Loading...
2019-12-02 - Ordinance 2019-068 - AMENDING FEES AND FINES Underlined=addition Str-ikeeut=deletion 11/22/2019 ORDINANCE NO. 2019- 068 AN ORDINANCE AMENDING FEES AND FINES WHEREAS,the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois Constitution of 1970; and WHEREAS, the Village desires to amend it's fees and fines because the existing rate does not adequately cover the cost of the service, no fee/fine existed previously, the fine is no longer a deterrent to noncompliance, or the fee is lower that other municipal comparables for similar service; and WHEREAS,the Village desires to amend Fees and Fines Schedule, as follows. NOW THEREFORE BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ]LLINOIS,as follows: Section 1. The foregoing recitals are hereby adopted and incorporated into and made a part of this Ordinance as if fully set forth herein. Section 2. Section 15.04.020 and Section 15.12.030 and Section 1.16.010, Fee Schedule of the Buffalo Grove Municipal Code are hereby amended to read as follows: Buffalo Grove Classification Fee Municipal Code Section 15.04.020 Section Building permit fee for construction costs up to.... 108.21 9.2 subsection $50.00 one thousand dollars. A.I. ._................ ..... .... $50.00 for the first ...�... 15.04.020 Section $1,000 of N sub section Building permit fee for construction costs over construction cost plus$10.00 - A.1. one thousand dollars. for each additional$1,000 or fraction thereof. 15.04.020 Section g p , sheds, gazebos $50.00 base fee Building permit fee for decks per square foot. $0.15 . 109.2 subsection and patios P q (not A.1. including any electrical fees). 15.04.020 Section �98�19.2 subsection Building plan review fee for buildings of up to $50.00 A 2 500 square feet 04.020 Section Building plan review square fee buildings of 501 $75.00 N 08.2109.2 subsectionthrou feet 1 15.04.020 Section Buildingplan review t' �2109.2 subsection p � fee for buildings of 1,001 $125.00 through 2,000 square feet A.2. 4.02 subsection ....., .. ......of .�. _.........,_, 15.04.020 Section 1 no � Building plan review fee for buildings of 2,001 $175.00 I YV8.� through 3,000 square feet A.2. 15.04.020 Section 109.2 subsection Building plan review fee for buildings of 3,001 $200.. . through 4,000 square feet .00 A.2. ..2...... Buildingplan review fee for 15.044.020 Section .................................. �2109.2 subsection r buildings of 4,001 $250.00 through 5,000 square feet A.2. 15.04.020 Section �219.2 subsection Building plan review fee for buildings of 5,001 $0.05 per square foot. and over square feet A.2. ........................ ................... 15.04.020 Section Alterations and remodeling where it is One-quarter percent (.0025) II U �2109.2 subsection impractical to compute plan review fees on a of the cost of the work to be A.2. square foot basis performed with a minimum fee of$50.00 ................................ ..... ............ 15.04.020 Section 108.2109.2 subsection Amendment Form plan review fee. $50.00 A.2. �mm ............. ............... �.. 15.04.020 Section 108. 109.2 subsection Plumbing permit fees for a water heater $50.00 A.3. 15.04.020 Section 2109.2 subsection Plumbing permit fees for each sump pump pit $15.00 A.3. 15.04.020 Section 108.219.2 subsection Plumbing permit fees for each sewer service $15.00 A.3. 15.04.020 S _... ection 108.2109.2 subsection Plumbing permit fees for each water service $15.00 A.3. 15.04.020 Section Plumbing permit fees for each water meter $15.00 408.2109.2 subsection 2 A.3. ________------------- _...... _....... ...................... ................ 15.04.020 Section 108.2109.2 subsection Plumbing permit fees for each clean out $10.00 A.3. 15.044.02.02 0 Section subsection Plumbing permit fees for each plumbing fixture 108. or opening not listed $10.00 A.3. 15.04.020 Section .....� ....w.a.a.�. _ __...................... �2109.2 subsection Plumbing permit fees for an in-ground $60.00 swimming pool A.3. 15.04.020 Section 108.2109.2 subsection Plumbing permit fees for a lawn sprinkler system $4.00/head$75.00 minimum A.3. 15.04.020 W Section .................. .. ..._.�. ._......... N108.2109.2 subsection Plumbing permit fees for a sewer repair $65.00 A.3. _........... ................ 15.04.020 Section I 4 21002 subsection Plumbing permit fees for a RPZ installation (new $50.00 or replacement) A.3. 15.04.020 Section .21 9.2 subsection Minimum plumbing fee $50.00 A.3. 15.04.020 Section $50.00 or 25 percent mmnt ........_.. of 108. 109.2 subsection Plumbing permit fees for a plan review fee building plan review fee, A.3. whichever is greater _....................... m 15.04.020 Section circuit o mElectrical permit fee for each closed ...... c l 108. 109.2 subsection AMPS f 15 $7.00 A.4. Electrical permit fee for each c 15.04.020 Section .......... �2109.2 subsection p AMPS closed circuit of 20 $12.00 A.4. 15.04.020 Section Electrical permit fee for each closed circuit of 30 109.21.11.0.2,®2 subsection AMPS $20.00 A.4. �p � Electrical permit fee for each ............. 15.04.020 Section YF10�1 9.2 subsection p h closed circuit of 40 $25.00 AMPS A.4. 3 15.04.020 Section Electricalpermit.... � � .. ..... �21 9.2 subsection fee fAo�MePsh closed circuit of 50 $30.00 A.4. 15.04.020 Section 108.21 9.2 subsection Electrical permit fee for closed circuit of 60 $40.00 A.4. 15.04.020 Section �2109.2 subsection Electrical permit fee for services, including $50.00 service revisions,of 100 AMPS A.4. 15.04.020 Section Electrical........_.....__ .................................. .... N02109.2 subsection permit fee for services, including $75.00 A.4. service revisions,of 101 through 200 amp 15.04.020 Section �98:21 subsection Electrical permit fee for services including $100.00 A.4. service revisions,of 201 through 400 amp 15 04 020 Section l00 subsection Electrical permit fee for services,including $150.00 ... service revisions, of 401 through 800 amp AA ..._ ............................... 15.04.020 Section YGO�C19.2 subsection Electrical permit fee for services, including $200.00 service revisions, of 801 through 1199 amp A.4. Section 15.040.�02 subsection Electrical permitfee for services, including $250.108.2 service revisions,of 1200 through 4000 amp 00 A.4. 15.04.020 Section . Electrical permit fee for services, including -10�219.2 subsection $300.00 AA service revisions,of 4001 through 8000 amp '� 9 ,,,,,subsection 2 Section Electrical permit fee for feeder circuits of 60 1 through 100 amp $35.00 AA _...__._._....... ......................_...... ........... .......... 15.04.020 Section �219.2 subsection Electrical permit fee for feeder circuits of 101 $50.00 A.4. through 200 amp 15.04.020 Section �209.2 subsection Electrical permit fee for feeder circuits of 201 $65.00 A.4. through 400 amp 15.04.020 Section perm it it fee for feeder circuits...... $85.00 .mmm .2109.2 subsection p of 401 4 _............................................. A.4. through 600 amp 15.04.020 Section �2109. c Electrical permit fee for feeder circuits of 601 2 subsection $110.00 through 1000 amp A.4. 15 04.020 Section Electrical permit fee for feeder circuits of 1001 $130..........___ ..._.._..... I �210 .2 subsection through 2000 amp .00 A.4. permit e fee for a motor three quarter 15.04.020 Section Electrical p The circuit fee plus$25.00 4�2109.2 subsection for the first and$15.00 for horsepower or more A.4. each additional 15.04.020 Section Electrical permit fee except for residential units, 108.21 9.2 subsection the fee for a motor less than three-quarter $10.00 plus the circuit fee A.4. horsepower ._1.. ........ ........... �............ ..... 5.04.020 Section 4219.2 subsection Audio communications system fee $50.00 A.4. ......... 15.04.020 Section 108. 109.2 subsection Burglar alarm system fee $50.00 A.4. 15.04.020 Section 108.2109.2 subsection Electronic computer/data processing system fee $50.00 A.4. 15.04.020 Section 48.1 9.2 subsection Fire alarm system fee $100.00 A.4. 15.04.020 Section 108z1 9.2 subsection Intercom and public address system fee $50.00 per system A.4. 15.04.020 Section '108.21 9.2 subsection Relocatable wired partitions system fee $50.00 A.4. ..................... 15.04.020 Section N49.21 9.2 subsection Temporary wiring system fee $50.00 A.4. 5.04.020 Electrical permit minimum fee for all .............Section S R . 19.2 subsection $50.00 installations, except signs A.4. 5 15 04.020 Sects on ww............. 108.21 9.2 subsection Electrical permit fees for a sign of 15 AMPS $7.00 A.4. ... ...... .... .. ..... ..... _. ............ 15 04.020 Section 108.2109.2 subsection Electrical permit fees for a sign of 20 AMPS $12.00 A.4. 15.04.020 Section 10821 9.2 subsection Electrical permit fees for a sign of 30 AMPS $20.00 A.4. ........ ..... 15.04.020 Section 108.219.2 subsection Electrical permit fees for a sign of 40 AMPS $25.00 A.4. _...... _ ....... .................. 15.04.020 Section 108. 109.2 subsection Electrical permit fees for a sign of 50 AMPS $30.00 A.4. 15.04.020 Section 108.219.2 subsection Electrical permit fees for a sign of 60 AMPS $40.00 A.4. ..............� .. 15.04.020 Section $50.00 or 25 percent of the 108.2109.2 subsection Electrical permit minimum plan review fee building plan review fee— A.4. whichever is greater. 15.04.020 Section 18�2109.2 subsection Mechanical permit fees for heating in residential $50.00 (new or replacement unit) A.5. 15.04.020 Section Mechanical permit fees for heating in all non- .2109.2 subsection residential uses(new installations)per 2,000 $50.00 A.5. square feet or fraction thereof 15.04.020 Section Mechanical e p rmit fee for air conditioning 108.2109.2 subsection (window units not included) in a residence (new $50.00 A.5. or replacement unit) 15.04.020 Secti Mechanical on units t included) anynomm� ....._. p conditioning on 109. 109.2 subsection n $50.00 A.S. residential unit(new installations)per 2,000 square feet or fraction thereof . _......... _ _...._...� 15.04.020 Section �08:-2 9.2 subsection Minimum mechanical permit fee for $50.00 modification of existing duct work A.5. 6 20 Section $50.00 or 25 percent of 108.2109.2 subsection Mechanical permit fee plan review fee building plan review fee— A.5. Whichever is greater �..._.. ...... ........_. w ...._._....... ...� .. 15.04.020 Section Elevator permit fee—New installation charge per 08. 109.2 subsection each elevator, dumbwaiter,moving walk, $125.00 A.6. escalator,conveyor or manlift(includes initial inspection) 15.04.020 Section Elevator permit fee—Semi-annual inspection/Certificate of compliance per each �2109.2 subsection $80.00 inspection per elevator, dumbwaiter, moving A.6. walk, escalator,conveyor or manlift 15.04.020 Section Elevator permit fee—Semi-annual 8. 109.2 subsection inspection/Certificate of compliance per each $80.00 A.6. inspection for repairs and reinspection 15.04.020 Section Elevator permit fee—Plan review fee for each 108.2109.2 subsection elevator, conveyor, dumbwaiter, moving walk, $175.00 A.6. escalator or manlift for buildings of four stories or less 15.04.022 0 Section 109 subsection Elevator permit fee—Additional fee per floor form .................... $1 4 .2 every story above four stories: 0.00 A.6. 15.04.020 Section Fire protection system fee, new automatic 4�219.2 subsection $125.00 A.7. sprinkler system, each system, 1-100 heads . 15 04 0 __ �... 20 Section Fire protection system fee,new automatic 108.2109.2 subsection sprinkler system,every 100 additional heads or $50.00 A.7. fraction thereof 15.04.020 Section Fire protection system fee,renovation to an 108.2109.22 subsection o $25.00 existing system of 20 heads or less A.7. 155... .04.020 Section...... Fire protection system fee,renovation to an ...... 108.2109.2 subsection $50.00 existing system of 21-100 heads A.7. 15.04.020 Section Fire ,protection system fee .._..... p y renovation to an C 108.2109.2 subsection existing system every 100 additional heads or $50.00 A.7. fraction thereof . Section 15.04.020 S _ Fire protection y $50. system fee, renovation to partial 108.2109.2 subsection stem of t he domestic waters stem 00 7 15.04.020 Section YV��1 02 subsection Fire protection system fee,renovation to existing $50.00 system: standpipes(each) A.7. 15.04.020 Section �9810922 subsection Fire protection system fee,renovation to existing $50.00 system: fire pumps (each) A.7. 15.04.020 Section Fire protection system fee, renovation to existing 108.2109.2 subsection $50.00 system: hood suppression systems A.7. ....... _. 15.04.020 Section YV019.2 subsection Fire protection system fee, renovation to existing $50.00 system: clean agent extinguishing systems A.7. ............ ........................................................ 15.04.020 Section 48�219.2 subsection Fire protection system fee, renovation to existing $50.00 system: alternate fire extinguishing systems A.7. _............................................................. ............ 15.04.020 Section Fire protection system fee, renovation to existing �219.2 subsection $50.00 system: means of egress access control systems A.7. protection system fee ....._.._____ 15.04.020 Section Fire p y , renovation to existing 108. .1,09.2.subsection system: plan review/inspection fee for fire $100.00 A.7. suppression systems 15.04.020 Section Fire alarm system fee: New or modification to an 108.219.2 subsection existing system(this is in addition to a$100.00 $60.00 A.7. electrical fee) stem fee: Plan re � 15.04.020 Section �2109.2 subsection Fire alarms y view/inspection fee $50.00 A.7. for fire alarm systems of 5,000 square feet or less .......... 15.04.020 Section Fire alarm system fee: Plan review/inspection fee Ytri .2109.2 subsection for fire alarm systems of 5,001 to 10,000 square $5.00 per device(minimum $100.00) A.7. feet 15.04.020 Section Fire alarm system fee: Plan review/inspection fee 108.219.2 subsection for fire alarm systems of 10,000 square feet or $5.00 per device(minimum $150.00) A.7. more 15......____...................ect Above-ground pool installation or alteration .04.020 Section �219.2 subsection g p tion $50.00 permit fee A.8. 8 15.04.020 Section $50.00 or 25% of building 108. 109.2 subsection Plan review fee for the Health Department plan review fee—Whichever A.9. is greater ................... ..........._... �........................... 15.04.020 Section Any inspection or reinspection not covered by 108.2109.2 subsection the fees designated in section 108.2109.2(per $50.00 A.10. inspection) ......................_ . .......... 15.04.020 Section Where work has been started prior to the Doubled the original permit 108.2109.2 subsection issuance of a permit, the normal permit fee shall $50.00 and a maximum fee(with a minimum of A.11. be increased to of $1,000.00) 15.04.022 0 Section 109 subsection The fee for Certificate of Occupancy: residential $50.� (per unit) 00 A.12. ....... T._._._----------- 15.04.020 Section 9�1p he fee for Certificate of Occupancy: non- 108..2109.2 subsection $150.00 residential(per unit) A.12. 4.020 Section Zoning/Code Compliance Letter(non-residential 1 109.2 subsection only) $ 50.00 A.B. -mmmmmmm15.04.020 mSection...... ... .a... 108..2109.2 subsection Parking Lot Repairs/Restriping $50.00 A.14. ......................... ._..... �.� 15.04.020 Section Permit fee for Fire Department construction 109.2109.2 subsection $50.00 inspections(includes one reinspection) A.15. ............. 15.04.020 Section Fee per reinspection b the Fire Department after 108.2109.2 subsection p y p $50.00 the first reinspection A.15. W 15.04.020 Section 19�219.2 subsection Fire Department annual safety inspection fee $0.00 A.15. (original inspection or the first reinspection) 408109 2 Fire Department annual ....... 0 Section V subsection p n safety inspection fee per A.15. reinspection subsequent to first reinspection $50.00 15.04.020 Section 408.2109.2 subsection Temporary food service permit fee $75.00 A.M. 9 .. ........... 15,04.020 Section 109.2 subsection Driveway and/or apron permit fee $50.00 A.17. 15.04.020 Section 109.2 subsection Permit cancellation fee $50.00 A.18. ............................................. Fee for Public orks D�j�tmentjogQmptete 15.12.030 subsection C connection to the Village storm sewer system in $1,200.00 the..paEkway Section 3. Table 2.62.015-1,Table of Offenses and Fines,of the Buffalo Grove Municipal Code is hereby amended by changing the following offenses of Sections 5.20.190.A,5.20.192,5.24.020, 5.24.080,5.24.090,5.24.100,5.32.090,5.32.105, 9.17.020, 9.28.010.C, 9.52.020,9.70.010and 9.80.010 as follows: .......................Chapter/Section Title/Offenses Minimum Maximum Minimum Fine/Fine Fine* Fine Paid Before Must Hearing Appear At Hearin Chapter 5.20 Liquor Controls 5.20.190.A Alcohol $10G- 150 underage/possession/consumption ........ ........—----------- 5.20.192 Social Hosting Responsibility 59 250 Chapter 5.24 Solicitors .................... —--- ------------------­--5.24.020 Soliciting without a permit $100-.09 5.24.080 Soliciting-Failure to leave when $100-.00 requested 5.24.090 Soliciting where posted "No $100-.00 Soliciting" 5.24.100 Soliciting in violation of soliciting $100-.09 hours/days Chapter 5.32 Tobacco 5.32.090 Sale/delivery of tobacco products tommmmm $I�LI25 person 10 under 21 years of age Possession of tobacco products by 5.32.105 -� 100 person under 18 years of age .................................... ... _... Chapter 9.17 Drug Paraphernalia Possession/sale of drug 9.17.020 $190- 15 paraphernalia .........Chapter.. .9.28.................. y ... ....��� Disorder) Conduct 9 28.010 C Possession of fireworks 1 00 Chapter 9.52 Theft ............ ..............—........... . 9.52.020 Theft5� 200 Chapter 9.70 Truancy 9.70.010 Truancy -C'7& 100 Section 4. Section 15.04.020 Section 109.2 subsection A.17., Schedule of permit fees,of the Buffalo Grove Municipal Code is hereby added to read as follows. 17. Driveway and/or apron permit fee is set forth in Chapter 1.16 of this Code. Section 5. Section 15.04.020 Section 109.2 subsection A.18., Schedule of permit fees,of the Buffalo Grove Municipal Code is hereby added to read as follows: 18. Permit cancellation fee is set forth in Chapter 1.16 of this Code. Section 6. Section 15.12.030, of the Buffalo Grove Municipal Code is hereby amended to read as follows: 15.12.030-Downspouts and sump pump discharges. A. New Connections and New Construction. Except as set forth in subsection B of this section, the following requirements for new connections and new construction apply: 1. Downspouts. a. All downspouts or roof drains shall discharge onto the ground or be connected to a storm sewer.No downspouts or roof drains shall be connected to the sanitary sewer. b. A downspout or roof drain shall be terminated no more than ten feet from the building unless written approval is granted from the Village Engineer. 2. Footing Drains. Footing drains shall be connected to sump pumps and discharge shall be made into a storm sewer. No footing drains or drainage tile shall be connected to the sanitary sewer. 11 3. Floor Drains. Floor drains in basements shall be connected to a sump pump and discharged to the sanitary sewer. 4. Sump Pumps. a. Sump pumps installed to receive and discharge groundwaters or other stormwaters shall be connected to the storm sewer. Sump pumps installed to receive and discharge floor drain flow or other sanitary sewage shall be connected to the sanitary sewer. A sump pump shall be used for one function only, either the discharge of stormwaters or the discharge of sanitary sewage. b. Sump pump discharges to the storm sewer system shall be a conduit of four inch minimum diameter P.V.C. pipe, at a minimum slope of one percent, and a minimum depth from finished grade to the top of pipe of eighteen inches. B. Existing Stormwater Sump Pump Discharges. The discharge piping from existing sump pumps installed to receive and discharge groundwaters or other stormwaters shall be terminated no more than ten feet from the building unless written approval is granted by the Village Engineer. C. Sum imp disc are Dipes ma be connected to the storm sewer with the review and apt�roval of the Public Works Department. The connection fee to perform this private connection to the Village storm sewer is set forth in Chapter 1.16 of this Cade. The resident will be responsible for this connection fee, the restoration of the vegetation in the parkway, the pipe length needed to complete the connection in the parkway and the replacement of t e sidewalk or other Villa e facilities or assets that are required to be moved or relocated or are da a e due to the private connectionto_t_he Village storm sewer. Upon completion the connection to the sump pump will be a private storm sewer service located in the Village right-of-way and the resident will be res osible for the entire private storm sewer service and connection to the Village storm sewer main as per Title 12.04 of the Buffalo Grove Municipal Code. DE. Unlawful Discharge.It is unlawful to cause or permit the discharge from any sump pump, downspout or roof drain to flow onto public streets,sidewalks or parkways. Section 7. Section 5.20.194, of the Buffalo Grove Municipal Code is hereby amended to read as follows: 5.20.194-Penalty. Aiiy per-son found guilty of vielathig Seefien 5.20.192 of 5.20.193 shall be fined in the mandatery afneunt of fiat less than afte thousand dellafs for the fifst violation and the fnafidatar-y aniount of not less than two thousand dollars for-eaeh subsequent vielationAnperson violatin the provisions of Section 5.20.192 or 5.20.193 shall be punished as movided in Chapter 1,08._ Section 8. If any section,paragraph,clause or provision of this Ordinance shall be held invalid, the invalidity thereof shall not affect any other provision of this Ordinance. Section 9'. This Ordinance shall be in full force and effect from and after its passage, approval and publication. This Ordinance may be published in pamphlet form. AYES: 6—Stein, Ottenheimer,Weidenfeld,Johnson, Smith,Pike NAYES: 0-None ABSENT: 0-None PASSED: December 2 2019 APPROVED: December 2„2019 12 APPROVED: Beverly Suss n,Village President ATTEST: ranet 1Y,Aabian Village Clerk 13