Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BIDTAB Sidewalk 2018
Village of Buffalo Grove Finance Department Sidewalk Project 2018 Tabulation Globe Construction Lorusso Cement Contractors RAI Concrete, Inc.Strada Construction Co.Schroeder & Schroeder.Suburban Concrete, Inc. Bid Opening: March 20, 2018 1781 W. Armitage Court 1090 Carolina Dr.1827 Blackhawk Dr.1742 Armitage Ct 7306 Central Park 21227 W. Commercial Dr. Ste B Addison, IL. 60101 West Chicago, IL 630-231-9009 West Chicago, IL. 60185 Addison IL 60101 Skokie, IL. 60076 Mundelein, IL. 60060 globeconstructioninc@gmail.com dorgan@lorussocc.com raiconcrete@sbcglobal.net stradaconstco@aol.com mary@schroederconcrete.net suburbanconcrete@comcast.net Bid Bond:Yes Yes Yes Yes Yes Signed Proposal Form:Yes Yes Yes Yes Yes Signed Public Contract Statements:Yes Yes Yes Yes Yes Contract Modifications Requested No No No No No Traffic Control & Protection $150.00 $17,000.00 $8,000.00 $500.00 $11,500.00 $2,500.00 lump sum Removal and Replacement of Sidewalk $150,400.00 $152,750.00 $141,000.00 $160,975.00 $170,375.00 $139,825.00 23500 SQ FT $6.40 $6.50 $6.00 $6.85 $7.25 $5.95 Detectable Warnings $1,050.00 $2,380.00 $1,260.00 $1,050.00 $3,150.00 $1,260.00 70 SQ FT $15.00 $34.00 $18.00 $15.00 $45.00 $18.00 Tree Root Pruning $7,800.00 $10,920.00 $6,600.00 $12,000.00 $6,000.00 $3,600.00 60 each $130.00 $182.00 $110.00 $200.00 $100.00 $60.00 Sidewalk Base Preparation $5,400.00 $1,800.00 $4,800.00 $3,000.00 $6,000.00 $3,600.00 60 each $90.00 $30.00 $80.00 $50.00 $100.00 $60.00 Aggregate Base Course - Type B $4,950.00 $5,250.00 $2,700.00 $2,250.00 $2,700.00 $3,750.00 150 TON $33.00 $35.00 $18.00 $15.00 $18.00 $25.00 Removal & replacement 6" Driveway $6,250.00 $7,875.00 $7,250.00 $7,875.00 $8,125.00 $6,875.00 125 SQ YD $50.00 $63.00 $58.00 $63.00 $65.00 $55.00 Class B Patches 10 inch $3,300.00 $11,000.00 $3,960.00 $4,950.00 $6,875.00 $4,400.00 55 SQ YD $60.00 $200.00 $72.00 $90.00 $125.00 $80.00 Removal & Replacement Curb & Gutter B-6.12 $2,090.00 $3,325.00 $2,375.00 $2,375.00 $4,275.00 $1,900.00 95 feet $22.00 $35.00 $25.00 $25.00 $45.00 $20.00 Removal & Replacement Curb & Gutter B-6.24 $1,250.00 $2,250.00 $1,400.00 $1,500.00 $3,250.00 $1,250.00 50 feet $25.00 $45.00 $28.00 $30.00 $65.00 $25.00 Drainage & Utility Structures Adjusted $300.00 $1,050.00 $750.00 $300.00 $1,650.00 $900.00 3 each $100.00 $350.00 $250.00 $100.00 $550.00 $300.00 Hot-Mix Asphalt Driveway Surface R&R $3,245.00 $2,475.00 $3,575.00 $2,475.00 $3,300.00 $3,300.00 55 SQ YD $59.00 $45.00 $65.00 $45.00 $60.00 $60.00 Topsoil and seed with Blanket $4,900.00 $6,860.00 $6,370.00 $4,900.00 $4,900.00 $3,920.00 490 SQ YD $10.00 $14.00 $13.00 $10.00 $10.00 $8.00 TOTAL COST $191,085.00 $224,935.00 $190,040.00 $204,150.00 $232,100.00 $177,080.00