Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BIDTAB Bikepath 2018
Village of Buffalo Grove Finance Department Bikepath & Parking Lot Project 2018 Tabulation Accu-Paving Co.Allstar Asphalt, Inc.Brothers Asphalt Paving Chadwick Contracting Chicagoland Paving Contrctors Inc.Continental Construction Co.J&R 1st in Asphalt Inc. Bid Opening: March 21, 2018 2665 S. 25th Ave.165 West Hintz Rd 315 S. Stewart Ave.12 Prosper Ct.225 Telser Road 1919 Greenwood St 7659 W. 98th Street Broadview, IL 60155 Wheeling, IL 60090 Addison, IL 60101 Lake in the Hills, IL 60156 Lake Zurich, IL. 60047 Evanston, IL 60201 Hickory Hills, IL 60457 andrew@mertes.com sales@allstarasphaltinc.com bapinc@brothersasphaltpaving.com chadjohnson@chadwickcontracting.com office@chicagolandpaving.com Haurd@yahoo.com estimator@jr-asphalt.com Bid Bond:Yes Yes Yes Yes Yes Yes Yes Signed Proposal Form:Yes Yes Yes Yes Yes Yes Yes Signed Public Contract Statements:Yes Yes Yes Yes Yes Yes Yes Contract Modifications Requested No No No No No No No Traffic Control and Protection $2,025.00 $450.00 $8,800.00 $2,000.00 $2,000.00 $20,000.00 $200.00 Lump Sum Class D Patches 3.5 inch $129,857.50 $134,937.50 $127,000.00 $150,812.50 $117,475.00 $88,900.00 $122,872.50 6350 SQ YD $20.45 $21.25 $20.00 $23.75 $18.50 $14.00 $19.35 Base Course Type B $2,449.25 $2,020.00 $2,525.00 $2,020.00 $1,515.00 $5,050.00 $2,424.00 101 ton $24.25 $20.00 $25.00 $20.00 $15.00 $50.00 $24.00 Preparation of Base $2,504.00 $3,130.00 $6,260.00 $2,191.00 $4,695.00 $25,040.00 $62.60 6260 SQ YD $0.40 $0.50 $1.00 $0.35 $0.75 $4.00 $0.01 Drainage & Utility Structures Adjusted $1,200.00 $1,200.00 $3,000.00 $1,500.00 $2,100.00 $2,400.00 $1,200.00 6 each $200.00 $200.00 $500.00 $250.00 $350.00 $400.00 $200.00 Two Coat Coal Tar Sealcoat $34,644.50 $40,943.50 $28,345.50 $28,345.50 $44,093.00 $125,980.00 $44,093.00 314950 SQ FT $0.11 $0.13 $0.09 $0.09 $0.14 $0.40 $0.14 Crack Sealant $4,626.50 $2,922.00 $2,532.40 $2,435.00 $3,896.00 $14,610.00 $4,139.50 4870 feet $0.95 $0.60 $0.52 $0.50 $0.80 $3.00 $0.85 4 inch Painted Lines $4,593.00 $5,817.80 $6,277.10 $4,593.00 $6,124.00 $30,620.00 $5,205.40 15310 feet $0.30 $0.38 $0.41 $0.30 $0.40 $2.00 $0.34 TOTAL COST $181,899.75 $191,420.80 $184,740.00 $193,897.00 $181,898.00 $312,600.00 $180,197.00 Notes page 1 Finance Department Bikepath & Parking Lot Project 2018 Tabulation Johnson Paving Maneval Construction Co.Patriot Maintenance Inc.Peter Baker & Son Schroeder Asphalt Services, Inc.TAT Enterprises Inc. Bid Opening: March 21, 2018 1025 East Addison Ct 28090 West Concrete Dr 405 Washington Blvd.1349 Rockland Rd P.O. Box 831 6546 Cherry Valley Rd Arlington Heights, IL 60005 Ingleside, IL 60041 Mundelein, IL 60060 Lake Bluff, IL 60044 Huntley, IL. 60142 Kingston, IL 60145 ajoiner@johnsonpaving.com elitchfield@manevalconst.com patriotmaintenanceinc@yahoo.com rusty@peterbaker.com grace@schroederasphalt.com terry@tatenterpriseinc.com Bid Bond:Yes Yes Yes Yes Yes Yes Signed Proposal Form:Yes Yes Yes Yes Yes Yes Signed Public Contract Statements:Yes Yes Yes Yes Yes Yes Contract Modifications Requested No No No No No No Traffic Control and Protection $7,500.00 $1,200.00 $1,500.00 $2,915.00 $1,500.00 $2,500.00 Lump Sum Class D Patches 3.5 inch $127,000.00 $222,250.00 $127,000.00 $119,380.00 $146,685.00 $119,380.00 6350 SQ YD $20.00 $35.00 $20.00 $18.80 $23.10 $18.80 Base Course Type B $2,474.50 $3,838.00 $2,020.00 $2,171.50 $1,767.50 $1,313.00 101 ton $24.50 $38.00 $20.00 $21.50 $17.50 $13.00 Preparation of Base $3,130.00 $1,565.00 $39,125.00 $9,390.00 $5,008.00 $3,130.00 6260 SQ YD $0.50 $0.25 $6.25 $1.50 $0.80 $0.50 Drainage & Utility Structures Adjusted $2,550.00 $3,870.00 $900.00 $5,250.00 $2,400.00 $2,400.00 6 each $425.00 $645.00 $150.00 $875.00 $400.00 $400.00 Two Coat Coal Tar Sealcoat $25,196.00 $37,794.00 $28,345.50 $40,943.50 $31,495.00 $25,196.00 314950 SQ FT $0.08 $0.12 $0.09 $0.13 $0.10 $0.08 Crack Sealant $2,435.00 $3,749.90 $2,435.00 $3,019.40 $2,581.10 $3,165.50 4870 feet $0.50 $0.77 $0.50 $0.62 $0.53 $0.65 4 inch Painted Lines $6,124.00 $4,593.00 $1,837.20 $5,817.80 $6,430.20 $5,817.80 15310 feet $0.40 $0.30 $0.12 $0.38 $0.42 $0.38 TOTAL COST $176,409.50 $278,859.90 $203,162.70 $188,887.20 $197,866.80 $162,902.30 No Subs listed Notes $165,037 as read page 2