Loading...
2020-02-18 - Ordinance 2020-022 - AUTHORIZING A MATERIALS TESTING AGREEMENT WITH SOIL AND MATERIALS CONSULTANTS, INC. (SMC) ORDINANCE 2020 - 022 AN ORDINANCE AUTHORIZING A MATERIALS TESTING AGREEMENT WITH SOIL AND MATERIALS CONSULTANTS INC. (SMC WHEREAS,the Village of Buffalo is a home rule unit pursuant to the Illinois Constitution of 1970; and WHEREAS, the Village seeks to enter into a Materials Testing Agreement with Soil and Material Consultants, Inc. for materials testing of construction projects from 2020 to 2022, NOW THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE,COOK AND LAKE COUNTIES, ILLINOIS, as follows: SECTION 1. The foregoing recitals are hereby adopted and incorporated and made a part of this Ordinance as if fully set forth herein. SECTION 2.The Village Manager is authorized to enter into a Materials Testing Agreement with Soil and Material Consultants,Inc.for materials testing of construction projects from 2020 to 2022 at a price not to exceed $131,806.00. SECTION 3. If any section,paragraph,clause or provision of this Ordinance shall be held invalid, the invalidity thereof shall not affect any other provision of this Ordinance. SECTION 4. This Ordinance shall be in full force and effect from and after its passage and approval and shall not be codified. AYES: 6 - Stein Ottenheimer.Weidenfeld Johnson Smite NAYES: 0—None ABSENT: 0—None PASSED: February 18, 2020 APPROVED: February 18 2020 ATTEST: m ,Beverly Suss Village President Janet M. Sira n, Village Clerk Office: 847-870-0544 i S Fax: 847-870-0661 us@soilandmatedalconsultants.com www.soilandmaterialconsultants.com January 23, 2019 Proposal No. 18,061 Mr. Kyle E. Johnson, P.E., CFM Village of Buffalo Grove 51 Raupp Blvd. Buffalo Grove, IL 60089 Re: Construction Material Testing, Pavement Investigation &CCDD Soil Assessment Years 2020 to 2022 Buffalo Grove Improvements Buffalo Grove, Illinois Dear Mr. Johnson: Submitted for your consideration is our proposal to provide the requested construction material testing, pavement investigations, and CCDD Soil Assessments on various Village of Buffalo Grove projects scheduled in years 2020 to 2022. Field I Plant Inspections We understand the testing requirements of the IDOT QC/QA program are applicable. We propose to be the QA project manager, provide QA plant testing and provide QA jobsite testing. Pavement Investigation We propose the layout of 168 cores at the requested locations. At each location, the existing pavement materials will be cored to determine material types and thicknesses. The location will be patched with cold-patch asphalt. Boring Investigation We also propose the layout of 46 borings at the requested locations and in areas accessible to our truck mounted drilling equipment. We will take reasonable precautions to minimize surface and subsurface damage due to our operations. We cannot be responsible for the cost of site restoration resulting from accessing and performing the investigation. We will contact JULIE for location of public utilities. The location of private services or other below grade improvements is the responsibility of the property owner. The borings will be power auger drilled and soils sampled using a split barrel sampler at intervals of 2.5 feet to depths of 7.5 feet. Soil samples will be returned to our laboratory for testing including determination of moisture content. Cohesive soils obtained by split barrel sampling will be further tested to determine dry unit weight and unconfined compressive strength. 8 W. COLLEGE DR. @ SUITE C e ARLINGTON HEIGHTS, IL 60004 SOIL BORINGS e SITE INVESTIGATIONS PAVEMENT INVESTIGATIONS GEOTECHNICAL ENGINEERING TESTING OF 0 SOIL ASPHALT le CONCRETE o MORTAR STEEL Proposal No. 18,061 Page 2 Re: 2020 - 2022 Buffalo Grove Improvements Buffalo Grove, Illinois Scope of the CCDD Soil Assessment The environmental testing will be conducted by True North Consultants, Inc. and will include a Historical and Regulatory Review along with soil sampling and analysis. The field investigation will include having an environmental engineer in the field during Soil and Material Consultants, Inc. geotechnical drilling for testing and sampling of soils. True North will perform PID screening within the proposed soil borings. Laboratory analysis costs reflect a standard turn-around time of 7 to 10 days. The analysis can be expedited for a surcharge. Some facilities may require additional testing beyond which is proposed. Upon receipt of analytical results, True North will issue a LPC #662 or LPC#663 for the soils if they do not exceed the Maximum Allowable Concentrations (MACs) published in 35 IAC Part 1100. If any of the RCRA metal results exceed the MAC table values, then a SPLP will be run to determine if the value meets uncontaminated requirements (excluding arsenic). If the soil analytical results do not support this, then the soils will require landfill waste analysis for landfill disposal. Waste soil characterization and delineating non-CCDD soils are not included in this proposal. Engineering Evaluation, Rel?ort The field investigation and laboratory testing will be completed under the direction of a Registered Professional Engineer. Preliminary information will be available upon request. Upon completion of the investigation an engineering evaluation will be completed and a report prepared. The report will present our findings, evaluate the findings and present appropriate recommendations. Charges Attached are Schedule of Fees for the requested services. Note that hourly rates are inclusive of mileage and equipment charges. Based on available information we estimate a charge of $131,806.00 for the anticipated services. Actual billing will be on a unit price basis and you will only be billed for those services actually provided. Final billing may be less than or greater than the estimated charge. Should additional services be requested which are not included within the scope of this proposal, they will be provided at our established unit prices Your consideration of this proposal is appreciated. The attached General Conditions are understood to be part of this proposal. If acceptable, please execute and return one copy to our office. Proposal No. 18,061 Page 3 Re: 2020 - 2022 Buffalo Grove Improvements Buffalo Grove, Illinois Should you have any questions concerning the scope of the investigation, please let us know. Very truly yours, SOIL AND MATERIAL CONSULTANTS, INC. Thomas P. Johnson, P.E. President TPJ:dd Proposal Accepted By: Client i t-L-A (1E of!::! Z U/--FAl-o 6a-oV6 Street S 1 RAOPP ALvo , Town u FF At o State 1 L Zip Code 6 on A 9 Phone ( S N 7 ) Ns - E-Mail Address C.. y b n.�!� Signature Position :IIcL o.%ri Printed Name Date Proposal 18,061 CONSTRUCTION MATERIAL TESTING Saxon/Downing Project(2020) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 8 hours $ 86.00 /hour $688.00 $ 344.00 /day min. Concrete Technician 16 hours $ 86.00 /hour $1,376.00 -includes temperature,slump, $ 344.00 /day min. air and cylinders Cylinder Pick-up 4 hours $ 86.00 /hour $344.00 Laboratory Testing: Cylinder Compressive Strength 16 each $ 16.00 each $256.00 Aggregate and Soil Field: Technician 16 hours $ 96.00/hour $1,536.00 $ 384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $ 140.00 /hour $420.00 -CA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $4,620.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Green Knolls/Gail-Street Reconstruction(2020) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 8 hours $86.00/hour $688.00 $344.00/day min. Concrete Technician 16 hours $86.00/hour $1,376.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 4 hours $86.00/hour $344.00 Laboratory Testing: Cylinder Compressive Strength 16 each $16.00 each $256.00 Aggregate and Soil Field: Technician 8 hours $86.00/hour $688.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $140.00/hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $3,772.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Melinda/Hiawatha Project(2020) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 8 hours $86.00/hour $688.00 $344.00/day min. Concrete Technician 12 hours $86.00/hour $1,032.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 3 hours $86.00/hour $258.00 Laboratory Testing: Cylinder Compressive Strength 12 each $16.00 each $192.00 Aggregate and Soil Field: Technician 16 hours $96.00/hour $1,536.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $140.00/hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review ............................................ Estimated Cost: $4,126.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Apple Hill/Tenerife Projed(2020) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 16 hours $ 86.00 /hour $1,376.00 $ 344.00 /day min. Concrete Technician 16 hours $ 86.00 /hour $1,376.00 -includes temperature,slump, $ 344.00 /day min. air and cylinders Cylinder Pick-up 4 hours $ 86.00 /hour $344.00 Laboratory Testing: Cylinder Compressive Strength 16 each $ 16.00 each $256.00 Aggregate and Soil Field: Technician 8 hours $ 96.00/hour $768.00 $ 384.00 /day min. Engineering: Senior Engineer(P.E.) 3 hours $ 140.00 /hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $4,540.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Hidden Lake-Pavement Patching(MFT)(2020) Asphalt Plant Testing: Technician 1 days $344.00/day $344.00 Asphalt Field Testing: Technician with Nudear Gauge 8 hours $86.00/hour $688.00 $344.00/day min. Asphalt Laboratory Testing: Asphalt Content (ignition) 1 each $175.00 each $175.00 Bulk Specific Gravity(gyratory) 1 each $260.00 each $260.00 Maximum Specific Gravity 1 each $100.00 each $100.00 Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Concrete Plant Testing: Technician 1 days $ 600.00/day $600.00 Concrete Field Testing: Concrete Technician 16 hours $ 86.00 /hour $1,376.00 -includes temperature,slump, $ 344.00 /day min. air and cylinders Cylinder Pick-up 4 hours $ 86.00 /hour $344.00 Laboratory Testing: Cylinder Compressive Strength 16 each $ 16.00 each $256.00 Engineering: Senior Engineer(P.E.) 2 hours $ 140.00 /hour $280.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $4,703.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2020 Pavement Patching Project(MFT) Asphalt Plant Testing: Technician 1 days $344.00/day $344.00 Asphalt Field Testing: Technician with Nuclear Gauge 4 hours $86.00/hour $344.00 $344.00/day min. Asphalt Laboratory Testing: Asphalt Content (ignition) 1 each $175.00 each $175.00 Bulk Specific Gravity(gyratory) 1 each $260.00 each $260.00 Maximum Specific Gravity 1 each $100.00 each $100.00 Engineering: Senior Engineer(P.E.) 1 hours $140.00/hour $140.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $1,363.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2020 Storm Sewer Project(MFT) Asphalt Plant Testing: Technician 1 days $344.00/day $344.00 Asphalt Field Testing: Technician with Nuclear Gauge 4 hours $86.00/hour $344.00 $344.00/day min. Asphalt Laboratory Testing: Asphalt Content (ignition) 1 each $175,00 each $175.00 Bulk Specific Gravity(gyratory) 1 each $260.00 each $260.00 Maximum Specific Gravity 1 each $100.00 each $100.00 Engineering: Senior Engineer(P.E.) 1 hours $140.00/hour $140.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Concrete Plant Testing: Technician 1 days $600.00/day $600.00 Concrete Field Testing: Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -CIA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $3,231.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2020 Sidewalk Improvements Project(MFT) Concrete Plant Testing: Technician 1 days $600.00/day $600.00 Concrete Field Testing: Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -CIA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $1,868.00 Total Field/Plant Inspection 2020: $28,223.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Northwood at Buffalo Grove-Street Reconstruction(2021) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 12 hours $86.00/hour $1,032.00 $344.00/day min. Concrete Technician 16 hours $86.00/hour $1,376.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 4 hours $86.00/hour $344.00 Laboratory Testing: Cylinder Compressive Strength 16 each $16.00 each $256.00 Aggregate and Soil Field: Technician 16 hours $96.00/hour $1,536.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $140.00/hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $4,964.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Cambridge Project(Joint Venture 2021) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 8 hours $86.00/hour $688.00 $344.00/day min. Concrete Technician 12 hours $86.00/hour $1,032.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 3 hours $86.00/hour $258.00 Laboratory Testing: Cylinder Compressive Strength 12 each $16.00 each $192.00 Aggregate and Soil Field: Technician 8 hours $96.00/hour $768.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $140.00/hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $3,358.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Rollling Hills Project(2021) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 16 hours $86.00/hour $1,376.00 $344.00/day min. Concrete Technician 16 hours $86.00/hour $1,376.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 4 hours $86.00/hour $344.00 Laboratory Testing: Cylinder Compressive Strength 16 each $16.00 each $256.00 Aggregate and Soil Field: Technician 8 hours $96.00[hour $768.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $140.00/hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $4,540.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Vintage at Buffalo Grove Project(2021) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 8 hours $86.00/hour $688.00 $344.00/day min. Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Aggregate and Soil Field: Technician 8 hours $96.00/hour $768.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -CA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $2,724,00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2021 Pavement Patching Project(MFT) Asphalt Plant Testing: Technician 1 days $344.00/day $344.00 Asphalt Field Testing: Technician with Nuclear Gauge 4 hours $86.00/hour $344.00 $344.00/day min. Asphalt Laboratory Testing: Asphalt Content (ignition) 1 each $175.00 each $175.00 Bulk Specific Gravity(gyratory) 1 each $260.00 each $260.00 Maximum Specific Gravity 1 each $100.00 each $100.00 Engineering: Senior Engineer(P.E.) 1 hours $140.00/hour $140.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $1,363.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2021 Storm Sewer Project(MFT) Asphalt Plant Testing: Technician 1 days $344.00/day $344.00 Asphalt Field Testing: Technician with Nudear Gauge 4 hours $86.00/hour $344.00 $344.00/day min. Asphalt Laboratory Testing: Asphalt Content (ignition) 1 each $175.00 each $175.00 Bulk Specific Gravity(gyratory) 1 each $260.00 each $260.00 Maximum Specific Gravity 1 each $100.00 each $100.00 Engineering: Senior Engineer(P.E.) 1 hours $140.00/hour $140.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Concrete Plant Testing: Technician 1 days $600.00/day $600.00 Concrete Field Testing: Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $3,231.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2021 Sidewalk Improvements project(MFT) Concrete Plant Testing: Technician 1 days $600.00/day $600.00 Concrete Field Testing: Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -CIA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $1,868.00 Total Field/Plant Inspection 2020: $22,048.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING forest/Glendale Project(2022) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 16 hours $86.00/hour $1,376.00 $344.00/day min. Concrete Technician 16 hours $86.00/hour $1,376.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 4 hours $86.00/hour $344.00 Laboratory Testing: Cylinder Compressive Strength 16 each $16.00 each $256.00 Aggregate and Soil Field: Technician 32 hours $96.00/hour $3,072.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 4 hours $140.00/hour $560.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $6,984.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Golfview Project(2022) Asphalt/Conaete Field: Asphalt Technician with Nuclear Gauge 8 hours $86.00/hour $688.00 $344.00/day min. Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Aggregate and Soil Field: Technician 16 hours $96.00/hour $1,536.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $140.00/hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $3,632.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING Candle wood Creek Project(2022) Asphalt/Concrete Field: Asphalt Technician with Nuclear Gauge 8 hours $86.00/hour $688.00 $344.00/day min. Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128,00 Aggregate and Soil Field: Technician 16 hours $96.00/hour $1,536.00 $384.00/day min. Engineering: Senior Engineer(P.E.) 3 hours $140.00/hour $420.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $3,632.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2022 Pavement Patching Project(MFT) Asphalt Plant Testing: Technician 1 days $344.00/day $344.00 Asphalt Field Testing: Technician with Nuclear Gauge 4 hours $86.00/hour $344.00 $344.00/day min. Asphalt Laboratory Testing: Asphalt Content (ignition) 1 each $175.00 each $175.00 Bulk Specific Gravity(gyratory) 1 each $260.00 each $260.00 Maximum Specific Gravity 1 each $100.00 each $100.00 Engineering: Senior Engineer(P.E.) 1 hours $140.00/hour $140.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $1,363.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2022 Storm Sewer Project(MFT) Asphalt Plant Testing: Technician 1 days $344.00/day $344.00 Asphalt Field Testing: Technician with Nuclear Gauge 4 hours $86.00/hour $344.00 $344.00/day min. Asphalt Laboratory Testing: Asphalt Content (ignition) 1 each $175.00 each $175.00 Bulk Specific Gravity(gyratory) 1 each $260.00 each $260.00 Maximum Specific Gravity 1 each $100.00 each $100.00 Engineering: Senior Engineer(P.E.) 1 hours $140.00/hour $140.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Concrete Plant Testing: Technician 1 days $600.00/day $600.00 Concrete Field Testing: Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $3,23 1.00 Proposal 18,061 CONSTRUCTION MATERIAL TESTING 2022 Sidewalk Improvements Project(MFT) Concrete Plant Testing: Technician 1 days $600.00/day $600.00 Concrete Field Testing: Concrete Technician 8 hours $86.00/hour $688.00 -includes temperature,slump, $344.00/day min. air and cylinders Cylinder Pick-up 2 hours $86.00/hour $172.00 Laboratory Testing: Cylinder Compressive Strength 8 each $16.00 each $128.00 Engineering: Senior Engineer(P.E.) 2 hours $140.00/hour $280.00 -QA Project Manager. includes project administration, field/laboratory engineering,mix design review,consultation and report review Estimated Cost: $1,868.00 Total Field/Plant Inspection 2020: $20,710.00 Proposal 18,061 PAVEMENT INVESTIGATIONS 2020 Buffalo Grove Improvement Schedule of Fees-Pavement Investigation Field: Boring Layout 1 hr. $96.00/hr. $96.00 Utility Location 1 hr. $96.00/hr. $96.00 Mobilization 1 Lump Sum $900.00 Drilling(8 at 7.5') 60 ft. $14.00/ft. $840.00 Split Barrel Sampling 24 ea. $10.00 ea. $240.00 Pavement Coring 42 ea. $110.00 ea. $4,620.00 Laboratory: Moisture Content Unit Weight 1 Lump Sum $380.00 Unconfined Compressive Strength Report: Senior Engineer(P.E.) 9 hr. $ 140.00 /hr. $1,260.00 $8,432.00 2021 Buffalo Grove Improvement Schedule of Fees-Pavement Investigation Field: Boring Layout 3 hr. $96.00/hr. $288.00 Utility Location 1 hr. $96.00/hr. $96.00 Mobilization 1 Lump Sum $1,800.00 Drilling(19 at 7.5') 142.5 ft. $14.00/ft. $1,995.00 Split Barrel Sampling 57 ea. $10.00 ea. $570.00 Pavement Coring 75 ea. $110.00 ea. $8,250.00 Laboratory: Moisture Content Unit Weight 1 Lump Sum $870.00 Unconfined Compressive Strength Report: Senior Engineer(P.E.) 18 hr. $140.00/hr. $2,520.00 $16,389.00 Proposal 18,061 PAVEMENT INVESTIGATIONS 2022 Buffalo Grove Improvement Schedule of Fees-Pavement Investigation Field: Boring Layout 3 hr. $96.00/hr. $288.00 Utility Location 1 hr. $96.00/hr. $96.00 Mobilization 1 Lump Sum $1,200.00 Drilling(19 at 7.5') 142.5 ft. $14.00/ft. $1,995.00 Split Barrel Sampling 57 ea. $10.00 ea. $570.00 Pavement Coring 51 ea. $110.00 ea. $5,610.00 Laboratory: Moisture Content Unit Weight 1 Lump Sum $870.00 Unconfined Compressive Strength Report: Senior Engineer(P.E.) 15 hr. $140.00/hr. $2,100.00 ............................................ $12,729.00 Proposal 18,061 CCDD SOIL ASSESSMENTS 2020 Buffalo Grove Improvement Schedule A Fees-CCDD Soil Assessment Field: PIP Evaluation 4 ea. $ 375.00 ea. $1,500.00 Soil Sampling(est.) 16 hr. $ 110.00 /hr. $1,760.00 Soil Sampling Equipment 2 day $ 300.00 /day $600.00 Apple Hill/Tenerlife Resurfacing(2020) CCDD Discrete Soil Anayltical: Discrete pH 6 ea. $ 20.00 ea. $120.00 Discrete PNAs 3 ea. $ 150.00 ea. $450.00 Discrete RCRA Metals 3 ea. $ 105.00 ea. $315,00 Green Knolls/Gall Reconstruction(2020) CCDD Discrete Soil Anayltical: Discrete pH 4 ea. $ 20.00 ea. $80.00 Hidden Lake Rehabilitation(2020) CCDD Discrete Soil Anayltical: Discrete pH 3 ea. $ 20.00 ea. $60.00 Discrete PNAs 1 ea. $ 150.00 ea. $150.00 Discrete RCRA Metals 1 ea. $ 105.00 ea. $105.00 Melinda/Hiawatha Project(2020) CCDD Discrete Soil Anayltical: Discrete pH 6 ea. $ 20.00 ea. $120.00 Ceritications and Field: LPC#663 Cert.and Sampling Doc. 2 ea. $ 650.00 ea. $1,300.00 LPC#663 Cert.and Sampling Doc 2 ea. $ 450.00 ea. $900.00 2020 Environmental Total: $7,460.00 '•SPLP testing of the RCRA Metals over the Mac Table limits can be run at an additional cost of$110 each Proposal 18,061 CCDD SOIL ASSESSMENTS 2021 Buffalo Grove Improvement Schedule of Fees-CCDD Soil Assessment Field: PIP Evaluation 4 ea. $ 375.00 ea. $1,500.00 Soil Sampling(est.) 16 hr. $ 110.00 /hr. $1,760.00 Soil Sampling Equipment 2 day $ 300.00 /day $600.00 Rolling Hills Resurfacing(2021) CCDD Discrete Soil Anayltical: Discrete pH 8 ea. $ 20.00 ea. $160.00 Vintage at Buffalo Grove Resurfacing CCDD Discrete Soil Anayltical: Discrete pH 4 ea. $ 20.00 ea. $80.00 Candlewood Creek Reconstruction CCDQ Discrete Soil Anayltical: Discrete pH 4 ea. $ 20.00 ea. $80.00 Discrete PNAs 2 ea. $ 150.00 ea. $300.00 Discrete RCRA Metals 2 ea. $ 105.00 ea. $210.00 Discrete VOCs 2 ea. $ 185.00 ea. $370.00 Melinda/Hiawatha Project(2020) CCDD Discrete Soil Anayltical: Discrete pH 5 ea. $ 20.00 ea. $100.00 Ceritications and Field: LPC#663 Cert.and Sampling Doc. 1 ea. $ 650.00 ea. $650.00 LPC#663 Cert.and Sampling Doc 3 ea. $ 450.00 ea. $1,350.00 2021 Environmental Total: $7,160.00 **SPLP testing of the RCRA Metals over the Mac Table limits can be run at an additional cost of$110 each Proposal 18,061 CCDD SOIL ASSESSMENTS 2022 Buffalo Grove Improvement Schedule of Fees-CCDD Soil Assessment Field: PIP Evaluation 3 ea. $ 375.00 ea. $1,125.00 Soil Sampling(est.) 16 hr. $ 110.00 /hr. $1,760.00 Soil Sampling Equipment 2 day $ 300.00 /day $600.00 Northwood at Buffalo Grove(2022) CCDD Discrete Soil Anayltical: Discrete pH 8 ea. $ 20.00 ea. $160.00 Discrete PNAs 1 ea. $ 150.00 ea. $1S0.00 Discrete RCRA Metals 3 ea. $ 105.00 ea. $315.00 Discrete VOCs 2 ea. $ 185.00 ea. $370.00 Discrete sVOC's 2 ea. $ 255.00 ea. $510.00 Discrete BETX 1 ea. $ 75.00 ea. $75.00 Forest/Glendale(2022) CCDD Discrete Soil Anayltical: Discrete pH 6 ea. $ 20.00 ea. $120.00 Discrete PNAs 1 ea. $ 150.00 ea. $150.00 Discrete RCRA Metals 1 ea. $ 105.00 ea. $105.00 Discrete BETX 1 ea. $ 75.00 ea. $75.00 Forest/Glendale(2022) CCDD Discrete Soil Anavitical: Discrete pH 6 ea. $ 20.00 ea. $120,00 Discrete VOCs 2 ea. $ 150.00 ea. $300.00 Discrete RCRA Metals 4 ea. $ 105.00 ea. $420.00 Discrete PNAs 4 ea. $ 75.00 ea. $300.00 Ceritications and Field: LPC#663 Cert.and Sampling Doc. 1 ea. $ 650.00 ea. $650.00 LPC#663 Cert.and Sampling Doc. 3 ea. $ 450.00 ea. $1,350.00 2022 Environmental Total: $8,655.00 **SPLP testing of the RCRA Metals over the Mac Table limits can be run at an additional cost of$110 each Proposal 18,061 Summary of Charges 2020 Material Testing Pavement Investigation CCDD Soil Assesment Saxon/Downing Project(2020) $4,620.00 Green Knolls/Gail-Street Reconstruction(2020) $3,772.00 Melinda/Hiawatha Project(2020) $4,126.00 Apple Hill/Tenerife Project(2020) $4,540.00 $8 432.00 $7,460.00 Hidden Lake-Pavement Patching(MFT)(2020) $4,703.00 2020 Pavement Patching Project(MFT) $1,363.00 2020 Storm Sewer Project(MFT) $3,231.00 2020 Sidewalk Improvements Project(MFT) $1,868.00 Total: $28,223.00 2021 Northwood at Buffalo Grove-Street Reconstruction(2021) $4,964.00 Cambridge Project(Joint Venture 2021) $3,358.00 Rollling Hills Project(2021) $4,540.00 Vintage at Buffalo Grove Project(2021) $2,724.00 $16,389.00 $7,160.00 2021 Pavement Patching Project(MFT) $1,363.00 2021 Storm Sewer Project(MFT) $3,231.00 2021 Sidewalk Improvements Project(MFT) $1,868.00 Total: $22,048.00 2022 Forest/Glendale Project(2022) $6,984.00 Golfview Project(2022) $3,632.00 Candlewood Creek Project(2022) $3,632.00 $12,729.00 $8,655.00 2022 Pavement Patching Project(MFT) $1,363.00 2022 Storm Sewer Project(MFT) $3,231.00 2022 Sidewalk Improvements Project(MFT) $1,868.00 Total: $20,710.00 Total for All Projects: $70,981.00 $37,550.00 $23,275.00 Grand Total: $131,806.00 Proposal No. 18,061 Page 4 Re: 2020 - 2022 Buffalo Grove Improvements Buffalo Grove, Illinois Soil and Material Consultants, Inc. (SMC)scope of work defined in the proposal TERMS AND CONDITIONS was based on information provided by the client. If incomplete,inaccurate or if unexpected site conditions are discovered,the scope of work may change. GEOTECHNICAL INVESTIGATIONS TESTING SERVICES Client will furnish SMC with right-of-access to the site. Client shall furnish SMC with at least one working day's notice on any part- SMC will take reasonable precautions to minimize site time(less than 8 hours/day)job when field personnel are requested. SMC damage due to its operations,but has not included in shall make reasonable effort to provide field personnel in a timely manner the fee the cost of restoration of any resulting but reserves the right to schedule field personnel as deemed appropriate. damage. SMC shall not be liable for damage or injury Minimum charges will be billed when work cancellations are received after due to encountering subsurface structures(pipes, field personnel have left for the project site. tanks,utilities or others)not called to SMC's attention in writing or are not correctly shown on the drawings SMC personnel will provide a professional service based on observations furnished by client or client's representative. If the and testing of the work of a contractor,subcontractor,or other client desires,SMC will restore any damage to the site service/material provider,as specifically requested. SMC field personnel and add the cost of restoration to the fee. will look for general conformance with project specifications,plans and/or soil report but does not accept the responsibility to control or direct the Field work,laboratory testing and engineering work of others. Discrepancies noted by SMC office or field personnel will analysis will be performed in accordance with be referred to client or client's representative. generally accepted soil and foundation engineering practices. Samples are retained in our laboratory for Testing Services furnished by SMC are defined as the taking of soil and/or 30 days from date of report and then destroyed unless material tests at various locations and the making of visual observations other disposition is requested. The data reported relating to earthwork,foundations,and/or materials as specifically applies only to the soils sampled and the conditions requested by the client and agreed to by SMC,and will be limited to those encountered at each boring location. This does not specifically agreed services. Such services will be performed by SMC imply or guarantee that soils between borings will be using that degree of care and skill ordinarily exercised,under similar identical in character. Isolated inclusions of better or circumstances,by reputable members of the profession practicing in this poorer soils can be found on any site. SMC will not or similar localities. be liable for extra work or other consequences due to changed conditions encountered between borings. Observations and testing of soils and/or materials by SMC in no way implies a guarantee or warranty of the work of the contractor, Any exploration,testing and analysis associated with subcontractor,or other service/material provider. SMC's work or failure to the investigation will be performed by SMC for the perform same shall in no way excuse such contractor,subcontractor or client's sole use to fulfill the purpose of this other service/material provider from liability in the event of subsequently Agreement. SMC is not responsible for use or discovered defects,omissions,errors,deficiencies or failure to perform in interpretation of the information by others. The client accordance with the project plans and specifications. SMC field personnel recognizes that subsurface conditions may vary from shall not be responsible for superintendence of the construction process those encountered in borings or explorations. nor direction of the work of the contractor,subcontractor,or other Information and recommendations developed by SMC service/material provider. SMC's work shall not include determining or are based solely on available information and for the implementing the means,methods,techniques,sequences or procedures currently proposed improvement. of construction. SMC shall not be responsible for evaluating,reporting or affecting job conditions concerning health,safety or welfare. Documents including but not limited to technical reports,original boring logs,field data,field notes,laboratory test data,calculations, reports of inspection and testing,geotechnical reports,technical reports,submittals and estimates furnished to the client or its agents pursuant to this agreement are not intended or represented to be suitable for reuse by the client or others on extensions of this project or on any other project. Any reuse without SMC's written consent will be at user's sole risk and without liability or legal exposure to SMC. User shall indemnify and hold harmless SMC from all claims,damages,losses and expenses including attorney's fees arising out of or resulting therefrom. To the maximum extent permitted by law,the Client agrees to limit SMC liability for clients'damages to$100,000 or the fee,whichever is lesser. This limitation shall apply regardless of the cause of action or legal theory pled or asserted. Soil and Material Consultants,Inc.is a Professional Engineering Corporation. Engineering services are often completed by extension through technical staff. The unit rates presented in this proposal do not reflect charges associated with organized labor. Future agreements,if any,with organized labor will invalidate some of the unit rates presented. Required rate adjustments will be presented to the client for acceptance prior to providing services at the adjusted rates. Services are invoiced monthly for the preceding period. Client agrees to pay each invoice within thirty(30)days of receipt and further agrees to pay interest on all amounts not paid at the rate of 2.0%per month,an annual rate of 24%,from the due date. Client agrees to pay all reasonable costs of collection including staff time,court costs,Attomeys'fees and related expenses,if this account becomes delinquent. Client agrees that reports furnished to the client but not paid for in full remain the sole property of SMC and will not be used for design,construction,permits,licensing,sales or other gain.