Loading...
2002-12-04 - Plan Commission - Minutes Board or Commission: ❑ Plan Commission Document Type: ❑A e g nda 0 Minutes Meeting ate: 12/04/2002 Type of Meeting: PUBLIC HEARING BUFFALO GROVE PLAN COMMISSION December 4, 2002 Riverwalk North, east of Milwaukee Avenue north of Riverwalk Drive—Amendment of a Planned Unit Development (P.U.D.) And Preliminary Plan in the B-3 District Riverwalk North, proposed restaurant, 931 Milwaukee Avenue— Annexation with B-3 zoning and approval of a Preliminary Plan Chairman Ottenheimer called the hearing to order at 7:30 p.m. in the Village Council Chambers, Buffalo Grove Municipal Building, 50 Raupp Boulevard, Buffalo Grove, Illinois. Chairman Ottenheimer read the Notice of Public Hearing as published in the Buffalo Grove Daily Herald, explained the procedure to be followed for the public hearing, and swore in all persons who wished to give testimony. Chairman Ottenheimer noted it was appropriate to hold both public hearings, as they are both the same project and the same parcel Commissioners present: Chairman Ottenheimer Mr. Smith Ms. Bocek Ms. Kenski-Sroka Mr. Teplinsky Mr. Billiter Mr. Stark Commissioners absent: Mr. Samuels Mr. Khan Also present: Mr. Timothy Beechick, Hamilton Partners Mr. Michael Werthmann, KLOA Mr. Hubert Loftus, Cowhey Gudmundson Leder, Ltd. Mr. Richard Mallory, The Brickman Group, Ltd. Mr. David Olson, The Jenkins Group Mr. William Raysa, Village Attorney Ms. DeAnn Glover, Village Trustee Mr. Richard Kuenkler, Village Engineer Mr. Robert Pfeil, Village Planner Mr. Greg Summers, Associate Village Planner The following exhibits were presented by the petitioner at the public hearing: Exhibit 1: Overall Site Plan dated November 18, 2002 Exhibit 2: Enlarged Site Plan for Riverwalk North dated November 18, 2002 Exhibit 3: Pedestrian Pathways dated November 18, 2002 Exhibit 4: Riverwalk North Alternative Site Plan, Multi-Family Option Exhibit 5: Aerial Photo dated October 10, 2002 Exhibit 6: Landscape Plan dated December 2, 2002 Exhibit 7: Alignment Option at Milwaukee Avenue Multi-family Entry Drive dated December 2, 2002 Exhibit 8: Section at Multi-family Entry Drive dated December 2, 2002 Exhibit 9: Open Space Comparison , undated Exhibit 10: Preliminary Engineering Plan dated December 4, 2002 Exhibit 11: Tax Comparison dated December 4, 2002 Mr. Timothy Beechick stated they have re-submitted the plans with subtle changes. One of the major issues they received from the Plan Commissioners was concern about how mixed-use really works and the staging of this development. Consequently a major part of tonight's proposal will be the two-plan approach they are submitting for consideration. The proposed plan includes all the elements they had in the original proposal, which includes an 8-story office building, 6-story hotel, 90 unit, six-story residential apartment dwelling unit and a restaurant. The alternate plan they have prepared addresses the issue about staging and what happens if it does not go quite this way. Mr. Beechick stated the proposed site plan shows a five-story parking structure connected to a 12-story office building and a 7 story parking structure connected to an 11-story office building. This building is 11 stories but is the same height due to higher ceiling heights on each floor. The importance is the density issue with this initial phase. This plan still contains the same amount of office space but also includes some alternative uses. The reason for these alternative uses is the fact they feel that the hotel and restaurant would be strong amenities that would service the proposed apartment complex as well as the existing office development as well as the new office building they have proposed at this project. The apartment complex also is located in an area that is a truly unique setting adjacent to the forest preserve with thousands of acres of property overlooking the Des Plaines River. Because of its high end nature more than likely there will be people that will rent apartments in this location and potentially work in the office environment. There will also be interplay between hotel guests, apartment dwellers and office building employees. Therefore, they see the nature of the project being something where each element of the project serves the other element and hence the mixed use nature. When one thinks of mixed use one thinks more of a town center approach with retail mixed with office and other alternative uses. However, those locations are usually surrounded by residential development. This is a very unique site and although they are mixed use they are located adjacent to the forest preserve and a high end commercial development, along with a lot of commercial and retail strip zoning along Milwaukee Avenue. He noted they are mixed use but in a unique location. The primary driver of this plan is the location of the stormwater detention basin. It is a dry basin with a specific function other than handling the stormwater detention. It also serves to handle overflow from the Des Plaines River at unique circumstances. As a result the location, size and length of the detention basin are very well engineered and must be where they are. Mr. Beechick noted they have increased the amount of green space on the site. They have removed one curb cut along North Riverwalk Drive and therefore created a larger area of landscaping at the entry to the hotel and multi-family site. They have also increased the amount of landscaping on the private drive that feeds down to the multi-family residential. In order to do that they shifted the hotel site and multi-family site to the north. This means they have to include some landscaped retaining walls in certain areas of the project. Mr. Beechick noted the pedestrian paths and bikepaths have been upgraded and they have incorporated additional sidewalk connections from the multi-family onto the trail system. They have also included sidewalks that lead all the way out to Milwaukee Avenue from the project along the edge of the proposed restaurant parking lot. Mr. Beechick reviewed the proposed alternative site plan is in response to the concern by the commissioners regarding a failure of execution of the project. This plan provides a second look at the project if for some reason the office plan does not move forward. He stated they could put another duplicate residential unit on the site. It has some shortcomings economically as taxes would be less, but it does provide an alternative. However, they feel relatively optimistic that they will execute the proposed plan. He suggested the Village Board consider this alternate plan after five years of zoning approval if they are not able to commence with the development of the office building. He noted it would be the option of the Board to determine if they want to wait until the market heals or go with the alternative plan. Mr. Beechick stated this site has elements that relate to retail and they have proven the location to be a strong office site. The hotel would be a terrific amenity for the entire project and surrounding area and the multi-family provides the necessary balance to offset the counterflow traffic to make this project work. Mr. Richard Mallory of The Brickman Group stated this plan is entirely rendered to show where the green space really is. He noted the plan is substantial in sheer quantity. He stated that with the room they now have, it offers flexibility in terms of the articulation and the alignment of roadways and parking. It also now allows for a greater variety of landforms, groups of trees, different species of trees, and serpentine walkways. Also with subtle manipulations of parking they can bring the parking away from the building. Mr. Beechick stated they did a green space calculation, which includes detention basins and compared this plan to what was approved in 1990. Currently the proposed plan is 50.6 percent of green space and the approved plan is 40.5 percent. He stated they have done a good job in getting as much relief on the plan as possible, integrated within the different uses, given the confined area they have to work with. Mr. Hugh Loftus of Cowhey Gudmundson Leder, Ltd. reviewed the FEMA status, which relates to the modification of the flood plain maps for the project. He noted it is moving slowly and steadily forward. It has been through the DNR and it is being reviewed by FEMA now. Mr. Loftus noted the memo to the Commission referenced the bikepath and its location. Originally the bikepath at the north end was running along the north property line. Subsequent to that they relocated it adjacent to the hotel parking lot and it was above the 100-year flood plain. With the efforts to try to gain more green space in the main site, they have lost the plateau north of the parking lot so they now propose to bring that bikepath back down, still on the south end, but at an elevation which is just about at or just below the 10 year high water level of the Des Plaines River. Mr. Michael Werthmann of KLOA stated the parcel has already been approved for the same size office building that they are proposing and the restaurant is just going to replace an existing restaurant. As such, the only additional density to this area is the hotel and the multi-family complex. The mixed use development helps to reduce the volume of traffic that is generated and the type of traffic that is generated. Mixed-use development has a captive market effect in the fact that it will generate multi-purpose trips. The apartment and hotel generate a reverse trip rate or volume of traffic than that of the office. In the mornings the office generates a high volume of inbound traffic and the multi-family and hotel is generating a high volume of outbound traffic. They are not generating the same type of traffic. He noted the additional density is not that significant? It is in the context of a multi-use development and all of the other improvements that have taken place since the original development was approved must be taken into consideration. Mr. Werthmann stated the main intersection serving the site at Riverwalk Drive and Milwaukee Avenue has sufficient reserve capacity to accommodate the traffic that will be generated by the development. It will operate at the same level of service that it is operating at now with minimal delay. The Milwaukee Avenue/Deerfield Road intersection is an existing problem. It is a regional problem and will take more than one developer or one municipality to rectify the situation. However, there are some circumstances that help reduce the impact on this intersection. One is the fact that only 25 percent of the traffic generated by the development will travel from the north through this intersection. As such, they project increasing the traffic at this intersection by only 1-2 percent. Second, IDOT has a significant traffic signal system improvement that will be implemented in 2003 along Milwaukee Avenue. This improvement consists of the interconnection of the traffic signals from Riverwalk Drive all the way to Busch Parkway. This system will become part of the existing system that extends from Wolf through Riverwalk Drive. As part of this improvement all of the signals along here will be optimized by retiming. This will result in greater progression of traffic. More importantly it will re-optimize and make each of the signalized intersections operate more efficiently. Mr. Werthmann noted Illinois 22 improvement through Lincolnshire will go through and construction will start next year. Once this done capacity on Illinois 22 will be doubled providing some relief to Deerfield Road and that intersection. Mr. Werthmann further noted that the Village's traffic engineer has concurred with the findings of this study and basically agreed with all of their findings. He recommended two improvements to the plan, which they have implemented. One is the establishment of a channeled right in, right out drive with a pork chop median. Secondly, they recommend some widening along Riverwalk Drive to extend the left turn lanes and to provide two westbound lanes through the North Riverwalk Drive intersection. Mr. Beechick stated the revision to the access drive leading to the multi-family is something they would definitely move forward with if the commission were comfortable with that approach. He further noted the inclusion of letters from the school districts and noted they have had discussions with them about this project. He noted they were informed about the revised proposal, which includes the alternative plan option to additional multi-family. In this instance and with the balance of what they are providing, they have both agreed to support the project including the potential alternative plan option for additional multi-family. Secondly, the tax impact of this plan is substantial. The plan that is currently approved has a total tax benefit to all the taxing bodies combined of$375,000 annually compared to the proposed plan which would bring in a total of$1,053,444 in tax revenue, of which the Village of Buffalo Grove would get a direct annual benefit of$245,000. This is something that needs to be recognized. Commissioner Billiter stated the project has not changed significantly from the way it was before. There were two main considerations. The first is this is really an island approach with four individual uses that are very isolated from one another. Secondly, the multi-family is buried to the back part of this site. This is good in its relation to the forest preserve background. On the other hand, it is very cut off from any other residences in the area. The problem would appear to be the interrelationships of all the buildings with a totally vehicular orientation. Perhaps more pedestrian walkways and paths would be better than relying solely on vehicular traffic. He noted it is the relationship from the buildings to one another that is the major obstacle in this project. Commissioner Bocek asked how this development would be a multi-use and not four individual development. She also asked if the hotel would be the next phase in construction. She noted it might be useful to put the hotel where the second multi-family building is on the alternate plan, which would alleviate all the hotel traffic from cutting through the middle of the development and then put the two multi-family buildings together for a more cohesive development. Mr. Beechick stated they did give that some thought. One of the things is the integration of the hotel site to the restaurant and the other retail along Milwaukee Avenue within walking distance which makes it advantageous to keep the hotel where it is so that there is that much more cohesiveness with those two elements of the mixed use plan. Commissioner Bocek asked what happens if the hotel falls through. Mr. Beechick stated they are bound by that particular parcel according to the proposed mixed-use zoning ordinance to keep that site for hotel use. Commissioner Bocek noted that part of the pedestrian walkway is in the flood plain and asked how many days that will be under water. Mr. Loftus noted the walkway within the detention area at the north end is at about the 10-year high water level of the Des Plaines River, which is about 7-8 feet above what the normal water level is. If the pedestrian walkway or bikepath is flooded on this site about one foot, it will be about 4-5 feet under water on the forest preserve. In a 10 year storm he would anticipate there would be flooding at less than a foot for about a day or two before receding. Commissioner Bocek asked what makes this a multi-use development versus four individual parcels. Mr. Beechick stated it is four individual parcels in a sense. By bringing in the restaurant site and by establishing lodging on the site you are helping the office market at this development. Then by bringing in the multi-family use as an additional supplement to provide the necessary counterflow traffic you are completing the multi-use function. You have a unique opportunity to have these different uses feed off of one another. What they are trying to do is create a plan that is driven by what already works at the corner and then provide some amenities that can support that and round out the development with multi-family that will help the counterflow traffic issue. Commissioner Bocek noted there could be more cohesiveness or more multi-use scenario on the alternate plan. Mr. Beechick stated there is no question that whatever plan they come up with as an alternative ultimately would be refined through the Plan Commission and the Village Board. What they tried to accomplish with the alternate plan was just to show that it fit. It is merely a preliminary plan for establishing of zoning use. Commissioner Teplinsky asked what the residents in the apartment building would be looking at to the south during whatever phase or process before another apartment building or office building goes up. Mr. Beechick they would agree to seeding and manicuring the area as a green field area. Commissioner Teplinsky asked if going to the alternative plan would effect the viability of the hotel. Mr. Beechick stated no. He stated the hotel would not only rely on this project but on the entire business and office market community surrounding it within a certain radius. Commissioner Teplinsky asked if the traffic analysis has taken into effect development that is currently going on along Milwaukee Avenue north of this site and north of Deerfield Road. Mr. Werthman stated the analysis did not take into account specific developments. However, they projected out for 5 years based on 1-percent background growth per year. They took the existing volumes and multiplied that by 5 percent and added on the proposed traffic. Chairman Ottenheimer recessed the public hearing until there is an opportunity for discussion at the regular meeting in order to give some feedback to the petitioner. The hearing was recessed at 9:00 p.m. and reconvened at 9:15 p.m. Mr. Beechick stated he would like to make some comments and then it would be in their best interests to come back at another time. He noted the only thing that makes this multi-use or mixed-use is that it has a common access point off of Milwaukee Avenue for all of its traffic. Once you are on the campus you can get from one building to another via the interconnected roadway system. The only reason use that did not conform to the B-3 zoning district was the apartment complex. The vast majority of this project conforms to the B-3 zoning district with different types of uses that are allowable in the B-3 zoning district. He stated they will try to find some subtle things they can do in increasing pedestrian linkage that will help tie some of this together. Commissioner Billiter stated the site acts like a college campus and that is the character of the site. On this site the campus is in the middle with the parking around the perimeter. Chairman Ottenheimer stated the public hearings would not be closed in order for the Commission to discuss various issues and procedural alternatives in the Regular Meeting. Respectfully submitted, Fay Rubin, Recording Secretary APPROVED BY: LESTER OTTENHEIMER, Chair Board or Commission: ❑ Plan Commission Document Type: 0 A e g nda 0 Minutes Meeting ate: 12/04/2002 Type of Meeting: ❑ Regular Meeting REGULAR MEETING BUFFALO GROVE PLAN COMMISSION December 4, 2002 Riverwalk North, east of Milwaukee Avenue north of Riverwalk Drive—Amendment of a Planned Unit Development (P.U.D.) And Preliminary Plan in the B-3 District Riverwalk North, proposed restaurant, 931 Milwaukee Avenue— Annexation with B-3 zoning and approval of a Preliminary Plan Prestige Leasing, 313 Dundee Road and 936 Betty Drive, Rezoning to the B-4 District and approval of a Preliminary Plan—Workshop #3 Chairman Ottenheimer called the meeting to order at 9:25 p.m. in the Village Council Chambers, Buffalo Grove Municipal Building, 50 Raupp Boulevard, Buffalo Grove, Illinois. Commissioners present: Chairman Ottenheimer Mr. Smith Ms. Bocek Ms. Kenski-Sroka Mr. Teplinsky Mr. Billiter Mr. Stark Commissioners absent: Mr. Samuels Mr. Khan Also present: Mr. John Schiess, Metropolis Architects/Builders Mr. Jamil Bou-Saab, Terra Engineering, Ltd. Ms. Josephine Bellalta, Altamanu Mr. Timothy Beechick, Hamilton Partners Mr. Hubert Loftus, Cowhey Gudmundson Leder, Ltd. Mr. David Olson, The Jenkins Group Mr. Michael Werthmann, KLOA Mr. Richard Mallory, The Brickman Group, Ltd. Mr. William Raysa, Village Attorney Ms. DeAnn Glover, Village Trustee Mr. Robert Pfeil, Village Planner Mr. Greg Summers, Associate Village Planner APPROVAL OF MINUTES Moved by Commissioner Smith, seconded by Commissioner Billiter to approve the minutes of the public hearing of October 16, 2002. All Commissioners were in favor of the motion and the motion passed unanimously with Commissioners Teplinsky and Stark abstaining. Moved by Commissioner Kenski-Sroka, seconded by Commissioner Bocek to approve the minutes of the second public hearing of October 16, 2002. All Commissioners were in favor of the motion and the motion passed unanimously with Commissioners Teplinsky and Stark abstaining. Moved by Commissioner Billiter, seconded by Commissioner Smith to approve the minutes of the regular meeting of October 16, 2002. All Commissioners were in favor of the motion and the motion passed unanimously with Commissioners Teplinsky and Stark abstaining. RIVERWALK NORTH, EAST OF MILWAUKEE AVENUE NORTH OF RIVERWALK DRIVE — AMENDMENT OF A PLANNED UNIT DEVELOPMENT (P.U.D.) AND PRELIMINARY PLAN IN THE B-3 DISTRICT RIVERWALK NORTH, PROPOSED RESTAURANT, 931 MILWAUKEE AVENUE — ANNEXATION WITH B-3 ZONING AND APPROVAL OF A PRELIMINARY PLAN Moved by Commissioner Kenski-Sroka, seconded by Commissioner Smith to recommend approval of the Riverwalk North projects as outlined on the agenda for purposes of discussion. Commissioner Kenski-Sroka stated she is not against the buildings at all but they seem to be dropped in the middle of a parking lot with no relationship. Buildings are disjoined and have no relationships. She is still concerned about the density of the project and she is not convinced there is the right mixture here. She noted she would like to see some kind of other uses married into the whole project and therefore cannot approve the project as is. Commissioner Teplinsky stated there really does seem to be a need for some transition in order to make this a true mixed use. He stated he would like to see some sort of cohesive transition among all of the parcels. Chairman Ottenheimer stated there is no dispute about the quality and reputation of Hamilton Partners. He stated he sees this as a multi-use rather than a mixed-use. A mixed use blends together. There is no problem with the types of uses proposed for this parcel. Something is needed to tie all the uses together with some kind of ancillary services and uses. Commissioner Kenski-Sroka moved to table the Riverwalk North matter to give the petitioner an opportunity to address the planning issues raised by the Commission. Commissioner Billiter seconded the motion and it passed unanimously. Chairman Ottenheimer indicated that the public hearings would be continued to December 18, 2002 at 7:30 PM in the Council Chambers, Village Hall, 50 Raupp Boulevard. PRESTIGE LEASING, 313 DUNDEE ROAD AND 936 BETTY DRIVE, REZONING TO THE B-4 DISTRICT AND APPROVAL OF A PRELIMINARY PLAN—WORKSHOP#3 Mr. Schiess stated they have submitted amendments to their earlier application. They were asked to look at the design of the building. The previous design had a rectilinear building with a hard corner. This was reflective of an earlier design they had submitted which had a curve addressing the general nature of that corner and the orientation they were favoring toward the northwest. He stated they have re-incorporated that idea into their design. The components of the building remain the same but they have just incorporated that corner. They have also reduced the grasscrete along the front in response to one of the Commissioner's concerns about having too many cars parked in the front. They have also relocated the driveway from Betty Drive to Golfview Terrace. They located it in such a fashion as to minimize the disruption to the detention pond there. He noted they were asked by staff to consider aligning the two driveways at the detention pond. However, they feel it is a much better solution not to align them as it will minimize the disruption to the detention pond and it also places it farther away from the intersection thereby not disrupting any traffic along the corridor. He further noted another design change incorporated since the last workshop is the driveway onto Golfview Terrace. They have made that a restricted right turn in and right turn out only. They were also asked to consider extending the proposed fence along the south property line to the east property to shield the view. They have considered taking into account police security so the fence allows site lines in various spots. Mr. Schiess noted they were asked to look at the view from the neighbors' driveway and he showed the view from 3340 Betty Drive looking northwest toward the building with the proposed trees. From 3409 Betty Drive to the east and slightly south toward the property, you can see the neighboring building and the proposed facility with either existing trees or new plantings and the fence. Mr. Schiess reviewed their responses to questions and issues raised at the previous workshop meeting. He noted there was a concern that the second driveway from Prestige if placed on Golfview Terrace would be blocked by cars that backup from the intersection of Golfview Terrace and Dundee Road. He noted that placing the driveway on Golfview Terrace takes that into account and the traffic report shows that the traffic generation would have a nominal impact and thereby cars that backup would not prohibit a right turn out of the facility. Mr. Schiess noted there was a concern about the turning radii for trucks and the design of the driveways. The engineer has looked at that and grafted the pattern the trucks would take on the property to show they have provided for adequate ingress and egress. There was also a concern about the angle of approach of the driveway from Dundee Road. The concern was that these trucks ride so low to the pavement that if they go up the steep slope they would continue to mar and scrape along the pavement. Terra Engineering has calculated that the slope based on the grade elevations would be no more than 5 percent where the recommended is actually 8 percent. He noted that Commissioner Samuels recommended the exit onto Golfview Terrace have a restricted right in, right out and they have now done so. There was concern about parking lot lights being on all the time and they will work with the police department to provide just enough adequate lighting for security. There was also concern about the light diffusion from the neighbors. He stated they have looked at that issue and determined with their photometric study shows that all of the light diffusion will remain on the property and will not spill over. He stated they were asked to look at the setback on Dundee and stated they believe the setback they are showing is allowed by the zoning ordinance. With regard to parking of delivery trucks, they submit that any trucks making deliveries to Prestige will not park on public streets. All staging operations will be done on Prestige property. There was also some concern about devaluation of properties. He stated they believe the development of this property will not have a detrimental effect on property values. The proposed development is in keeping with the character of other properties along Dundee. The setbacks and easements are adhered to. The height and area limitations are not exceeded and they are, in fact, well below the allowed FAR for the property. Another development within the current zoning could propose a much larger building. The materials used for the building are attractive, long lasting, well designed and in keeping with the materials on other properties along Dundee Road. Further, the design facility, its location relative to neighbors' properties and the extensive landscaping buffers incorporated into the design, minimizes the impact of this proposed facility. He noted there had been a question about whether Prestige would sell new or used cars and states that Prestige would sell both. He noted the concern about test-drives and stated Prestige would do everything reasonable to control the test drives on neighborhood roads. He further stated they do not believe this facility will create any more noise than a typical business. There will be no outdoor activities other than the movement of cars, which is typical in a parking lot whether it is a bank or office building. There will be no public address system or music piped to the outside. Mr. Schiess noted the questions keeps coming up as to whether Prestige has considered alternate sites. He stated they have considered quite a few other sites and this site fits the operations and the goals of Prestige best. He stated the owners of Prestige had quite a few conversations with the owners of the old Dominicks property. It was a facility designed for a food retailer and not as an auto showroom and because of that there was a great deal of square footage that could not be used by them. Furthermore the retrofit of the existing building would be such that it would not be feasible. There was also a question about IDOT's position on the restrictions on driveways. In preliminary talks they have not filed for an IDOT permit, as it is very premature to do so and that is the point where IDOT actually raises any concerns. However, preliminary reviews seem to indicate the driveway will meet IDOT's approval. He further noted only minor auto repairs and tune-ups will be performed. He also noted there will be no off hour deliveries as there would not be anyone there to receive the cars. Mr. Schiess responded to the question about what protection there was for the subdivision of the parcel once rezoned, by stating it is a question for the Board. If the rezoning is approved and if the parcel needs to be sub-divided or some subsequent owner requests for it to be sub-divided, they would need to come before the Plan Commission and the Village board. Mr. Schiess stated that cars are disposed of by being removed from the lot via a flatbed tow truck and either sold at auction or traded. Mr. Bou-Saab stated they looked at the full access from the property onto Golfview Terrace and noted the detention has been designed with a high water elevation and other utilities. They thought it would not be a good idea to align the driveways there because to do so they would lose some of the detention volume that exists in the pond and they would have to compensate for that. Secondly they would increase the length of the driveway which means they would have more impervious area to deal with. Mr. Bou-Saab responded to the memo from Troy Shannon regarding the access for fire department trucks. He noted they provided a simulation of the truck access onto the site from both Dundee and Golfview. He further noted the fire department requested a fire lane and access to the hydrant within 100 feet from the building connection. This has now been addressed. He further noted the fire department asked what is going on with the pipes for the underground detention. He stated the pipes are reinforced concrete pipes, class III that can sustain a heavy load with only two feet of cover on them. In this case there will be three feet of cover. Ms. Josephine Bellalta stated the original plan showed a 6 foot high solid wood fence along the south side of the property which has now been added along the east side on Betty Drive. There have been some changes to the landscape. Previously they had a single of row of trees with a hedge. They have taken the tree line and the hedge line and broken it up so that it is not just a straight line. It now has more variety on both sides of the fence. She noted there have been no more trees slated for removal as they have merely shifted the ones they intend to plant. Because of the new shape of the curved building they have managed to save one more tree on the corner. Mr. Schiess stated they were asked to look at the westernmost overhead door which is a door that allows them to bring vehicles in for washing and prepping thereby taking up as little space as possible. The door is important to their operations and they would like to paint it a color that blends in better with the brick color so it will not call attention to itself. Mr. Summers also asked that they look at the east elevation and the difference in the treatment of the doors between the west elevation and the east elevation. They have provided an awning on the door, which will be a secondary customer entrance point. They have not provided such an awning on the other door and the reason is that they saw this side of the building more of a service area and the fire department has asked them to actually create a fire lane there. They actually back up to a neighbor on the east and did not feel they wanted to highlight the area. Mr. Schiess stated they were asked to look at the relationship between the windows shown on an elevation and the plan as shown. They do not match up on the overhead but will do so before they build. Commissioner Kenski-Sroka stated she likes the curved wall much better. There has been substantial improvement with the elimination of the access on Betty Drive and the rationale of the misalignment on Golfview Terrace and the landscaping is very nice. However, she cannot see a 40-foot truck making its way around the site and that is her only concern with the project at this point. Mr. Bou-Saab stated he is very confident of the scale used in the simulation for truck maneuvers. Commissioner Bocek stated approximately 168 cars coming in and out at this intersection seems to be very significant instead of the minimal as suggested. Commissioner Bocek asked if they have looked into acquiring the existing commercial building to the east. Mr. Schiess stated the owner has noted the property is not for sale. Commissioner Bocek asked if it would be possible for a visual display of the impact of the removal of trees on the western edge of the property. Ms. Bellalta stated the tree line that is there now will have about 11 large trees left on the site and will provide some thickness there. They have also left and added quite a few trees on their property. They have taken out only anything that is weedy and will begin to become maintenance issues on the site. What is left will still be essentially a screen for the building. It won't be a solid screen as is now but it will be partial. Commissioner Teplinsky asked if there are restrictions in place at Prestige's current facility as to where customers can test-drive cars. Mr. Schiess stated there are no restrictions, although most test drives are done on Waukegan Road. Commissioner Teplinsky asked what Prestige has in mind to stop test drives in the neighborhood. What exactly does "reasonable control" mean. Mr. Schiess stated "reasonable control" means there is a sales person along on the test drive. They will direct the customer to certain roads. Also customers would be advised that residential roads are off limits. Commissioner Teplinsky asked if Prestige could guarantee there would be loading and unloading only on site. Mr. Schiess stated yes. Commissioner Billiter asked what percentage of time would cars be parked on the grasscrete. Mr. Schiess stated only during business hours. Commissioner Billiter asked how the grasscrete would be maintained. Ms. Bellalta stated they would be using shade tolerant lawns as long as they get 4 hours of sunlight during the day. If cars are shifted off and on so they are not parked in the exact same spot all the time. Commissioner Billiter asked what enforcement the Village has to prevent bad looking lawns. Mr. Pfeil stated it would initially be part of the approved landscaping plan so there would have to be some understanding of what the exact intent is for maintenance. It would then have to be monitored by Village Forester and the Building and Zoning Department to discuss any problems that may occur. In the event that voluntary compliance is not achieved, additional enforcement action would be taken to ensure adequate maintenance. Mr. Schiess stated you could think of the Village's enforcement as a safety net. He commented that it is not in Prestige's best interests to show even minor disrepair in the building and surroundings since the business is focused on the sale of upscale automobiles. Commissioner Billiter asked where all the water from the parking lots goes. Mr. Bou-Saab stated they are storing for a 100-storm event. There are catch basins and the main line comes in and there is a restrictor value. Whatever is allowable to release drains into the 54-inch stormsewer system on the IDOT right-of-way on Dundee Road. Commissioner Smith stated he has not liked this use from day one and he still does not like the use here. Test-drives and truck deliveries do not fit in here and the benefits do not outweigh the negatives of this property. This does not blend in with the community at all. Mr. Gerald Scott, 508 Parkview Terrace, the residents are opposed to this variation of use due to the fact there are three condo units and two commercial uses using this access. He asked if the Village could have an ordinance prohibiting the parking of delivery trucks on Golfview Terrace. Also how will trucks exit the property onto Dundee Road as they can only turn around by going through the subdivision, which is on big cul-de-sac. He further asked why the proposed project appears to stick out from the adjacent property to the east. Lastly, he noted the grass on the north side of the building would not work, as the north side sees no sun. Ms. Ruth Reynolds, 357 Parkview Terrace, noted that the gravel trucks now being used in the construction of the 11 new townhomes use up the entire street and she wonders how a flatbed will make it through on the street delivering cars. She further noted there has been a great deal of new construction in this subdivision and traffic is bad and will be a nightmare with even more traffic. She asked what kind of white building material is being used for the proposed building. She also noted that overnight lighting disturbs her greatly and wonders what it will look like from the back of the new townhomes. Ms. Sharon Sims, Remax Suburban, 1808 Arlington Heights Road, stated that no matter how beautiful this building will be it will hurt the value of the homes in this area. Ms. Maya Anderson, 3211 Betty Drive, stated it is inevitable for this parcel to change and she encourages the commission to take the time and find an appropriate proposal and solution for this site. In response to the questions asked by the public, Mr. Schiess stated they have repeatedly noted there will be no trucks parked on either Golfview Terrace, Dundee or Betty Drive. The last place one of these trucks would turn is south into the neighborhood. A truck driver would seek the nearest road to get back to Dundee. The setback onto Dundee is allowed under the ordinance and he stated he would actually site the chapter of the zoning ordinance that allows it at the next meeting. Mr. Schiess noted that all of the different uses under construction on the east side of Golfview were taken into account in the traffic analysis and the numbers have been provided. He did, however, noted he will have to check out the drives coming too close to the back yards of the new townhomes. He noted they are willing to work with the police department regarding leaving on only the amount of lights required for adequate safety. He noted the white material proposed for the building is pre-finished aluminum panels that will wear very well. Mr. Schiess stated he would like to see a substantiation of the realtor's statements on homeowner's values. In summary Mr. Schiess stated the use, while not specifically mentioned in the Master Plan for this location is a compatible use. The design, materials, setbacks, and height all support their contention that this is a compatible use with the Master Plan. Secondly, the design is consistent with the character of buildings along Dundee Road. This building may actually assist in bringing up the level of design along Dundee Road. The design employs certain elements of fencing and landscaping so as to be a good neighbor. He noted they have a reduced FAR and lastly, this is a viable business that will generate tax revenues to the Village of Buffalo Grove as it does in Glenview now in the amount of approximately $100,000. He noted that in a time when many villages are having to tighten their belts, the Village should support a zoning change, which will have such a positive effect. The Commission agreed that the next step for the petitioner is a public hearing. CHAIRMAN'S REPORT—None FUTURE AGENDA SCHEDULE Mr. Pfeil stated the next meeting is scheduled for December 18, 2002. PUBLIC COMMENTS AND QUESTIONS—None STAFF REPORT—None NEW BUSINESS—None ADJOURNMENT Moved by Commissioner Teplinsky, seconded by Commissioner Kenski-Sroka and carried unanimously to adjourn. Chairman Ottenheimer adjourned the meeting at 10:55 p.m. Respectfully submitted, Fay Rubin, Recording Secretary APPROVED BY: LESTER OTTENHEIMER, Chair