Loading...
PM C VILLAGE OF BUFFALO GROVE PUBLIC WORKS DEPARTMENT PERFORMANCE STANDARDS SECTION #465 PROGRAM #811 ACTIVITY NAME NUMBER 01 PM-C ____________________________________________________________________________ DESCRIPTION See systematic sequence for PM-C service _____________________________________________________________________________ EQUIPMENT AND SAFETY GEAR 1. Mechanics tools 1. As required 2. V.A.T. 2. Safety toe shoes 3. Hoist 4. Drop lite ______________________________________________________________________________ MATERIALS 1. As required _____________________________________________________________________________ CREW SIZE ONE X TWO THREE FOUR VARIOUS _____________________________________________________________________________ Rev. 5/00 VILLAGE OF BUFFALO GROVE PUBLIC WORKS DEPARTMENT PERFORMANCE STANDARDS SECTION #547 PROGRAM #811 ACTIVITY NAME NUMBER 01 PM-C ____________________________________________________________________________ WORK METHOD 1. See systematic sequence 2. Motors manual 3. Manufacturer's service/shop manual 4. Complete condition record ____________________________________________________________________________ SAFETY PROCEDURES 1. Same as PM-A and PM-B ___________________________________________________________________________ PERFORMANCE STANDARD man-hours/C service ___________________________________________________________________________ SYSTEMATIC SEQUENCE FOR PM ‘C’ INSPECTION INCLUDES ALL ITEMS LISTED FOR PM ‘A’ or ‘B’ Service Level 1. Inspect alternator, test output voltage. 2. Inspect air compressor if equipped. 3. Spark plugs, if necessary replace and gap except platinum. 4. Distributor: a) If equipped, inspect contacts for corrosion and cap for cracks. b) Inspect wiring condition. c) Inspect for burning, or insulation cracks. 6. Electronic Ignition a) Note CEL lamp, check for misfire history, b) Inspect condition of components. 7. Emission Controls a) Note CEL lamp, check for failure history, b) Inspect condition of components. 7. Positive crankcase ventilator valve - remove, replace if necessary. 8. Cab hold-down - bolt insulators - inspect, tighten bolts if required. 9. Body mounts - tighten if required. 10. PTO - inspect for wear and lubricate pivot points.