BID TAB Fire 25 RoofIRS CONTRACTOR Bennett & Brosseau CSR Roofing Contractors DCG Roofing Solutions L. Marshall Malcor Roofing Metalmaster Roofmaster R. E. Burke Roofing BASE PRICES BASE BID:$195,800.00 $172,250.00 $146,300.00 $219,000.00 $185,500.00 $199,977.00 $177,857.00 ALLOWANCE: (Funding of Unit Price Items)$3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 TOTAL BID (Base Bid + Allowance)$198,800.00 $175,250.00 $149,300.00 $222,000.00 $188,500.00 $202,977.00 $180,857.00 UNIT PRICING Replace plywood roof decking (per 4x8 sheet)$160.00 $192.00 $150.00 $256.00 $85.00 $477.00 $8.00 Replace steel roof decking (per sq. ft.)$15.00 $15.00 $11.00 $10.00 $13.85 $9.49 $18.00 Repair steel roof decking (per sq. ft.)$7.00 $11.00 $7.00 $8.50 $8.50 $6.29 $9.00 Replace 2” x 4” wood blocking (per lineal foot)$7.00 $7.00 $6.00 $5.50 $4.80 $6.99 $5.50 Replace 2” x 6” wood blocking (per lineal foot)$8.00 $7.50 $7.00 $6.50 $6.25 $7.49 $6.00 Replace 2” x 8” wood blocking (per lineal foot)$9.00 $8.75 $8.00 $7.50 $7.75 $7.75 $7.50 Replace 2” x 10” wood blocking (per lineal foot)$10.00 $10.25 $9.00 $9.00 $9.50 $8.25 $8.00 Replace 2” x 12” wood blocking (per lineal foot)$12.00 $13.00 $10.00 $10.00 $12.50 $8.99 $9.00 Replace cast iron roof drain (per drain)$4,000.00 $2,000.00 $3,000.00 $2,500.00 $3,250.00 $3.00 $2,800.00 Time & Material Time per-man-hour 125.00$ 130.00$ 130.00$ 153.00$ 115.00$ 139.00$ 130.00$ Material cost plus %10%15%15%20%10%10%10% SCHEDULE Commence Work in Days 30 30 20 14 30 12 30 Completion Work in Days 30 30 30 30 30 48 30 Bid Bond Y/N Y Y Y Y Y Y Y Attachments Y/N Y Y Y Y Y Y Y VILLAGE OF BUFFALO GROVE FIRE STATION #25 ROOF REPLACEMENT IRS JOB # 16513 IRS Sealtight Exteriors $156,700.00 $3,000.00 $159,700.00 $160.00 $13.00 $8.00 $10.00 $12.00 $14.00 $16.00 $18.00 $2,500.00 125.00$ 10% 30 21 Y Y