 2% 7:30 AM - 8:30 AM Articulated Trucks 0 0 4 0 4 6 0 0 6 0 6 4 0 0 0 0 0 0 0 0 0 0 0 0 10 %0% 0% 0% 0% 0% 1% 0% 0% 1% 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 18 1551 7 1576 597 1 16 573 13 603 1576 0 4 1 16 21 23 0 8 0 20 28 32 2228 PHF 0 0.75 0.97 0.58 0.98 0.9 0.25 0.36 0.88 0.65 0.92 0.98 0 0.33 0.25 0.67 0.58 0.41 0 0.33 0 0.62 0.7 0.73 0.97 HV %0% 0% 1% 0% 1% 4% 0% 6% 4% 0% 4% 1% 0% 0% 0% 6% 5% 4% 0% 0% 0% 0% 0% 0% 2% PM Peak Hour Lights 1 9 737 16 763 1604 1 53 1574 18 1646 776 0 10 0 36 46 70 0 2 1 19 22 27 2477 Specified Period %100% 100% 99% 100% 99% 100% 100% 100% 100% 100% 100% 99% 0% 100% 0% 100% 100% 100% 0% 100% 100% 100% 100% 100% 100% 4:45 PM - 5:45 PM Mediums 0 0 4 0 4 7 0 0 7 0 7 4 0 0 0 0 0 0 0 0 0 0 0 0 11 One Hour Peak %0% 0% 1% 0% 1% 0% 0% 0% 0% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 4:45 PM - 5:45 PM Articulated Trucks 0 0 1 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 1 9 742 16 768 1611 1 53 1581 18 1653 781 0 10 0 36 46 70 0 2 1 19 22 27 2489 PHF 0.25 0.56 0.93 0.57 0.94 0.95 0.25 0.78 0.94 0.64 0.94 0.93 0 0.62 0 0.75 0.88 0.73 0 0.25 0.25 0.53 0.5 0.75 0.97 HV %0% 0% 1% 0% 1% 0% 0% 0% 0% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Study Name McHenry Rd & Access Driveway Start Date Thursday, March 07, 2019 Report Summary Eastbound Westbound Northbound Southbound 2.2.b Packet Pg. 74 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Time Period Class. U L T R I O U L T R I O U L T R I O U L T R I O Total SAT Peak Hour Lights 0 9 785 3 797 722 0 37 687 13 737 814 0 11 0 21 32 40 0 8 0 24 32 22 1598 Specified Period %0% 100% 99% 100% 100% 99% 0% 100% 99% 100% 99% 100% 0% 100% 0% 100% 100% 100% 0% 100% 0% 100% 100% 100% 100% 11:00 AM - 12:00 PM Mediums 0 0 4 0 4 3 0 0 3 0 3 4 0 0 0 0 0 0 0 0 0 0 0 0 7 One Hour Peak %0% 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 11:00 AM - 12:00 PM Articulated Trucks 0 0 0 0 0 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 9 789 3 801 726 0 37 691 13 741 818 0 11 0 21 32 40 0 8 0 24 32 22 1606 PHF 0 0.75 0.93 0.38 0.93 0.93 0 0.84 0.91 0.65 0.93 0.91 0 0.69 0 0.58 0.62 0.83 0 0.67 0 0.55 0.57 0.79 0.95 HV %0% 0% 1% 0% 0% 1% 0% 0% 1% 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Study Name McHenry Rd & Access Driveway End Date Saturday, March 09, 2019 Report Summary Eastbound Westbound Northbound Southbound 2.2.b Packet Pg. 75 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Time Period Class.U L R I O U L T I O U T R I O Total AM Peak Hour Lights 0 0 2 2 4 0 4 4 8 22 0 20 0 20 4 30 Specified Period %0% 0% 100% 100% 100% 0% 100% 57% 73% 100% 0% 100% 0% 100% 57% 91% 7:30 AM - 8:30 AM Mediums 0 0 0 0 0 0 0 3 3 0 0 0 0 0 3 3 One Hour Peak %0% 0% 0% 0% 0% 0% 0% 43% 27% 0% 0% 0% 0% 0% 43% 9% 7:30 AM - 8:30 AM Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 0 2 2 4 0 4 7 11 22 0 20 0 20 7 33 PHF 0 0 0.5 0.5 0.5 0 0.5 0.35 0.39 0.79 0 0.83 0 0.83 0.35 0.63 HV %0% 0% 0% 0% 0% 0% 0% 43% 27% 0% 0% 0% 0% 0% 43% 9% PM Peak Hour Lights 0 1 11 12 14 3 13 35 51 24 0 10 1 11 36 74 Specified Period %0% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 100% 100% 100% 100% 100% 4:45 PM - 5:45 PM Mediums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 One Hour Peak %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 4:45 PM - 5:45 PM Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 1 11 12 14 3 13 35 51 24 0 10 1 11 36 74 PHF 0 0.25 0.46 0.5 0.58 0.75 0.54 0.8 0.91 0.67 0 0.83 0.25 0.69 0.82 0.88 HV %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Study Name Ranchview Ct & Access Driveway Start Date Thursday, March 07, 2019 Report Summary Eastbound Northbound Southbound 2.2.b Packet Pg. 76 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Time Period Class.U L R I O U L T I O U T R I O Total SAT Peak Hour Lights 0 1 10 11 8 1 8 24 33 30 0 19 0 19 25 63 Specified Period %0% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 100% 0% 100% 100% 100% 11:00 AM - 12:00 PM Mediums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 One Hour Peak %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 11:00 AM - 12:00 PM Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 1 10 11 8 1 8 24 33 30 0 19 0 19 25 63 PHF 0 0.25 0.83 0.69 0.5 0.25 0.5 0.75 0.69 0.75 0 0.68 0 0.68 0.78 0.75 HV %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Study Name Ranchview Ct & Access Driveway End Date Saturday, March 09, 2019 Report Summary Eastbound Northbound Southbound 2.2.b Packet Pg. 77 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Time Period Class.U L R I O U T R I O U L T I O Total AM Peak Hour Lights 0 15 1 16 24 0 11 23 34 56 0 1 41 42 12 92 Specified Period %0% 100% 100% 100% 100% 0% 92% 100% 97% 95% 0% 100% 93% 93% 92% 96% 7:30 AM - 8:30 AM Mediums 0 0 0 0 0 0 1 0 1 3 0 0 3 3 1 4 One Hour Peak %0% 0% 0% 0% 0% 0% 8% 0% 3% 5% 0% 0% 7% 7% 8% 4% 7:30 AM - 8:30 AM Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 15 1 16 24 0 12 23 35 59 0 1 44 45 13 96 PHF 0 0.62 0.25 0.57 0.6 0 0.38 0.64 0.62 0.82 0 0.25 0.79 0.8 0.41 0.83 HV %0% 0% 0% 0% 0% 0% 8% 0% 3% 5% 0% 0% 7% 7% 8% 4% PM Peak Hour Lights 0 27 2 29 17 0 28 16 44 58 0 1 31 32 30 105 Specified Period %0% 100% 100% 100% 100% 0% 100% 100% 100% 100% 0% 100% 100% 100% 100% 100% 4:45 PM - 5:45 PM Mediums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 One Hour Peak %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 4:45 PM - 5:45 PM Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 27 2 29 17 0 28 16 44 58 0 1 31 32 30 105 PHF 0 0.61 0.5 0.6 0.53 0 0.64 0.5 0.79 0.85 0 0.25 0.65 0.67 0.62 0.88 HV %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Study Name Courtland Dr & Access Driveway Start Date Thursday, March 07, 2019 Report Summary Westbound Northbound Southbound 2.2.b Packet Pg. 78 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Time Period Class.U L R I O U T R I O U L T I O Total SAT Peak Hour Lights 0 21 0 21 7 0 13 7 20 37 0 0 16 16 13 57 Specified Period %0% 100% 0% 100% 100% 0% 100% 100% 100% 97% 0% 0% 94% 94% 100% 98% 11:00 AM - 12:00 PM Mediums 0 0 0 0 0 0 0 0 0 1 0 0 1 1 0 1 One Hour Peak %0% 0% 0% 0% 0% 0% 0% 0% 0% 3% 0% 0% 6% 6% 0% 2% 11:00 AM - 12:00 PM Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total 0 21 0 21 7 0 13 7 20 38 0 0 17 17 13 58 PHF 0 0.52 0 0.52 0.58 0 0.65 0.58 0.83 0.73 0 0 0.85 0.85 0.65 0.91 HV %0% 0% 0% 0% 0% 0% 0% 0% 0% 3% 0% 0% 6% 6% 0% 2% Study Name Courtland Dr & Access Driveway End Date Saturday, March 09, 2019 Report Summary Westbound Northbound Southbound 2.2.b Packet Pg. 79 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r Page 21 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 EXISTING (2019) SYNCHRO CAPACITY REPORTS Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour 2.2.b Packet Pg. 80 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 85 1085 830 170 415 15 585 200 490 45 125 Future Volume (veh/h) 5 85 1085 830 170 415 15 585 200 490 45 125 Number 1 6 16 5 2 12 7 4 14 3 8 Initial Q, veh 00000000000 Ped-Bike Adj (A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1829 1961 1845 1863 1821 1900 1827 1863 1900 1882 1792 Adj Flow Rate, veh/h 89 1142 874 179 437 16 616 211 516 47 132 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %42324442256 Opposing Right Turn Influence Yes Yes Yes Yes Cap, veh/h 450 1567 976 200 1530 56 680 172 422 61 267 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Prop Arrive On Green 0.04 0.42 0.42 0.07 0.45 0.45 0.20 0.36 0.36 0.03 0.19 Ln Grp Delay, s/veh 26.5 44.1 39.9 64.4 30.5 30.5 76.2 0.0 169.7 100.3 0.0 Ln Grp LOS C D D E C C E F F Approach Vol, veh/h 2105 632 1343 211 Approach Delay, s/veh 41.6 40.1 126.8 71.0 Approach LOS D D F E Timer:12345678 Assigned Phs 12345678 Case No 1.1 4.0 2.0 4.0 1.1 3.0 2.0 4.0 Phs Duration (G+Y+Rc), s 10.4 82.4 10.2 67.0 15.2 77.5 38.8 38.5 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green (Gmax), s 11.5 67.0 10.5 61.0 16.5 62.0 46.5 25.0 Max Allow Headway (MAH), s 3.7 4.9 3.8 5.1 3.7 4.5 3.7 5.3 Max Q Clear (g_c+l1), s 6.9 15.8 6.4 63.0 11.5 73.5 32.3 16.4 Green Ext Time (g_e), s 0.1 2.6 0.0 0.0 0.2 0.0 2.0 0.5 Prob of Phs Call (p_c)0.99 1.00 0.89 1.00 1.00 1.00 1.00 1.00 Prob of Max Out (p_x)0.37 0.00 0.70 1.00 0.34 1.00 0.01 0.17 Left-Turn Movement Data Assigned Mvmt 1357 Mvmt Sat Flow, veh/h 1742 1792 1774 3375 Through Movement Data Assigned Mvmt 2468 Mvmt Sat Flow, veh/h 3405 480 3725 1395 Right-Turn Movement Data Assigned Mvmt 12 14 16 18 Mvmt Sat Flow, veh/h 124 1175 1568 338 Left Lane Group Data Assigned Mvmt 10305070 Lane Assignment (Pr/Pm) (Prot) (Pr/Pm) (Prot) 2.2.b Packet Pg. 81 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 2 Movement SBR Lane Configurations Traffic Volume (veh/h) 30 Future Volume (veh/h) 30 Number 18 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 32 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 6 Opposing Right Turn Influence Cap, veh/h 65 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.19 Ln Grp Delay, s/veh 62.6 Ln Grp LOS E Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer: 2.2.b Packet Pg. 82 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 3 Lanes in Grp 10101020 Grp Vol (v), veh/h 89 0 47 0 179 0 616 0 Grp Sat Flow (s), veh/h/ln 1742 0 1792 0 1774 0 1688 0 Q Serve Time (g_s), s 4.9 0.0 4.4 0.0 9.5 0.0 30.3 0.0 Cycle Q Clear Time (g_c), s 4.9 0.0 4.4 0.0 9.5 0.0 30.3 0.0 Perm LT Sat Flow (s_l), veh/h/ln 917 0 0 0 211 0 0 0 Shared LT Sat Flow (s_sh), veh/h/ln 00000000 Perm LT Eff Green (g_p), s 71.5 0.0 0.0 0.0 73.5 0.0 0.0 0.0 Perm LT Serve Time (g_u), s 62.6 0.0 0.0 0.0 28.0 0.0 0.0 0.0 Perm LT Q Serve Time (g_ps), s 1.0 0.0 0.0 0.0 28.0 0.0 0.0 0.0 Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop LT Inside Lane (P_L)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Lane Grp Cap (c), veh/h 450 0 61 0 200 0 680 0 V/C Ratio (X)0.20 0.00 0.78 0.00 0.90 0.00 0.91 0.00 Avail Cap (c_a), veh/h 498 0 111 0 249 0 923 0 Upstream Filter (I)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Uniform Delay (d1), s/veh 26.3 0.0 81.5 0.0 36.8 0.0 66.3 0.0 Incr Delay (d2), s/veh 0.2 0.0 18.8 0.0 27.5 0.0 9.9 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 26.5 0.0 100.3 0.0 64.4 0.0 76.2 0.0 1st-Term Q (Q1), veh/ln 2.4 0.0 2.2 0.0 4.6 0.0 14.1 0.0 2nd-Term Q (Q2), veh/ln 0.0 0.0 0.3 0.0 1.5 0.0 0.9 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 %ile Back of Q (50%), veh/ln 2.4 0.0 2.5 0.0 6.2 0.0 15.0 0.0 %ile Storage Ratio (RQ%)0.27 0.00 0.41 0.00 0.69 0.00 0.88 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Middle Lane Group Data Assigned Mvmt 02040608 Lane Assignment T T Lanes in Grp 01000200 Grp Vol (v), veh/h 0 222 0 0 0 1142 0 0 Grp Sat Flow (s), veh/h/ln 0 1730 0 0 0 1863 0 0 Q Serve Time (g_s), s 0.0 13.8 0.0 0.0 0.0 43.5 0.0 0.0 Cycle Q Clear Time (g_c), s 0.0 13.8 0.0 0.0 0.0 43.5 0.0 0.0 Lane Grp Cap (c), veh/h 0 777 0 0 0 1567 0 0 V/C Ratio (X)0.00 0.29 0.00 0.00 0.00 0.73 0.00 0.00 Avail Cap (c_a), veh/h 0 777 0 0 0 1567 0 0 Upstream Filter (I)0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d1), s/veh 0.0 29.6 0.0 0.0 0.0 41.1 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.9 0.0 0.0 0.0 3.0 0.0 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 30.5 0.0 0.0 0.0 44.1 0.0 0.0 1st-Term Q (Q1), veh/ln 0.0 6.6 0.0 0.0 0.0 22.4 0.0 0.0 2.2.b Packet Pg. 83 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 4 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.7 0.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 6.8 0.0 0.0 0.0 23.0 0.0 0.0 %ile Storage Ratio (RQ%)0.00 0.41 0.00 0.00 0.00 0.96 0.00 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Right Lane Group Data Assigned Mvmt 0 12 0 14 0 16 0 18 Lane Assignment T+R T+R R T+R Lanes in Grp 01010101 Grp Vol (v), veh/h 0 231 0 727 0 874 0 164 Grp Sat Flow (s), veh/h/ln 0 1799 0 1655 0 1568 0 1733 Q Serve Time (g_s), s 0.0 13.8 0.0 61.0 0.0 71.5 0.0 14.4 Cycle Q Clear Time (g_c), s 0.0 13.8 0.0 61.0 0.0 71.5 0.0 14.4 Prot RT Sat Flow (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 1568.0 0.0 0.0 Prot RT Eff Green (g_R), s 0.0 0.0 0.0 0.0 0.0 34.3 0.0 0.0 Prop RT Outside Lane (P_R) 0.00 0.07 0.00 0.71 0.00 1.00 0.00 0.20 Lane Grp Cap (c), veh/h 0 808 0 594 0 976 0 331 V/C Ratio (X)0.00 0.29 0.00 1.22 0.00 0.90 0.00 0.50 Avail Cap (c_a), veh/h 0 808 0 594 0 976 0 331 Upstream Filter (I)0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d1), s/veh 0.0 29.6 0.0 54.5 0.0 27.4 0.0 61.4 Incr Delay (d2), s/veh 0.0 0.9 0.0 115.2 0.0 12.5 0.0 1.1 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 30.5 0.0 169.7 0.0 39.9 0.0 62.6 1st-Term Q (Q1), veh/ln 0.0 6.9 0.0 27.9 0.0 34.8 0.0 6.9 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 19.0 0.0 3.4 0.0 0.1 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 7.1 0.0 46.9 0.0 38.2 0.0 7.0 %ile Storage Ratio (RQ%)0.00 0.43 0.00 2.21 0.00 1.60 0.00 1.27 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 33.3 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 69.5 HCM 2010 LOS E Notes User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 84 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 5 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 85 1085 830 170 415 15 585 200 490 45 125 Future Volume (veh/h) 5 85 1085 830 170 415 15 585 200 490 45 125 Number 1 6 16 5 2 12 7 4 14 3 8 Initial Q (Qb), veh 00000000000 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1829 1961 1845 1863 1821 1900 1827 1863 1900 1882 1792 Adj Flow Rate, veh/h 89 1142 874 179 437 16 616 211 516 47 132 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %42324442256 Cap, veh/h 450 1567 976 200 1530 56 680 172 422 61 267 Arrive On Green 0.04 0.42 0.42 0.07 0.45 0.45 0.20 0.36 0.36 0.03 0.19 Sat Flow, veh/h 1742 3725 1568 1774 3405 124 3375 480 1175 1792 1395 Grp Volume(v), veh/h 89 1142 874 179 222 231 616 0 727 47 0 Grp Sat Flow(s),veh/h/ln 1742 1863 1568 1774 1730 1799 1688 0 1655 1792 0 Q Serve(g_s), s 4.9 43.5 71.5 9.5 13.8 13.8 30.3 0.0 61.0 4.4 0.0 Cycle Q Clear(g_c), s 4.9 43.5 71.5 9.5 13.8 13.8 30.3 0.0 61.0 4.4 0.0 Prop In Lane 1.00 1.00 1.00 0.07 1.00 0.71 1.00 Lane Grp Cap(c), veh/h 450 1567 976 200 777 808 680 0 594 61 0 V/C Ratio(X)0.20 0.73 0.90 0.90 0.29 0.29 0.91 0.00 1.22 0.78 0.00 Avail Cap(c_a), veh/h 498 1567 976 249 777 808 923 0 594 111 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 26.3 41.1 27.4 36.8 29.6 29.6 66.3 0.0 54.5 81.5 0.0 Incr Delay (d2), s/veh 0.2 3.0 12.5 27.5 0.9 0.9 9.9 0.0 115.2 18.8 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 23.0 38.2 6.2 6.8 7.1 15.0 0.0 46.9 2.5 0.0 LnGrp Delay(d),s/veh 26.5 44.1 39.9 64.4 30.5 30.5 76.2 0.0 169.7 100.3 0.0 LnGrp LOS C D D E C C E F F Approach Vol, veh/h 2105 632 1343 211 Approach Delay, s/veh 41.6 40.1 126.8 71.0 Approach LOS D D F E Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 10.4 82.4 10.2 67.0 15.2 77.5 38.8 38.5 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green Setting (Gmax), s 11.5 67.0 10.5 61.0 16.5 62.0 46.5 25.0 Max Q Clear Time (g_c+I1), s 6.9 15.8 6.4 63.0 11.5 73.5 32.3 16.4 Green Ext Time (p_c), s 0.1 2.6 0.0 0.0 0.2 0.0 2.0 0.5 Intersection Summary HCM 2010 Ctrl Delay 69.5 HCM 2010 LOS E Notes 2.2.b Packet Pg. 85 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 6 Movement SBR Lane Configurations Traffic Volume (veh/h) 30 Future Volume (veh/h) 30 Number 18 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 32 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 6 Cap, veh/h 65 Arrive On Green 0.19 Sat Flow, veh/h 338 Grp Volume(v), veh/h 164 Grp Sat Flow(s),veh/h/ln 1733 Q Serve(g_s), s 14.4 Cycle Q Clear(g_c), s 14.4 Prop In Lane 0.20 Lane Grp Cap(c), veh/h 331 V/C Ratio(X)0.50 Avail Cap(c_a), veh/h 331 HCM Platoon Ratio 1.00 Upstream Filter(I)1.00 Uniform Delay (d), s/veh 61.4 Incr Delay (d2), s/veh 1.1 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(50%),veh/ln 7.0 LnGrp Delay(d),s/veh 62.6 LnGrp LOS E Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer 2.2.b Packet Pg. 86 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 7 User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 87 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 200: Access A & Courtland Drive 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 8 Intersection Int Delay, s/veh 1.6 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 10 25 1 45 15 1 Future Vol, veh/h 10 25 1 45 15 1 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22722 Mvmt Flow 11 26 1 47 16 1 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 37 0 73 24 Stage 1 - - - - 24 - Stage 2 - - - - 49 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1574 - 931 1052 Stage 1 - - - - 999 - Stage 2 - - - - 973 - Platoon blocked, % - -- Mov Cap-1 Maneuver - - 1574 - 930 1052 Mov Cap-2 Maneuver - - - - 930 - Stage 1 - - - - 998 - Stage 2 - - - - 973 - Approach EB WB NB HCM Control Delay, s 0 0.2 8.9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)937 - - 1574 - HCM Lane V/C Ratio 0.018 - - 0.001 - HCM Control Delay (s) 8.9 - - 7.3 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - 2.2.b Packet Pg. 88 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 300: Private Driveway/Access B & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 9 Intersection Int Delay, s/veh 2.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 20 1550 5 15 575 15 5 1 15 10 1 20 Future Vol, veh/h 20 1550 5 15 575 15 5 1 15 10 1 20 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 22642226222 Mvmt Flow 21 1632 5 16 605 16 5 1 16 11 1 21 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 621 0 0 1637 0 0 2012 2330 819 1504 2324 311 Stage 1 ------1677 1677 - 645 645 - Stage 2 ------335653-8591679 - Critical Hdwy 4.14 - - 4.22 - - 7.54 6.54 7.02 7.54 6.54 6.94 Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.26 - - 3.52 4.02 3.36 3.52 4.02 3.32 Pot Cap-1 Maneuver 956 - - 374 - - 35 37 310 84 37 685 Stage 1 ------99150-427466- Stage 2 ------653462-317150- Platoon blocked, %- -- - Mov Cap-1 Maneuver 956 - - 374 - - 25 26 310 60 26 685 Mov Cap-2 Maneuver ------2526-6026- Stage 1 ------75113-323436- Stage 2 ------590432-225113- Approach EB WB NB SB HCM Control Delay, s 1.2 0.8 74.4 41 HCM LOS F E Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)73 956 - - 374 - - 132 HCM Lane V/C Ratio 0.303 0.022 - - 0.042 - - 0.247 HCM Control Delay (s) 74.4 8.8 1.1 - 15.1 0.5 - 41 HCM Lane LOS F A A - C A - E HCM 95th %tile Q(veh) 1.1 0.1 - - 0.1 - - 0.9 2.2.b Packet Pg. 89 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 400: Ranchview Court & Access C 03/29/2019 Existing (2019) Traffic Volumes 7:30 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 10 Intersection Int Delay, s/veh 1.8 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 2 5 5 20 1 Future Vol, veh/h 1 2 5 5 20 1 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 43 2 2 Mvmt Flow 1 2 5 5 21 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 37 22 22 0 - 0 Stage 1 22 ----- Stage 2 15 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 975 1055 1593 - - - Stage 1 1001 ----- Stage 2 1008 ----- Platoon blocked, %- - - Mov Cap-1 Maneuver 972 1055 1593 - - - Mov Cap-2 Maneuver 972 ----- Stage 1 998 ----- Stage 2 1008 ----- Approach EB NB SB HCM Control Delay, s 8.5 3.6 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1593 - 1026 - - HCM Lane V/C Ratio 0.003 - 0.003 - - HCM Control Delay (s) 7.3 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - 2.2.b Packet Pg. 90 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 55 550 760 370 1205 25 835 165 170 60 255 55 Future Volume (veh/h) 55 550 760 370 1205 25 835 165 170 60 255 55 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q, veh 000000000000 Ped-Bike Adj (A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1862 1900 1863 1863 1900 1937 1863 1900 Adj Flow Rate, veh/h 58 579 800 389 1268 26 879 174 179 63 268 58 Adj No. of Lanes 121120210110 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %222222222222 Opposing Right Turn Influence Yes Yes Yes Yes Cap, veh/h 130 928 795 409 1402 29 871 339 348 80 285 62 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Prop Arrive On Green 0.03 0.25 0.25 0.18 0.40 0.40 0.25 0.40 0.40 0.04 0.19 0.19 Ln Grp Delay, s/veh 48.2 56.6 73.2 71.3 62.8 62.3 92.5 0.0 36.7 97.8 0.0 95.1 Ln Grp LOS D E F E E E F D F F Approach Vol, veh/h 1437 1683 1232 389 Approach Delay, s/veh 65.5 64.6 76.5 95.6 Approach LOS E E E F Timer:12345678 Assigned Phs 12345678 Case No 1.1 4.0 2.0 4.0 1.1 3.0 2.0 4.0 Phs Duration (G+Y+Rc), s 9.0 69.3 11.5 70.3 32.4 45.9 45.0 36.8 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green (Gmax), s 10.5 57.0 9.5 63.0 30.5 37.0 40.5 32.0 Max Allow Headway (MAH), s 3.7 4.9 3.8 5.1 3.7 4.3 3.7 5.3 Max Q Clear (g_c+l1), s 5.9 55.9 7.4 26.9 28.6 41.9 42.5 30.5 Green Ext Time (g_e), s 0.0 0.8 0.0 2.2 0.3 0.0 0.0 0.3 Prob of Phs Call (p_c)0.92 1.00 0.94 1.00 1.00 1.00 1.00 1.00 Prob of Max Out (p_x)0.29 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Left-Turn Movement Data Assigned Mvmt 1357 Mvmt Sat Flow, veh/h 1774 1845 1774 3442 Through Movement Data Assigned Mvmt 2468 Mvmt Sat Flow, veh/h 3545 843 3725 1485 Right-Turn Movement Data Assigned Mvmt 12 14 16 18 Mvmt Sat Flow, veh/h 73 867 1583 321 Left Lane Group Data Assigned Mvmt 10305070 Lane Assignment (Pr/Pm) (Prot) (Pr/Pm) (Prot) 2.2.b Packet Pg. 91 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 2 Lanes in Grp 10101020 Grp Vol (v), veh/h 58 0 63 0 389 0 879 0 Grp Sat Flow (s), veh/h/ln 1774 0 1845 0 1774 0 1721 0 Q Serve Time (g_s), s 3.9 0.0 5.4 0.0 26.6 0.0 40.5 0.0 Cycle Q Clear Time (g_c), s 3.9 0.0 5.4 0.0 26.6 0.0 40.5 0.0 Perm LT Sat Flow (s_l), veh/h/ln 425 0 0 0 391 0 0 0 Shared LT Sat Flow (s_sh), veh/h/ln 00000000 Perm LT Eff Green (g_p), s 39.9 0.0 0.0 0.0 41.9 0.0 0.0 0.0 Perm LT Serve Time (g_u), s 9.4 0.0 0.0 0.0 17.8 0.0 0.0 0.0 Perm LT Q Serve Time (g_ps), s 4.8 0.0 0.0 0.0 17.8 0.0 0.0 0.0 Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop LT Inside Lane (P_L)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Lane Grp Cap (c), veh/h 130 0 80 0 409 0 871 0 V/C Ratio (X)0.44 0.00 0.78 0.00 0.95 0.00 1.01 0.00 Avail Cap (c_a), veh/h 186 0 110 0 427 0 871 0 Upstream Filter (I)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Uniform Delay (d1), s/veh 45.8 0.0 75.8 0.0 40.3 0.0 59.7 0.0 Incr Delay (d2), s/veh 2.4 0.0 22.0 0.0 31.0 0.0 32.7 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 48.2 0.0 97.8 0.0 71.3 0.0 92.5 0.0 1st-Term Q (Q1), veh/ln 1.9 0.0 2.8 0.0 17.0 0.0 19.2 0.0 2nd-Term Q (Q2), veh/ln 0.1 0.0 0.5 0.0 3.5 0.0 4.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 %ile Back of Q (50%), veh/ln 2.0 0.0 3.3 0.0 20.5 0.0 23.2 0.0 %ile Storage Ratio (RQ%)0.22 0.00 0.52 0.00 2.31 0.00 1.34 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 Middle Lane Group Data Assigned Mvmt 02040608 Lane Assignment T T Lanes in Grp 01000200 Grp Vol (v), veh/h 0 632 0 0 0 579 0 0 Grp Sat Flow (s), veh/h/ln 0 1769 0 0 0 1863 0 0 Q Serve Time (g_s), s 0.0 53.8 0.0 0.0 0.0 22.1 0.0 0.0 Cycle Q Clear Time (g_c), s 0.0 53.8 0.0 0.0 0.0 22.1 0.0 0.0 Lane Grp Cap (c), veh/h 0 700 0 0 0 928 0 0 V/C Ratio (X)0.00 0.90 0.00 0.00 0.00 0.62 0.00 0.00 Avail Cap (c_a), veh/h 0 700 0 0 0 928 0 0 Upstream Filter (I)0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d1), s/veh 0.0 45.5 0.0 0.0 0.0 53.4 0.0 0.0 Incr Delay (d2), s/veh 0.0 17.3 0.0 0.0 0.0 3.2 0.0 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 62.8 0.0 0.0 0.0 56.6 0.0 0.0 1st-Term Q (Q1), veh/ln 0.0 26.4 0.0 0.0 0.0 11.4 0.0 0.0 2.2.b Packet Pg. 92 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 3 2nd-Term Q (Q2), veh/ln 0.0 3.4 0.0 0.0 0.0 0.4 0.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 29.7 0.0 0.0 0.0 11.8 0.0 0.0 %ile Storage Ratio (RQ%)0.00 1.78 0.00 0.00 0.00 0.49 0.00 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Right Lane Group Data Assigned Mvmt 0 12 0 14 0 16 0 18 Lane Assignment T+R T+R R T+R Lanes in Grp 01010101 Grp Vol (v), veh/h 0 662 0 353 0 800 0 326 Grp Sat Flow (s), veh/h/ln 0 1849 0 1710 0 1583 0 1806 Q Serve Time (g_s), s 0.0 53.9 0.0 24.9 0.0 39.9 0.0 28.5 Cycle Q Clear Time (g_c), s 0.0 53.9 0.0 24.9 0.0 39.9 0.0 28.5 Prot RT Sat Flow (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 1583.3 0.0 0.0 Prot RT Eff Green (g_R), s 0.0 0.0 0.0 0.0 0.0 40.5 0.0 0.0 Prop RT Outside Lane (P_R) 0.00 0.04 0.00 0.51 0.00 1.00 0.00 0.18 Lane Grp Cap (c), veh/h 0 731 0 687 0 795 0 347 V/C Ratio (X)0.00 0.90 0.00 0.51 0.00 1.01 0.00 0.94 Avail Cap (c_a), veh/h 0 731 0 687 0 795 0 361 Upstream Filter (I)0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d1), s/veh 0.0 45.5 0.0 36.1 0.0 39.8 0.0 63.7 Incr Delay (d2), s/veh 0.0 16.8 0.0 0.7 0.0 33.4 0.0 31.4 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 62.3 0.0 36.7 0.0 73.2 0.0 95.1 1st-Term Q (Q1), veh/ln 0.0 27.6 0.0 11.8 0.0 35.0 0.0 14.2 2nd-Term Q (Q2), veh/ln 0.0 3.4 0.0 0.1 0.0 7.4 0.0 3.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 31.0 0.0 11.9 0.0 42.4 0.0 17.3 %ile Storage Ratio (RQ%)0.00 1.86 0.00 0.56 0.00 1.77 0.00 3.04 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 70.5 HCM 2010 LOS E Notes User approved pedestrian interval to be less than phase max green. 2.2.b Packet Pg. 93 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 55 550 760 370 1205 25 835 165 170 60 255 55 Future Volume (veh/h) 55 550 760 370 1205 25 835 165 170 60 255 55 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1862 1900 1863 1863 1900 1937 1863 1900 Adj Flow Rate, veh/h 58 579 800 389 1268 26 879 174 179 63 268 58 Adj No. of Lanes 121120210110 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %222222222222 Cap, veh/h 130 928 795 409 1402 29 871 339 348 80 285 62 Arrive On Green 0.03 0.25 0.25 0.18 0.40 0.40 0.25 0.40 0.40 0.04 0.19 0.19 Sat Flow, veh/h 1774 3725 1583 1774 3545 73 3442 843 867 1845 1485 321 Grp Volume(v), veh/h 58 579 800 389 632 662 879 0 353 63 0 326 Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1769 1849 1721 0 1710 1845 0 1806 Q Serve(g_s), s 3.9 22.1 39.9 26.6 53.8 53.9 40.5 0.0 24.9 5.4 0.0 28.5 Cycle Q Clear(g_c), s 3.9 22.1 39.9 26.6 53.8 53.9 40.5 0.0 24.9 5.4 0.0 28.5 Prop In Lane 1.00 1.00 1.00 0.04 1.00 0.51 1.00 0.18 Lane Grp Cap(c), veh/h 130 928 795 409 700 731 871 0 687 80 0 347 V/C Ratio(X)0.44 0.62 1.01 0.95 0.90 0.90 1.01 0.00 0.51 0.78 0.00 0.94 Avail Cap(c_a), veh/h 186 928 795 427 700 731 871 0 687 110 0 361 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 45.8 53.4 39.8 40.3 45.5 45.5 59.7 0.0 36.1 75.8 0.0 63.7 Incr Delay (d2), s/veh 2.4 3.2 33.4 31.0 17.3 16.8 32.7 0.0 0.7 22.0 0.0 31.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 11.8 42.4 20.5 29.7 31.0 23.2 0.0 11.9 3.3 0.0 17.3 LnGrp Delay(d),s/veh 48.2 56.6 73.2 71.3 62.8 62.3 92.5 0.0 36.7 97.8 0.0 95.1 LnGrp LOS D E F E E E F D F F Approach Vol, veh/h 1437 1683 1232 389 Approach Delay, s/veh 65.5 64.6 76.5 95.6 Approach LOS E E E F Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 69.3 11.5 70.3 32.4 45.9 45.0 36.8 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green Setting (Gmax), s 10.5 57.0 9.5 63.0 30.5 37.0 40.5 32.0 Max Q Clear Time (g_c+I1), s 5.9 55.9 7.4 26.9 28.6 41.9 42.5 30.5 Green Ext Time (p_c), s 0.0 0.8 0.0 2.2 0.3 0.0 0.0 0.3 Intersection Summary HCM 2010 Ctrl Delay 70.5 HCM 2010 LOS E Notes 2.2.b Packet Pg. 94 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 5 User approved pedestrian interval to be less than phase max green. 2.2.b Packet Pg. 95 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 200: Access A & Courtland Drive 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 6 Intersection Int Delay, s/veh 2.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 30 15 1 30 25 2 Future Vol, veh/h 30 15 1 30 25 2 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 8 22222 Mvmt Flow 32 16 1 32 26 2 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 48 0 74 40 Stage 1 - - - - 40 - Stage 2 - - - - 34 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1559 - 930 1031 Stage 1 - - - - 982 - Stage 2 - - - - 988 - Platoon blocked, % - -- Mov Cap-1 Maneuver - - 1559 - 929 1031 Mov Cap-2 Maneuver - - - - 929 - Stage 1 - - - - 981 - Stage 2 - - - - 988 - Approach EB WB NB HCM Control Delay, s 0 0.2 9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)936 - - 1559 - HCM Lane V/C Ratio 0.03 - - 0.001 - HCM Control Delay (s) 9 - - 7.3 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - 2.2.b Packet Pg. 96 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 300: Private Driveway/Access B & McHenry Road 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 7 Intersection Int Delay, s/veh 3.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 10 740 15 55 1580 20 10 1 35 2 1 20 Future Vol, veh/h 10 740 15 55 1580 20 10 1 35 2 1 20 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 22222222222 Mvmt Flow 11 779 16 58 1663 21 11 1 37 2 1 21 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1684 0 0 795 0 0 1757 2609 398 2202 2607 842 Stage 1 ------809809-1790 1790 - Stage 2 ------9481800 - 412 817 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 376 - - 822 - - 54 24 601 25 24 308 Stage 1 ------340392-84132- Stage 2 ------280130-588388- Platoon blocked, %- -- - Mov Cap-1 Maneuver 376 - - 822 - - - 0 601 - 0 308 Mov Cap-2 Maneuver -------0--0- Stage 1 ------322371-800- Stage 2 -------0-521367- Approach EB WB NB SB HCM Control Delay, s 0.6 4.6 HCM LOS -- Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)- 376 - - 822 - - - HCM Lane V/C Ratio - 0.028 - - 0.07 - - - HCM Control Delay (s) - 14.8 0.4 - 9.7 4.5 - - HCM Lane LOS - B A - A A - - HCM 95th %tile Q(veh) - 0.1 - - 0.2 - - - 2.2.b Packet Pg. 97 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 400: Ranchview Court & Access C 04/04/2019 Existing (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 8 Intersection Int Delay, s/veh 2.6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 10 15 40 10 1 Future Vol, veh/h 1 10 15 40 10 1 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22222 Mvmt Flow 1 11 16 42 11 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 86 12 12 0 - 0 Stage 1 12 ----- Stage 2 74 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 915 1069 1607 - - - Stage 1 1011 ----- Stage 2 949 ----- Platoon blocked, %- - - Mov Cap-1 Maneuver 906 1069 1607 - - - Mov Cap-2 Maneuver 906 ----- Stage 1 1001 ----- Stage 2 949 ----- Approach EB NB SB HCM Control Delay, s 8.5 2 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1607 - 1052 - - HCM Lane V/C Ratio 0.01 - 0.011 - - HCM Control Delay (s) 7.3 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - 2.2.b Packet Pg. 98 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 60 560 615 175 510 20 475 95 175 55 105 Future Volume (veh/h) 5 60 560 615 175 510 20 475 95 175 55 105 Number 1 6 16 5 2 12 3 8 18 7 4 Initial Q, veh 00000000000 Ped-Bike Adj (A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1863 1900 1863 1863 1900 1937 1863 Adj Flow Rate, veh/h 63 589 647 184 537 21 500 100 184 58 111 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %22222222222 Opposing Right Turn Influence Yes Yes Yes Yes Cap, veh/h 504 1832 778 373 1840 72 327 116 214 76 161 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Prop Arrive On Green 0.03 0.49 0.49 0.07 0.53 0.53 0.09 0.20 0.20 0.04 0.14 Ln Grp Delay, s/veh 12.0 15.8 31.9 11.9 13.9 13.8 298.4 0.0 46.0 61.7 0.0 Ln Grp LOS B B C B B B F D E Approach Vol, veh/h 1299 742 784 232 Approach Delay, s/veh 23.6 13.4 207.0 48.5 Approach LOS C B F D Timer:12345678 Assigned Phs 12345678 Case No 1.1 4.0 2.0 4.0 1.1 3.0 2.0 4.0 Phs Duration (G+Y+Rc), s 6.6 59.0 14.0 20.4 10.5 55.2 8.6 25.7 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green (Gmax), s 10.5 23.0 9.5 37.0 10.5 23.0 13.5 33.0 Max Allow Headway (MAH), s 3.7 4.9 3.7 5.4 3.7 4.4 3.8 5.1 Max Q Clear (g_c+l1), s 3.8 10.6 11.5 11.4 6.8 37.1 5.1 18.4 Green Ext Time (g_e), s 0.1 2.4 0.0 1.0 0.2 0.0 0.1 1.3 Prob of Phs Call (p_c)0.83 1.00 1.00 1.00 0.99 1.00 0.80 1.00 Prob of Max Out (p_x)0.02 0.14 1.00 0.00 1.00 1.00 0.00 0.02 Left-Turn Movement Data Assigned Mvmt 1357 Mvmt Sat Flow, veh/h 1774 3442 1774 1845 Through Movement Data Assigned Mvmt 2468 Mvmt Sat Flow, veh/h 3473 1117 3725 589 Right-Turn Movement Data Assigned Mvmt 12 14 16 18 Mvmt Sat Flow, veh/h 136 634 1583 1083 Left Lane Group Data Assigned Mvmt 10305070 Lane Assignment (Pr/Pm) (Prot) (Pr/Pm) (Prot) 2.2.b Packet Pg. 99 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 2 Movement SBR Lane Configurations Traffic Volume (veh/h) 60 Future Volume (veh/h) 60 Number 14 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 63 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Cap, veh/h 91 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.14 Ln Grp Delay, s/veh 44.1 Ln Grp LOS D Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer: 2.2.b Packet Pg. 100 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 3 Lanes in Grp 10201010 Grp Vol (v), veh/h 63 0 500 0 184 0 58 0 Grp Sat Flow (s), veh/h/ln 1774 0 1721 0 1774 0 1845 0 Q Serve Time (g_s), s 1.8 0.0 9.5 0.0 4.8 0.0 3.1 0.0 Cycle Q Clear Time (g_c), s 1.8 0.0 9.5 0.0 4.8 0.0 3.1 0.0 Perm LT Sat Flow (s_l), veh/h/ln 848 0 0 0 449 0 0 0 Shared LT Sat Flow (s_sh), veh/h/ln 00000000 Perm LT Eff Green (g_p), s 49.2 0.0 0.0 0.0 51.2 0.0 0.0 0.0 Perm LT Serve Time (g_u), s 44.4 0.0 0.0 0.0 39.6 0.0 0.0 0.0 Perm LT Q Serve Time (g_ps), s 0.4 0.0 0.0 0.0 8.0 0.0 0.0 0.0 Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop LT Inside Lane (P_L)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Lane Grp Cap (c), veh/h 504 0 327 0 373 0 76 0 V/C Ratio (X)0.13 0.00 1.53 0.00 0.49 0.00 0.76 0.00 Avail Cap (c_a), veh/h 634 0 327 0 436 0 249 0 Upstream Filter (I)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Uniform Delay (d1), s/veh 11.9 0.0 45.3 0.0 10.9 0.0 47.4 0.0 Incr Delay (d2), s/veh 0.1 0.0 253.1 0.0 1.0 0.0 14.3 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 12.0 0.0 298.4 0.0 11.9 0.0 61.7 0.0 1st-Term Q (Q1), veh/ln 0.8 0.0 4.5 0.0 2.3 0.0 1.6 0.0 2nd-Term Q (Q2), veh/ln 0.0 0.0 11.5 0.0 0.1 0.0 0.3 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 %ile Back of Q (50%), veh/ln 0.9 0.0 16.0 0.0 2.4 0.0 1.9 0.0 %ile Storage Ratio (RQ%)0.09 0.00 0.92 0.00 0.27 0.00 0.30 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 43.3 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 Middle Lane Group Data Assigned Mvmt 02040608 Lane Assignment T T Lanes in Grp 01000200 Grp Vol (v), veh/h 0 273 0 0 0 589 0 0 Grp Sat Flow (s), veh/h/ln 0 1770 0 0 0 1863 0 0 Q Serve Time (g_s), s 0.0 8.6 0.0 0.0 0.0 9.5 0.0 0.0 Cycle Q Clear Time (g_c), s 0.0 8.6 0.0 0.0 0.0 9.5 0.0 0.0 Lane Grp Cap (c), veh/h 0 938 0 0 0 1832 0 0 V/C Ratio (X)0.00 0.29 0.00 0.00 0.00 0.32 0.00 0.00 Avail Cap (c_a), veh/h 0 938 0 0 0 1832 0 0 Upstream Filter (I)0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d1), s/veh 0.0 13.1 0.0 0.0 0.0 15.3 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.8 0.0 0.0 0.0 0.5 0.0 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 13.9 0.0 0.0 0.0 15.8 0.0 0.0 1st-Term Q (Q1), veh/ln 0.0 4.2 0.0 0.0 0.0 4.9 0.0 0.0 2.2.b Packet Pg. 101 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 4 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 4.4 0.0 0.0 0.0 5.0 0.0 0.0 %ile Storage Ratio (RQ%)0.00 0.26 0.00 0.00 0.00 0.21 0.00 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Right Lane Group Data Assigned Mvmt 0 12 0 14 0 16 0 18 Lane Assignment T+R T+R R T+R Lanes in Grp 01010101 Grp Vol (v), veh/h 0 285 0 174 0 647 0 284 Grp Sat Flow (s), veh/h/ln 0 1839 0 1751 0 1583 0 1672 Q Serve Time (g_s), s 0.0 8.6 0.0 9.4 0.0 35.1 0.0 16.4 Cycle Q Clear Time (g_c), s 0.0 8.6 0.0 9.4 0.0 35.1 0.0 16.4 Prot RT Sat Flow (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prot RT Eff Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop RT Outside Lane (P_R) 0.00 0.07 0.00 0.36 0.00 1.00 0.00 0.65 Lane Grp Cap (c), veh/h 0 974 0 252 0 778 0 330 V/C Ratio (X)0.00 0.29 0.00 0.69 0.00 0.83 0.00 0.86 Avail Cap (c_a), veh/h 0 974 0 648 0 778 0 552 Upstream Filter (I)0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d1), s/veh 0.0 13.1 0.0 40.7 0.0 21.8 0.0 38.8 Incr Delay (d2), s/veh 0.0 0.8 0.0 3.4 0.0 10.1 0.0 7.2 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 13.8 0.0 44.1 0.0 31.9 0.0 46.0 1st-Term Q (Q1), veh/ln 0.0 4.3 0.0 4.6 0.0 15.2 0.0 7.6 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 0.2 0.0 2.2 0.0 0.7 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 4.6 0.0 4.8 0.0 17.4 0.0 8.2 %ile Storage Ratio (RQ%)0.00 0.27 0.00 0.85 0.00 0.73 0.00 0.39 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 70.1 HCM 2010 LOS E Notes User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 102 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 5 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 60 560 615 175 510 20 475 95 175 55 105 Future Volume (veh/h) 5 60 560 615 175 510 20 475 95 175 55 105 Number 1 6 16 5 2 12 3 8 18 7 4 Initial Q (Qb), veh 00000000000 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1863 1900 1863 1863 1900 1937 1863 Adj Flow Rate, veh/h 63 589 647 184 537 21 500 100 184 58 111 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %22222222222 Cap, veh/h 504 1832 778 373 1840 72 327 116 214 76 161 Arrive On Green 0.03 0.49 0.49 0.07 0.53 0.53 0.09 0.20 0.20 0.04 0.14 Sat Flow, veh/h 1774 3725 1583 1774 3473 136 3442 589 1083 1845 1117 Grp Volume(v), veh/h 63 589 647 184 273 285 500 0 284 58 0 Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1770 1839 1721 0 1672 1845 0 Q Serve(g_s), s 1.8 9.5 35.1 4.8 8.6 8.6 9.5 0.0 16.4 3.1 0.0 Cycle Q Clear(g_c), s 1.8 9.5 35.1 4.8 8.6 8.6 9.5 0.0 16.4 3.1 0.0 Prop In Lane 1.00 1.00 1.00 0.07 1.00 0.65 1.00 Lane Grp Cap(c), veh/h 504 1832 778 373 938 974 327 0 330 76 0 V/C Ratio(X)0.13 0.32 0.83 0.49 0.29 0.29 1.53 0.00 0.86 0.76 0.00 Avail Cap(c_a), veh/h 634 1832 778 436 938 974 327 0 552 249 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 11.9 15.3 21.8 10.9 13.1 13.1 45.3 0.0 38.8 47.4 0.0 Incr Delay (d2), s/veh 0.1 0.5 10.1 1.0 0.8 0.8 253.1 0.0 7.2 14.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 5.0 17.4 2.4 4.4 4.6 16.0 0.0 8.2 1.9 0.0 LnGrp Delay(d),s/veh 12.0 15.8 31.9 11.9 13.9 13.8 298.4 0.0 46.0 61.7 0.0 LnGrp LOS B B C B B B F D E Approach Vol, veh/h 1299 742 784 232 Approach Delay, s/veh 23.6 13.4 207.0 48.5 Approach LOS C B F D Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 6.6 59.0 14.0 20.4 10.5 55.2 8.6 25.7 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green Setting (Gmax), s 10.5 23.0 9.5 37.0 10.5 23.0 13.5 33.0 Max Q Clear Time (g_c+I1), s 3.8 10.6 11.5 11.4 6.8 37.1 5.1 18.4 Green Ext Time (p_c), s 0.1 2.4 0.0 1.0 0.2 0.0 0.1 1.3 Intersection Summary HCM 2010 Ctrl Delay 70.1 HCM 2010 LOS E Notes 2.2.b Packet Pg. 103 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 6 Movement SBR Lane Configurations Traffic Volume (veh/h) 60 Future Volume (veh/h) 60 Number 14 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 63 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 91 Arrive On Green 0.14 Sat Flow, veh/h 634 Grp Volume(v), veh/h 174 Grp Sat Flow(s),veh/h/ln 1751 Q Serve(g_s), s 9.4 Cycle Q Clear(g_c), s 9.4 Prop In Lane 0.36 Lane Grp Cap(c), veh/h 252 V/C Ratio(X)0.69 Avail Cap(c_a), veh/h 648 HCM Platoon Ratio 1.00 Upstream Filter(I)1.00 Uniform Delay (d), s/veh 40.7 Incr Delay (d2), s/veh 3.4 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(50%),veh/ln 4.8 LnGrp Delay(d),s/veh 44.1 LnGrp LOS D Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer 2.2.b Packet Pg. 104 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 7 User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 105 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 200: Access A & Courtland Drive 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 8 Intersection Int Delay, s/veh 3.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 15 5 1 15 20 1 Future Vol, veh/h 15 5 1 15 20 1 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22622 Mvmt Flow 16 5 1 16 21 1 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 21 0 37 19 Stage 1 - - - - 19 - Stage 2 - - - - 18 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1595 - 975 1059 Stage 1 - - - - 1004 - Stage 2 - - - - 1005 - Platoon blocked, % - -- Mov Cap-1 Maneuver - - 1595 - 974 1059 Mov Cap-2 Maneuver - - - - 974 - Stage 1 - - - - 1003 - Stage 2 - - - - 1005 - Approach EB WB NB HCM Control Delay, s 0 0.5 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)978 - - 1595 - HCM Lane V/C Ratio 0.023 - - 0.001 - HCM Control Delay (s) 8.8 - - 7.3 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - 2.2.b Packet Pg. 106 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 300: Private Driveway/Access B & McHenry Road 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 9 Intersection Int Delay, s/veh 1.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 10 790 5 35 690 15 10 1 20 10 1 25 Future Vol, veh/h 10 790 5 35 690 15 10 1 20 10 1 25 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 22222222222 Mvmt Flow 11 832 5 37 726 16 11 1 21 11 1 26 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 742 0 0 837 0 0 1295 1673 419 1247 1667 371 Stage 1 ------857857-808808- Stage 2 ------438816-439859- Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 861 - - 793 - - 120 95 583 130 96 626 Stage 1 ------318372-341392- Stage 2 ------567389-567371- Platoon blocked, %- -- - Mov Cap-1 Maneuver 861 - - 793 - - 105 85 583 114 86 626 Mov Cap-2 Maneuver ------10585-11486- Stage 1 ------310363-333361- Stage 2 ------498358-532362- Approach EB WB NB SB HCM Control Delay, s 0.2 0.8 24.3 21.3 HCM LOS C C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)219 861 - - 793 - - 258 HCM Lane V/C Ratio 0.149 0.012 - - 0.046 - - 0.147 HCM Control Delay (s) 24.3 9.2 0.1 - 9.8 0.4 - 21.3 HCM Lane LOS C A A - A A - C HCM 95th %tile Q(veh) 0.5 0 - - 0.1 - - 0.5 2.2.b Packet Pg. 107 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 400: Ranchview Court & Access C 03/29/2019 Existing (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 10 Intersection Int Delay, s/veh 2.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 10 10 25 20 1 Future Vol, veh/h 1 10 10 25 20 1 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22222 Mvmt Flow 1 11 11 26 21 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 70 22 22 0 - 0 Stage 1 22 ----- Stage 2 48 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 934 1055 1593 - - - Stage 1 1001 ----- Stage 2 974 ----- Platoon blocked, %- - - Mov Cap-1 Maneuver 927 1055 1593 - - - Mov Cap-2 Maneuver 927 ----- Stage 1 994 ----- Stage 2 974 ----- Approach EB NB SB HCM Control Delay, s 8.5 2.1 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1593 - 1042 - - HCM Lane V/C Ratio 0.007 - 0.011 - - HCM Control Delay (s) 7.3 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - 2.2.b Packet Pg. 108 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Page 22 Proposed Outlot Development at Spoerlein Commons – Buffalo Grove, Illinois July 2020 BUILD SYNCHRO CAPACITY REPORTS Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour 2.2.b Packet Pg. 109 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 85 1085 830 175 420 15 585 200 490 45 125 Future Volume (veh/h) 5 85 1085 830 175 420 15 585 200 490 45 125 Number 1 6 16 5 2 12 7 4 14 3 8 Initial Q, veh 00000000000 Ped-Bike Adj (A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1829 1961 1845 1863 1821 1900 1827 1863 1900 1882 1792 Adj Flow Rate, veh/h 89 1142 874 184 442 16 616 211 516 47 132 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %42324442256 Opposing Right Turn Influence Yes Yes Yes Yes Cap, veh/h 448 1555 970 204 1530 55 680 172 422 61 267 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Prop Arrive On Green 0.04 0.42 0.42 0.07 0.45 0.45 0.20 0.36 0.36 0.03 0.19 Ln Grp Delay, s/veh 26.8 44.7 40.9 67.0 30.6 30.6 76.2 0.0 169.7 100.3 0.0 Ln Grp LOS C D D E C C E F F Approach Vol, veh/h 2105 642 1343 211 Approach Delay, s/veh 42.4 41.0 126.8 71.0 Approach LOS D D F E Timer:12345678 Assigned Phs 12345678 Case No 1.1 4.0 2.0 4.0 1.1 3.0 2.0 4.0 Phs Duration (G+Y+Rc), s 10.4 82.3 10.2 67.0 15.8 77.0 38.8 38.5 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green (Gmax), s 11.5 67.0 10.5 61.0 16.5 62.0 46.5 25.0 Max Allow Headway (MAH), s 3.7 4.9 3.8 5.1 3.7 4.5 3.7 5.3 Max Q Clear (g_c+l1), s 7.0 16.0 6.4 63.0 12.1 73.0 32.3 16.4 Green Ext Time (g_e), s 0.1 2.6 0.0 0.0 0.2 0.0 2.0 0.5 Prob of Phs Call (p_c)0.99 1.00 0.89 1.00 1.00 1.00 1.00 1.00 Prob of Max Out (p_x)0.39 0.00 0.70 1.00 0.56 1.00 0.01 0.17 Left-Turn Movement Data Assigned Mvmt 1357 Mvmt Sat Flow, veh/h 1742 1792 1774 3375 Through Movement Data Assigned Mvmt 2468 Mvmt Sat Flow, veh/h 3407 480 3725 1395 Right-Turn Movement Data Assigned Mvmt 12 14 16 18 Mvmt Sat Flow, veh/h 123 1175 1568 338 Left Lane Group Data Assigned Mvmt 10305070 Lane Assignment (Pr/Pm) (Prot) (Pr/Pm) (Prot) 2.2.b Packet Pg. 110 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 2 Movement SBR Lane Configurations Traffic Volume (veh/h) 30 Future Volume (veh/h) 30 Number 18 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 32 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 6 Opposing Right Turn Influence Cap, veh/h 65 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.19 Ln Grp Delay, s/veh 62.6 Ln Grp LOS E Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer: 2.2.b Packet Pg. 111 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 3 Lanes in Grp 10101020 Grp Vol (v), veh/h 89 0 47 0 184 0 616 0 Grp Sat Flow (s), veh/h/ln 1742 0 1792 0 1774 0 1688 0 Q Serve Time (g_s), s 5.0 0.0 4.4 0.0 10.1 0.0 30.3 0.0 Cycle Q Clear Time (g_c), s 5.0 0.0 4.4 0.0 10.1 0.0 30.3 0.0 Perm LT Sat Flow (s_l), veh/h/ln 913 0 0 0 211 0 0 0 Shared LT Sat Flow (s_sh), veh/h/ln 00000000 Perm LT Eff Green (g_p), s 71.0 0.0 0.0 0.0 73.0 0.0 0.0 0.0 Perm LT Serve Time (g_u), s 62.3 0.0 0.0 0.0 27.2 0.0 0.0 0.0 Perm LT Q Serve Time (g_ps), s 0.9 0.0 0.0 0.0 27.2 0.0 0.0 0.0 Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop LT Inside Lane (P_L)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Lane Grp Cap (c), veh/h 448 0 61 0 204 0 680 0 V/C Ratio (X)0.20 0.00 0.78 0.00 0.90 0.00 0.91 0.00 Avail Cap (c_a), veh/h 495 0 111 0 248 0 923 0 Upstream Filter (I)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Uniform Delay (d1), s/veh 26.5 0.0 81.5 0.0 38.2 0.0 66.3 0.0 Incr Delay (d2), s/veh 0.2 0.0 18.8 0.0 28.8 0.0 9.9 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 26.8 0.0 100.3 0.0 67.0 0.0 76.2 0.0 1st-Term Q (Q1), veh/ln 2.4 0.0 2.2 0.0 8.5 0.0 14.1 0.0 2nd-Term Q (Q2), veh/ln 0.0 0.0 0.3 0.0 1.6 0.0 0.9 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 %ile Back of Q (50%), veh/ln 2.4 0.0 2.5 0.0 10.2 0.0 15.0 0.0 %ile Storage Ratio (RQ%)0.27 0.00 0.41 0.00 1.15 0.00 0.88 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Middle Lane Group Data Assigned Mvmt 02040608 Lane Assignment T T Lanes in Grp 01000200 Grp Vol (v), veh/h 0 224 0 0 0 1142 0 0 Grp Sat Flow (s), veh/h/ln 0 1730 0 0 0 1863 0 0 Q Serve Time (g_s), s 0.0 13.9 0.0 0.0 0.0 43.8 0.0 0.0 Cycle Q Clear Time (g_c), s 0.0 13.9 0.0 0.0 0.0 43.8 0.0 0.0 Lane Grp Cap (c), veh/h 0 777 0 0 0 1555 0 0 V/C Ratio (X)0.00 0.29 0.00 0.00 0.00 0.73 0.00 0.00 Avail Cap (c_a), veh/h 0 777 0 0 0 1555 0 0 Upstream Filter (I)0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d1), s/veh 0.0 29.6 0.0 0.0 0.0 41.6 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.9 0.0 0.0 0.0 3.1 0.0 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 30.6 0.0 0.0 0.0 44.7 0.0 0.0 1st-Term Q (Q1), veh/ln 0.0 6.7 0.0 0.0 0.0 22.5 0.0 0.0 2.2.b Packet Pg. 112 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 4 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.7 0.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 6.9 0.0 0.0 0.0 23.2 0.0 0.0 %ile Storage Ratio (RQ%)0.00 0.42 0.00 0.00 0.00 0.97 0.00 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Right Lane Group Data Assigned Mvmt 0 12 0 14 0 16 0 18 Lane Assignment T+R T+R R T+R Lanes in Grp 01010101 Grp Vol (v), veh/h 0 234 0 727 0 874 0 164 Grp Sat Flow (s), veh/h/ln 0 1800 0 1655 0 1568 0 1733 Q Serve Time (g_s), s 0.0 14.0 0.0 61.0 0.0 71.0 0.0 14.4 Cycle Q Clear Time (g_c), s 0.0 14.0 0.0 61.0 0.0 71.0 0.0 14.4 Prot RT Sat Flow (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 1568.0 0.0 0.0 Prot RT Eff Green (g_R), s 0.0 0.0 0.0 0.0 0.0 34.3 0.0 0.0 Prop RT Outside Lane (P_R) 0.00 0.07 0.00 0.71 0.00 1.00 0.00 0.20 Lane Grp Cap (c), veh/h 0 808 0 594 0 970 0 331 V/C Ratio (X)0.00 0.29 0.00 1.22 0.00 0.90 0.00 0.50 Avail Cap (c_a), veh/h 0 808 0 594 0 970 0 331 Upstream Filter (I)0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d1), s/veh 0.0 29.7 0.0 54.5 0.0 27.9 0.0 61.4 Incr Delay (d2), s/veh 0.0 0.9 0.0 115.2 0.0 13.0 0.0 1.1 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 30.6 0.0 169.7 0.0 40.9 0.0 62.6 1st-Term Q (Q1), veh/ln 0.0 7.0 0.0 27.9 0.0 35.1 0.0 6.9 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 19.0 0.0 3.5 0.0 0.1 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 7.2 0.0 46.9 0.0 38.7 0.0 7.0 %ile Storage Ratio (RQ%)0.00 0.44 0.00 2.21 0.00 1.63 0.00 1.27 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 33.3 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 69.9 HCM 2010 LOS E Notes User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 113 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 5 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 85 1085 830 175 420 15 585 200 490 45 125 Future Volume (veh/h) 5 85 1085 830 175 420 15 585 200 490 45 125 Number 1 6 16 5 2 12 7 4 14 3 8 Initial Q (Qb), veh 00000000000 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1829 1961 1845 1863 1821 1900 1827 1863 1900 1882 1792 Adj Flow Rate, veh/h 89 1142 874 184 442 16 616 211 516 47 132 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %42324442256 Cap, veh/h 448 1555 970 204 1530 55 680 172 422 61 267 Arrive On Green 0.04 0.42 0.42 0.07 0.45 0.45 0.20 0.36 0.36 0.03 0.19 Sat Flow, veh/h 1742 3725 1568 1774 3407 123 3375 480 1175 1792 1395 Grp Volume(v), veh/h 89 1142 874 184 224 234 616 0 727 47 0 Grp Sat Flow(s),veh/h/ln 1742 1863 1568 1774 1730 1800 1688 0 1655 1792 0 Q Serve(g_s), s 5.0 43.8 71.0 10.1 13.9 14.0 30.3 0.0 61.0 4.4 0.0 Cycle Q Clear(g_c), s 5.0 43.8 71.0 10.1 13.9 14.0 30.3 0.0 61.0 4.4 0.0 Prop In Lane 1.00 1.00 1.00 0.07 1.00 0.71 1.00 Lane Grp Cap(c), veh/h 448 1555 970 204 777 808 680 0 594 61 0 V/C Ratio(X)0.20 0.73 0.90 0.90 0.29 0.29 0.91 0.00 1.22 0.78 0.00 Avail Cap(c_a), veh/h 495 1555 970 248 777 808 923 0 594 111 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 26.5 41.6 27.9 38.2 29.6 29.7 66.3 0.0 54.5 81.5 0.0 Incr Delay (d2), s/veh 0.2 3.1 13.0 28.8 0.9 0.9 9.9 0.0 115.2 18.8 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 23.2 38.7 10.2 6.9 7.2 15.0 0.0 46.9 2.5 0.0 LnGrp Delay(d),s/veh 26.8 44.7 40.9 67.0 30.6 30.6 76.2 0.0 169.7 100.3 0.0 LnGrp LOS C D D E C C E F F Approach Vol, veh/h 2105 642 1343 211 Approach Delay, s/veh 42.4 41.0 126.8 71.0 Approach LOS D D F E Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 10.4 82.3 10.2 67.0 15.8 77.0 38.8 38.5 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green Setting (Gmax), s 11.5 67.0 10.5 61.0 16.5 62.0 46.5 25.0 Max Q Clear Time (g_c+I1), s 7.0 16.0 6.4 63.0 12.1 73.0 32.3 16.4 Green Ext Time (p_c), s 0.1 2.6 0.0 0.0 0.2 0.0 2.0 0.5 Intersection Summary HCM 2010 Ctrl Delay 69.9 HCM 2010 LOS E Notes 2.2.b Packet Pg. 114 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 6 Movement SBR Lane Configurations Traffic Volume (veh/h) 30 Future Volume (veh/h) 30 Number 18 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 32 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 6 Cap, veh/h 65 Arrive On Green 0.19 Sat Flow, veh/h 338 Grp Volume(v), veh/h 164 Grp Sat Flow(s),veh/h/ln 1733 Q Serve(g_s), s 14.4 Cycle Q Clear(g_c), s 14.4 Prop In Lane 0.20 Lane Grp Cap(c), veh/h 331 V/C Ratio(X)0.50 Avail Cap(c_a), veh/h 331 HCM Platoon Ratio 1.00 Upstream Filter(I)1.00 Uniform Delay (d), s/veh 61.4 Incr Delay (d2), s/veh 1.1 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(50%),veh/ln 7.0 LnGrp Delay(d),s/veh 62.6 LnGrp LOS E Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer 2.2.b Packet Pg. 115 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 7 User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 116 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 200: Access A & Courtland Drive 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 8 Intersection Int Delay, s/veh 1.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 10 30 1 45 15 1 Future Vol, veh/h 10 30 1 45 15 1 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22722 Mvmt Flow 11 32 1 47 16 1 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 43 0 76 27 Stage 1 - - - - 27 - Stage 2 - - - - 49 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1566 - 927 1048 Stage 1 - - - - 996 - Stage 2 - - - - 973 - Platoon blocked, % - -- Mov Cap-1 Maneuver - - 1566 - 926 1048 Mov Cap-2 Maneuver - - - - 926 - Stage 1 - - - - 995 - Stage 2 - - - - 973 - Approach EB WB NB HCM Control Delay, s 0 0.2 8.9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)933 - - 1566 - HCM Lane V/C Ratio 0.018 - - 0.001 - HCM Control Delay (s) 8.9 - - 7.3 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - 2.2.b Packet Pg. 117 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 300: Private Driveway/Access B & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 9 Intersection Int Delay, s/veh 3.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 30 1540 5 15 575 25 5 1 15 20 1 30 Future Vol, veh/h 30 1540 5 15 575 25 5 1 15 20 1 30 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 22642226222 Mvmt Flow 32 1621 5 16 605 26 5 1 16 21 1 32 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 631 0 0 1626 0 0 2023 2351 813 1525 2340 316 Stage 1 ------1688 1688 - 650 650 - Stage 2 ------335663-8751690 - Critical Hdwy 4.14 - - 4.22 - - 7.54 6.54 7.02 7.54 6.54 6.94 Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.26 - - 3.52 4.02 3.36 3.52 4.02 3.32 Pot Cap-1 Maneuver 947 - - 378 - - 34 35 313 81 36 680 Stage 1 ------97148-424463- Stage 2 ------653457-310148- Platoon blocked, %- -- - Mov Cap-1 Maneuver 947 - - 378 - - 22 21 313 51 22 680 Mov Cap-2 Maneuver ------2221-5122- Stage 1 ------6396-275432- Stage 2 ------580427-18996- Approach EB WB NB SB HCM Control Delay, s 1.6 0.8 86.6 69.6 HCM LOS F F Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)65 947 - - 378 - - 106 HCM Lane V/C Ratio 0.34 0.033 - - 0.042 - - 0.506 HCM Control Delay (s) 86.6 8.9 1.5 - 14.9 0.5 - 69.6 HCM Lane LOS F A A - B A - F HCM 95th %tile Q(veh) 1.3 0.1 - - 0.1 - - 2.3 2.2.b Packet Pg. 118 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 400: Ranchview Court & Access C 04/05/2019 Build (2019) Traffic Volumes 7:30 am 03/07/2019 AM Peak Hour Synchro 10 Report Page 10 Intersection Int Delay, s/veh 3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 5 10 5 20 1 Future Vol, veh/h 1 5 10 5 20 1 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 43 2 2 Mvmt Flow 1 5 11 5 21 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 49 22 22 0 - 0 Stage 1 22 ----- Stage 2 27 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 960 1055 1593 - - - Stage 1 1001 ----- Stage 2 996 ----- Platoon blocked, %- - - Mov Cap-1 Maneuver 953 1055 1593 - - - Mov Cap-2 Maneuver 953 ----- Stage 1 994 ----- Stage 2 996 ----- Approach EB NB SB HCM Control Delay, s 8.5 4.9 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1593 - 1037 - - HCM Lane V/C Ratio 0.007 - 0.006 - - HCM Control Delay (s) 7.3 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - 2.2.b Packet Pg. 119 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 55 555 760 370 1210 25 835 165 170 60 255 55 Future Volume (veh/h) 55 555 760 370 1210 25 835 165 170 60 255 55 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q, veh 000000000000 Ped-Bike Adj (A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1862 1900 1863 1863 1900 1937 1863 1900 Adj Flow Rate, veh/h 58 584 800 389 1274 26 879 174 179 63 268 58 Adj No. of Lanes 121120210110 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %222222222222 Opposing Right Turn Influence Yes Yes Yes Yes Cap, veh/h 129 926 795 408 1402 29 871 339 348 80 285 62 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Prop Arrive On Green 0.03 0.25 0.25 0.18 0.40 0.40 0.25 0.40 0.40 0.04 0.19 0.19 Ln Grp Delay, s/veh 48.4 56.8 73.5 71.7 63.4 62.9 92.5 0.0 36.7 97.8 0.0 95.1 Ln Grp LOS D E F E E E F D F F Approach Vol, veh/h 1442 1689 1232 389 Approach Delay, s/veh 65.7 65.1 76.5 95.6 Approach LOS E E E F Timer:12345678 Assigned Phs 12345678 Case No 1.1 4.0 2.0 4.0 1.1 3.0 2.0 4.0 Phs Duration (G+Y+Rc), s 9.0 69.3 11.5 70.3 32.4 45.8 45.0 36.8 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green (Gmax), s 10.5 57.0 9.5 63.0 30.5 37.0 40.5 32.0 Max Allow Headway (MAH), s 3.7 4.9 3.8 5.1 3.7 4.3 3.7 5.3 Max Q Clear (g_c+l1), s 5.9 56.3 7.4 26.9 28.7 41.8 42.5 30.5 Green Ext Time (g_e), s 0.0 0.5 0.0 2.2 0.2 0.0 0.0 0.3 Prob of Phs Call (p_c)0.92 1.00 0.94 1.00 1.00 1.00 1.00 1.00 Prob of Max Out (p_x)0.29 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Left-Turn Movement Data Assigned Mvmt 1357 Mvmt Sat Flow, veh/h 1774 1845 1774 3442 Through Movement Data Assigned Mvmt 2468 Mvmt Sat Flow, veh/h 3546 843 3725 1485 Right-Turn Movement Data Assigned Mvmt 12 14 16 18 Mvmt Sat Flow, veh/h 72 867 1583 321 Left Lane Group Data Assigned Mvmt 10305070 Lane Assignment (Pr/Pm) (Prot) (Pr/Pm) (Prot) 2.2.b Packet Pg. 120 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 2 Lanes in Grp 10101020 Grp Vol (v), veh/h 58 0 63 0 389 0 879 0 Grp Sat Flow (s), veh/h/ln 1774 0 1845 0 1774 0 1721 0 Q Serve Time (g_s), s 3.9 0.0 5.4 0.0 26.7 0.0 40.5 0.0 Cycle Q Clear Time (g_c), s 3.9 0.0 5.4 0.0 26.7 0.0 40.5 0.0 Perm LT Sat Flow (s_l), veh/h/ln 422 0 0 0 390 0 0 0 Shared LT Sat Flow (s_sh), veh/h/ln 00000000 Perm LT Eff Green (g_p), s 39.8 0.0 0.0 0.0 41.8 0.0 0.0 0.0 Perm LT Serve Time (g_u), s 9.0 0.0 0.0 0.0 17.4 0.0 0.0 0.0 Perm LT Q Serve Time (g_ps), s 4.9 0.0 0.0 0.0 17.4 0.0 0.0 0.0 Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop LT Inside Lane (P_L)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Lane Grp Cap (c), veh/h 129 0 80 0 408 0 871 0 V/C Ratio (X)0.45 0.00 0.78 0.00 0.95 0.00 1.01 0.00 Avail Cap (c_a), veh/h 185 0 110 0 426 0 871 0 Upstream Filter (I)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Uniform Delay (d1), s/veh 46.0 0.0 75.8 0.0 40.6 0.0 59.7 0.0 Incr Delay (d2), s/veh 2.4 0.0 22.0 0.0 31.1 0.0 32.7 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 48.4 0.0 97.8 0.0 71.7 0.0 92.5 0.0 1st-Term Q (Q1), veh/ln 1.9 0.0 2.8 0.0 17.0 0.0 19.2 0.0 2nd-Term Q (Q2), veh/ln 0.1 0.0 0.5 0.0 3.5 0.0 4.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 %ile Back of Q (50%), veh/ln 2.0 0.0 3.3 0.0 20.5 0.0 23.2 0.0 %ile Storage Ratio (RQ%)0.22 0.00 0.52 0.00 2.31 0.00 1.34 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 Middle Lane Group Data Assigned Mvmt 02040608 Lane Assignment T T Lanes in Grp 01000200 Grp Vol (v), veh/h 0 635 0 0 0 584 0 0 Grp Sat Flow (s), veh/h/ln 0 1769 0 0 0 1863 0 0 Q Serve Time (g_s), s 0.0 54.2 0.0 0.0 0.0 22.3 0.0 0.0 Cycle Q Clear Time (g_c), s 0.0 54.2 0.0 0.0 0.0 22.3 0.0 0.0 Lane Grp Cap (c), veh/h 0 700 0 0 0 926 0 0 V/C Ratio (X)0.00 0.91 0.00 0.00 0.00 0.63 0.00 0.00 Avail Cap (c_a), veh/h 0 700 0 0 0 926 0 0 Upstream Filter (I)0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d1), s/veh 0.0 45.6 0.0 0.0 0.0 53.6 0.0 0.0 Incr Delay (d2), s/veh 0.0 17.8 0.0 0.0 0.0 3.3 0.0 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 63.4 0.0 0.0 0.0 56.8 0.0 0.0 1st-Term Q (Q1), veh/ln 0.0 26.5 0.0 0.0 0.0 11.5 0.0 0.0 2.2.b Packet Pg. 121 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 3 2nd-Term Q (Q2), veh/ln 0.0 3.5 0.0 0.0 0.0 0.4 0.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 29.9 0.0 0.0 0.0 11.9 0.0 0.0 %ile Storage Ratio (RQ%)0.00 1.79 0.00 0.00 0.00 0.50 0.00 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Right Lane Group Data Assigned Mvmt 0 12 0 14 0 16 0 18 Lane Assignment T+R T+R R T+R Lanes in Grp 01010101 Grp Vol (v), veh/h 0 665 0 353 0 800 0 326 Grp Sat Flow (s), veh/h/ln 0 1849 0 1710 0 1583 0 1806 Q Serve Time (g_s), s 0.0 54.3 0.0 24.9 0.0 39.8 0.0 28.5 Cycle Q Clear Time (g_c), s 0.0 54.3 0.0 24.9 0.0 39.8 0.0 28.5 Prot RT Sat Flow (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 1583.3 0.0 0.0 Prot RT Eff Green (g_R), s 0.0 0.0 0.0 0.0 0.0 40.5 0.0 0.0 Prop RT Outside Lane (P_R) 0.00 0.04 0.00 0.51 0.00 1.00 0.00 0.18 Lane Grp Cap (c), veh/h 0 731 0 687 0 795 0 347 V/C Ratio (X)0.00 0.91 0.00 0.51 0.00 1.01 0.00 0.94 Avail Cap (c_a), veh/h 0 731 0 687 0 795 0 361 Upstream Filter (I)0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d1), s/veh 0.0 45.6 0.0 36.1 0.0 39.9 0.0 63.7 Incr Delay (d2), s/veh 0.0 17.3 0.0 0.7 0.0 33.6 0.0 31.4 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 62.9 0.0 36.7 0.0 73.5 0.0 95.1 1st-Term Q (Q1), veh/ln 0.0 27.7 0.0 11.8 0.0 35.0 0.0 14.2 2nd-Term Q (Q2), veh/ln 0.0 3.5 0.0 0.1 0.0 7.4 0.0 3.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 31.2 0.0 11.9 0.0 42.5 0.0 17.3 %ile Storage Ratio (RQ%)0.00 1.87 0.00 0.56 0.00 1.77 0.00 3.04 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 70.7 HCM 2010 LOS E Notes User approved pedestrian interval to be less than phase max green. 2.2.b Packet Pg. 122 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 55 555 760 370 1210 25 835 165 170 60 255 55 Future Volume (veh/h) 55 555 760 370 1210 25 835 165 170 60 255 55 Number 1 6 16 5 2 12 7 4 14 3 8 18 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1862 1900 1863 1863 1900 1937 1863 1900 Adj Flow Rate, veh/h 58 584 800 389 1274 26 879 174 179 63 268 58 Adj No. of Lanes 121120210110 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %222222222222 Cap, veh/h 129 926 795 408 1402 29 871 339 348 80 285 62 Arrive On Green 0.03 0.25 0.25 0.18 0.40 0.40 0.25 0.40 0.40 0.04 0.19 0.19 Sat Flow, veh/h 1774 3725 1583 1774 3546 72 3442 843 867 1845 1485 321 Grp Volume(v), veh/h 58 584 800 389 635 665 879 0 353 63 0 326 Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1769 1849 1721 0 1710 1845 0 1806 Q Serve(g_s), s 3.9 22.3 39.8 26.7 54.2 54.3 40.5 0.0 24.9 5.4 0.0 28.5 Cycle Q Clear(g_c), s 3.9 22.3 39.8 26.7 54.2 54.3 40.5 0.0 24.9 5.4 0.0 28.5 Prop In Lane 1.00 1.00 1.00 0.04 1.00 0.51 1.00 0.18 Lane Grp Cap(c), veh/h 129 926 795 408 700 731 871 0 687 80 0 347 V/C Ratio(X)0.45 0.63 1.01 0.95 0.91 0.91 1.01 0.00 0.51 0.78 0.00 0.94 Avail Cap(c_a), veh/h 185 926 795 426 700 731 871 0 687 110 0 361 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 46.0 53.6 39.9 40.6 45.6 45.6 59.7 0.0 36.1 75.8 0.0 63.7 Incr Delay (d2), s/veh 2.4 3.3 33.6 31.1 17.8 17.3 32.7 0.0 0.7 22.0 0.0 31.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 11.9 42.5 20.5 29.9 31.2 23.2 0.0 11.9 3.3 0.0 17.3 LnGrp Delay(d),s/veh 48.4 56.8 73.5 71.7 63.4 62.9 92.5 0.0 36.7 97.8 0.0 95.1 LnGrp LOS D E F E E E F D F F Approach Vol, veh/h 1442 1689 1232 389 Approach Delay, s/veh 65.7 65.1 76.5 95.6 Approach LOS E E E F Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 69.3 11.5 70.3 32.4 45.8 45.0 36.8 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green Setting (Gmax), s 10.5 57.0 9.5 63.0 30.5 37.0 40.5 32.0 Max Q Clear Time (g_c+I1), s 5.9 56.3 7.4 26.9 28.7 41.8 42.5 30.5 Green Ext Time (p_c), s 0.0 0.5 0.0 2.2 0.2 0.0 0.0 0.3 Intersection Summary HCM 2010 Ctrl Delay 70.7 HCM 2010 LOS E Notes 2.2.b Packet Pg. 123 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 5 User approved pedestrian interval to be less than phase max green. 2.2.b Packet Pg. 124 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 200: Access A & Courtland Drive 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 6 Intersection Int Delay, s/veh 2.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 30 15 1 30 30 2 Future Vol, veh/h 30 15 1 30 30 2 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 8 22222 Mvmt Flow 32 16 1 32 32 2 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 48 0 74 40 Stage 1 - - - - 40 - Stage 2 - - - - 34 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1559 - 930 1031 Stage 1 - - - - 982 - Stage 2 - - - - 988 - Platoon blocked, % - -- Mov Cap-1 Maneuver - - 1559 - 929 1031 Mov Cap-2 Maneuver - - - - 929 - Stage 1 - - - - 981 - Stage 2 - - - - 988 - Approach EB WB NB HCM Control Delay, s 0 0.2 9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)935 - - 1559 - HCM Lane V/C Ratio 0.036 - - 0.001 - HCM Control Delay (s) 9 - - 7.3 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - 2.2.b Packet Pg. 125 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 300: Private Driveway/Access B & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 7 Intersection Int Delay, s/veh 3.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 20 735 15 55 1575 35 10 1 35 5 1 30 Future Vol, veh/h 20 735 15 55 1575 35 10 1 35 5 1 30 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 22222222222 Mvmt Flow 21 774 16 58 1658 37 11 1 37 5 1 32 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1695 0 0 790 0 0 1770 2635 395 2223 2625 848 Stage 1 ------824824-1793 1793 - Stage 2 ------9461811 - 430 832 - Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 372 - - 826 - - 53 23 604 24 24 305 Stage 1 ------333385-83131- Stage 2 ------281129-574382- Platoon blocked, %- -- - Mov Cap-1 Maneuver 372 - - 826 - - - 0 604 - 0 305 Mov Cap-2 Maneuver -------0--0- Stage 1 ------299346-750- Stage 2 -------0-483343- Approach EB WB NB SB HCM Control Delay, s 1.1 4.6 HCM LOS -- Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)- 372 - - 826 - - - HCM Lane V/C Ratio - 0.057 - - 0.07 - - - HCM Control Delay (s) - 15.3 0.7 - 9.7 4.5 - - HCM Lane LOS - C A - A A - - HCM 95th %tile Q(veh) - 0.2 - - 0.2 - - - 2.2.b Packet Pg. 126 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 400: Ranchview Court & Access C 04/05/2019 Build (2019) Traffic Volumes 4:45 pm 03/07/2019 PM Peak Hour Synchro 10 Report Page 8 Intersection Int Delay, s/veh 3.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 15 20 35 10 1 Future Vol, veh/h 1 15 20 35 10 1 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22222 Mvmt Flow 1 16 21 37 11 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 91 12 12 0 - 0 Stage 1 12 ----- Stage 2 79 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 909 1069 1607 - - - Stage 1 1011 ----- Stage 2 944 ----- Platoon blocked, %- - - Mov Cap-1 Maneuver 897 1069 1607 - - - Mov Cap-2 Maneuver 897 ----- Stage 1 998 ----- Stage 2 944 ----- Approach EB NB SB HCM Control Delay, s 8.5 2.6 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1607 - 1056 - - HCM Lane V/C Ratio 0.013 - 0.016 - - HCM Control Delay (s) 7.3 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - 2.2.b Packet Pg. 127 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 1 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 60 565 615 180 520 20 475 95 180 55 105 Future Volume (veh/h) 5 60 565 615 180 520 20 475 95 180 55 105 Number 1 6 16 5 2 12 3 8 18 7 4 Initial Q, veh 00000000000 Ped-Bike Adj (A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1863 1900 1863 1863 1900 1937 1863 Adj Flow Rate, veh/h 63 595 647 189 547 21 500 100 189 58 111 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %22222222222 Opposing Right Turn Influence Yes Yes Yes Yes Cap, veh/h 496 1813 770 372 1830 70 327 116 219 76 164 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Prop Arrive On Green 0.03 0.49 0.49 0.07 0.53 0.53 0.09 0.20 0.20 0.04 0.15 Ln Grp Delay, s/veh 12.3 16.2 33.0 12.2 14.1 14.1 298.4 0.0 46.3 61.7 0.0 Ln Grp LOS B B C B B B F D E Approach Vol, veh/h 1305 757 789 232 Approach Delay, s/veh 24.3 13.6 206.0 48.0 Approach LOS C B F D Timer:12345678 Assigned Phs 12345678 Case No 1.1 4.0 2.0 4.0 1.1 3.0 2.0 4.0 Phs Duration (G+Y+Rc), s 6.7 58.6 14.0 20.7 10.6 54.7 8.6 26.1 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green (Gmax), s 10.5 23.0 9.5 37.0 10.5 23.0 13.5 33.0 Max Allow Headway (MAH), s 3.7 4.9 3.7 5.4 3.7 4.4 3.8 5.1 Max Q Clear (g_c+l1), s 3.8 10.9 11.5 11.4 7.0 37.5 5.1 18.7 Green Ext Time (g_e), s 0.0 2.4 0.0 1.0 0.2 0.0 0.1 1.3 Prob of Phs Call (p_c)0.83 1.00 1.00 1.00 0.99 1.00 0.80 1.00 Prob of Max Out (p_x)0.02 0.16 1.00 0.00 1.00 1.00 0.00 0.02 Left-Turn Movement Data Assigned Mvmt 1357 Mvmt Sat Flow, veh/h 1774 3442 1774 1845 Through Movement Data Assigned Mvmt 2468 Mvmt Sat Flow, veh/h 3476 1117 3725 578 Right-Turn Movement Data Assigned Mvmt 12 14 16 18 Mvmt Sat Flow, veh/h 133 634 1583 1092 Left Lane Group Data Assigned Mvmt 10305070 Lane Assignment (Pr/Pm) (Prot) (Pr/Pm) (Prot) 2.2.b Packet Pg. 128 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 2 Movement SBR Lane Configurations Traffic Volume (veh/h) 60 Future Volume (veh/h) 60 Number 14 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 63 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Cap, veh/h 93 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.15 Ln Grp Delay, s/veh 43.5 Ln Grp LOS D Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer: 2.2.b Packet Pg. 129 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 3 Lanes in Grp 10201010 Grp Vol (v), veh/h 63 0 500 0 189 0 58 0 Grp Sat Flow (s), veh/h/ln 1774 0 1721 0 1774 0 1845 0 Q Serve Time (g_s), s 1.8 0.0 9.5 0.0 5.0 0.0 3.1 0.0 Cycle Q Clear Time (g_c), s 1.8 0.0 9.5 0.0 5.0 0.0 3.1 0.0 Perm LT Sat Flow (s_l), veh/h/ln 840 0 0 0 446 0 0 0 Shared LT Sat Flow (s_sh), veh/h/ln 00000000 Perm LT Eff Green (g_p), s 48.7 0.0 0.0 0.0 50.7 0.0 0.0 0.0 Perm LT Serve Time (g_u), s 43.8 0.0 0.0 0.0 38.9 0.0 0.0 0.0 Perm LT Q Serve Time (g_ps), s 0.4 0.0 0.0 0.0 8.6 0.0 0.0 0.0 Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop LT Inside Lane (P_L)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Lane Grp Cap (c), veh/h 496 0 327 0 372 0 76 0 V/C Ratio (X)0.13 0.00 1.53 0.00 0.51 0.00 0.76 0.00 Avail Cap (c_a), veh/h 626 0 327 0 432 0 249 0 Upstream Filter (I)1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Uniform Delay (d1), s/veh 12.2 0.0 45.3 0.0 11.2 0.0 47.4 0.0 Incr Delay (d2), s/veh 0.1 0.0 253.1 0.0 1.1 0.0 14.3 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 12.3 0.0 298.4 0.0 12.2 0.0 61.7 0.0 1st-Term Q (Q1), veh/ln 0.9 0.0 4.5 0.0 2.4 0.0 1.6 0.0 2nd-Term Q (Q2), veh/ln 0.0 0.0 11.5 0.0 0.1 0.0 0.3 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 %ile Back of Q (50%), veh/ln 0.9 0.0 16.0 0.0 2.5 0.0 1.9 0.0 %ile Storage Ratio (RQ%)0.10 0.00 0.92 0.00 0.29 0.00 0.30 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 43.3 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 Middle Lane Group Data Assigned Mvmt 02040608 Lane Assignment T T Lanes in Grp 01000200 Grp Vol (v), veh/h 0 278 0 0 0 595 0 0 Grp Sat Flow (s), veh/h/ln 0 1770 0 0 0 1863 0 0 Q Serve Time (g_s), s 0.0 8.8 0.0 0.0 0.0 9.8 0.0 0.0 Cycle Q Clear Time (g_c), s 0.0 8.8 0.0 0.0 0.0 9.8 0.0 0.0 Lane Grp Cap (c), veh/h 0 932 0 0 0 1813 0 0 V/C Ratio (X)0.00 0.30 0.00 0.00 0.00 0.33 0.00 0.00 Avail Cap (c_a), veh/h 0 932 0 0 0 1813 0 0 Upstream Filter (I)0.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d1), s/veh 0.0 13.3 0.0 0.0 0.0 15.7 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.8 0.0 0.0 0.0 0.5 0.0 0.0 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 14.1 0.0 0.0 0.0 16.2 0.0 0.0 1st-Term Q (Q1), veh/ln 0.0 4.3 0.0 0.0 0.0 5.0 0.0 0.0 2.2.b Packet Pg. 130 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Capacity Analysis 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 4 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 4.5 0.0 0.0 0.0 5.1 0.0 0.0 %ile Storage Ratio (RQ%)0.00 0.27 0.00 0.00 0.00 0.21 0.00 0.00 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Right Lane Group Data Assigned Mvmt 0 12 0 14 0 16 0 18 Lane Assignment T+R T+R R T+R Lanes in Grp 01010101 Grp Vol (v), veh/h 0 290 0 174 0 647 0 289 Grp Sat Flow (s), veh/h/ln 0 1839 0 1751 0 1583 0 1670 Q Serve Time (g_s), s 0.0 8.9 0.0 9.4 0.0 35.5 0.0 16.7 Cycle Q Clear Time (g_c), s 0.0 8.9 0.0 9.4 0.0 35.5 0.0 16.7 Prot RT Sat Flow (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prot RT Eff Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Prop RT Outside Lane (P_R) 0.00 0.07 0.00 0.36 0.00 1.00 0.00 0.65 Lane Grp Cap (c), veh/h 0 968 0 257 0 770 0 335 V/C Ratio (X)0.00 0.30 0.00 0.68 0.00 0.84 0.00 0.86 Avail Cap (c_a), veh/h 0 968 0 648 0 770 0 551 Upstream Filter (I)0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d1), s/veh 0.0 13.3 0.0 40.4 0.0 22.3 0.0 38.6 Incr Delay (d2), s/veh 0.0 0.8 0.0 3.1 0.0 10.7 0.0 7.6 Initial Q Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay (d), s/veh 0.0 14.1 0.0 43.5 0.0 33.0 0.0 46.3 1st-Term Q (Q1), veh/ln 0.0 4.5 0.0 4.5 0.0 15.3 0.0 7.7 2nd-Term Q (Q2), veh/ln 0.0 0.2 0.0 0.2 0.0 2.3 0.0 0.7 3rd-Term Q (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back of Q Factor (f_B%) 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 %ile Back of Q (50%), veh/ln 0.0 4.7 0.0 4.8 0.0 17.6 0.0 8.4 %ile Storage Ratio (RQ%)0.00 0.28 0.00 0.84 0.00 0.73 0.00 0.40 Initial Q (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Final (Residual) Q (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Q (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sat Cap (cs), veh/h 00000000 Initial Q Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Intersection Summary HCM 2010 Ctrl Delay 70.0 HCM 2010 LOS E Notes User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 131 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 5 Movement EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (veh/h) 5 60 565 615 180 520 20 475 95 180 55 105 Future Volume (veh/h) 5 60 565 615 180 520 20 475 95 180 55 105 Number 1 6 16 5 2 12 3 8 18 7 4 Initial Q (Qb), veh 00000000000 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1961 1863 1863 1863 1900 1863 1863 1900 1937 1863 Adj Flow Rate, veh/h 63 595 647 189 547 21 500 100 189 58 111 Adj No. of Lanes 12112021011 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %22222222222 Cap, veh/h 496 1813 770 372 1830 70 327 116 219 76 164 Arrive On Green 0.03 0.49 0.49 0.07 0.53 0.53 0.09 0.20 0.20 0.04 0.15 Sat Flow, veh/h 1774 3725 1583 1774 3476 133 3442 578 1092 1845 1117 Grp Volume(v), veh/h 63 595 647 189 278 290 500 0 289 58 0 Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1770 1839 1721 0 1670 1845 0 Q Serve(g_s), s 1.8 9.8 35.5 5.0 8.8 8.9 9.5 0.0 16.7 3.1 0.0 Cycle Q Clear(g_c), s 1.8 9.8 35.5 5.0 8.8 8.9 9.5 0.0 16.7 3.1 0.0 Prop In Lane 1.00 1.00 1.00 0.07 1.00 0.65 1.00 Lane Grp Cap(c), veh/h 496 1813 770 372 932 968 327 0 335 76 0 V/C Ratio(X)0.13 0.33 0.84 0.51 0.30 0.30 1.53 0.00 0.86 0.76 0.00 Avail Cap(c_a), veh/h 626 1813 770 432 932 968 327 0 551 249 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 12.2 15.7 22.3 11.2 13.3 13.3 45.3 0.0 38.6 47.4 0.0 Incr Delay (d2), s/veh 0.1 0.5 10.7 1.1 0.8 0.8 253.1 0.0 7.6 14.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 5.1 17.6 2.5 4.5 4.7 16.0 0.0 8.4 1.9 0.0 LnGrp Delay(d),s/veh 12.3 16.2 33.0 12.2 14.1 14.1 298.4 0.0 46.3 61.7 0.0 LnGrp LOS B B C B B B F D E Approach Vol, veh/h 1305 757 789 232 Approach Delay, s/veh 24.3 13.6 206.0 48.0 Approach LOS C B F D Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 6.7 58.6 14.0 20.7 10.6 54.7 8.6 26.1 Change Period (Y+Rc), s 3.5 6.0 4.5 6.0 3.5 6.0 4.5 6.0 Max Green Setting (Gmax), s 10.5 23.0 9.5 37.0 10.5 23.0 13.5 33.0 Max Q Clear Time (g_c+I1), s 3.8 10.9 11.5 11.4 7.0 37.5 5.1 18.7 Green Ext Time (p_c), s 0.0 2.4 0.0 1.0 0.2 0.0 0.1 1.3 Intersection Summary HCM 2010 Ctrl Delay 70.0 HCM 2010 LOS E Notes 2.2.b Packet Pg. 132 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 6 Movement SBR Lane Configurations Traffic Volume (veh/h) 60 Future Volume (veh/h) 60 Number 14 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Adj Sat Flow, veh/h/ln 1900 Adj Flow Rate, veh/h 63 Adj No. of Lanes 0 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 93 Arrive On Green 0.15 Sat Flow, veh/h 634 Grp Volume(v), veh/h 174 Grp Sat Flow(s),veh/h/ln 1751 Q Serve(g_s), s 9.4 Cycle Q Clear(g_c), s 9.4 Prop In Lane 0.36 Lane Grp Cap(c), veh/h 257 V/C Ratio(X)0.68 Avail Cap(c_a), veh/h 648 HCM Platoon Ratio 1.00 Upstream Filter(I)1.00 Uniform Delay (d), s/veh 40.4 Incr Delay (d2), s/veh 3.1 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(50%),veh/ln 4.8 LnGrp Delay(d),s/veh 43.5 LnGrp LOS D Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer 2.2.b Packet Pg. 133 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 Signalized Intersection Summary 100: Arlington Heights Road & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 7 User approved pedestrian interval to be less than phase max green. User approved ignoring U-Turning movement. 2.2.b Packet Pg. 134 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 200: Access A & Courtland Drive 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 8 Intersection Int Delay, s/veh 3.8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 15 5 1 15 25 1 Future Vol, veh/h 15 5 1 15 25 1 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22622 Mvmt Flow 16 5 1 16 26 1 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 21 0 37 19 Stage 1 - - - - 19 - Stage 2 - - - - 18 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1595 - 975 1059 Stage 1 - - - - 1004 - Stage 2 - - - - 1005 - Platoon blocked, % - -- Mov Cap-1 Maneuver - - 1595 - 974 1059 Mov Cap-2 Maneuver - - - - 974 - Stage 1 - - - - 1003 - Stage 2 - - - - 1005 - Approach EB WB NB HCM Control Delay, s 0 0.5 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)977 - - 1595 - HCM Lane V/C Ratio 0.028 - - 0.001 - HCM Control Delay (s) 8.8 - - 7.3 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - 2.2.b Packet Pg. 135 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 300: Private Driveway/Access B & McHenry Road 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 9 Intersection Int Delay, s/veh 2.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 35 775 5 35 675 45 10 1 20 30 1 55 Future Vol, veh/h 35 775 5 35 675 45 10 1 20 30 1 55 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 22222222222 Mvmt Flow 37 816 5 37 711 47 11 1 21 32 1 58 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 758 0 0 821 0 0 1323 1725 411 1292 1704 379 Stage 1 ------893893-809809- Stage 2 ------430832-483895- Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 849 - - 804 - - 114 88 590 120 91 619 Stage 1 ------303358-340392- Stage 2 ------574382-534357- Platoon blocked, %- -- - Mov Cap-1 Maneuver 849 - - 804 - - 90 74 590 101 77 619 Mov Cap-2 Maneuver ------9074-10177- Stage 1 ------279329-313361- Stage 2 ------477351-472328- Approach EB WB NB SB HCM Control Delay, s 0.7 0.8 27 33.2 HCM LOS D D Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)196 849 - - 804 - - 216 HCM Lane V/C Ratio 0.166 0.043 - - 0.046 - - 0.419 HCM Control Delay (s) 27 9.4 0.3 - 9.7 0.4 - 33.2 HCM Lane LOS D A A - A A - D HCM 95th %tile Q(veh) 0.6 0.1 - - 0.1 - - 1.9 2.2.b Packet Pg. 136 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) HCM 2010 TWSC 400: Ranchview Court & Access C 04/05/2019 Build (2019) Traffic Volumes 11:00 am 03/07/2019 PM Peak Hour Synchro 10 Report Page 10 Intersection Int Delay, s/veh 3.2 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 15 15 25 20 1 Future Vol, veh/h 1 15 15 25 20 1 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 22222 Mvmt Flow 1 16 16 26 21 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 80 22 22 0 - 0 Stage 1 22 ----- Stage 2 58 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 922 1055 1593 - - - Stage 1 1001 ----- Stage 2 965 ----- Platoon blocked, %- - - Mov Cap-1 Maneuver 913 1055 1593 - - - Mov Cap-2 Maneuver 913 ----- Stage 1 991 ----- Stage 2 965 ----- Approach EB NB SB HCM Control Delay, s 8.5 2.7 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1593 - 1045 - - HCM Lane V/C Ratio 0.01 - 0.016 - - HCM Control Delay (s) 7.3 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - 2.2.b Packet Pg. 137 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Inbound Outbound Inbound Outbound EXISTING: ACCESS DRIVEWAYS ALIGNED ON OPPOSITE SIDES OF McHENRY ROAD SUGGESTED MODIFICATION: RELOCATE SPOERLEIN COMMONS ACCESS DRIVEWAY WEST Potential vehicle conflict LE F T ON L Y LE F T ON L Y LE F T ON L Y LE F T ON L Y McHENRY ROAD DRIVEWAY SPACING EXHIBIT N 2.2.b Packet Pg. 138 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) March 26, 2020 Update: June 19, 2020 File: 271-121-16 Preliminary Storm Water Management Report For Proposed Dunkin Drive-Thru Spoerlein Commons 1151 McHenry Road Buffalo Grove (Lake County), Il Description of Proposed Development (Refer also to the Preliminary Engineering Plans and Drainage Exhibit): Spoerlein Commons is an existing office and retail development located to the north of McHenry Road (Illinois State Route 83) and easterly of Arlington Heights Road . An existing Bucky’s Express Convenience Store and Fuel Sales Center is located immediately to the west of Spoerlein Commons, between the Spoerlein Commons parcel and Arlington Heights Rd. The proposed new drive-thru facility is a stand-alone/outbuilding located at the southwest portion of the existing Spoerlein Commons. The previously approved plan for Spoerlein Commons included additional out buildings, in the general vicinity of the currently proposed drive -thru, which to date have not been built. An existing stormwater detention system is located at the southwest corner of the subject parcel, adjacent to the Bucky’s Express. This existing detention basin is part of an overall stormwater management system for both the Spoerlein Commons and Bucky’s Express parcels. The proposed Spoerlein Commons development includes two drainage areas. The southern area drains to the existing detention basin at the southwest corner of the Spoerlein Commons parcel. The north portion of the proposed development area drains to a separate existing detention basin/stormwater management system located at the southeast corner of the overall Spoerlein Commons parcel. Per a Bucky’s Express Storm Water Memorandum, with a latest date of October 25, 2012, with the combined surface and underground storage provided by the Bucky’s Express site and the existing Spoerlein Commons basin, 0.545 acre-feet of storage is provided. This includes 0.182 acre-feet of detention storage volume provided within the existing basin located primarily on the Spoerlein Commons parcel. For the design of this overall stormwater management system, a tributary area of 0.69 acres with a composite runoff coefficient (“C”) of 0.90 (approximately 90% impervious), and an allocated release rate of 0.311 cfs, the associated detention volume requirement used for the tributary portion of Spoerlein Commons was 0.188 acre-feet. The design for this overall stormwater management system used a 713.90 high water elevation controlled by a stand pipe within the Bucky’sExpress site. Engineering, LLC Civil Engineering Real Estate Consulting Project Management 975 E. 22nd Street, Suite 400, Wheaton IL 60189 630.480.7889 www.rwg-engineering.com 2.2.b Packet Pg. 139 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 975 E. 22nd Street, Suite 400, Wheaton IL 60189 (630)480-7889 www.rwg-engineering.com As shown on the attached Drainage Exhibit, as well as the Detention Calculations and Table A -summary of storage provided in the existing basin at the southwest corner of the site, 0.81 acres , with a composite “C” value of 0.77, is tributary to the Spoerlein Commons basin, which results is a detention storage volume requirement of 0.187 acre-feet, or slightly less than the 0.188 acre feet required for the Spoerlein Commons parcel as indicated in the above referenced Bucky’s Express Storm Water Memorandum. In regards to storage provided, based on a recent topographic survey of the Spoerlein Commons parcel, including the existing Spoerlein Commons detention basin, the existing storage with the basin at the 713.9 high water elevation is approximately 0.208 acre-feet (which is greater than the 0.182 acre-feet of storage allocated to the basin per the Bucky’s Express Memorandum). It is noted, the topographic survey reflected a stormwater overflow from the Spoerlein Commons basin at an elevation of 714.66+/-. Therefore, an existing basin high water level (HWL) of 714.7 was also reviewed, which provides 0.280 acre-feet of storage. With the proposed Dunkin Drive-Thru, the area tributary to the existing Spoerlein Commons basin is approximately 0.78 acres, with a composite “C” of 0.83, which results in a required storage volume of 0.198 acre-feet. Proposed site modifications slightly increase the storage provided within the Spoerlein Commons basin to approximately 0.214 acre-feet at the 713.9 elevation, and 0.291 acre-feet at the 714.7 elevation. For reference, a Table B is attached which provides a summary of the various conditions associated with the existing basin at the southwest corner of Spoerlein Commons. The north drainage area, which drains to an existing basin at the southeast corner of the overall Spoerlein Commons parcel, has an existing drainage area of approximately 0.50 acres, with a composite “C” value of 0.87 (see attached Calculation of Composite Run-Off Coefficients). The previously approved plan for Spoerlein Commons included a future building within this north drainage area which would increase the impervious area by approximately 1750 sq ft, resulting in an increased composite “C” of 0.90. The proposed condition for the north drainage area reflects a tributary area of approximately 0.52 acres, with a “C” value of 0.88. Comparing the CxA value for the north drainage area existing condition (with the future building included) to the proposed condition indicates the following: • Existing condition with future building – 0.50 x .90 = 0.450 • Proposed condition -------------------------0.52 x .88 = 0.458 Therefore, storm water runoff from the north drainage area in the proposed condition would be very comparable to the existing condition with the additional buildings included with the previously approved Spoerlein Commons plan. Review of Stormwater Ordinance: Per the Village of Buffalo Grove Municipal Code, detention and stormwater management are to be in accordance with the Lake County Watershed Development Ordinance (WDO) for parcels in Lake County. Per the Site Data Table with the Site Geometric and Paving Plan, the project site area as outlined is approximately 1.19 ac and the increase in impervious area with the proposed conditions is 5,042 sq ft (0.12 Ac+/-), which does not reflect the 4,481 sq ft of future building area included in the previously approved plan for Spoerlein Commons. (If the 4,481 sq ft of future building area is reflected in the impervious area comparison, the increase in impervious area would be reduced to approximately 561 sq ft.) It is noted the existing Spoerlein Commons area was constructed in the mid to late 1980’s – prior to the 10/18/92 effective date of the WDO. Therefeore, the “new impervious” area per the WDO would be the above referenced 5,042 sq ft. The 2.2.b Packet Pg. 140 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 975 E. 22nd Street, Suite 400, Wheaton IL 60189 (630)480-7889 www.rwg-engineering.com proposed “development area” (and “hydrologically disturbed” area) is reflected on the attached Drainage Exhibit and includes approximately 0.96 acres. With a hydrologically disturbed area of 0.96 +/- acres (less than 3 acres) and new impervious surface of 0.12 acres+/- (less than 0.5 acres), a Watershed Development Permit as outlined in the WDO is not required. Also, with a hydrologically disturbed area less than one (1) acre and the proposed new impervious surface less than one-half (0.5) acre, the Runoff Volume Reduction (RVR) Quantitative Standard of the WDO is not applicable. With the 5,042 sq ft of new impervious area and a hydrologically disturbed area greater than 5,000 sq feet, a soils erosion and sediment control plan in accordance with the WDO will be provided in conjunction with the Final Engineering Plans and associated approvals. The WDO also indicates “redevelopment of previously developed sites shall maintain existing storage volume and shall not increase the rate of runoff from the site”. With the proposed Dunkin Drive-Thru, there is no change to the release rate and associated control system for the existing stormwater basins and the existing storage volumes are maintained. For the existing basin at the southwest corner of Spoerlein Commons the storage volume is actually increased as discussed above. 2.2.b Packet Pg. 141 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) CALCULATION OF COMPOSITE RUN-OFF COEFFICIENTS Designer:PDL Description:SPOERLEIN COMMONS - DUNKIN TOTAL PROJECT AREA (FROM SITE DATA SUMMARY)1.19 Ac. DEVELOPED RUNOFF COEFFICIENTS AREA NO. 1 (NORTH) EXISTING Area (Ac)%"C" Wt. Avg. Impervious Area 17,602 S.F.0.404 81.0 0.95 0.770 Pervious Area 4,126 S.F.0.095 19.0 0.50 0.095 Total 0.499 100.00 0.865 COMPOSITE "C" (USE) =0.87 EXISTING (INCLUDING 1750+/- S.F. FOR FUTURE BUILDING) Area (Ac)%"C" Wt. Avg. Impervious Area 19,352 S.F.0.444 89.1 0.95 0.846 Pervious Area 2,376 S.F.0.055 10.9 0.50 0.055 Total 0.499 100.00 0.901 COMPOSITE "C" (USE) =0.90 PROPOSED Area (Ac)%"C" Wt. Avg. Impervious Area 19,187 S.F.0.440 84.2 0.95 0.800 Pervious Area 3,604 S.F.0.083 15.8 0.50 0.079 Total 0.523 100.00 0.879 COMPOSITE "C" (USE) =0.88 AREA NO. 2 (SOUTH) EXISTING Area (Ac)%"C" Wt. Avg. Impervious Area 21,435 S.F.0.492 60.9 0.95 0.579 Pervious Area 13,753 S.F.0.316 39.1 0.50 0.195 Total 0.808 100.00 0.774 COMPOSITE "C" (USE) =0.77 PROPOSED Area (Ac)%"C" Wt. Avg. Impervious Area 25,183 S.F.0.578 73.8 0.95 0.701 Pervious Area 8,943 S.F.0.205 26.2 0.50 0.131 Total 0.783 100.00 0.832 COMPOSITE "C" (USE) =0.83 NOTE: THE AREA 2 IMPERVIOUS AREA INCLUDES 5,079 S.F. OF EXISTING BUILDING AREA FOR BOTH THE EXISTING AND PROPOSED CONDITION ] 2.2.b Packet Pg. 142 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) RWG ENGINEERING, LLC. 975 E. 22nd Street Wheaton, IL 60189 (630) 774-9501 Detention Calculator Modified Rational Method TELEPHONE (630) 774-9501 DESCRIPTION Spoerlein Commons - Update to Bucky's Aug 2012 Basin Calculation- Technical Bulletin 70 (7.58 in. - 100 Year Rainfall) STORAGE VOLUME WITH EXISTING SITE TRIBUTARY AREA DURATION TIME 100 YR. INT INFLOW RATE STORED RATE VOLUME Area of site in acres:0.81 (HOURS)(MIN)(IN/HR)(CFS)(CFS)(ACRE-FT)Trapped water area in acres:0.00 0.50 30 5.60 3.49 3.18 0.13 Net area for release computation in acres:0.00 0.67 40 4.92 3.07 2.76 0.15 Design release rate in CFS:0.31 0.83 50 4.24 2.64 2.33 0.16 Unrestricted release rate in CFS:0.00 1.00 60 3.56 2.22 1.91 0.16 Bypass release rate in CFS:0.00 1.50 90 2.90 1.81 1.50 0.19 <===Total design release in CFS:0.31 2.00 120 2.24 1.40 1.09 0.18 Developed runoff coefficient:0.77 3.00 180 1.62 1.01 0.70 0.18 4.00 240 1.40 0.87 0.56 0.19 5.00 300 1.17 0.73 0.42 0.18 Maximum volume in Acre-Ft =0.187 6.00 360 0.95 0.59 0.28 0.14 7.00 420 0.88 0.55 0.24 0.14 8.00 480 0.82 0.51 0.20 0.13 9.00 540 0.75 0.47 0.16 0.12 10.00 600 0.68 0.43 0.12 0.10 11.00 660 0.62 0.38 0.07 0.07 12.00 720 0.55 0.34 0.03 0.03 13.00 780 0.52 0.33 0.02 0.02 14.00 840 0.50 0.31 0.00 0.00 15.00 900 0.47 0.29 -0.02 -0.02 16.00 960 0.44 0.28 -0.03 -0.04 17.00 1020 0.42 0.26 -0.05 -0.07 18.00 1080 0.39 0.24 -0.07 -0.10 19.00 1140 0.38 0.24 -0.07 -0.12 20.00 1200 0.37 0.23 -0.08 -0.14 21.00 1260 0.36 0.22 -0.09 -0.16 22.00 1320 0.34 0.21 -0.10 -0.18 23.00 1380 0.33 0.21 -0.10 -0.20 24.00 1440 0.32 0.20 -0.11 -0.22 % of site "C" Factor Composite "C" Open Water Area 0.00 1.00 0.00 Impervious Area 60.90 0.95 0.58 Pervious Area 39.10 0.50 0.20 Total :100.00 0.77 6/24/2020 12:07 PM File:2020-03-25_Det Storage Review-Exist_271 Sheet:Fixed Known Release Rate Page 1 of 1 2.2.b Packet Pg. 143 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) RWG ENGINEERING, LLC. 975 E. 22nd Street Wheaton, IL 60189 (630) 774-9501 Detention Calculator Modified Rational Method TELEPHONE (630) 774-9501 DESCRIPTION Spoerlein Commons - Update to Bucky's Aug 2012 Basin Calculation- Technical Bulletin 70 (7.58 in. - 100 Year Rainfall) STORAGE VOLUME WITH PROPOSED SITE TRIBUTARY AREA DURATION TIME 100 YR. INT INFLOW RATE STORED RATE VOLUME Area of site in acres:0.78 (HOURS)(MIN)(IN/HR)(CFS)(CFS)(ACRE-FT)Trapped water area in acres:0.00 0.50 30 5.60 3.63 3.32 0.14 Net area for release computation in acres:0.00 0.67 40 4.92 3.19 2.88 0.16 Design release rate in CFS:0.31 0.83 50 4.24 2.74 2.43 0.17 Unrestricted release rate in CFS:0.00 1.00 60 3.56 2.30 1.99 0.17 Bypass release rate in CFS:0.00 1.50 90 2.90 1.88 1.57 0.20 Total design release in CFS:0.31 2.00 120 2.24 1.45 1.14 0.19 Developed runoff coefficient:0.83 3.00 180 1.62 1.05 0.74 0.18 4.00 240 1.40 0.90 0.59 0.20 <=== 5.00 300 1.17 0.76 0.45 0.19 Maximum volume in Acre-Ft =0.198 6.00 360 0.95 0.62 0.31 0.15 7.00 420 0.88 0.57 0.26 0.15 8.00 480 0.82 0.53 0.22 0.15 9.00 540 0.75 0.49 0.18 0.13 10.00 600 0.68 0.44 0.13 0.11 11.00 660 0.62 0.40 0.09 0.08 12.00 720 0.55 0.36 0.05 0.05 13.00 780 0.52 0.34 0.03 0.03 14.00 840 0.50 0.32 0.01 0.01 15.00 900 0.47 0.30 -0.01 -0.01 16.00 960 0.44 0.29 -0.02 -0.03 17.00 1020 0.42 0.27 -0.04 -0.06 18.00 1080 0.39 0.25 -0.06 -0.09 19.00 1140 0.38 0.24 -0.07 -0.10 20.00 1200 0.37 0.24 -0.07 -0.12 21.00 1260 0.36 0.23 -0.08 -0.14 22.00 1320 0.34 0.22 -0.09 -0.16 23.00 1380 0.33 0.21 -0.10 -0.18 24.00 1440 0.32 0.21 -0.10 -0.21 % of site "C" Factor Composite "C" Open Water Area 0.00 1.00 0.00 Impervious Area 73.80 0.95 0.70 Pervious Area 26.20 0.50 0.13 Total :100.00 0.83 6/24/2020 12:08 PM File:2020-03-25_Det Storage Review-Proposed_271 Sheet:Fixed Known Release Rate Page 1 of 1 2.2.b Packet Pg. 144 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Date: 03-24-2020 Project No. 271-121-16 Designer: PDL Description: Dunkin-Spoerlein Commons, Buffalo Grove, IL EXISTING CONDITIONS INCREM'T TOTAL CONTOUR AREA AVERAGE INCREMENT VOLUME VOLUME 709.1 0 S.F. 606.5 S.F.0.9 FT. 546 C.F.546 C.F. 710.0 1,213 S.F. 1,487.5 S.F.1.0 FT. 1,488 C.F.2,033 C.F. 711.0 1,762 S.F 1,967.0 S.F.1.0 FT. 1,967 C.F.4,000 C.F. 712.0 2,172 S.F. 2,401.0 S.F.1.0 FT. 2,401 C.F.6,401 C.F. 713.0 2,630 S.F. 2,973.5 S.F.0.9 FT. 2,676 C.F.9,078 C.F. 714.0 3,317 S.F. TOTAL STORAGE @ 713.9 HWL--9,078 C.F.0.208 Ac-Ft PROPOSED CONDITIONS INCREM'T TOTAL CONTOUR AREA AVERAGE INCREMENT VOLUME VOLUME 709.1 0 S.F. 606.5 S.F.0.9 FT. 546 C.F.546 C.F. 710.0 1,213 S.F. 1,487.5 S.F.1.0 FT. 1,488 C.F.2,033 C.F. 711.0 1,762 S.F 1,967.0 S.F.1.0 FT. 1,967 C.F.4,000 C.F. 712.0 2,172 S.F. 2,413.0 S.F.1.0 FT. 2,413 C.F.6,413 C.F. 713.0 2,654 S.F. 3,211.5 S.F.0.9 FT. 2,890 C.F.9,304 C.F. 714.0 3,769 S.F. TOTAL STORAGE @ 713.9 HWL--9,304 C.F.0.214 Ac-Ft TABLE A STORAGE IN EXISTING BASIN AT SOUTHWEST CORNER OF SITE 2.2.b Packet Pg. 145 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Date: 03-24-2020 Project No. 271-121-16 Designer: PDL Description: Dunkin-Spoerlein Commons, Buffalo Grove, IL EXISTING CONDITIONS INCREM'T TOTAL CONTOUR AREA AVERAGE INCREMENT VOLUME VOLUME 709.1 0 S.F. 606.5 S.F.0.9 FT. 546 C.F.546 C.F. 710.0 1,213 S.F. 1,487.5 S.F.1.0 FT. 1,488 C.F.2,033 C.F. 711.0 1,762 S.F 1,967.0 S.F.1.0 FT. 1,967 C.F.4,000 C.F. 712.0 2,172 S.F. 2,401.0 S.F.1.0 FT. 2,401 C.F.6,401 C.F. 713.0 2,630 S.F. 2,973.5 S.F.1.0 FT. 2,974 C.F.9,375 C.F. 714.0 3,317 S.F. 4,013.5 S.F.0.7 FT. 2,809 C.F.12,184 C.F. 714.7 4,710 S.F. 4,918.5 S.F.0.3 FT. 1,476 C.F.13,660 C.F. 715.0 5,127 S.F. TOTAL STORAGE @ 714.7 HWL -12,184 C.F.0.280 Ac-Ft PROPOSED CONDITIONS INCREM'T TOTAL CONTOUR AREA AVERAGE INCREMENT VOLUME VOLUME 709.1 0 S.F. 606.5 S.F.0.9 FT. 546 C.F.546 C.F. 710.0 1,213 S.F. 1,487.5 S.F.1.0 FT. 1,488 C.F.2,033 C.F. 711.0 1,762 S.F 1,967.0 S.F.1.0 FT. 1,967 C.F.4,000 C.F. 712.0 2,172 S.F. 2,413.0 S.F.1.0 FT. 2,413 C.F.6,413 C.F. 713.0 2,654 S.F. 3,211.5 S.F.1.0 FT. 3,212 C.F.9,625 C.F. 714.0 3,769 S.F. 4,336.5 S.F.0.7 FT. 3,036 C.F.12,660 C.F. 714.7 4,904 S.F. 5,025.0 S.F.0.3 FT. 1,508 C.F.14,168 C.F. 715.0 5,146 S.F. TOTAL STORAGE @ 714.7 HWL -12,660 C.F.0.291 Ac-Ft TABLE A STORAGE IN EXISTING BASIN AT SOUTHWEST CORNER OF SITE 2.2.b Packet Pg. 146 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) Date: 03-24-2020 Project No. 271-121-16 Update: 06-19-2020 Designer: PDL Description: Dunkin-Spoerlein Commons, Buffalo Grove, IL Per Bucky's Memo Existing Spoerlein Proposed Spoerlein 1 0.69 Ac 0.81 Ac 0.78 Ac 2 0.90 0.77 0.83 3 0.188 Ac-Ft 0.187 Ac-Ft 0.198 Ac-Ft 4 0.182 Ac-Ft 0.208 Ac-Ft 0.214 Ac-Ft 5 N/A 0.280 Ac-Ft 0.291 Ac-Ft NOTES: 1 corner of the Spoerlein Comons parcel, as outlined in the Bucky's Express Storm Water Memorandum, with a latest date of October 25 2012 2 3 TABLE B SUMMARY FOR EXISTING BASIN AT SOUTHWEST CORNER OF SITE Tributary Area to Basin and Table A - Storage in Existing Basin Composite "C" Value Description "Existing Spoerlein" - refers to the existing Spoerlein Commons site conditions, as reflected on the attached Existing & Proposed Drainage Exhibit, Calculation of Composite Run-Off Coefficients, Detention Calculations, and Table A - Storage in Existing Basin "Proposed Spoerlein" - refers to the proposed Spoerlein Commons site conditions, as reflected on the attached Existing & Proposed Drainage Exhibit, Calculation of Composite Run-Off Coefficients, Detention Calculations, Detention Storage Required Detention Storage Provided @ 713.9 HWL Detention Storage Provided @ 714.7 HWL "Per Bucky's Memo" - refers to criteria for the Spoerlein Commons stormwater detention basis at the southwest 2.2.b Packet Pg. 147 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) No. 1 A=0.52 ac. No. 2 A=0.78 ac. No. 2 A=0.81 ac. No. 1 A=0.50 ac. SP O E R L E I N C O M M O N S - P R O P O S E D D R I V E T H R U BU F F A L O G R O V E , I L L I N O I S 1 1 EX I S T I N G & P R O P O S E D D R A I N A G E E X H I B I T En g i n e e r i n g , L L C Ci v i l E n g i n e e r i n g R e a l E s t a t e C o n s u l t i n g P r o j e c t M a n a g e m e n t 97 5 E . 2 2 n d S t , S u i t e 4 0 0 Wh e a t o n , I L 6 0 1 8 9 63 0 . 4 8 0 . 7 8 8 9 ww w . r w g - e n g i n e e r i n g . c o m PROPOSED DRAINAGE PLANEXISTING DRAINAGE PLAN LEGEND 2.2.b Packet Pg. 148 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 149 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 150 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 151 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 152 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 153 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 154 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 155 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 156 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 157 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 158 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 159 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 160 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 161 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 162 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 163 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 164 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 165 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 166 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 167 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 168 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 169 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 170 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 171 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 172 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 173 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 2.2.b Packet Pg. 174 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 11/7/2018 MINUTES OF THE REGULAR MEETING OF THE PLANNING AND ZONING COMMISSION OF THE VILLAGE OF BUFFALO GROVE HELD IN THE COUNCIL CHAMBERS, 50 RAUPP BOULEVARD, BUFFALO GROVE, ILLINOIS ON WEDNESDAY, NOVEMBER 7, 2018 Call to Order The meeting was called to order at 7:30 PM by Chairman Frank Cesario Public Hearings/Items For Consideration Regular Meeting Other Matters for Discussion 1. Workshop- Proposed Amendment to the Spoerlein Commons Planned Development (Trustee Stein) (Staff Contact: Chris Stilling) Daniel Kovacevic, Whitestone Reit, 20789 N. Pima Road, Scottsdale, AZ 85255; Rick Burton, Whitestone Reit, 20789 N. Pima Road, Scottsdale, AZ 85255; Rory Fancler, Kimley Horn, 1001 Warrenville Road, Lisle, IL 60532; and Paul Leder, RWG Engineering, 975 E. 22nd Street, Wheaton, IL 60189, were present and sworn in. Mr. Stilling provided a brief overview of the site history and request. The existing development consists of approximately 41,000 square feet of commercial and office space in multiple buildings. The original development was approved with a second phase allowing for an additional 2,000 square feet of retail space. The second phase was never constructed and the current owner is seeking an amendment to the original Ordinance to allow for the construction of a 2,800 square foot outbuilding with drive-thru (Dunkin Donuts). This item was reviewed by the Village Board on October 15, 2018 and was referred to the Planning & Zoning Commission (PZC) for review and public hearing. As a result of the amendment and prior to the required public hearing, the owner is seeking comments from the PZC. Mr. Kovacevic reviewed the concept plan. The existing Spoerlein Commons development was approved by the Village via Ordinance 83-8. The approved development included a total of 51,050 square feet of office and retail space. The original development plan was not completed as approved and as a result, 41,180 square feet of retail and office space was constructed. The development was approved for two additional outbuildings (2,000 square feet), which were never constructed. The Petitioner is seeking an amendment to the development to allow for the construction of a new 2,800 square foot Dunkin Donuts outbuilding with drive- through. Dunkin Donuts is currently located in the corner unit of the existing retail building and is looking to expand their services by including a drive-thru. To accommodate the new building, parking would be relocated to the open area originally identified for the 2 outbuildings. The existing access points at Route 83 and access to Courtyard Drive to the west would remain unchanged. As part of the Village Board referral, the Trustees commented on the potential of relocating 2.2.b Packet Pg. 175 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 11/7/2018 the access drive along Route 83 further to the west to align with the relocated drive aisle. The existing condition was cited as a concern since it is a difficult turn as you come into the center. The Petitioner would be making improvements to the existing detention pond to accommodate the proposed development. The proposed project would most likely require variations for parking lot setbacks. What is being proposed is consistent with existing conditions. The Petitioner has also provided a concept plan showing the elevations of the proposed new building. The existing development currently has 161 parking spaces for the 41,180 square foot development, which meets the approved parking but does not meet current code requirements. While the final site plan is subject to refinement as part of the public hearing process, with the new outbuilding, the site would still maintain 161 parking spaces. It should be noted that the 161 parking spaces were intended to serve both the existing 41,180 square feet but also the additional 2,000 square feet, which was not built. As a result of the change, a total net increase in square footage would be approximately 800 square feet. The owner has provided a parking analysis by their traffic consultant who has reviewed both the existing and proposed conditions and found that sufficient parking is provided. Staff also had the Village traffic consultant, Gewalt Hamilton & Associates (GHA) to review the report and proposed plans. GHA found that the proposed development would still provide sufficient parking. The proposed 2,800 square foot building would include a drive-thru for Dunkin Donuts. Pursuant to Village Code, a drive-thru shall have a minimum stacking of ten (10) vehicles. The Village’s consultant (GHA) has reviewed the drive-thru operations. As part of their analysis, GHA also provided data regarding their research on multiple Dunkin Donut facilities and found that in most instances, the maximum stacking for a Dunkin Donuts drive-thru is approximately 7 vehicles. GHA finds that sufficient stacking can be provid ed. Com. Goldspiel advised that he attended the Village Board meeting on October 15, 2018. At that meeting, this proposed project was reviewed by the Board. The Board had several items that they wished to be addressed by the PZC. The proposed use would be a Baskin Robbins, in addition to a Dunkin Donuts. The Board also had questions regarding the parking variance, detention, traffic safety and drive-thru stacking. He asked what the proposed seating capacity would be for the new building. Mr. Kovacevic responded that he is not sure since he was not given that information. Com. Goldspiel advised that he needs that information to know what the parking requirements will be. He asked if the original plan included the parking for the two outlots. Mr. Kovacevic responded yes. Com. Goldspiel asked about the proposed detention improvements. Mr. Leder responded that there will not be any decreased storage area with the proposed building and that the current conditions provide for the additional building. Com. Goldspiel asked about the concern with the driveway configuration. Ms. Fancler advised that the concern was with traffic entering the center and making the left turn in the parking lot. Her recommendation is to not relocate the existing driveway entrance. The current entrance on McHenry Road aligns with the driveway entrance across the street. This center is also close to a signalized 2.2.b Packet Pg. 176 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 11/7/2018 intersection. Relocation would create issues. They will work with staff to address those concerns. Com. Goldspiel advised that when entering the center, you will have to make a left turn, then a right turn. He asked how that will be addressed. Mr. Leder responded that the driveway entrance will not be widened but that the turning radius within the parking lot will be increased. There is a steep slope on the driveway entrance. They will improve the grade at the entrance. There is an existing power pole that would need to be relocated if the entrance is moved. Com. Goldspiel asked about the traffic study and the finding that there is more north/westbound traffic on McHenry Road in the morning. Ms. Fancler advised that information was provided by GHA and that she could not comment the traffic flow of McHenry Road. Kimley Horn only conducted a study of the traffic flow and parking within the center. Com. Goldspiel stated that he wants to make sure that south/eastbound traffic trying to access the center would not create a traffic hazard. Ms. Fancler does not expect a negative impact but she can take a look at the traffic flow. Com. Goldspiel asked how customers would be directed to the drive-thru lane. Ms. Fancler explained that there would be wayfinding signs within the center to direct customers. The proposed design is not a-typical. The wayfinding signage will help. Mr. Stilling advised that included in the packet is a second drive-thru stacking scenario. He also advised that Dunkin Donuts usually does not have a stacking issue since they typically provide quicker service. Com. Goldspiel asked if there are dedicated parking spaces for waitin g drive-thru customers. Ms. Fancler responded that Dunkin Donuts is unique since their typical drive-thru time is one and a half (1-1/2) to two (2) minutes and they do not offer specialty orders. Com. Goldspiel stated that Dunkin Donuts has a new menu that could affect the drive-thru timing. Mr. Stilling stated that he would recommend that the Dunkin Donuts operator attend the public hearing to answer these questions. Com. Goldspiel asked if the location of the accessible parking spaces on the proposed plan would be the location of the entrance. Mr. Burton stated that they do not yet have the interior detail of the building. Ch. Cesario advised that there is a Dunkin Donuts located across the street from Buffalo Grove High School on Dundee Road that could be used for comparison. Com. Moodhe asked Mr. Stilling about the stacking at the Dunkin Donuts by the Community Arts Center. Mr. Stilling does not have the details for that location but would rather see more parking than stacking. Com. Moodhe stated that there has been some stacking outside the drive-thru lane but that is rare. He does not recall being in the drive-thru line for more than a minute. He asked if there are any changes planned to the center entrance off of Courtland Drive. Mr. Burton responded there are no plans to change that entrance. Com. Moodhe asked about a proposed sign package. Mr. Stilling advised that the proposed sign package should be included for the public hearing. Mr. Burton added that they have not yet looked at the proposed signs. Com. Moodhe asked about traffic counts. Ms. Fancler advised that they have only conducted the parking counts. Com. Moodhe asked if there would be any outdoor seating provided. Mr. Kovacevic believes that there will be one (1) or two (2) tables provided but not a patio. Com. Moodhe suggested adding some additional outdoor seating. Com. Khan advised that he has questions regarding the GHA report. He knows this center and would generally avoid it. He will not enter the center from McHenry Road. Most of the traffic is north/westbound in the morning and south/eastbound in the evening. This is an IDOT road and traffic data should be available. There is a raised median along McHenry Road. He suggested contacting IDOT and advising them there is a usage change in the center. IDOT 2.2.b Packet Pg. 177 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 11/7/2018 may have a future road plan. He also confirmed the steep slope at the driveway entrance. He also referred to the Dunkin Donuts on Dundee Road, across from the high school. That location has a right-in, right-out entrance. He believes the proposed project is similar to that location. GHA believes that peak times are when other businesses are closed or just opening. However, a combined Dunkin Donuts and Baskin Robbins generate more traffic. Com. Au agrees with Com. Khan that the combined Dunkin Donuts and Baskin Robbins are busier, especially during the summer months. She would like to see the traffic flow counts. She is concerned that customers may pull into the neighboring gas station by mistake thinking they can access the site. Mr. Kovacevic advised that he will take a look at that. Com. Lesser asked why it is so important to have the driveway entrance aligned with the driveway entrance across McHenry Road. Ms. Fancler advised that with the raised median having the driveways aligned allows vehicles to make opposite turns at the same time. To not have the driveways aligned would confuse drivers. Com. Lesser stated that moving the driveway entrance to the west would not impede turning traffic. To not move the driveway entrance makes the driver involved in a lot of turns to get to the drive-thru. Traffic movement within the center now is not that great. Moving the driveway entrance to the west would solve a lot of problems. Mr. Stilling advised that IDOT would need to approve any relocation of the entrance. He will have staff ask IDOT about long term plans for improvements at that intersection. Com. Weinstein does not see any concerns with traffic flow. He agrees the center is a little confusing. He compared it to the Portillo’s location on Du ndee Road. He does have a small concern with the proposed stacking. He asked about the height of the proposed building, the distance to the nearby residential housing and the location of the speaker box for the drive-thru. Mr. Kovacevic advised that they are not looking for any height variances. He also advised that the proposed building will be located a bit of a distance from the residential housing. He also advised that the speaker would be located near the front of the building. Mr. Stilling stated that the speaker would be required to be located on the gas station side of the building. Ch. Cesario believes that the proposed configuration makes sense. He noted on Page 13 of the packet it is referenced that currently during peak occupancy only fifty percent (50%) of the parking spaces are used. In addition, future parking conditions with full occupancy, including the proposed project, anticipates ninety three (93%) of the total spaces to be used. He has no concerns with the total number of parking spaces. He also believes that the drive-thru configuration makes sense. Com. Moodhe asked if there is a tenant to replace Dunkin Donuts in its current space. Mr. Kovacevic advised that they anticipate a sandwich shop to occupy that space in the future. Mr. Stilling added that the Village may pursue a future use condition depending on the future use of the existing Dunkin Donuts tenant space. Com. Moodhe suggested removing the end parking space and island median just to the south of the drive-thru exit to eliminate the tight turn radius. 2.2.b Packet Pg. 178 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 11/7/2018 Ch. Cesario advised that he does have some concerns with the traffic flow. He is not concerned with the drive-thru stacking. He asked for the traffic data to be provided. There were no more questions from the Commissioners at this time. Mr. Burton asked if the PZC would prefer another workshop or if the concerns noted should be addressed and they proceed to public hearing. Mr. Stilling indicated that staff would like to have the Village’s consultant, GHA, appear at the public hearing to answer any questions. Com. Moodhe asked if there will be a report from Engineering provided. Mr. Stilling responded that the Engineering report will be provided for the public hearing. Com. Moodhe noted that there are no major issues with the proposed development and asked for the requested traffic flow and other data, including proposed signage, be provided for the public hearing. There were no additional questions or comments from the Commissioners. Approval of Minutes 1. Planning and Zoning Commission - Regular Meeting - Oct 3, 2018 7:30 PM Moved by Com. Khan, seconded by Com. Weinstein, to approve the October 3, 2018 regular meeting minutes as submitted. RESULT: ACCEPTED [5 TO 0] MOVER: Zill Khan, Commissioner SECONDER: Mitchell Weinstein, Comm issioner AYES: Cesario, Goldspiel, Khan, Weinstein, Au ABSTAIN: Adam Moodhe, Matthew Cohn, Scott Lesser 2. Planning and Zoning Commission - Special Meeting - Oct 30, 2018 7:30 PM Moved by Com. Moodhe, seconded by Com. Lesser, to approve the October 30, 2018 regular meeting minutes as submitted. RESULT: ACCEPTED [UNANIMOUS] MOVER: Adam Moodhe, Commissioner SECONDER: Scott Lesser, Commissioner AYES: Moodhe, Cesario, Cohn, Goldspiel, Khan, Lesser, Weinstein, Au Chairman's Report None. Committee and Liaison Reports Com. Goldspiel advised that Sky Fitness was approved by the Village Board on October 15, 2018. Com. Moodhe advised there were no PZC items on the November 5, 2018 Village Board agenda. 2.2.b Packet Pg. 179 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 11/7/2018 Staff Report/Future Agenda Schedule Mr. Stilling advised that the November 21, 2018 PZC regular meeting will be canceled. A Special Meeting may be scheduled for November 28, 2018 for an RV variation. Mr. Stilling advised that staff is starting to get to the enforcement phase of the new RV regulations and that the PZC may see future requests that are not as clear concerning meeting the standards. He asked the PZC to provide guidance concerning RV's that never met the Ordinance in relation to screening, size and location. He also asked for guidance concerning Petitioner 's that are not cooperating. Ms. Woods asked the PZC to provide feedback on the recent training. Public Comments and Questions None. Adjournment The meeting was adjourned at 8:54 PM Chris Stilling APPROVED BY ME THIS 7th DAY OF November , 2018 2.2.b Packet Pg. 180 At t a c h m e n t : P l a n S e t ( C o n s i d e r a n A m e n d m e n t t o O r d i n a n c e 8 3 - 8 f o r a N e w O u t b u i l d i n g , S p e c i a l U s e f o r a D r i v e - T h r o u g h F a c i l ) 10/21/2020 MINUTES OF THE REGULAR MEETING OF THE PLANNING AND ZONING COMMISSION OF THE VILLAGE OF BUFFALO GROVE HELD IN THE COUNCIL CHAMBERS, 50 RAUPP BOULEVARD, BUFFALO GROVE, ILLINOIS ON WEDNESDAY, OCTOBER 21, 2020 Call to Order The meeting was called to order at 7:32 PM by Chairman Frank Cesario 2. Open Meetings Act Compliance Pursuant to orders issued in response to the COVID-19 pandemic, this Public Hearing is closed to in-person, public attendance. The hearing is being held via Zoom web conference meeting, which permits the public to fully participate in the virtual Public Hearing via Zoom on a computer, tablet or phone. Details on how to access and participate in this online virtual hearing are available below. More information pertaining to the meeting information and links to the virtual meeting can be found at <https://us02web.zoom.us/j/89708021192> Or iPhone one-tap : US: +13126266799,,89708021192# or +13017158592,,89708021192# Or Telephone: Dial(for higher quality, dial a number based on your current location): US: +1 312 626 6799 or +1 301 715 8592 or +1 929 436 2866 or +1 346 248 7799 or +1 669 900 6833 or +1 253 215 8782 Webinar ID: 897 0802 1192 International numbers available: <https://us02web.zoom.us/u/kew5FYmXuN> Public Hearings/Items For Consideration 1. Consider an Amendment to Chapter 15.20 Fence Code of the Buffalo Grove Municipal Code Allowing Residential Fences in the Corner-Side Yard Setback and Allowing Six Foot Solid Fences Under Certain Conditions. (Trustee Weidenfeld) (Staff Contact: Nicole Woods) Deputy Community Development Director Woods gave a brief overview of the petition by the Village regarding fence modifications to corner yard setbacks and 6 foot solid fences on properties adjacent to contrasting use. Ms. Woods noted that swimming pools were not addressed in this modification and will be addressed at a later date. Village Planner Akash provided additional detail on the fence modifications and the changes that were made from the previous meetings workshop. Com. Goldspiel asked for clarification regarding information on packet page 6 which referenced 6 foot solid fences and asked if it should say 5 foot and the special criteria in paragraph D. Village Planner Akash provided clarification regarding the height of a fence in that specific section of the code. 3.B.1 Packet Pg. 181 Mi n u t e s A c c e p t a n c e : M i n u t e s o f O c t 2 1 , 2 0 2 0 7 : 3 0 P M ( A p p r o v a l o f M i n u t e s ) 10/21/2020 Village Attorney Brankin stated that the section in question acts states a general maximum and the sections that are being changed hold the special criteria that states when 6 foot is not allowed. Com. Goldspiel asked for additional clarification on paragraph D. Village Planner Akash explained that paragraph D stands alone for those who do not meet the exceptions for a 6 foot fence and that a 6 foot open/shadow box fence would be permitted. Com. Khan asked for additional clarification on section 15. He asked if 6 feet could be changed to 5 feet. Deputy Community Development Director Woods gave an overview of the Code modifications for additional clarification. She also shared the documents that would aid the residents without having to read the Code. Com. Khan provided additional modifications regarding the fence Code. Village Planner Akash replied that the points Com. Khan made were good and will be addressed at another time as they are incorporated in other sections of the Code. Chairperson Cesario asked the Village Attorney to review the language. Village Attorney Brankin reminded the Commissioners that this is not a complete overhaul of the fence Code, the changes that are being presented today are to help mitigate the number of variations that come before the Commission that continue to be approved and help with the backlog of petitioners. Com. Moodhe asked if staff checked with the police department. Village Planner Akash said yes, staff talked with the police department. Com. Weinstein agrees with the modifications to the fence Code and does not think the language needs to be modified anymore. Additionally, he commented that the handouts that staff provides gives that added clarification. Com. Worlikar is also in favor of the modifications to the fence Code. Village Planner Akash thanked the Commissioners for their help in modifying the fence Code and noted how helpful it will be in handling several permits in the pipeline that would otherwise need a variation. Chairperson Cesario commented in favor of the modifications. Chairperson Cesario entered the staff report as exhibit one Public Comment: Mr. Gusev thanked the commissioners for their time in making these modifications so he can put up his fence. He had some specific questions regarding his specific property that Village Planner Akash will help with. Ms. Basham with Fence Solutions thanked the commissioners for recommending the approval of the fence modifications. Ms. Tran thanked the commissioners for recommending approval of the fence modifications. Public Hearing close 8:32 PM 3.B.1 Packet Pg. 182 Mi n u t e s A c c e p t a n c e : M i n u t e s o f O c t 2 1 , 2 0 2 0 7 : 3 0 P M ( A p p r o v a l o f M i n u t e s ) 10/21/2020 Com. Weinstein made a motion to recommend approval to the Village Board amendment to chapter 15.20 to the Buffalo Grove fence Code. Com. Moodhe seconded the motion. Com. Moodhe commented that the amendments do address the current issues and understands that a larger overhaul of the Fence Code is forthcoming. Com. Goldspiel commented that he supports the amendments, but thinks more work needs to be done. Com. Worlikar commented that this is good temporary fix and is in favor of the motion. Com. Weinstein commented that he is in support of the motion. RESULT: RECOMMENDATION TO APPROVE [UNANIMOUS] Next: 11/2/2020 7:30 PM AYES: Moodhe, Spunt, Cesario, Goldspiel, Khan, Weinstein, Au, Richards, Worlikar Regular Meeting Other Matters for Discussion None Approval of Minutes 1. Planning and Zoning Commission - Regular Meeting - Oct 7, 2020 7:30 PM RESULT: ACCEPTED [UNANIMOUS] AYES: Moodhe, Spunt, Cesario, Goldspiel, Khan, Weinstein, Au, Richards, Worlikar Chairman's Report None. Committee and Liaison Reports Com. Worlikar provided an overview of the last Village Board Meeting. Staff Report/Future Agenda Schedule Deputy Director of Community Development Woods provided an overview of the next agenda schedule. Public Comments and Questions None. Adjournment The meeting was adjourned at 9:00 PM 3.B.1 Packet Pg. 183 Mi n u t e s A c c e p t a n c e : M i n u t e s o f O c t 2 1 , 2 0 2 0 7 : 3 0 P M ( A p p r o v a l o f M i n u t e s ) 10/21/2020 Chris Stilling APPROVED BY ME THIS 21st DAY OF October , 2020 3.B.1 Packet Pg. 184 Mi n u t e s A c c e p t a n c e : M i n u t e s o f O c t 2 1 , 2 0 2 0 7 : 3 0 P M ( A p p r o v a l o f M i n u t e s )