Loading...
1973-041}- r 460 ORDINANCE NO. 73 -41 r � AN ORDINANCE AMENDING THE SUBDIVISION REGULATION ORDINANCE OF 1965, ,AS AMENDED. BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS: Section 1. The Subdivision Regulation Ordinance of 1960, as amended, is further amended as follows: Paragraph A -1,c. of Section VI is hereby amended by deleting therefrom the following sentence: "The Plan Commission and the Village Engineer shall within 60 days from referral, submit their written recommendations for approval or disapproval of the Village Board." Paragraph A -1,d. of Section VI is hereby repealed. Paragraph A -3,a. of Section VI is hereby repealed and the following Paragraph A -3,a. is enacted in its place and stead: A -3,a. The Plan Commission shall within 60 days after a preliminary plat is filed with it, hold a public hearing after giving notice required by Article XVII of the Zoning Ordinance of the Village. Within 30 days after the last public hearing the Plan Commission shall prepare and submit (unless time is extended by mutual consent or by the failure on the part of the applicant to file required supporting data) its findings and recommendations with the President and Board of Trustees. The President and Board shall accept or reject the plat within 30 days after it receives the findings and the recommendations of the Plan Commission or within 30 days from date applicant files with the Board any additional data required by the Board whichever is latest unless the time is extended by mutual consent. Paragraph B -1a., Section VI, is hereby amended to read as follows: B -1,a. After approval of the preliminary plat by the Village Board and the fulfillment of the requirements of these Regulations, a reproducible plan of the final plat of the subdivision, shall be submitted to the Plan Commission for approval. Paragraph B -1,b., Section VI, is hereby amended to read as follows: •9 .. B -1,b. When a final plat has been submitted to the Plan Com- mission with all satisfactory documents required, the Plan Commission shall approve the plat within 30 days from submission of last required document or within 30 days from date of filing application with the Plan Commission, whichever is later. Application for final approval of a plat shall be made not later than one year after preliminary approval has been granted. Paragraph B -1,c., Section VI, is hereby amended to read as follows: B -1,c. Except as otherwise specifically set forth in this Ordinance or in the Zoning Ordinance, when approval has been given a final plat by the Plan Commission, the President and Board of Trustees shall act upon the same within 30 days from date of approval by the Plan Com- mission or within 30 days from submission of any additional data required by the Board whichever is latest. Paragraph B, Section VI, is hereby amended by adding thereto an additional Paragraph B -1,d., as follows: B -1,d. Upon approval of the final plat by the President and Board, the developer -owner shall record the plat with the County Recorder, Lake /Cook County within 6 months after said approval. The original of the plat shall be delivered to, and become the property of, the Village after recording. Upon failure to so record, the final plat shall automatically and without further notice be void. Paragraph A, Section VIII is hereby amended to read as follows: A At the time of submission of a preliminary plat of sub- division, a preliminary plan or plans of public im- provements shall also be submitted There shall be five (5) copies of the preliminary plans and fifteen (15) copies of preliminary plats of subdivision sub- mitted. These documents shall include at least the following: 1. Preliminary layout of grading and drainage showing the approximate method of lot drainage and street drainage throughout the subdivision. 2. Preliminary layout of sanitary sewerage facilities showing approximate sizes and lengths of sanitary sewers, location of treatment facilities, depths and gradients of sewers, and other pertinent in- formation concerning the sanitary sewer system. 3. Preliminary layout of water mains, showing sizes and locations of mains, valves, fire hydrants, and other appurtenances. 4. Preliminary layout of storm sewers, showing locations, sizes, gradients, and depths of all storm sewers and drainage swales and ditches. -2- 5. Preliminary layout of streets, showing cross section and grades and gradients of all streets proposed within the subdivision. 6. A statement concerning the materials to be used in the construction of the above. Upon receipt of the preliminary plans, the Plan Com- mission shall refer same to the Village Engineer for his review and comments. The Village Engineer shall review these plans for general compliance with the overall requirements of the Village of Buffalo Grove and shall return them, together with his recommenda- tion, to the Plan Commission and the Village Board. One set of the reviewed plans shall be returned to the subdivider, together with his preliminary plat. All preliminary plans shall bear the signature and seal of the Illinois Registered Professional Engineer under whose direction they were prepared. The definition of "Planned Development" as forth in Section IV is hereby repealed and the following definition enacted in its place and stead: Planned Development A "planned development" is a tract of land developed as a unit, which includes two or more principal buildings, and which is at least four acres in area, except for planned developments operated by a municipal corporation which shall be at least two acres in area, and manufacturing planned developments which shall be at least ten acres in area. All applicable provisions of the Subdivision Ordinance shall apply to a planned develop- ment except as modified by the provisions of Section 5 of Article VI of the Zoning Ordinance. Paragraph B, Section VIII is hereby amended to read as follows: B Final Plans and Specifications At the time of submission of a final plat of subdivision, a final plan or plans of public improvements shall also be submitted. There shall be five (5) copies of the final plans and fifteen (15) copies of final plats of subdivision submitted. These documents shall include at least the following: 1. A title sheet showing the name of the project, section, township and range, an index of sheets, a tabulation of symbols, location of benchmarks, and a graphic location with respect to nearest traveled streets and roads. -3- _' 10 0 0 2. A detailed grading plan indicating the vertical elevations of all houses, lot corners, and points of change in gradient. Directions of flow of surface waters will be delineated with arrows and the gradient of the land indicated above the arrows. Curb elevations will be indicated opposite each lot corner and at all changes in gradient. 3. A detailed plan of street improvements showing hori- zontal and vertical locations of all street and side- walk improvements and including horizontal and vertical locations of all points of curvature, points of inter - section, points of tangency, points of vertical curvature, points of vertical intersection, and points of vertical tangency. Radii of intersection of streets will be shown on this plan. 4. A detailed plan of storm sewer improvements showing horizontal and vertical location of all manholes, catch basins, inlets, headwalls, and the like and indicating lengths, types, and grades and gradients of all storm sewers and ditches. Cross sections will be required for all ditches having side slopes greater than 10 horizontal to 1 vertical. Manholes, catch basins, and inlets will be dimensioned from lot corners. 5. A detailed plan of sanitary sewer improvements showing horizontal and vertical locations of all manholes, and indicating lengths, types, and grades and gradients of all sanitary sewers. Manholes will be dimensioned from lot corners. 6. A detailed plan of water system improvements indicating horizontal and vertical location of all fire hydrants and valve vaults and showing lengths, sizes, and locations of all water mains. 7. Plans and profiles drawn at a scale not to exceed one inch equals 100 feet horizontally and l inch to 10 feet vertically indicating additional horizontal and vertical location of streets, sewers, appurtenances, and the existing grade. 8. Such additional details as are necessary to clarify the extent or manner of construction. -4- 9. Detailed material and construction specifications concerning the work to be performed including general conditions of -the contract acceptable by the Village of Buffalo Grove.. 10. A detailed cost estimate of the work to be performed. Upon receipt of these final plans, the Plan Ca' iss on shall refer same to the Village Engineer for his comments and corrections. The Village Engineer shall review these plans for compliance with the requirements of the Village of Buffalo Grove, and shall return them together with his recommendations to the Plan Commission and Village Board. One set of the reviewed plans with suggested changes shall be returned to the subdivider at time of final approval. The Village Engineer may, at his discretion, confer with the engineer for the developer con- cerning correction to the final plans prior to his final approval. All final plans shall be submitted on 24 inch by 36 inch cloth or paper and shall bear the signature and embossed seal of the Illinois Registered Professional Engineer under whose directions they were prepared. No substantial deviations from these plans and specifications will be allowed without the written permission of the Village Board. Field changes will be allowed by the Village Engineer. The Village Engineer shall be empowered to require such field and laboratory tests as may be necessary to insure the quality of the work. The costs of such tests shall be borne by the subdivider. Section 2. All provisions of any Ordinance in conflict herewith are hereby repealed. Section 3. This Ordinance shall be in full force and effect from and after its passage, approval, and publication according to law. AYES __/1 NAYES O ABSENT oZ 1'2 PASSED this / d day of 1973. APPROVED this /61) day of 1973. PUBLISHED this Z / day of 1973. -5-