15.24.060___ Stormwater Management Application.
Created with a trial version of Syncfusion Essential DocIO.
15.24.060 - Application.
A. No site development or building permit shall be issued until the applicant submits an acceptable site
development plan and certifies that any land-clearing construction or development involving the
movement of earth shall be in accordance with such plan.
B. Each application for a site development permit shall be made by the owner of the property or his
authorized representative to the Village Engineer and shall be accompanied by a site development
plan consisting of the following, unless the Village Engineer finds any item unnecessary to insure
compliance with the provision of this Chapter; provided; however, that no exemption from subsection
A of this section shall be granted to any applicant who intends to move in excess of five hundred cubic
yards of dirt:
1. With respect to site developments, a vicinity sketch, showing acreage of site, boundary line
survey, zoning, type of proposed sewer and water facilities, location of existing utilities, buildings
and drains on and within one hundred and fifty feet of the site, together with a legend and scale.
There shall be included on or with such a vicinity sketch:
a. A soil map of the subject property showing the predominant soil types on the site,
b. Information regarding those areas abutting or adjacent to the site sufficient to shown existing
drainage pattern and the drainage course that may affect, or be affected by the development
of the site,
c. The name and address of the developer and owner,
d. The name and address of any consulting firm retained by the applicant, together with the
name of the applicant's principal contact at such firm,
e. Limits of regulatory floodplain(s),
f. Areas to be sodded, seeded, mulched or paved,
g. Acreage of area to be vegetatively stabilized, if any,
h. Areas to be left undisturbed;
2. With respect to site grading, a grading plan showing the site and one hundred fifty foot adjacent
peripheral strip, proposed contours at one-foot intervals, final grades, and street profiles.
3. Stormwater Management Plan per the requirements of the Watershed Development Ordinance
(WDO) and the Watershed Management Ordinance (VMO) including a soil erosion and sediment
control plan shall be submitted to the Village Engineer for approval prior to beginning any work.
A soil erosion and sediment control plan shall include, but not be limited to, the requirements of
the WDO or WMO, or as required by the Village Engineer.
4. For the purpose of exemplifying the considerations and factors which should enter into the
preparation of a site development plan, the standards and requirements of the Illinois Urban
Manual published by the Association of Illinois Soil and Water Conservation Districts, latest
edition, shall be used or as determined by the Village Engineer.
(Ord. 92-14 § 1 (part), 1992; Ord. 85-13 § 10 (part), 1985: Ord. 79-19 § 1 (part), 1979).
(Ord. No. 2016-017, § 5, 3-21-2016)